Regional integrated energy management system and method based on multi-agent

Through a multi-agent-based regional integrated energy management system, coordinate the operation of distributed and centralized energy, the problem of energy management in the existing technology is solved, and the efficiency and sustainability of energy utilization are improved, ensuring that The reliability and optimized operation of the system.

CN112686505BActive Publication Date: 2024-11-19TSINGHUA UNIVERSITY +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011495713.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-12-17
Publication Date
2024-11-19
Estimated Expiration
2040-12-17

AI Technical Summary

Technical Problem

The existing regional integrated energy system management methods are difficult to effectively coordinate the operation of distributed and centralized energy, and cannot meet the multi-level structural characteristics of the system, making it difficult to achieve the best energy utilization efficiency and sustainability.

Method used

Adopting a regional integrated energy management system based on multiple agents, through the hierarchical structure of the regional management layer, the coordination management layer and the user layer, each agent is responsible for power, natural gas, heat supply and energy storage management, and uses historical data to make predictions and plans recently. Formulate and achieve coordinated operation of each device and autonomous operation in independent mode through communication mechanisms.

Benefits of technology

The coordinated operation of distributed and centralized energy in the region has been achieved, the cleanliness and efficiency of energy utilization has been improved, the limitations of centralized control and distributed autonomous control have been overcome, and the reliability and optimized operation of the system have been ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112686505B_ABST
    Figure CN112686505B_ABST
Patent Text Reader

Abstract

The present invention provides a regional integrated energy management system and method based on multiple agents, including a regional management layer, a coordination management layer and a user layer, wherein the regional management layer includes a regional power supply agent, a regional natural gas supply agent, a regional heat supply agent and a regional energy operation agent, the coordination management layer includes a regional centralized energy supply agent, a regional centralized energy storage agent and a distributed energy supply user agent, and the user layer includes a load agent, a distributed power generation agent, a distributed heating agent and a distributed energy storage agent, and obtains historical data of each device; makes a day-ahead forecast based on each energy demand of each user, formulates a day-ahead plan and performs safety verification; formulates an operation plan for each time period of each device in the user layer, sends instructions, and according to the operation status of each device in the past time period, rolls over the operation plan for the remaining time periods of the day, and the agent that receives the instruction works according to the instruction, and the agent that does not receive the instruction enters an independent mode. The above system and method realize the coordinated operation of distributed and centralized energy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of integrated energy technology, and more specifically, to a multi-agent-based regional integrated energy management system and method. Background Art

[0002] The integrated energy system must ensure its safe, economical and efficient operation goals. The management of the integrated energy system is a process of comprehensive optimization of multiple energy sources, which faces complex constraints. In the operation of the regional integrated energy system, it is necessary to balance the contradiction between the safety of the system operation and its economy; it is necessary to balance the contradiction between energy utilization efficiency, energy sustainability and energy economy, and it is necessary to comprehensively consider the operation status of each energy subsystem to seek the optimal state of the entire energy system. The complementary coupling of various equipment in the system and the "network reconstruction" in the event of a fault make the energy flow path have a variable characteristic. The diversification and variability of energy path selection and energy distribution bring challenges to the operation and management of the energy Internet. On the basis of the information architecture of the integrated energy system, how to make in-depth use of system information to predict energy supply and demand, manage the demand side, and optimize energy production is a key research area in the operation and management of the integrated energy system.

[0003] The regional integrated energy system has obvious hierarchical characteristics. There are power distribution networks, gas distribution networks, and thermal networks in the region. There are also regional centralized energy supply and user-side distributed energy supply facilities. The centralized energy facilities are connected to the urban backbone energy network, and the coordinated dispatch of various energy forms is achieved through the distributed energy supply on the user side; the distributed energy supply on the user side combines local renewable energy to directly supply various types of loads such as residents, industry and commerce. The energy supply at all levels has formed a multi-energy multi-level coupling situation. At present, most of the research focuses on centralized energy supply facilities or user-level multi-energy microgrids, and there is a lack of research on relevant management methods and systems for the hierarchical structure of regional integrated energy systems. Distributed energy supply in the region requires the support of centralized energy supply facilities while achieving local autonomy, and centralized energy supply facilities need to optimize the system energy flow based on the distributed energy supply situation. Centralized control or distributed autonomous control structure cannot meet the operating characteristics of regional integrated energy systems. Summary of the invention

[0004] In response to the above-mentioned regional integrated energy system's multi-level energy facility operation and management needs, the purpose of the present invention is to provide a multi-agent-based regional integrated energy management system and method, so that the regional integrated energy system can achieve coordinated operation of distributed energy and centralized energy in the region with the participation of users, energy suppliers and other parties.

[0005] According to one aspect of the present invention, a multi-agent-based regional integrated energy management system is provided, comprising a regional management layer, a coordination management layer and a user layer, wherein the regional management layer comprises a regional electricity supply agent, a regional natural gas supply agent, a regional thermal supply agent and a regional energy operation agent, the coordination management layer comprises a regional centralized energy supply agent, a regional centralized energy storage agent and a distributed energy supply user agent, and the user layer comprises a load agent, a distributed power generation agent, a distributed heating agent and a distributed energy storage agent, wherein: the load agent, the distributed power generation agent, the distributed heating agent and the distributed energy storage agent respectively manage the load equipment, the power generation equipment, the heating equipment and the energy storage equipment of the distributed energy system, and send the historical data of each equipment to the regional energy operation agent of the regional management layer through the distributed energy supply user agent of the coordination management layer; the regional energy operation agent based on According to the historical data of each device, a day-ahead forecast is made for each energy demand of each user, and a day-ahead plan for regional centralized energy production and storage is formulated based on the forecast results and a safety check is performed; the distributed energy supply user agent formulates an operation plan for each device in each time period of the user layer under its jurisdiction based on the day-ahead plan that has passed the safety check, and sends corresponding instructions to each agent in the user layer, and the regional energy operation agent and the distributed energy supply user agent make rolling revisions to the operation plan for the remaining time periods of the day according to the original targets in the operation plan based on the operation status of each device in the region in the past time periods. The agents of the user layer that receive the instructions work in accordance with the instructions, and the agents of the user layer that do not receive the instructions enter an independent mode, wherein the independent mode includes that each device corresponding to the agent of the user layer that does not receive the instructions obtains the working status of other devices through communication with neighboring agents, and operates autonomously according to the strategy set in the independent mode.

[0006] Preferably, a publish / subscribe communication mechanism is adopted between the regional energy operation agent and the regional electricity supply agent, the regional natural gas supply agent, and the regional thermal supply agent; a request / response communication mechanism is adopted between the regional energy operation agent and the regional centralized energy supply agent, the regional energy storage agent, and the distributed energy supply user agent; a request / response communication mechanism is adopted between the distributed energy supply user agent and the load agent, the distributed power generation agent, the distributed heating agent, and the distributed energy storage agent; and a publish / subscribe communication mechanism is adopted between the load agent and the distributed power generation agent, the distributed heating agent, and the distributed energy storage agent.

[0007] Further, preferably, when the day-ahead plan formulated by the regional energy operation agent meets the safety check, the day-ahead plan is sent to the distributed energy supply user agents, regional centralized energy supply agents, regional centralized energy storage agents, regional electricity supply agents, regional natural gas supply agents, and regional thermal supply agents; when the day-ahead plan formulated by the regional energy operation agent does not meet the safety check, the energy consumption limit of each user is obtained according to the system safety boundary, and the day-ahead plan after the energy consumption limit is sent to the distributed energy supply user agents, regional centralized energy supply agents, regional centralized energy storage agents, regional electricity supply agents, regional natural gas supply agents, and regional thermal supply agents.

[0008] Furthermore, preferably, the regional energy operation agent includes:

[0009] The day-ahead prediction model predicts the maximum demand of each user for each energy source in the distributed energy system based on the historical data provided by the distributed energy supply user agent. The historical data includes electricity, natural gas and heat demand data:

[0010] (P i e ,V i g ,P i h )i=1,...,n

[0011] Among them, P i e 、V i g , P i h is the predicted value of the daily maximum electricity power, gas consumption rate and heat power of the i-th user in the area, and n is the number of users;

[0012] The energy demand forecasting model combines the maximum demand of each user for each energy source predicted by the day-ahead forecasting model to predict the overall regional energy demand according to the following formula

[0013]

[0014]

[0015]

[0016] in, is the predicted value of the regional overall daily maximum power demand, is the predicted value of the regional daily overall maximum gas consumption rate demand, is the predicted value of the regional daily overall maximum thermal power demand; e , g , hIt is the simultaneous coefficient of electricity, natural gas and heat energy for each user in the area;

[0017] The day-ahead plan acquisition model combines the regional overall energy demand of each energy source predicted by the energy demand forecasting model and the price of each energy source, and formulates the day-ahead plan of regional centralized energy production and storage according to the following formula in accordance with the economic operation target:

[0018]

[0019] Among them, E b is the total cost of purchasing energy for the regional energy operation agent; t is the serial number of the planning period; t=1,2...T, T is the total number of planning periods; ΔT is the length of the planning period; ξ=[ξ e ,ξ g ,ξ h ] is the price vector of regional energy electricity, natural gas and thermal energy; Confirm the energy demand vector for the i-th user in period t, are the electricity, natural gas and heat demand confirmations of the i-th user in period t; j is the serial number of the regional centralized energy production facility, is the start and stop status of the production facility, Indicates the cessation of centralized energy production facilities, Indicates the start-up of centralized energy production facilities, j = 1,2...m; C j is the input-output coupling matrix of the facility, which is a 3×3 dimensional matrix determined by the input-output conversion characteristics of the energy production facility; is the capacity vector of the jth centralized energy production facility in period t, are the electric power, natural gas flow rate and thermal power produced by the j-th regional centralized energy production facility in period t; k is the serial number of the regional centralized energy storage facility, is the start and stop status of the energy storage facility, Indicates that the energy storage facility is stopped. Indicates the start-up of energy storage facilities, k = 1, 2...s; The input-storage and input-release coupling matrices of the centralized energy storage facility are both 3×3 dimensional matrices, determined by the storage / release conversion characteristics of the equipment; are the energy storage vector and energy release vector of the kth centralized energy storage facility in period t, are the electric power, natural gas flow rate and thermal power stored in the k-th regional centralized energy storage facility during period t, are respectively the electric power, natural gas flow rate and thermal power released by the centralized energy storage facility in the kth region during period t.

[0020] Further, preferably, in the day-ahead plan acquisition model, the regional centralized energy production and storage and release can meet the system balance constraints, facility ramping and start-stop constraints, and the regional maximum energy supply capacity:

[0021]

[0022] in, is the maximum energy supply capacity vector of the region, and the energy demand of the user is not less than the user energy demand forecast, is the energy demand forecast vector of the i-th user in period t, are respectively the predicted quantities of electricity, natural gas and heat for the ith user in the region during period t.

[0023] Preferably, the distributed energy supply user agent includes:

[0024] Equipment division unit, which divides the equipment into electrical equipment, heat equipment, power generation equipment, heating equipment and energy storage equipment;

[0025] A data collection unit collects the electrical load of each user's electrical equipment, the thermal load of thermal equipment, the power generation power of power generation equipment and heating equipment, and the energy storage power and energy release power of energy storage equipment in each time period;

[0026] The power operation range acquisition unit obtains the power operation range of each device from the user-level load agent, distributed generation agent, distributed energy storage agent, and distributed heating agent, including: the adjustment range of the user's electric and heating load is the minimum electric load and minimum thermal load of the ith user in period t, is the maximum electrical load and maximum thermal load of the ith user in period t; the regulation range of distributed generation equipment is the lower and upper limits of the power generation capacity of the fth power generation equipment of the i-th user in the t-th period; the adjustment range of the distributed heating equipment is the lower and upper limits of the power generation of the o-th heating equipment of the i-th user in time period t; the adjustment range of the distributed energy storage device are the lower and upper limits of the energy storage power of the cth energy storage device of the i-th user in period t, are the lower and upper limits of the energy release power of the cth energy storage device of the i-th user in time period t;

[0027] The operation plan acquisition model obtains the operation plan of each device based on the user energy demand confirmation or restriction issued by the regional energy operation agent, with the lowest operation cost as the coordination goal:

[0028]

[0029] Among them, X i is the total operating cost of the user, le=1,2...Le, lh=1,2...Lh, Le is the number of types of user's electrical equipment, Lh is the number of types of user's thermal equipment, f=1,2...F, F is the number of user's power generation equipment, o=1,2...O, O is the number of user's heating equipment, c=1,2...C, C is the number of user's energy storage equipment, Unit cost of losses caused by adjusting electrical and thermal loads for users; Unit cost for adjusting power generation or heating losses for users' power generation and heating equipment; Unit cost of the loss caused by modulating the energy storage and release power of the energy storage device; J i is the coupling matrix of distributed energy users, which is a 3×(Le+Lh+F+R+O)-dimensional matrix; is the energy flow vector of the distributed energy user, They are respectively the power instruction of the electrical load, the power instruction of the thermal load, the power instruction of the power generation equipment, the heating power instruction of the heating equipment, the energy storage power instruction of the energy storage equipment and the energy release power instruction; is the deviation of each power command from the original plan,

[0030] The sending unit, the distributed energy supply user agent sends the power instructions of each device in each time period to the load agent, distributed power generation agent, distributed energy storage agent, and distributed heating agent at the user layer, and obtains the response of each agent.

[0031] Preferably, the regional electricity supply agent, regional natural gas supply agent, and regional thermal supply agent are respectively used for the connection between the region and the external power grid, natural gas, and thermal supply facilities, as well as the management of the electricity, natural gas, and thermal supply network facilities in the region; the regional energy operation agent is used to interact with the agents of the coordination management layer, and at the same time interact with the regional electricity supply agent, the regional natural gas supply agent, and the regional thermal supply agent; the regional centralized energy supply agent is used for the management of centralized energy production facilities in the region, the regional centralized energy storage agent is used for the management of centralized energy storage facilities in the region, and the distributed energy supply user agent is used for distributed functional users in the distributed energy system.

[0032] According to another aspect of the present invention, a multi-agent-based regional integrated energy management method is provided, comprising:

[0033] Multiple agents corresponding to each energy source in the distributed energy management system are set in layers. The layers include regional management layer, coordination management layer and user layer. The agents in the regional management layer include regional power supply agent, regional natural gas supply agent, regional heat supply agent and regional energy operation agent. The agents in the coordination management layer include regional centralized energy supply agent, regional centralized energy storage agent and distributed energy supply user agent. The agents in the user layer include load agent, distributed power generation agent, distributed heating agent and distributed energy storage agent.

[0034] The load agent, distributed power generation agent, distributed heating agent and distributed energy storage agent respectively manage the load equipment, power generation equipment, heating equipment and energy storage equipment of the distributed energy system, and send the historical data of each device to the regional energy operation agent of the regional management layer through the distributed energy supply user agent of the coordination management layer;

[0035] The regional energy operation agent makes a day-ahead forecast of each user's energy demand based on the historical data of each device, formulates a day-ahead plan for regional centralized energy production and storage based on the forecast results, and performs safety verification;

[0036] The distributed energy supply user agent formulates the operation plan for each device in each time period of the user layer under its jurisdiction according to the day-ahead plan after safety verification, and sends corresponding instructions to each agent in the user layer;

[0037] The regional energy operation agent and the distributed energy user agent shall make rolling revisions to the operation plan for the remaining time periods of the day according to the operation status of each device in the region in the past period and the original target in the operation plan;

[0038] The user layer agents that receive the instructions work according to the instructions, and the user layer agents that do not receive the instructions enter the independent mode. The independent mode includes that each device corresponding to the user layer agent that does not receive the instructions obtains the working status of other devices through communication with the neighboring agents, and operates autonomously according to the policy set in the independent mode.

[0039] Preferably, the method for obtaining the day-ahead plan includes:

[0040] The maximum demand of each user in the system is predicted based on the historical data provided by the distributed energy supply user agent, which includes electricity, natural gas and heat demand data:

[0041] (P i e ,V i g ,P i h )i=1,...,n

[0042] Among them, Pi e 、V i g , P i h is the predicted value of the daily maximum electricity power, gas consumption rate and heat power of the i-th user in the area, and n is the number of users;

[0043] The overall regional energy demand is obtained according to the following formula

[0044]

[0045]

[0046]

[0047] In the formula, is the predicted value of the regional overall daily maximum power demand, is the predicted value of the regional daily overall maximum gas consumption rate demand, is the predicted value of the regional daily overall maximum thermal power demand; e , g , h It is the simultaneous coefficient of electricity, natural gas and heat energy for each user in the area;

[0048] The regional energy operation agent sends the regional electricity, natural gas, and heat energy demand forecasts to the regional power supply agent, regional natural gas supply agent, and regional heat supply agent, and each agent feeds back the maximum energy supply capacity to the regional energy operation agent. and the prices of various energy supplies (ξ e ,ξ g ,ξ h ),in is the maximum power supply in the region, is the maximum natural gas supply rate in the region, is the maximum heating power of the region; e is the regional electricity price, g is the regional natural gas supply price, ξ h for district heating prices;

[0049] The regional energy operation agent formulates the day-ahead plan for regional centralized energy production and storage according to the following formula in accordance with the economic operation target:

[0050]

[0051] Among them, E b is the total cost of purchasing energy for the regional energy operation agent; t is the serial number of the planning period; t=1,2...T, T is the total number of planning periods; ΔT is the length of the planning period; ξ=[ξe ,ξ g ,ξ h ] is the price vector of regional energy electricity, natural gas and thermal energy; Confirm the energy demand vector for the i-th user in period t, are the electricity, natural gas and heat demand confirmations of the i-th user in period t; j is the serial number of the regional centralized energy production facility, is the start and stop status of the production facility, Indicates the cessation of centralized energy production facilities, Indicates the start-up of centralized energy production facilities, j = 1,2...m; C j is the input-output coupling matrix of the facility, which is a 3×3 dimensional matrix determined by the input-output conversion characteristics of the energy production facility; is the capacity vector of the jth centralized energy production facility in period t, are the electric power, natural gas flow rate and thermal power produced by the j-th regional centralized energy production facility in period t; k is the serial number of the regional centralized energy storage facility, is the start and stop status of the energy storage facility, Indicates that the energy storage facility is stopped. Indicates the start-up of energy storage facilities, k = 1, 2...s; The input-storage and input-release coupling matrices of the centralized energy storage facility are both 3×3 dimensional matrices, determined by the storage / release conversion characteristics of the equipment; are the energy storage vector and energy release vector of the kth centralized energy storage facility in period t, are the electric power, natural gas flow rate and thermal power stored in the k-th regional centralized energy storage facility during period t, are respectively the electric power, natural gas flow rate and thermal power released by the centralized energy storage facility in the kth region during period t.

[0052] Preferably, the method for obtaining the operation plan includes:

[0053] The equipment is divided into electrical equipment, heat equipment, power generation equipment, heating equipment and energy storage equipment, and the electrical load of electrical equipment, the thermal load of heat equipment, the power generation power of power generation equipment and heating equipment, and the energy storage power and energy release power of energy storage equipment are obtained for each user in each time period;

[0054] The distributed energy supply user agent obtains the power operating range of each device from the user layer's load agent, distributed generation agent, distributed energy storage agent, and distributed heating agent, including: the adjustment range of the user's electric and thermal load is the minimum electric load and minimum thermal load of the ith user in period t, is the maximum electrical load and maximum thermal load of the ith user in period t; the regulation range of distributed generation equipment is the lower and upper limits of the power generation capacity of the fth power generation equipment of the i-th user in the t-th period; the adjustment range of the distributed heating equipment is the lower and upper limits of the power generation of the o-th heating equipment of the i-th user in time period t; the adjustment range of the distributed energy storage device are the lower and upper limits of the energy storage power of the cth energy storage device of the i-th user in period t, are the lower and upper limits of the energy release power of the cth energy storage device of the i-th user in time period t;

[0055] The distributed energy supply user agent confirms or limits the user energy demand issued by the regional energy operation agent, takes the lowest operating cost as the coordination goal, and obtains the operation plan of each device:

[0056]

[0057] Among them, X i is the total operating cost of the user, le=1,2...Le, lh=1,2...Lh, Le is the number of types of user's electrical equipment, Lh is the number of types of user's thermal equipment, f=1,2...F, F is the number of user's power generation equipment, o=1,2...O, O is the number of user's heating equipment, c=1,2...C, C is the number of user's energy storage equipment, Unit cost of losses caused by adjusting electrical and thermal loads for users; Unit cost for adjusting power generation or heating losses for users' power generation and heating equipment; Unit cost of the loss caused by modulating the energy storage and release power of the energy storage device; J i is the coupling matrix of distributed energy users, which is a 3×(Le+Lh+F+R+O)-dimensional matrix; is the energy flow vector of the distributed energy user, They are respectively the power instruction of the electrical load, the power instruction of the thermal load, the power instruction of the power generation equipment, the heating power instruction of the heating equipment, the energy storage power instruction of the energy storage equipment and the energy release power instruction; is the deviation of each power command from the original plan,

[0058] The distributed energy supply user agent sends the power instructions of each device in each time period to the load agent, distributed power generation agent, distributed energy storage agent, and distributed heating agent at the user layer, and obtains responses from each agent.

[0059] The multi-agent mechanism provides a basis for the coordinated operation of energy supply facilities at all levels in the regional integrated energy system. It can resolve the contradiction between local autonomy and regional overall optimized operation in the regional integrated energy system, and provide a guarantee for the regional integrated energy system to achieve clean and efficient energy utilization.

[0060] The present invention adopts a hierarchical agent mechanism, with clear division of responsibilities and objectives of each agent, and has a coordinated operation mechanism for each agent, which can overcome the limitations of centralized control and distributed autonomous control of the integrated energy system; the present invention takes into account the distributed energy supply user management at the coordination management level, and can coordinate a large number of dispersed distributed components as a whole to achieve optimization of regional overall energy supply and consumption; the distributed energy supply system achieves autonomous operation under the constraints of regional energy operations, and at the same time, each distributed component can also operate independently, ensuring the reliability of the distributed energy supply system. BRIEF DESCRIPTION OF THE DRAWINGS

[0061] Figure 1 It is a structural schematic diagram of the regional integrated energy management system based on multi-agent according to the present invention;

[0062] Figure 2 It is a schematic diagram of the security verification of the regional integrated energy management system based on multi-agents of the present invention;

[0063] Figure 3 It is a schematic diagram of the communication connection between the agents of the multi-agent-based regional integrated energy management system according to the present invention;

[0064] Figure 4 It is a flow chart of the multi-agent-based regional integrated energy management method of the present invention. DETAILED DESCRIPTION

[0065] The exemplary embodiments will now be described more fully with reference to the accompanying drawings. However, the exemplary embodiments can be implemented in many forms and should not be construed as limited to the examples set forth herein; rather, these embodiments are provided so that the disclosure will be more comprehensive and complete and fully convey the concepts of the exemplary embodiments to those skilled in the art. The described features, structures, or characteristics may be combined in any suitable manner in one or more embodiments.

[0066] In addition, the accompanying drawings are only schematic illustrations of the present disclosure and are not necessarily drawn to scale. The same reference numerals in the figures represent the same or similar parts, and their repeated description will be omitted. Some of the block diagrams shown in the accompanying drawings are functional entities and do not necessarily correspond to physically or logically independent entities. These functional entities can be implemented in software form, or implemented in one or more hardware modules or integrated circuits, or implemented in different networks and / or processor devices and / or microcontroller devices.

[0067] It should be noted that in the present disclosure, the terms “including”, “configured with”, and “set on” are used to express an open-ended inclusion meaning, and mean that other elements / components / etc. may exist in addition to the listed elements / components / etc.

[0068] Figure 1 The schematic diagram of the structure of the regional integrated energy management system based on multi-agent of the present invention is as follows: Figure 1 As shown, the regional integrated energy management system includes a regional management layer, a coordination management layer and a user layer. The regional management layer includes a regional power supply agent 101, a regional natural gas supply agent 102, a regional heat supply agent 103 and a regional energy operation agent 104. The coordination management layer includes a regional centralized energy supply agent 111, a regional centralized energy storage agent 112 and a distributed energy supply user agent 113. The user layer includes a load agent 121, a distributed power generation agent 123, a distributed heating agent 122 and a distributed energy storage agent 124, wherein:

[0069] In the regional management layer, the regional power supply agent, regional natural gas supply agent, and regional heat supply agent are used to connect the region with external power grids, natural gas, and heat supply facilities, and manage the power, natural gas, and heat supply network facilities in the region; the regional energy operation agent is used to interact with the agents in the coordination management layer, and interact with the regional power supply agent, regional natural gas supply agent, and regional heat supply agent;

[0070] In the coordination management layer, the regional centralized energy supply agent is used for the management of centralized energy production facilities in the region, the regional centralized energy storage agent is used for the management of centralized energy storage facilities in the region, and the distributed energy supply user agent is used for the distributed functional users of the distributed energy system. A regional comprehensive energy system may have several distributed energy supply users, and there are multiple distributed energy supply user agents in the coordination management layer; a region may have multiple energy production facilities, such as cogeneration, renewable energy sites, heating stations, etc., and there are multiple regional centralized energy supply agents; a region may have multiple energy storage facilities, involving electric energy storage, heat storage, gas storage, etc., and there may be multiple regional energy storage agents;

[0071] In the user layer, load agents, distributed power generation agents, distributed heating agents and distributed energy storage agents respectively manage the load equipment, power generation equipment, heating equipment and energy storage equipment with independent control capabilities in the distributed energy system, and send the historical data of each device to the regional energy operation agent of the regional management layer through the distributed energy supply user agent of the coordination management layer. Since there may be multiple power generation, heating and energy storage equipment in the distributed energy supply system, there are multiple agents corresponding to them. The load classification corresponds to the load agent, and there are also multiple load agents. The combination of each agent corresponds to a complete distributed energy supply system, and each agent interacts with the distributed energy supply user agent in the coordination management layer.

[0072] In one embodiment, in a regional integrated energy management system:

[0073] The load agent, distributed power generation agent, distributed heating agent and distributed energy storage agent respectively manage the load equipment, power generation equipment, heating equipment and energy storage equipment of the distributed energy system, and send the historical data of each device to the regional energy operation agent of the regional management layer through the distributed energy supply user agent of the coordination management layer;

[0074] The regional energy operation agent predicts the energy demand of each user according to the historical data of each device, formulates the day-ahead plan of regional centralized energy production and storage according to the prediction results, and performs safety verification. The safety verification includes: comparing the day-ahead plan with the static safety domain, which is a set of working points that meet the N-1 safety criteria and is a high-dimensional space; the safety boundary is the boundary of the static safety domain of the system; if the system operation plan does not meet the safety verification, that is, exceeds the safety boundary, the operation plan needs to be changed, such as Figure 2 As shown in the figure, the security domain is a high-dimensional space composed of hyperplanes. For the convenience of explanation, a two-dimensional Wayne diagram is used as an illustration, where Ω0 is the static security domain of the system, L s is the safety domain boundary; Ω1 is the operation domain formed by the working points included in a certain operation plan, which is included in the safety domain and is considered to have passed the safety check. The dot-dash line area in the figure is also an operation domain formed by the working points included in the operation plan, which is composed of Ω3 and Ω2. Among them, the Ω2 part exceeds the system safety boundary and is considered to have failed the safety check;

[0075] The distributed energy supply user agent formulates the operation plan for each device in the user layer under its jurisdiction for each time period according to the day-ahead plan after the safety check, and sends the corresponding instructions to each agent in the user layer. The regional energy operation agent and the distributed energy supply user agent make rolling corrections to the operation plan for the remaining time periods of the day according to the original target in the operation plan based on the operation status of each device in the region in the past time period. The agent of the user layer that receives the instruction works according to the instruction, and the agent of the user layer that does not receive the instruction enters the independent mode. The independent mode includes that each device corresponding to the agent of the user layer that does not receive the instruction obtains the working status of other devices through communication with the neighboring agent, and operates autonomously according to the strategy set in the independent mode. The operation status includes, for the regional energy operation agent, the energy production power of the regional centralized energy supply in the time period that has occurred, the energy storage and release power of the regional energy storage, and the exchange power between each distributed energy supply user and the region. For the distributed user agent, it refers to the power of each device in the user's distributed energy supply system in the time period that has occurred. The rolling correction includes: according to the objective function of the original operation plan, the operation point of the previous time period is used as the initial condition, and the operation plan for the remaining time period is arranged; the strategy set includes pre-set strategies, such as the strategy for switching devices, the strategy for switching loads, etc.

[0076] In one embodiment, agents at various levels of the regional integrated energy management system are connected through a set communication mechanism, and the coordinated operation of the regional integrated energy system is completed by relying on the decisions of each agent.

[0077] Figure 3 FIG. 1 is a schematic diagram of the communication connection between the agents in the multi-agent regional integrated energy management system of the present invention. Figure 3 As shown, a publish / subscribe communication mechanism is adopted between the regional energy operation agent and the regional electricity supply agent, the regional natural gas supply agent, and the regional heat supply agent; a request / response communication mechanism is adopted between the regional energy operation agent and the regional centralized energy supply agent, the regional energy storage agent, and the distributed energy supply user agent; a request / response communication mechanism is adopted between the distributed energy supply user agent and the load agent, the distributed power generation agent, the distributed heating agent, and the distributed energy storage agent; a publish / subscribe communication mechanism is adopted between the load agent and the distributed power generation agent, the distributed heating agent, and the distributed energy storage agent.

[0078] In one embodiment, when the day-ahead plan formulated by the regional energy operation agent meets the safety check, the day-ahead plan is sent to the distributed energy supply user agent, the regional centralized energy supply agent, the regional centralized energy storage agent, the regional electricity supply agent, the regional natural gas supply agent, and the regional thermal supply agent; when the day-ahead plan formulated by the regional energy operation agent does not meet the safety check, the energy consumption limit of each user is obtained according to the system safety boundary, and the day-ahead plan after the energy consumption limit is sent to the distributed energy supply user agent, the regional centralized energy supply agent, the regional centralized energy storage agent, the regional electricity supply agent, the regional natural gas supply agent, and the regional thermal supply agent.

[0079] In one embodiment, the regional energy operation agent includes:

[0080] The day-ahead prediction model predicts the maximum demand of each user for each energy source in the distributed energy system based on the historical data provided by the distributed energy supply user agent. The historical data includes electricity, natural gas and heat demand data:

[0081] (P i e ,V i g ,P i h )i=1,...,n

[0082] Among them, P i e 、V i g , P i h is the predicted value of the daily maximum electricity power, gas consumption rate and heat power of the i-th user in the area, and n is the number of users;

[0083] The energy demand forecasting model combines the maximum demand of each user for each energy source predicted by the day-ahead forecasting model to predict the overall regional energy demand according to the following formula

[0084]

[0085]

[0086]

[0087] in, is the predicted value of the regional overall daily maximum power demand, is the predicted value of the regional daily overall maximum gas consumption rate demand, is the predicted value of the regional daily overall maximum thermal power demand; e , g , hIt is the simultaneous coefficient of electricity, natural gas and heat energy for each user in the area;

[0088] The day-ahead plan acquisition model combines the regional overall energy demand of each energy source predicted by the energy demand forecasting model and the price of each energy source, and formulates the day-ahead plan of regional centralized energy production and storage according to the following formula in accordance with the economic operation target:

[0089]

[0090] Among them, E b is the total cost of purchasing energy for the regional energy operation agent; t is the serial number of the planning period; t=1,2...T, T is the total number of planning periods; ΔT is the length of the planning period; ξ=[ξ e ,ξ g ,ξ h ] is the price vector of regional energy electricity, natural gas and thermal energy; Confirm the energy demand vector for the i-th user in period t, are the electricity, natural gas and heat demand confirmations of the i-th user in period t; j is the serial number of the regional centralized energy production facility, is the start and stop status of the production facility, Indicates the cessation of centralized energy production facilities, Indicates the start-up of centralized energy production facilities, j = 1,2...m; C j is the input-output coupling matrix of the facility, which is a 3×3 dimensional matrix determined by the input-output conversion characteristics of the energy production facility; is the capacity vector of the jth centralized energy production facility in period t, are the electric power, natural gas flow rate and thermal power produced by the j-th regional centralized energy production facility in period t; k is the serial number of the regional centralized energy storage facility, is the start and stop status of the energy storage facility, Indicates that the energy storage facility is stopped. Indicates the start-up of energy storage facilities, k = 1, 2...s; The input-storage and input-release coupling matrices of the centralized energy storage facility are both 3×3 dimensional matrices, determined by the storage / release conversion characteristics of the equipment; are the energy storage vector and energy release vector of the kth centralized energy storage facility in period t, are the electric power, natural gas flow rate and thermal power stored in the k-th regional centralized energy storage facility during period t, are respectively the electric power, natural gas flow rate and thermal power released by the centralized energy storage facility in the kth region during period t.

[0091] Preferably, the regional energy operation agent also includes:

[0092] In the day-ahead planning model, regional centralized energy production and storage and release can meet system balance constraints, facility ramping and start-stop constraints, and regional maximum energy supply capacity:

[0093]

[0094] in, is the maximum energy supply capacity vector of the region, and the energy demand of the user is not less than the user energy demand forecast, is the energy demand forecast vector of the i-th user in period t, are respectively the predicted quantities of electricity, natural gas and heat for the ith user in the region during period t.

[0095] In one embodiment, the distributed energy supply user agent includes:

[0096] Equipment division unit, which divides the equipment into electrical equipment, heat equipment, power generation equipment, heating equipment and energy storage equipment;

[0097] A data collection unit collects the electrical load of each user's electrical equipment, the thermal load of thermal equipment, the power generation power of power generation equipment and heating equipment, and the energy storage power and energy release power of energy storage equipment in each time period;

[0098] The power operation range acquisition unit obtains the power operation range of each device from the user-level load agent, distributed generation agent, distributed energy storage agent, and distributed heating agent, including: the adjustment range of the user's electric and heating load is the minimum electric load and minimum thermal load of the ith user in period t, is the maximum electrical load and maximum thermal load of the ith user in period t; the regulation range of distributed generation equipment is the lower and upper limits of the power generation capacity of the fth power generation equipment of the i-th user in the t-th period; the adjustment range of the distributed heating equipment is the lower and upper limits of the power generation of the o-th heating equipment of the i-th user in time period t; the adjustment range of the distributed energy storage device are the lower and upper limits of the energy storage power of the cth energy storage device of the i-th user in period t, are the lower and upper limits of the energy release power of the cth energy storage device of the i-th user in time period t;

[0099] The operation plan acquisition model obtains the operation plan of each device based on the user energy demand confirmation or restriction issued by the regional energy operation agent, with the lowest operation cost as the coordination goal:

[0100]

[0101] Among them, X i is the total operating cost of the user, le=1,2...Le, lh=1,2...Lh, Le is the number of types of user's electrical equipment, Lh is the number of types of user's thermal equipment, f=1,2...F, F is the number of user's power generation equipment, o=1,2...O, O is the number of user's heating equipment, c=1,2...C, C is the number of user's energy storage equipment, Unit cost of losses caused by adjusting electrical and thermal loads for users; Unit cost for adjusting power generation or heating losses for users' power generation and heating equipment; Unit cost of the loss caused by modulating the energy storage and release power of the energy storage device; J i is the coupling matrix of distributed energy users, which is a 3×(Le+Lh+F+R+O)-dimensional matrix; is the energy flow vector of the distributed energy user, They are respectively the power instruction of the electrical load, the power instruction of the thermal load, the power instruction of the power generation equipment, the heating power instruction of the heating equipment, the energy storage power instruction of the energy storage equipment and the energy release power instruction; is the deviation of each power command from the original plan,

[0102] The sending unit, the distributed energy supply user agent sends the power instructions of each device in each time period to the load agent, distributed power generation agent, distributed energy storage agent, and distributed heating agent at the user layer, and obtains the response of each agent.

[0103] Figure 4 FIG. 1 is a flow chart of the multi-agent-based regional integrated energy management method of the present invention, as shown in FIG. Figure 4 As shown, the regional integrated energy management method includes:

[0104] Step S1, hierarchically setting multiple agents corresponding to each energy source of the distributed energy management system, the divided layers include regional management layer, coordination management layer and user layer, the agents divided in the regional management layer include regional power supply agent, regional natural gas supply agent, regional heat supply agent, regional energy operation agent; the agents divided in the coordination management layer include regional centralized energy supply agent, regional centralized energy storage agent, distributed energy supply user agent; the agents divided in the user layer include load agent, distributed power generation agent, distributed heating agent and distributed energy storage agent;

[0105] Step S2, the load agent, distributed power generation agent, distributed heating agent and distributed energy storage agent respectively manage the load equipment, power generation equipment, heating equipment and energy storage equipment of the distributed energy system, and send the historical data of each device to the regional energy operation agent of the regional management layer through the distributed energy supply user agent of the coordination management layer;

[0106] Step S3, the regional energy operation agent makes a day-ahead forecast of each user's energy demand based on the historical data of each device, formulates a day-ahead plan for regional centralized energy production and energy storage based on the forecast results, and performs a safety check;

[0107] Step S4, the distributed energy supply user agent formulates the operation plan for each device in each time period of the user layer under its jurisdiction according to the day-ahead plan after the safety check, and sends the corresponding instructions to each agent in the user layer;

[0108] Step S5, the regional energy operation agent and the distributed energy supply user agent make rolling corrections to the operation plan for the remaining time periods of the day according to the operation status of each device in the region in the past time period and the original target in the operation plan;

[0109] Step S6, the user-level agent that receives the instruction works according to the instruction, and the user-level agent that does not receive the instruction enters the independent mode, wherein the independent mode includes that each device corresponding to the user-level agent that does not receive the instruction obtains the working status of other devices through communication with the neighboring agent, and operates autonomously according to the strategy set in the independent mode. The independent mode is the working mode adopted by each user-level device when it cannot accept the distributed energy supply user agent instruction.

[0110] In step S3, it includes:

[0111] The maximum demand of each user in the system is predicted based on the historical data provided by the distributed energy supply user agent, which includes electricity, natural gas and heat demand data:

[0112] (P i e ,V i g ,P i h )i=1,...,n

[0113] Among them, P i e 、V i g , P i h is the daily maximum electricity consumption (MW) and gas consumption rate (m 3 / h) and the predicted value of thermal power (MW), n is the number of users;

[0114] The overall regional energy demand is obtained according to the following formula

[0115]

[0116]

[0117]

[0118] In the formula, is the predicted value of the regional overall daily maximum power demand, is the predicted value of the regional daily overall maximum gas consumption rate demand, is the predicted value of the regional daily overall maximum thermal power demand; e , g , h It is the simultaneous coefficient of electricity, natural gas and heat energy for each user in the area;

[0119] The regional energy operation agent sends the regional electricity, natural gas, and heat energy demand forecasts to the regional power supply agent, regional natural gas supply agent, and regional heat supply agent, and each agent feeds back the maximum energy supply capacity to the regional energy operation agent. and the prices of various energy supplies (ξ e ,ξ g ,ξ h ),in is the maximum power supply in the region, is the maximum natural gas supply rate in the region, is the maximum heating power of the region; e is the regional power supply price (yuan / kWh), g is the regional natural gas supply price (yuan / m 3 ),ξ h is the district heating price (yuan / MJ);

[0120] The regional energy operation agent formulates the day-ahead plan for regional centralized energy production and storage according to the following formula in accordance with the economic operation target:

[0121]

[0122] Among them, E b is the total cost of purchasing energy for the regional energy operation agent; t is the serial number of the planning period; t=1,2...T, T is the total number of planning periods; ΔT is the length of the planning period; ξ=[ξ e ,ξ g ,ξ h ] is the price vector of regional energy electricity, natural gas and thermal energy; Confirm the energy demand vector for the i-th user in period t, are the electricity, natural gas and heat demand confirmations of the i-th user in period t; j is the serial number of the regional centralized energy production facility, is the start and stop status of the production facility, Indicates the cessation of centralized energy production facilities, Indicates the start-up of centralized energy production facilities, j = 1,2...m; C j is the input-output coupling matrix of the facility, which is a 3×3 dimensional matrix determined by the input-output conversion characteristics of the energy production facility; is the capacity vector of the jth centralized energy production facility in period t, are the electric power, natural gas flow rate and thermal power produced by the j-th regional centralized energy production facility in period t; k is the serial number of the regional centralized energy storage facility, is the start and stop status of the energy storage facility, Indicates that the energy storage facility is stopped. Indicates the start-up of energy storage facilities, k = 1, 2...s; The input-storage and input-release coupling matrices of the centralized energy storage facility are both 3×3 dimensional matrices, determined by the storage / release conversion characteristics of the equipment; are the energy storage vector and energy release vector of the kth centralized energy storage facility in period t, are the electric power, natural gas flow rate and thermal power stored in the k-th regional centralized energy storage facility during period t, are respectively the electric power, natural gas flow rate and thermal power released by the centralized energy storage facility in the kth region during period t.

[0123] Step S3 also includes:

[0124] Regional centralized energy production and storage and release can meet system balance constraints, facility ramping and start-stop constraints, and the region’s maximum energy supply capacity:

[0125]

[0126] in, is the maximum energy supply capacity vector of the region, and the energy demand of the user is not less than the user energy demand forecast, is the energy demand forecast vector of the i-th user in period t, are respectively the predicted quantities of electricity, natural gas and heat for the ith user in the region during period t.

[0127] When the safety check is satisfied, the day-ahead plan is sent to the distributed energy supply user agent, the regional centralized energy supply agent, the regional centralized energy storage agent, the regional electricity supply agent, the regional natural gas supply agent, and the regional heat supply agent;

[0128] When the safety check is not met, the energy consumption limit of each user is obtained according to the system safety margin. is the energy consumption restriction vector of the ith user in period t, The electricity, natural gas and heat demands of the i-th user in the region in period t are respectively sent to the distributed energy supply user agent, regional centralized energy supply agent, regional centralized energy storage agent, regional electricity supply agent, regional natural gas supply agent and regional heat supply agent after energy consumption restriction.

[0129] In step S5, it includes:

[0130] The equipment is divided into electrical equipment, heat equipment, power generation equipment, heating equipment and energy storage equipment, and the electrical load of electrical equipment, the thermal load of heat equipment, the power generation power of power generation equipment and heating equipment, and the energy storage power and energy release power of energy storage equipment are obtained for each user in each time period;

[0131] The distributed energy supply user agent obtains the power operation range of each device from the load agent, distributed generation agent, distributed energy storage agent, and distributed heating agent at the user layer, including: the distributed energy supply user agent obtains the energy production and consumption plan of each device from the load agent, distributed generation agent, distributed energy storage agent, and distributed heating agent at the user layer, including: the power load of the user's first category of electrical equipment in time period t The electrical load of the user's class lh electrical equipment in period t le=1,2...Le,lh=1,2...Lh,Le is the number of types of electrical equipment used by the user, Lh is the number of types of thermal equipment used by the user; the power generation of the user's fth power generation equipment in time period t f=1,2...F, F is the number of the user's power generation equipment; the power generation of the user's oth heating equipment in time period t o=1,2...O, O is the number of heating devices of the user; the energy storage power of the user's cth energy storage device in time period t Energy release power c=1,2...C, C is the number of energy storage devices of the user; the distributed energy supply user agent obtains the power operation range of each device from the load agent, distributed generation agent, distributed energy storage agent and distributed heating agent at the user layer, including the adjustment range of the user's electric and thermal load is the minimum electric load and minimum thermal load of the ith user in period t, is the maximum electrical load and maximum thermal load of the ith user in period t; the regulation range of distributed generation equipment is the lower and upper limits of the power generation capacity of the fth power generation equipment of the i-th user in the t-th period; the adjustment range of the distributed heating equipment is the lower and upper limits of the power generation of the o-th heating equipment of the i-th user in time period t; the adjustment range of the distributed energy storage device are the lower and upper limits of the energy storage power of the cth energy storage device of the i-th user in period t, are the lower and upper limits of the energy release power of the cth energy storage device of the i-th user in time period t;

[0132] Distributed energy supply user agents confirm or limit user energy demand issued by regional energy operation agents, optimize the operation plan of each device with the lowest operating cost as the coordination goal:

[0133]

[0134] Among them, X i is the total operating cost of the user, le=1,2...Le, lh=1,2...Lh, Le is the number of types of user's electrical equipment, Lh is the number of types of user's thermal equipment, f=1,2...F, F is the number of user's power generation equipment, o=1,2...O, O is the number of user's heating equipment, c=1,2...C, C is the number of user's energy storage equipment, Unit cost of losses caused by adjusting electrical and thermal loads for users; Unit cost for adjusting power generation or heating losses for users' power generation and heating equipment; Unit cost of the loss caused by modulating the energy storage and release power of the energy storage device; J i is the coupling matrix of distributed energy users, which is a 3×(Le+Lh+F+R+O)-dimensional matrix; is the energy flow vector of the distributed energy user, They are respectively the power instruction of the electrical load, the power instruction of the thermal load, the power instruction of the power generation equipment, the heating power instruction of the heating equipment, the energy storage power instruction of the energy storage equipment and the energy release power instruction; is the deviation of each power command from the original plan,

[0135] The distributed energy supply user agent sends the power instructions of each device in each time period to the load agent, distributed power generation agent, distributed energy storage agent, and distributed heating agent at the user layer, and obtains responses from each agent.

[0136] Although the above disclosed content shows exemplary embodiments of the present invention, it should be noted that, without departing from the scope defined in the claims, various changes and modifications may be made. The functions, steps and / or actions of the method claims according to the invention embodiments described herein do not need to be performed in any particular order. In addition, although the elements of the present invention may be described or required in individual form, it is also conceivable to have multiple elements unless explicitly limited to a single element.

Claims

1. A regional integrated energy management system based on multi-agent, It is characterized in that It includes a regional management layer, a coordination management layer and a user layer, wherein the regional management layer includes a regional power supply agent, a regional natural gas supply agent, a regional heat supply agent and a regional energy operation agent, the coordination management layer includes a regional centralized energy supply agent, a regional centralized energy storage agent and a distributed energy supply user agent, and the user layer includes a load agent, a distributed power generation agent, a distributed heating agent and a distributed energy storage agent, wherein: the load agent, the distributed power generation agent, the distributed heating agent and the distributed energy storage agent respectively manage the load equipment, power generation equipment, heating equipment and energy storage equipment of the distributed energy system, and send the historical data of each equipment to the regional energy operation agent of the regional management layer through the distributed energy supply user agent of the coordination management layer; the regional energy operation agent manages each user according to the historical data of each equipment Energy demand is predicted on the day-ahead, and a day-ahead plan for regional centralized energy production and storage is formulated based on the prediction results and a safety check is performed; the distributed energy supply user agent formulates an operation plan for each device in the user layer under its jurisdiction for each time period based on the day-ahead plan that has passed the safety check, and sends corresponding instructions to each agent in the user layer. The regional energy operation agent and the distributed energy supply user agent make rolling revisions to the operation plan for the remaining time periods of the day according to the original target in the operation plan based on the operation status of each device in the region in the past time period. The agent of the user layer that receives the instruction works according to the instruction, and the agent of the user layer that does not receive the instruction enters an independent mode, wherein the independent mode includes that each device corresponding to the agent of the user layer that does not receive the instruction obtains the working status of other devices through communication with the neighboring agents, and operates autonomously according to the strategy set in the independent mode; Among them, the regional energy operation agent adopts a publish / subscribe communication mechanism with the regional electricity supply agent, the regional natural gas supply agent, and the regional heat supply agent; the regional energy operation agent adopts a request / response communication mechanism with the regional centralized energy supply agent, the regional energy storage agent, and the distributed energy supply user agent; the distributed energy supply user agent adopts a request / response communication mechanism with the load agent, the distributed power generation agent, the distributed heating agent, and the distributed energy storage agent; the load agent adopts a publish / subscribe communication mechanism with the distributed power generation agent, the distributed heating agent, and the distributed energy storage agent; The regional energy operation agent includes: The day-ahead prediction model predicts the maximum demand of each user for each energy source in the distributed energy system based on the historical data provided by the distributed energy supply user agent. The historical data includes electricity, natural gas and heat demand data: (P i e ,V i g ,P i h )i=1,K,n Among them, P i e 、V i g , P i h is the predicted value of the daily maximum electricity power, gas consumption rate and heat power of the i-th user in the area, and n is the number of users; The energy demand forecasting model combines the maximum demand of each user for each energy source predicted by the day-ahead forecasting model to predict the overall regional energy demand according to the following formula in, is the predicted value of the regional overall daily maximum power demand, is the predicted value of the regional daily overall maximum gas consumption rate demand, is the predicted value of the regional daily overall maximum thermal power demand; e , g , h It is the simultaneous coefficient of electricity, natural gas and heat energy for each user in the area; The day-ahead plan acquisition model combines the regional overall energy demand of each energy source predicted by the energy demand forecasting model and the price of each energy source, and formulates the day-ahead plan of regional centralized energy production and storage according to the following formula in accordance with the economic operation target: Among them, E b is the total cost of purchasing energy for the regional energy operation agent; t is the serial number of the planning period; t=1,2...T, T is the total number of planning periods; ΔT is the length of the planning period; ξ=[ξ e ,ξ g ,ξ h ] is the price vector of regional energy electricity, natural gas and thermal energy; Confirm the energy demand vector for the i-th user in period t, are the electricity, natural gas and heat demand confirmations of the i-th user in period t; j is the serial number of the regional centralized energy production facility, is the start and stop status of the production facility, Indicates the cessation of centralized energy production facilities, Indicates the start-up of centralized energy production facilities, j = 1,2...m; C j is the input-output coupling matrix of the facility, which is a 3×3 dimensional matrix determined by the input-output conversion characteristics of the energy production facility; is the capacity vector of the jth centralized energy production facility in period t, are the electric power, natural gas flow rate and thermal power produced by the j-th regional centralized energy production facility in period t; k is the serial number of the regional centralized energy storage facility, is the start and stop status of the energy storage facility, Indicates that the energy storage facility is stopped. Indicates the start-up of energy storage facilities, k = 1, 2...s; The input-storage and input-release coupling matrices of the centralized energy storage facility are both 3×3 dimensional matrices, determined by the storage / release conversion characteristics of the equipment; are the energy storage vector and energy release vector of the kth centralized energy storage facility in period t, are the electric power, natural gas flow rate and thermal power stored in the k-th regional centralized energy storage facility during period t, They are respectively the electric power, natural gas flow rate and thermal power released by the centralized energy storage facility in the kth region during period t.

2. The multi-agent-based regional integrated energy management system according to claim 1, It is characterized in that When the day-ahead plan formulated by the regional energy operation agent meets the safety verification, the day-ahead plan is sent to the distributed energy supply user agent, the regional centralized energy supply agent, the regional centralized energy storage agent, the regional electricity supply agent, the regional natural gas supply agent, and the regional thermal supply agent; when the day-ahead plan formulated by the regional energy operation agent does not meet the safety verification, the energy consumption limit of each user is obtained according to the system safety boundary, and the day-ahead plan after the energy consumption limit is sent to the distributed energy supply user agent, the regional centralized energy supply agent, the regional centralized energy storage agent, the regional electricity supply agent, the regional natural gas supply agent, and the regional thermal supply agent.

3. The multi-agent-based regional integrated energy management system according to claim 1, It is characterized in that In the day-ahead planning model, regional centralized energy production and storage and release can meet system balance constraints, facility ramping and start-stop constraints, and regional maximum energy supply capacity: in, is the maximum energy supply capacity vector of the region, and the energy demand of the user is not less than the user energy demand forecast, is the energy demand forecast vector of the i-th user in period t, are respectively the predicted quantities of electricity, natural gas and heat for the ith user in the region during period t.

4. The multi-agent-based regional integrated energy management system according to claim 2, It is characterized in that The distributed energy supply user agent includes: Equipment division unit, which divides the equipment into electrical equipment, heat equipment, power generation equipment, heating equipment and energy storage equipment; A data collection unit collects the electrical load of each user's electrical equipment, the thermal load of thermal equipment, the power generation power of power generation equipment and heating equipment, and the energy storage power and energy release power of energy storage equipment in each time period; The power operation range acquisition unit obtains the power operation range of each device from the user-level load agent, distributed generation agent, distributed energy storage agent, and distributed heating agent, including: the adjustment range of the user's electric and heating load is the minimum electric load and minimum thermal load of the ith user in period t, is the maximum electrical load and maximum thermal load of the ith user in period t; the regulation range of distributed generation equipment is the lower and upper limits of the power generation capacity of the fth power generation equipment of the i-th user in the t-th period; the adjustment range of the distributed heating equipment is the lower and upper limits of the power generation of the o-th heating equipment of the i-th user in time period t; the adjustment range of the distributed energy storage device are the lower and upper limits of the energy storage power of the cth energy storage device of the i-th user in period t, are the lower and upper limits of the energy release power of the cth energy storage device of the i-th user in time period t; The operation plan acquisition model obtains the operation plan of each device based on the user energy demand confirmation or restriction issued by the regional energy operation agent, with the lowest operation cost as the coordination goal: Among them, X i is the total operating cost of the user, le=1,2...Le, lh=1,2...Lh, Le is the number of types of user's electrical equipment, Lh is the number of types of user's thermal equipment, f=1,2...F, F is the number of user's power generation equipment, o=1,2...O, O is the number of user's heating equipment, c=1,2...C, C is the number of user's energy storage equipment, Unit cost of losses caused by adjusting electrical and thermal loads for users; Unit cost for adjusting power generation or heating losses for users' power generation and heating equipment; Unit cost of the loss caused by modulating the energy storage and release power of the energy storage device; J i is the coupling matrix of distributed energy users, which is a 3×(Le+Lh+F+R+O)-dimensional matrix; is the energy flow vector of the distributed energy user, They are respectively power instructions for electrical loads, power instructions for thermal loads, power generation power instructions for power generation equipment, heating power instructions for heating equipment, energy storage power instructions for energy storage equipment, and energy release power instructions; is the deviation of each power command from the original plan, The sending unit, the distributed energy supply user agent sends the power instructions of each device in each time period to the load agent, distributed power generation agent, distributed energy storage agent, and distributed heating agent at the user layer, and obtains the response of each agent.

5. The multi-agent-based regional integrated energy management system according to claim 1, It is characterized in that The regional power supply agent, regional natural gas supply agent, and regional heat supply agent are used for the connection between the region and the external power grid, natural gas, and heat supply facilities, and the management of the power, natural gas, and heat supply network facilities in the region; the regional energy operation agent is used to interact with the agents of the coordination management layer, and interact with the regional power supply agent, the regional natural gas supply agent, and the regional heat supply agent; The regional centralized energy supply agent is used for the management of centralized energy production facilities in the region, the regional centralized energy storage agent is used for the management of centralized energy storage facilities in the region, and the distributed energy supply user agent is used for distributed functional users of the distributed energy system.

6. A multi-agent-based regional integrated energy management method, It is characterized in that include: Multiple agents corresponding to each energy source in the distributed energy management system are set in layers. The layers include regional management layer, coordination management layer and user layer. The agents in the regional management layer include regional power supply agent, regional natural gas supply agent, regional heat supply agent and regional energy operation agent. The agents in the coordination management layer include regional centralized energy supply agent, regional centralized energy storage agent and distributed energy supply user agent. The agents in the user layer include load agent, distributed power generation agent, distributed heating agent and distributed energy storage agent. The load agent, distributed power generation agent, distributed heating agent and distributed energy storage agent respectively manage the load equipment, power generation equipment, heating equipment and energy storage equipment of the distributed energy system, and send the historical data of each device to the regional energy operation agent of the regional management layer through the distributed energy supply user agent of the coordination management layer; The regional energy operation agent makes a day-ahead forecast of each user's energy demand based on the historical data of each device, formulates a day-ahead plan for regional centralized energy production and storage based on the forecast results, and performs safety verification; The distributed energy supply user agent formulates the operation plan for each device in each time period of the user layer under its jurisdiction according to the day-ahead plan after safety verification, and sends corresponding instructions to each agent in the user layer; The regional energy operation agent and the distributed energy user agent shall make rolling revisions to the operation plan for the remaining time periods of the day according to the operation status of each device in the region in the past period and the original target in the operation plan; The agent of the user layer that receives the instruction works according to the instruction, and the agent of the user layer that does not receive the instruction enters the independent mode, wherein each device corresponding to the agent of the user layer that does not receive the instruction obtains the working status of other devices through communication with the neighboring agent, and operates autonomously according to the strategy set in the independent mode; The method for obtaining the day-ahead plan includes: The maximum demand of each user in the system is predicted based on the historical data provided by the distributed energy supply user agent, which includes electricity, natural gas and heat demand data: (P i e ,V i g ,P i h )i=1,K,n Among them, P i e 、V i g , P i h is the predicted value of the daily maximum electricity power, gas consumption rate and heat power of the i-th user in the area, and n is the number of users; The overall regional energy demand is obtained according to the following formula In the formula, is the predicted value of the regional overall daily maximum power demand, is the predicted value of the regional daily overall maximum gas consumption rate demand, is the predicted value of the regional daily overall maximum thermal power demand; e , g , h It is the simultaneous coefficient of electricity, natural gas and heat energy for each user in the area; The regional energy operation agent sends the regional electricity, natural gas, and heat energy demand forecasts to the regional power supply agent, regional natural gas supply agent, and regional heat supply agent, and each agent feeds back the maximum energy supply capacity to the regional energy operation agent. and the prices of various energy supplies (ξ e ,ξ g ,ξ h ),in is the maximum power supply in the region, is the maximum natural gas supply rate in the region, is the maximum heating power of the region; e is the regional electricity price, g is the regional natural gas supply price, ξ h for district heating prices; The regional energy operation agent formulates the day-ahead plan for regional centralized energy production and storage according to the following formula in accordance with the economic operation target: Among them, E b is the total cost of purchasing energy for the regional energy operation agent; t is the serial number of the planning period; t=1,2...T, T is the total number of planning periods; ΔT is the length of the planning period; ξ=[ξ e ,ξ g ,ξ h ] is the price vector of regional energy electricity, natural gas and thermal energy; Confirm the energy demand vector for the i-th user in period t, are the electricity, natural gas and heat demand confirmations of the i-th user in period t; j is the serial number of the regional centralized energy production facility, is the start and stop status of the production facility, Indicates the cessation of centralized energy production facilities, Indicates the start-up of centralized energy production facilities, j = 1,2...m; C j is the input-output coupling matrix of the facility, which is a 3×3 dimensional matrix determined by the input-output conversion characteristics of the energy production facility; is the capacity vector of the jth centralized energy production facility in period t, are the electric power, natural gas flow rate and thermal power produced by the j-th regional centralized energy production facility in period t; k is the serial number of the regional centralized energy storage facility, is the start and stop status of the energy storage facility, Indicates that the energy storage facility is stopped. Indicates the start-up of energy storage facilities, k = 1, 2...s; The input-storage and input-release coupling matrices of the centralized energy storage facility are both 3×3 dimensional matrices, determined by the storage / release conversion characteristics of the equipment; are the energy storage vector and energy release vector of the kth centralized energy storage facility in period t, are the electric power, natural gas flow rate and thermal power stored in the k-th regional centralized energy storage facility during period t, They are respectively the electric power, natural gas flow rate and thermal power released by the centralized energy storage facility in the kth region during period t.

7. The multi-agent-based regional integrated energy management method according to claim 6, It is characterized in that The method for obtaining the operation plan includes: The equipment is divided into electrical equipment, heat equipment, power generation equipment, heating equipment and energy storage equipment, and the electrical load of electrical equipment, the thermal load of heat equipment, the power generation power of power generation equipment and heating equipment, and the energy storage power and energy release power of energy storage equipment are obtained for each user in each time period; The distributed energy supply user agent obtains the power operating range of each device from the user layer's load agent, distributed generation agent, distributed energy storage agent, and distributed heating agent, including: the adjustment range of the user's electric and thermal load is the minimum electric load and minimum thermal load of the ith user in period t, is the maximum electrical load and maximum thermal load of the ith user in period t; the regulation range of distributed generation equipment is the lower and upper limits of the power generation capacity of the fth power generation equipment of the i-th user in the t-th period; the adjustment range of the distributed heating equipment is the lower and upper limits of the power generation of the o-th heating equipment of the i-th user in time period t; the adjustment range of the distributed energy storage device are the lower and upper limits of the energy storage power of the cth energy storage device of the i-th user in period t, are the lower and upper limits of the energy release power of the cth energy storage device of the i-th user in time period t; The distributed energy supply user agent confirms or limits the user energy demand issued by the regional energy operation agent, takes the lowest operating cost as the coordination goal, and obtains the operation plan of each device: Among them, X i is the total operating cost of the user, le=1,2...Le, lh=1,2...Lh, Le is the number of types of user's electrical equipment, Lh is the number of types of user's thermal equipment, f=1,2...F, F is the number of user's power generation equipment, o=1,2...O, O is the number of user's heating equipment, c=1,2...C, C is the number of user's energy storage equipment, Unit cost of losses caused by adjusting electrical and thermal loads for users; Unit cost for adjusting power generation or heating losses for users' power generation and heating equipment; Unit cost of the loss caused by modulating the energy storage and release power of the energy storage device; J i is the coupling matrix of distributed energy users, which is a 3×(Le+Lh+F+R+O)-dimensional matrix; is the energy flow vector of the distributed energy user, They are respectively power instructions for electrical loads, power instructions for thermal loads, power generation power instructions for power generation equipment, heating power instructions for heating equipment, energy storage power instructions for energy storage equipment, and energy release power instructions; is the deviation of each power command from the original plan, The distributed energy supply user agent sends the power instructions of each device in each time period to the load agent, distributed power generation agent, distributed energy storage agent, and distributed heating agent at the user layer, and obtains responses from each agent.