An electric energy meter insulation sheet installation device

By designing automated insulating sheet installation equipment, the automatic insulating assembly of the insulating sheet is achieved by using vacuum adsorption heads and rotating cylinders, and the assembly efficiency is improved through the channel splitting mechanism, the inefficiency and inconsistent quality problems caused by manual operation in the prior art are solved. Achieve efficient and accurate insulation sheet installation.

CN112589419BActive Publication Date: 2024-11-26NINGBO SANXING INTELLIGENT ELECTRIC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011369645.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-11-30
Publication Date
2024-11-26
Estimated Expiration
2040-11-30

AI Technical Summary

Technical Problem

The installation of existing power meter insulating sheets mainly relies on manual operation, resulting in low production efficiency and inconsistent installation quality, affecting the factory pass rate of the power meter.

Method used

An automated device including a first transmission mechanism, a second transmission mechanism and a transfer assembly mechanism is designed, and the automatic inclination assembly of the insulating sheet is achieved by using a vacuum adsorption head and a rotating cylinder, and the assembly efficiency is improved through a channel splitting mechanism.

Benefits of technology

It realizes automatic insulation sheet installation without manual operation, improves production efficiency and assembly quality, and ensures accurate fit and efficient placement of the insulation sheet and the electric energy meter.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112589419B_ABST
    Figure CN112589419B_ABST
Patent Text Reader

Abstract

The present invention relates to an electric energy meter insulation sheet installation device, comprising a frame, a first transmission mechanism arranged on the frame for transporting the electric energy meter to be assembled, a second transmission mechanism for transporting the insulation sheet to one side of the first transmission mechanism, and a transfer assembly mechanism for transferring the insulation sheet on the second transmission mechanism to the top of the first transmission mechanism for assembly with the electric energy meter to be assembled, wherein the transfer assembly mechanism transfers the insulation sheet to the top of the first transmission mechanism and tilts the insulation sheet at a certain angle for assembly with the electric energy meter to be assembled. The installation device has a high degree of automation and a fast assembly speed, which is conducive to saving production costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of electric energy meter production, and in particular to an electric energy meter insulating sheet installation device. Background Art

[0002] After the connection of the terminals of the electric energy meter is connected, in order to prevent electric shock accidents and improve the safety of the electric energy meter, an insulating sheet is usually installed at the terminals to prevent the installation and maintenance personnel from accidentally touching the terminals and causing electric shock. In the prior art, insulation installation is mostly done manually, which has low production efficiency and is not conducive to cost saving. In addition, manual installation makes the installation quality uneven, affecting the factory qualification rate of the electric energy meter. Summary of the invention

[0003] In view of the above problems, an object of the present invention is to provide an electric energy meter insulating sheet installation device which has high production efficiency and is conducive to improving the installation quality of the insulating sheet.

[0004] In order to achieve the above object, the technical solution of the present invention is: an electric energy meter insulation sheet installation device, characterized in that:

[0005] The invention comprises a frame, a first transmission mechanism arranged on the frame for transmitting an electric energy meter to be assembled, a second transmission mechanism for transmitting an insulating sheet (901) to one side of the first transmission mechanism, and a transfer and assembly mechanism for horizontally transferring the insulating sheet on the second transmission mechanism to above the first transmission mechanism, then tilting the insulating sheet and assembling the downwardly tilted end and the upwardly raised end of the insulating sheet with the electric energy meter to be assembled in sequence.

[0006] Furthermore, the transfer and assembly mechanism includes a first vacuum adsorption head capable of adsorbing an insulating sheet, a first transfer assembly for driving the first vacuum adsorption head to move between a first transmission mechanism and a second transmission mechanism, and a rotating cylinder capable of driving the insulating sheet on the first vacuum adsorption head to have a certain inclination angle.

[0007] Furthermore, the first transfer assembly includes a first guide rail and a first driving assembly for driving the rotary cylinder and the first vacuum adsorption head to move along the first guide rail.

[0008] Furthermore, a lane dividing mechanism for dividing the insulating sheets on the second conveying mechanism into two groups is provided between the second conveying mechanism and the first conveying mechanism, and the transfer and assembly mechanism has two groups accordingly.

[0009] Furthermore, the lane dividing mechanism includes two pallets, a second transfer assembly for transferring the insulating sheets on the second transmission mechanism to the corresponding two pallets respectively, and a lane dividing assembly for driving the two pallets to move between the second transfer assembly and the corresponding transfer assembly mechanism in sequence.

[0010] Furthermore, the lane dividing assembly includes a second guide rail arranged along the transmission direction of the first transmission mechanism and a second cylinder arranged at both ends of the second guide rail and respectively connected to the two pallets to drive the pallets to move successively on the second guide rail.

[0011] Furthermore, the second guide rail includes a support plate and two guide bars arranged on the support plate.

[0012] Furthermore, the second transfer assembly includes a second vacuum adsorption head and a third guide rail and a third cylinder for driving the second vacuum adsorption head to move between the first transmission mechanism and the lane dividing assembly.

[0013] Furthermore, the installation device also includes positioning components arranged on both sides of the first transmission mechanism to clamp and position the electric energy meter to be assembled.

[0014] Furthermore, the first transmission mechanism includes two first transmission guide rails arranged in parallel.

[0015] Compared with the prior art, the advantages of the present invention are: when the equipment is used to install the insulating sheet, the entire assembly process does not require manual operation, has a high degree of automation, and a fast assembly speed, which is conducive to improving production efficiency. At the same time, through the setting of the rotating cylinder, the two ends of the insulating sheet can be tilted at a certain angle relative to the horizontal plane, and the downwardly tilted end and the upward end can be installed in sequence with the electric meter to be assembled, which is more convenient for installing the insulating sheet into place and is conducive to improving the assembly quality. The setting of the lane dividing mechanism can simultaneously install the insulating sheets of two electric energy meters to be assembled, which is conducive to further improving production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a schematic diagram of the installation equipment structure of this application.

[0017] Figure 2 This is a schematic diagram of the transfer and assembly mechanism structure of this application.

[0018] Figure 3 Bit Figure 1 Enlarged structural diagram at A in the middle. DETAILED DESCRIPTION

[0019] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.

[0020] like Figures 1 to 3The schematic diagram of the structure of the preferred embodiment of the present invention is shown in the figure. The electric energy meter insulating sheet installation device includes a frame 6, a first transmission mechanism 1 arranged on the frame 6 for conveying the electric energy meter 900 to be assembled, a second transmission mechanism 2 for conveying the insulating sheet 901 to one side of the first transmission mechanism 1, and a transfer assembly mechanism 3 for horizontally transferring the insulating sheet 901 on the second transmission mechanism 2 to the top of the first transmission mechanism 1, tilting the insulating sheet 901, and assembling the downwardly tilted end and the upward end of the insulating sheet 901 with the electric energy meter 900 to be assembled in sequence. The inclination angle of the insulating sheet 901 can be set and adjusted according to practice. By assembling after the insulating sheet 901 is tilted at a certain angle, it is convenient to install the insulating sheet 901 in place, improve the assembly efficiency, and facilitate the better fit of the insulating sheet 901 with the assembly position on the electric energy meter 900, which is conducive to improving the assembly quality.

[0021] Specifically, the transfer assembly mechanism 3 includes a first vacuum adsorption head 31 capable of adsorbing the insulating sheet 901, a first transfer assembly 32 for driving the first vacuum adsorption head 31 to move between the first conveying mechanism 1 and the second conveying mechanism 2, and a rotating cylinder 33 capable of driving the insulating sheet 901 on the first vacuum adsorption head 31 to be tilted at a certain angle. After the first transfer assembly 32 drives the first vacuum adsorption head 31 to move above the first conveying mechanism 1, the rotating cylinder 33 is actuated to tilt the first vacuum adsorption head 31 at a certain angle, thereby tilting the insulating sheet 901 at a corresponding angle.

[0022] In this embodiment, the first transfer assembly 32 includes a first guide rail 321 and a first drive assembly 322 for driving the rotating cylinder 33 and the first vacuum adsorption head 31 to move along the first guide rail 321. The first drive assembly 322 can be a screw drive, a cylinder drive or a belt drive.

[0023] In order to improve the assembly efficiency, a lane dividing mechanism is provided between the second transmission mechanism 2 and the first transmission mechanism 1 to divide the insulating sheet 901 on the second transmission mechanism 2 into two groups, and the transfer assembly mechanism 3 has two corresponding groups. This can double the assembly efficiency of the insulating sheet 901. Of course, using a similar principle, the insulating sheet installation device of the present application can also be set to multiple groups of assembly.

[0024] Specifically, the lane dividing mechanism includes two trays 41, a second transfer assembly 42 for transferring the insulating sheet 901 on the second transmission mechanism 2 to the two corresponding trays 41 respectively, and a lane dividing assembly for driving the two trays 41 to move between the second transfer assembly 42 and the corresponding transfer assembly mechanism 3 in sequence.

[0025] In this embodiment, the lane dividing assembly includes a second guide rail 43 arranged along the transmission direction of the first transmission mechanism 1 and second cylinders 44 arranged at both ends of the second guide rail 43 and respectively connected to the two trays 41 to drive the two trays 41 to move successively on the second guide rail 43. Of course, it is conceivable that the second cylinder 44 can also be replaced by a drive belt or the like.

[0026] In this embodiment, the second guide rail 43 includes a support plate 431 and two guide bars 432 arranged on the support plate 431. Correspondingly, the lower surface of the tray 41 is provided with guide grooves that can match the two guide bars respectively. With this arrangement, the tray 41 can be very stable during the movement, so that the first vacuum adsorption head 31 can accurately adsorb the insulating sheet 901.

[0027] In the present application, the second transfer assembly 42 includes a second vacuum adsorption head and a third guide rail and a third cylinder for driving the second vacuum adsorption head to move between the first transmission mechanism and the lane dividing assembly. Since the structural principle of the second transfer assembly is similar to that of the first transfer assembly, it is not shown separately in the accompanying drawings.

[0028] In order to enable the electric energy meter 900 to be assembled to be accurately positioned so that the insulating sheet 901 can be accurately placed in place, the installation device also includes a positioning component 5 arranged on both sides of the first transmission mechanism 1 to clamp and position the electric energy meter 900 to be assembled. Specifically, the positioning component 5 can be configured to push the clamping block of the pushing cylinder to limit the electric energy meter 900 to be assembled. Of course, other methods of blocking and positioning the electric energy meter 900 to be assembled can also be used.

[0029] In order to make better use of the space, the first transmission mechanism 1 includes two first transmission rails arranged in parallel. The first transmission rails can adopt a driving chain, so that other components can be assembled in the space between the two chains, which is conducive to saving the overall space.

[0030] It should be noted that the installation equipment of the present application also includes multiple drive motors, controllers and other structures. Since these structures are not within the scope of protection of the present application, they will not be described in detail here.

[0031] Although embodiments of the present invention have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.

Claims

1. An installation device for insulating sheets of electric energy meters, Features: The invention comprises a frame (6), a first transmission mechanism (1) arranged on the frame (6) for transmitting an electric energy meter (900) to be assembled, a second transmission mechanism (2) for transmitting an insulating sheet (901) to one side of the first transmission mechanism (1), and a transfer and assembly mechanism (3) for horizontally transferring the insulating sheet (901) on the second transmission mechanism (2) to the top of the first transmission mechanism (1), tilting the insulating sheet (901), and assembling the downwardly tilted end and the upwardly raised end of the insulating sheet (901) with the electric energy meter (900) to be assembled in sequence; The transfer assembly mechanism (3) comprises a first vacuum adsorption head (31) capable of adsorbing the insulating sheet (901), a first transfer assembly (32) for driving the first vacuum adsorption head (31) to move between the first transmission mechanism (1) and the second transmission mechanism (2), and a rotating cylinder (33) capable of driving the insulating sheet (901) on the first vacuum adsorption head (31) to be inclined. The first transfer assembly (32) comprises a first guide rail (321) and a first drive assembly (322) for driving the rotary cylinder (33) and the first vacuum adsorption head (31) to move along the first guide rail (321); A lane dividing mechanism for dividing the insulating sheets (901) on the second conveying mechanism (2) into two groups is provided between the second conveying mechanism (2) and the first conveying mechanism (1), and the transfer assembly mechanism (3) has two groups accordingly; The lane division mechanism comprises two trays (41), a second transfer assembly (42) for respectively transferring the insulating sheet (901) on the second transmission mechanism (2) to the corresponding two trays (41), and a lane division assembly for driving the two trays (41) to move between the second transfer assembly (42) and the corresponding transfer assembly mechanism (3) in a sequential order; The lane dividing assembly comprises a second guide rail (43) arranged along the transmission direction of the first transmission mechanism (1), and second cylinders (44) arranged at both ends of the second guide rail (43) and respectively connected to two trays (41) to drive the trays (41) to move successively on the second guide rail (43).

2. The electric energy meter insulation sheet installation device according to claim 1, Features: The second guide rail (43) comprises a support plate (431) and two guide bars (432) arranged on the support plate (431).

3. The electric energy meter insulation sheet installation device according to claim 1, Features: The second transfer assembly (42) comprises a second vacuum adsorption head, and a third guide rail and a third cylinder for driving the second vacuum adsorption head to move between the first transmission mechanism (1) and the lane dividing assembly.

4. The electric energy meter insulating sheet installation device according to claim 1, Features: The installation device further comprises positioning components (5) arranged on both sides of the first transmission mechanism (1) for clamping and positioning the electric energy meter (900) to be assembled.

5. The electric energy meter insulating sheet installation device according to claim 1, Features: The first transmission mechanism (1) comprises two first transmission guide rails arranged in parallel.