A connection structure and construction method of prefabricated eaves and prefabricated walls
Through the connection structure of prefabricated caps and prefabricated walls, holes and hollow slots are used to tie steel bars and connect cast-in-place concrete, which solves the linear error and long construction period problems of traditional capping and grinding installation, and achieves efficient and convenient capping. The head is connected to the wall, which reduces construction costs and labor intensity.
Patent Information
- Application Number
- CN202011351921.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-11-27
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2040-11-27
AI Technical Summary
In construction, the traditional method of grinding and installing caps has linear errors, long construction period, and low efficiency.
The connection structure between the prefabricated caps and the prefabricated wall is adopted. The holes at the bottom of the prefabricated caps and the hollow slots at the top are tied with the connecting steel bars, and the cast-in-place concrete connections are made at the hollow slots, which simplifies the construction process and reduces manpower. Material resources are invested and quick fixing is achieved through temporary fixing measures such as elastic strapping and wooden boards.
This method greatly reduces the linear error, saves the construction period, improves the construction efficiency, reduces the labor intensity, and the temporary fixing measures can be reused, which is economical and convenient.
Smart Images

Figure CN112411902B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, and in particular to a connection structure of a prefabricated eave and a prefabricated wall and a construction method. Background Art
[0002] In the current domestic construction, buildings with a strong ancient style often have eaves under the eaves of each building, with beautiful shapes composed of multiple arc curves of different radii.
[0003] During on-site construction, formwork is set up for the cast-in-place wall and the eaves. Since wooden formwork is difficult to reflect the essence of its shape, it takes a lot of time and manpower to set up the inner circle shape of the eaves. After the pouring is completed and reaches a certain strength, it needs to be manually painted into the outer circle lines to show the actual eaves design shape. Polishing a eave will take a worker more than a day, which is extremely inefficient and the linear quality cannot be guaranteed.
[0004] Therefore, there is an urgent need for a connection structure between a prefabricated eave and a prefabricated wall to solve the above problems. Summary of the invention
[0005] The purpose of the present invention is to provide a connection structure and construction method of a prefabricated edging and a prefabricated wall, so as to solve the problem of linear error and long construction period in the manual grinding and installation of the edging by traditional construction workers.
[0006] In order to solve the above technical problems, the technical solution of the present invention is as follows:
[0007] A connection structure of a prefabricated eave and a prefabricated wall, comprising:
[0008] A prefabricated wall, wherein connecting steel bars are reserved on the prefabricated wall;
[0009] A prefabricated ledge, wherein the bottom of the prefabricated ledge is provided with a hole for inserting the connecting steel bar, and the top of the prefabricated ledge is provided with a hollow groove for inserting the connecting steel bar, the connecting steel bar passes through the hole and the hollow groove in turn and is tied and fixed, and the connection between the connecting steel bar of the prefabricated wall and the prefabricated ledge is completed by casting concrete at the hollow groove.
[0010] Compared with the prior art, the beneficial technical effects of the present invention are:
[0011] (1) The connection structure of the prefabricated ledge and the prefabricated wall of the present invention adopts a prefabricated ledge component to connect with the prefabricated wall. The bottom of the prefabricated ledge is provided with a hole for inserting the connecting steel bar, and the top of the prefabricated ledge is provided with a hollow groove for inserting the connecting steel bar. The connecting steel bar passes through the hole and the hollow groove in turn and is tied and fixed. The connection between the connecting steel bar of the prefabricated wall and the prefabricated ledge is completed by pouring concrete at the hollow groove. The connection structure is simple in structure and convenient in operation. It saves a lot of manpower and material resources, saves construction time, and avoids linear errors caused by manual grinding by construction workers.
[0012] (2) The construction method of the connection structure of the prefabricated ledge and the prefabricated wall of the present invention, when the prefabricated ledge and the prefabricated wall are connected, due to the light weight of the prefabricated ledge, the construction personnel only need to manually hold it in combination with temporary fixing measures such as elastic binding bands and wooden boards, without the need to set up additional supporting devices, and without the need to use the crane and other lifting equipment used in traditional prefabricated building construction for lifting. The temporary fixing measures can be removed when the cast-in-place concrete at the connection point reaches the design strength. Moreover, the construction method is highly operable and can overcome the defects of traditional prefabricated building construction that the crane needs to be occupied and can only be removed after the concrete at the connection reaches the design strength. In addition, the assembly construction of the connection structure of the prefabricated ledge and the prefabricated wall is efficient and convenient, which reduces the labor intensity, and the temporary fixing measures can be repeatedly recycled and reused, which is economical and has good promotion value.
[0013] Furthermore, bonding slurry is applied at the connection between the connecting steel bars and the holes at the bottom of the prefabricated eaves and the hollow grooves at the top. By applying or coating bonding slurry such as epoxy resin glue or bonding mortar at the connection between the two structural components, the connectivity between the structural components to be connected can be enhanced, thereby ensuring the firmness of the node.
[0014] Furthermore, it also includes L-shaped steel bars and wooden boards, the short sides of the L-shaped steel bars are inserted into the reserved holes on the top of the prefabricated wall, the long sides of the L-shaped steel bars are placed above the wooden boards, and are tied and fixed to the prefabricated eaves by elastic binding bands, thereby completing the temporary fixation of the prefabricated eaves and the prefabricated wall.
[0015] Furthermore, in order to facilitate the pouring of concrete at the joint, the wooden board is provided with grooves, the cross-sectional size of which is consistent with the cross-sectional size of the hollow notch. Concrete is poured from the grooves reserved on the wooden board and fills the hollow notch in the prefabricated eaves.
[0016] The present invention also provides a construction method for a connection structure of a prefabricated eave and a prefabricated wall, the construction method comprising the following steps:
[0017] Step S1, providing a prefabricated wall and a prefabricated eave for standby use, the prefabricated wall is provided with connection steel bars, the bottom of the prefabricated eave is provided with holes for inserting the connection steel bars, and the top of the prefabricated eave is provided with a hollow notch;
[0018] Step S2, passing the connecting steel bars of the prefabricated wall through the bottom holes and the top hollow notches of the prefabricated eaves in sequence;
[0019] Step S3, the construction workers hold the prefabricated ledge with their hands, and place a wooden board with a notch whose cross section is consistent with the hollow notch on the top of the prefabricated ledge, then provide L-shaped steel bars, insert the short side of the L-shaped steel bars into the reserved hole on the top of the prefabricated wall, and place the long side of the L-shaped steel bars above the wooden board. Finally, use an elastic binding band to tie the L-shaped steel bars, the wooden board and the prefabricated ledge together to complete the temporary fixation of the prefabricated ledge;
[0020] Step S4: The construction workers release their hands holding the prefabricated abutment and pour concrete through the grooves on the wooden board until the hollow grooves in the prefabricated abutment are filled, thereby completing the construction of the connection structure between the prefabricated wall and the prefabricated abutment.
[0021] Furthermore, step S5 is also included, after the maintenance of the connecting structure is completed, the L-shaped steel bars, wooden boards and elastic binding bands are removed. The L-shaped steel bars, wooden boards and elastic binding bands used as temporary fixing measures can be used for the connection construction between the prefabricated eaves and prefabricated walls of the next node, thereby achieving repeated turnover use.
[0022] Furthermore, bonding slurry is applied at the connection points between the connecting steel bars and the holes at the bottom of the prefabricated eaves and the hollow notches at the top, which can enhance the connectivity between the structural components to be connected, thereby ensuring the firmness of the nodes.
[0023] Furthermore, in order to facilitate the construction of temporary fixing measures, the parts where the prefabricated eaves are fixed with the elastic binding belts in step S3 are the recessed parts of the prefabricated eaves and the continuous right-angle turns.
[0024] Furthermore, in order to facilitate material acquisition and increase construction convenience, the elastic binding belt is a rubber belt or a spring rope. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a structural schematic diagram of the prefabricated eaves of the present invention;
[0026] Figure 2 It is a schematic diagram of the connection between the prefabricated eave and the prefabricated wall of the present invention;
[0027] Figure 3 A top view of the connection between the prefabricated eave and the prefabricated wall of the present invention;
[0028] Figure 4 It is a schematic diagram of the wooden board in the connection structure of the prefabricated eaves and prefabricated walls of the present invention.
[0029] In the figure:
[0030] 1- Prefabricated eaves; 2- Cast-in-place concrete; 3- Prefabricated walls; 4- Connecting steel bars; 5- L-shaped steel bars; 6- Wooden boards; 7- Hollow notches; 8- Elastic binding straps. DETAILED DESCRIPTION
[0031] The connection structure and construction method of the prefabricated fascia and the prefabricated wall proposed by the present invention are further described in detail below in combination with the accompanying drawings and specific embodiments. According to the following description, the advantages and features of the present invention will become clearer. It should be noted that the accompanying drawings are all in a very simplified form and are not in precise proportions, which are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention. For the convenience of description, the "upper" and "lower" described below are consistent with the upper and lower directions of the accompanying drawings, but this cannot be a limitation of the technical solution of the present invention.
[0032] Combine the following Figures 1 to 4 The connection structure and construction method of the prefabricated eaves and prefabricated walls of the present invention are described in detail. Embodiment 1
[0033] like Figures 1 to 4 As shown, a connection structure of a prefabricated ledge and a prefabricated wall includes a prefabricated wall 3 and a prefabricated ledge 1, and connecting steel bars 4 are reserved on the prefabricated wall 3; a hole is provided at the bottom of the prefabricated ledge 1 for inserting the connecting steel bars 4, and a hollow groove 7 is provided at the top of the prefabricated ledge 1 for inserting the connecting steel bars 4, and the connecting steel bars 4 pass through the hole and the hollow groove 7 in turn and are tied and fixed, and the connection between the connecting steel bars 4 of the prefabricated wall and the prefabricated ledge 1 is completed by casting concrete at the hollow groove 7. Specifically, the connection structure of the prefabricated ledge 1 and the prefabricated wall 3 of the present invention adopts the connection of the prefabricated ledge 1 and the prefabricated wall 3, the bottom of the prefabricated ledge 1 is provided with a hole for inserting the connecting steel bar 4, the top of the prefabricated ledge 1 is provided with a hollow notch 7 for inserting the connecting steel bar 4, the connecting steel bar 4 passes through the hole and the hollow notch 7 in turn and is tied and fixed, and the connection of the connecting steel bar of the prefabricated wall and the prefabricated ledge is completed by pouring concrete at the hollow notch 7. The connection structure is simple in structure, convenient in operation, saves a lot of manpower and material resources, saves construction time, and avoids the linear error caused by manual grinding by construction workers.
[0034] Moreover, when the prefabricated ledge 1 is connected to the prefabricated wall 3, due to the light weight of the prefabricated ledge 1, the construction personnel only need to manually hold it in combination with temporary fixing measures such as elastic binding bands 8 and wooden boards 6, without the need to set up additional supporting devices, and without the need to use the cranes and other hoists used in traditional prefabricated building construction for hoisting. The temporary fixing measures can be removed when the cast-in-place concrete at the connection point reaches the design strength. Moreover, the construction method is highly operable and can overcome the defects of traditional prefabricated building construction that requires the use of cranes and can only be removed after the concrete at the connection reaches the design strength. In addition, the assembly construction of the connection structure between the prefabricated ledge and the prefabricated wall is efficient and convenient, which reduces the labor intensity, and the temporary fixing measures can be repeatedly recycled and reused, which is economical and has good promotion value.
[0035] In this embodiment, more preferably, bonding slurry is applied at the connection between the connecting steel bars 4 and the holes at the bottom of the prefabricated ledge 1 and the hollow grooves 7 at the top. By applying or coating bonding slurry such as epoxy resin glue or bonding mortar at the connection between the two structural components, the connectivity between the structural components to be connected can be enhanced, thereby ensuring the firmness of the nodes.
[0036] In this embodiment, more preferably, it also includes L-shaped steel bars 5 and wooden boards 6, the short sides of the L-shaped steel bars 5 are inserted into the reserved holes at the top of the prefabricated wall 3, the long sides of the L-shaped steel bars 5 are placed above the wooden boards 6, and are tied and fixed to the prefabricated ledge 1 by elastic binding bands 8, thereby completing the temporary fixation of the prefabricated ledge 1 and the prefabricated wall 3.
[0037] In this embodiment, more preferably, in order to facilitate the pouring of concrete at the connection, the wooden board 6 is provided with grooves, and the cross-sectional size of the grooves is consistent with the cross-sectional size of the hollow notches 7. Concrete is poured from the grooves reserved on the wooden board 6 and fills the hollow notches 7 in the prefabricated ledge 1.
[0038] Please continue to refer to Figures 1 to 4 The present invention also provides a construction method for a connection structure between a prefabricated eave and a prefabricated wall, the construction method comprising the following steps:
[0039] Step S1, providing a prefabricated wall 3 and a prefabricated ledge 1 for standby use, a connection steel bar 4 is reserved on the prefabricated wall 3, a hole is provided at the bottom of the prefabricated ledge 1 for inserting the connection steel bar 4, and a hollow notch 7 is provided at the top of the prefabricated ledge 1;
[0040] Step S2, passing the connecting steel bars 4 of the prefabricated wall 3 through the bottom holes and the top hollow notches 7 of the prefabricated eaves 1 in sequence;
[0041] Step S3, the construction workers hold the prefabricated ledge 1 with their hands, and place a wooden board 6 with a notch whose cross section is consistent with the hollow notch 7 on the top of the prefabricated ledge 1, then provide an L-shaped steel bar 5, insert the short side of the L-shaped steel bar 5 into the reserved hole on the top of the prefabricated wall 3, and place the long side of the L-shaped steel bar 5 above the wooden board 6. Finally, use an elastic binding band 8 to bind the L-shaped steel bar 5, the wooden board 6 and the prefabricated ledge 1 together to complete the temporary fixation of the prefabricated ledge 1;
[0042] Step S4, the construction workers release their hands holding the prefabricated abutment 1, and pour concrete through the grooves on the wooden board 6 until the hollow grooves 7 in the prefabricated abutment 1 are filled, thereby completing the construction of the connection structure between the prefabricated wall 3 and the prefabricated abutment 1.
[0043] Furthermore, step S5 is also included, after the maintenance of the connecting structure is completed, the L-shaped steel bars 5, wooden boards 6 and elastic binding bands 8 are removed. The L-shaped steel bars 5, wooden boards 6 and elastic binding bands 8 used as temporary fixing measures can be used for the connection construction of the prefabricated eaves 1 and the prefabricated wall 3 at the next node, thereby achieving repeated turnover use.
[0044] In this embodiment, more preferably, bonding slurry is applied at the connection points between the connecting steel bars 4 and the holes at the bottom of the prefabricated abutment 1 and the hollow notches 7 at the top, which can enhance the connectivity between the structural components to be connected, thereby ensuring the firmness of the nodes.
[0045] In this embodiment, more preferably, in order to facilitate the construction of temporary fixing measures, the parts where the prefabricated ledge 1 is tied and fixed with the elastic binding belt 8 in step S3 are the recessed parts of the prefabricated ledge 1 and the continuous right-angle turns.
[0046] In this embodiment, more preferably, in order to facilitate material acquisition and increase construction convenience, the elastic binding belt 8 is a rubber belt or a spring rope.
[0047] The above description is only a description of the preferred embodiments of the present invention, and is not intended to limit the scope of the present invention. Any changes or modifications made by a person skilled in the art in the field of the present invention based on the above disclosure shall fall within the scope of protection of the claims.
Claims
1. A construction method for a connection structure between a prefabricated eave and a prefabricated wall, characterized in that: The steps include: Step S1, providing a prefabricated wall and a prefabricated eave for standby use, the prefabricated wall is provided with connection steel bars, the bottom of the prefabricated eave is provided with holes for inserting the connection steel bars, and the top of the prefabricated eave is provided with a hollow notch; Step S2, passing the connecting steel bars of the prefabricated wall through the bottom holes and the top hollow notches of the prefabricated eaves in sequence; applying bonding slurry at the connection points between the connecting steel bars and the bottom holes and the top hollow notches of the prefabricated eaves; Step S3, the construction workers hold the prefabricated ledge with their hands, and place a wooden board with a notch whose cross section is consistent with the hollow notch on the top of the prefabricated ledge, then provide L-shaped steel bars, insert the short side of the L-shaped steel bars into the reserved hole on the top of the prefabricated wall, and place the long side of the L-shaped steel bars above the wooden board. Finally, use an elastic binding belt to bind the L-shaped steel bars, the wooden board and the prefabricated ledge together to complete the temporary fixation of the prefabricated ledge; the parts where the prefabricated ledge is bound and fixed with the elastic binding belt are the concave parts of the prefabricated ledge and the continuous right-angle turns, and the elastic binding belt is a rubber belt or a spring rope; Step S4: The construction worker releases the hand holding the prefabricated abutment and pours concrete through the grooves on the wooden board until the hollow grooves in the prefabricated abutment are filled, thereby completing the construction of the connection structure between the prefabricated wall and the prefabricated abutment; Step S5, after the maintenance of the connection structure is completed, the L-shaped steel bars, wooden boards and elastic binding belts are removed.
Citation Information
Patent Citations
Connecting structure of prefabricated lichiyu and prefabricated wall body
CN214461916U