Large diameter steel pipe pile

By designing rotatable left and right blades, large-diameter steel pipe piles can quickly sink piles and form closed pipe piles, which solves the problems of pile sinking difficulties and large material usage in the existing technology, and improves the bearing capacity of the pile foundation and Practicality.

CN112942318BActive Publication Date: 2024-11-08CCCC SHEC FIRST HIGHWAY ENG
View PDF 13 Cites 0 Cited by

Patent Information

Application Number
CN201911269592.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-12-11
Publication Date
2024-11-08
Estimated Expiration
2039-12-11

AI Technical Summary

Technical Problem

The existing large-diameter steel pipe piles have problems such as pile sinking difficulties, large material usage and large construction workload in construction, which leads to the difficulty of rapid and low-cost pile sinking and high soil plug effects, and are less practical.

Method used

A steel pipe pile including pipe piles, long shafts, fixed shafts, left blades, right blades, pull rods, rotary shafts and draw ropes are designed. The pile ends are opened by the rotation of the left blades and the right blades to form a closed pipe pile, thereby Quickly sink piles and improve pile foundation bearing capacity.

Benefits of technology

It realizes rapid pile sinking and improves the pile foundation bearing capacity, reduces the difficulty of fast and low-cost pile sinking of large-diameter steel pipe piles, and enhances practicality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112942318B_ABST
    Figure CN112942318B_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of attachments of civil engineering pile driving equipment, and in particular to a large-diameter steel pipe pile, which can sink piles quickly, and then after sinking the piles, the pile ends of the steel pipe piles are opened to form the effect of closed pipe piles, so that the pile ends and the pile bodies are connected as a whole, thereby ensuring the efficiency of pile sinking construction and improving the bearing capacity of the pile foundation, thereby reducing the difficulty of fast and low-cost sinking of large-diameter steel pipe piles with a large soil plug effect coefficient; the invention comprises a pipe pile, a long axis, a fixed axis, a left blade, a right blade, two groups of pull rods, two groups of rotating shafts and a pull rope, the bottom end of the pipe pile is penetrated by a penetration hole, the front end and the rear end of the long axis are respectively connected to the front end and the rear end bottom areas of the penetration hole, the bottom ends of the left blade and the right blade are both rotatably connected to the long axis, the inner ends of the left blade and the right blade are tightly attached, and the bottom areas of the left end and the right end of the penetration hole of the pipe pile are respectively connected and provided with two groups of long holes.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of attachments of civil engineering pile driving equipment, in particular to a large-diameter steel pipe pile. Background Art

[0002] As is known to all, conventional large-diameter steel pipe piles are generally divided into three types: steel pipe piles with closed or semi-closed pile ends, steel pipe piles with transverse partitions at appropriate positions of the steel pipe piles, or steel pipe piles with longitudinal partitions in the steel pipe piles at the pile ends. The three existing large-diameter steel pipe piles are found in use:

[0003] 1. By setting a closed or semi-closed pile end, the pile end can be improved, and then the open pile end can be converted into a closed pile end. However, this method requires the pile end and the pile body to be connected as a whole before piling, which usually makes it difficult to sink the pile, and often there is a problem of not being able to reach the designed elevation during construction;

[0004] 2. By setting a diaphragm at an appropriate position in the steel pipe pile, the soil column in the pipe can be prevented from rising, thereby achieving the purpose of increasing the pile end resistance. Since the position of the diaphragm in the steel pipe pile determines the magnitude of the increase in pile end resistance, the position of the diaphragm must be set properly. If the diaphragm is set too high, it will have no effect, and if it is set too low, it will affect the pile sinking;

[0005] 3. By setting a longitudinal partition in the steel pipe pile at the pile end, that is, changing the large diameter steel pipe pile to a small diameter steel pipe pile, the soil plug effect of the steel pipe pile can be improved, thereby increasing the pile end resistance. When the pile end is sandy soil, the more the steel pipe pile is divided, the more significant the soil plug effect is, and the greater the pile end resistance is. However, this will cause difficulties in pile sinking, increase the amount of materials used and the construction workload.

[0006] It can be seen that all three types of large-diameter steel pipe piles have advantages and disadvantages, which makes it difficult to sink large-diameter steel pipe piles quickly and at low cost, and have a large soil plugging effect coefficient, resulting in poor practicality. Summary of the invention

[0007] In order to solve the above technical problems, the present invention provides a method for quickly sinking piles, and then the pile end of the steel pipe pile is opened after the pile is sunk to form a closed pipe pile, so that the pile end and the pile body are connected as a whole, thereby ensuring the efficiency of pile sinking construction and improving the bearing capacity of the pile foundation, thereby reducing the difficulty of quickly and low-cost sinking large-diameter steel pipe piles, and having a large soil plug effect coefficient, thereby enhancing the practicality of large-diameter steel pipe piles.

[0008] A large-diameter steel pipe pile of the present invention comprises a pipe pile, a long axis, a fixed axis, a left blade, a right blade, two groups of pull rods, two groups of rotating shafts and a pull rope, wherein a penetration hole is provided through the bottom end of the pipe pile, the front end and the rear end of the long axis are respectively connected to the front end and the rear end bottom areas of the penetration hole, the bottom ends of the left blade and the right blade are both rotatably connected to the long axis, the inner ends of the left blade and the right blade are tightly attached, the bottom areas of the left and right ends of the penetration hole of the pipe pile are respectively connected and provided with two groups of long holes, the left end and the right end of the fixed axis are respectively fixedly fitted with the two groups of long holes, the fixed axis is located at the lower side of the long axis, the axial direction of the fixed axis and the axial direction of the long axis are perpendicular to each other, the front ends and the rear ends of the two groups of rotating shafts are respectively provided with Two groups of front mounting plates and two groups of rear mounting plates are provided, and the inner ends of the two groups of front mounting plates and the two groups of rear mounting plates are respectively connected to the left end of the left blade and the middle part of the right end of the right blade, and the top ends of the two groups of pull rods are respectively hinged to the two groups of rotating shafts, and the left end of the fixed shaft is penetrated by a T-slot, and the bottom ends of the two groups of pull rods are respectively provided with two groups of sliders, and the two groups of sliders are respectively slidably clamped with the left area and the right area of ​​the T-slot, and two groups of output ends are provided on the lower side of the pull rope, and the two groups of output ends of the pull rope are respectively inserted into the T-slot from the left and right sides of the T-slot of the fixed shaft, and the two groups of output ends of the pull rope are respectively connected to the outer ends of the two groups of sliders, and the input end of the pull rope is located on the outside of the top end of the pipe pile.

[0009] A large-diameter steel pipe pile of the present invention also includes two groups of elastic columns and two groups of springs. Two groups of limiting cavities are respectively arranged inside the left and right sides of the middle area at the bottom end of the T-slot. The top ends of the two groups of limiting cavities are respectively connected to the left and right areas of the T-slot and are provided with two groups of limiting holes. The top ends of the two groups of elastic columns slide through the two groups of limiting holes from the two groups of limiting cavities and extend into the T-slot. Two groups of baffles are respectively arranged at the bottom ends of the two groups of elastic columns. The top edge areas of the two groups of baffles are respectively tightly attached to the top ends of the two groups of limiting cavities. The bottom ends and top ends of the two groups of springs are respectively tightly attached to the bottom ends of the two groups of limiting cavities and the bottom ends of the two groups of baffles. The top ends of the two groups of elastic columns are both arranged as hemispherical surfaces.

[0010] Compared with the prior art, the beneficial effects of the present invention are as follows: first, the steel pipe pile sinking operation is started with the inner ends of the left blade and the right blade kept in close contact. At this time, the bottom of the steel pipe pile is not blocked, so the pile sinking speed is very fast. After the pile sinking operation is completed, the staff pulls the input end of the pull rope so that the two sets of output ends of the pull rope simultaneously pull the two sets of sliders at the bottom of the two sets of pull rods, so that the two sets of sliders slide to the outside of the T-slot of the fixed shaft respectively, and at the same time, the two sets of sliders will respectively drive the bottoms of the two sets of pull rods to slide outwards. At this time, the two sets of pull rods pull the left blade and the right blade respectively through the two sets of rotating shafts. The blade rotates outward around the long axis, and the left blade and the right blade gradually separate. Then continue to pull the pull rope until the left blade and the right blade rotate to the same plane, stop pulling the pull rope and fix the pull rope. At this time, the bottom of the pipe pile is in a closed state, so that the pile can be quickly sunk. After the pile is sunk, the pile end of the steel pipe pile opens to form the effect of a closed pipe pile, so that the pile end and the pile body are connected as a whole. Therefore, the efficiency of pile sinking construction is guaranteed and the bearing capacity of the pile foundation is improved, thereby reducing the difficulty of fast and low-cost pile sinking of large-diameter steel pipe piles with a large soil plug effect coefficient, thereby enhancing practicality. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a schematic diagram of the structure of the present invention;

[0012] Figure 2 It is a schematic diagram of the structure of the pipe pile and the pull rope of the present invention;

[0013] Figure 3 It is a schematic diagram of the closed structure of the left blade and the right blade of the present invention;

[0014] Figure 4 It is a schematic diagram of the left blade and the right blade opening structure of the present invention;

[0015] Figure 5 It is a schematic diagram of the connection structure between the left blade and the long shaft of the present invention;

[0016] Figure 6 It is a schematic diagram of the connection structure between the pull rod and the fixed shaft of the present invention;

[0017] Figure 7 It is a partial enlarged structural schematic diagram of A of the present invention;

[0018] Figure 8 It is a partial enlarged structural schematic diagram of B of the present invention;

[0019] Fig. 9 It is a partial enlarged structural schematic diagram of C of the present invention;

[0020] Markings in the attached figure: 1, pipe pile; 2, long axis; 3, fixed axis; 4, left blade; 5, right blade; 6, pull rod; 7, rotating shaft; 8, elastic column; 9, spring; 10, pull rope. DETAILED DESCRIPTION

[0021] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

[0022] like Figures 1 to 9 As shown, a large-diameter steel pipe pile of the present invention comprises a pipe pile 1, a long axis 2, a fixed axis 3, a left blade 4, a right blade 5, two groups of pull rods 6, two groups of rotating shafts 7 and a pull rope 10. A through hole is provided at the bottom end of the pipe pile 1, the front end and the rear end of the long axis 2 are respectively connected to the front end and the rear end bottom area of ​​the through hole, the bottom ends of the left blade 4 and the right blade 5 are both rotatably connected to the long axis 2, the inner ends of the left blade 4 and the right blade 5 are tightly attached, the bottom areas of the left and right ends of the through hole of the pipe pile 1 are respectively connected and provided with two groups of long holes, the left and right ends of the fixed axis 3 are respectively fixedly fitted with the two groups of long holes, the fixed axis 3 is located at the lower side of the long axis 2, and the fixed axis 3 is located at the lower side of the long axis 2. The axial direction and the axial direction of the long axis 2 are perpendicular to each other, the front ends and rear ends of the two groups of rotating shafts 7 are respectively provided with two groups of front mounting plates and two groups of rear mounting plates, the inner ends of the two groups of front mounting plates and the two groups of rear mounting plates are respectively connected to the left end of the left blade 4 and the middle of the right end of the right blade 5, the top ends of the two groups of pull rods 6 are respectively hinged to the two groups of rotating shafts 7, a T-slot is penetrated at the left end of the fixed shaft 3, and two groups of sliders are respectively provided at the bottom ends of the two groups of pull rods 6, and the two groups of sliders are respectively slidably mounted with the left and right areas of the T-slot, and two groups of output ends are provided on the lower side of the pull rope 10, and the two groups of output ends of the pull rope 10 are respectively inserted from the left and right sides of the T-slot of the fixed shaft 3 The two output ends of the pull rope 10 are connected to the outer ends of the two sliders, and the input end of the pull rope 10 is located outside the top of the pipe pile 1. First, the inner ends of the left blade and the right blade are kept close to each other to start the steel pipe pile sinking operation. At this time, the bottom of the steel pipe pile is not blocked, so the pile sinking speed is very fast. After the pile sinking operation is completed, the staff pulls the input end of the pull rope so that the two output ends of the pull rope simultaneously pull the two sliders at the bottom of the two pull rods, so that the two sliders slide to the outside of the T-slot of the fixed axis, and the two sliders drive the bottoms of the two pull rods to slide outwards, respectively. At this time, the two pull rods pass The two sets of rotating shafts pull the left blade and the right blade to rotate outward around the long axis respectively. At this time, the left blade and the right blade gradually separate, and then continue to pull the pull rope until the left blade and the right blade rotate to the same plane, stop pulling the pull rope and fix the pull rope. At this time, the bottom of the pipe pile is in a closed state, so that the steel pipe pile is first quickly sunk, and then the pile end of the steel pipe pile is opened after the pile is sunk to form an effect of a closed pipe pile, so that the pile end and the pile body are connected as a whole, thereby ensuring the efficiency of pile sinking construction and improving the bearing capacity of the pile foundation, thereby reducing the difficulty of fast and low-cost sinking of large-diameter steel pipe piles with a large soil plug effect coefficient, thereby enhancing practicality.

[0023] A large-diameter steel pipe pile of the present invention also includes two groups of elastic columns 8 and two groups of springs 9. Two groups of limiting cavities are respectively arranged inside the left and right sides of the middle area at the bottom end of the T-slot. The top ends of the two groups of limiting cavities are respectively connected to the left and right areas of the T-slot and are provided with two groups of limiting holes. The top ends of the two groups of elastic columns 8 slide through the two groups of limiting holes from the two groups of limiting cavities and extend into the T-slot. The bottom ends of the two groups of elastic columns 8 are respectively provided with two groups of baffles. The top edge areas of the two groups of baffles are respectively tightly attached to the top ends of the two groups of limiting cavities. The bottom ends and top ends of the two groups of springs 9 are respectively tightly attached to the bottom ends of the two groups of limiting cavities and the bottom ends of the two groups of baffles. The top of the column 8 is set to a hemispherical surface; the two groups of springs push the two groups of elastic columns to limit the two groups of sliders, so that the two groups of pull rods on the two groups of sliders support the left blade and the right blade more firmly, reducing the occurrence of the left blade and the right blade separating by themselves during the pile sinking process and increasing the pile sinking resistance. After the pile sinking is completed, it is only necessary to pull the pull rope hard so that the pull rope pulls the sliders at the bottom of the two groups of pull rods outward. At this time, the two groups of sliders will squeeze the two groups of elastic columns back into the two groups of limiting holes by squeezing the hemispherical surfaces of the two groups of elastic columns respectively. At this time, the two groups of sliders can smoothly slide at both ends of the T-slot to open the left blade and the right blade, thereby enhancing reliability.

[0024] The large-diameter steel pipe pile of the present invention starts the steel pipe pile sinking operation when working, and the inner ends of the left blade and the right blade are kept tightly together. At this time, the bottom of the steel pipe pile is not blocked, so the pile sinking speed is very fast. After the pile sinking operation is completed, the staff pulls the input end of the pull rope so that the two groups of output ends of the pull rope simultaneously pull the two groups of sliders at the bottom of the two groups of pull rods. At this time, the two groups of sliders squeeze the two groups of elastic columns back into the two groups of limiting holes by squeezing the hemispherical surfaces of the two groups of elastic columns respectively, and then make the two groups of sliders slide to the outside of the T-slot of the fixed axis respectively. At the same time, the two groups of sliders will respectively drive the bottoms of the two groups of pull rods to slide outward. At this time, the two groups of pull rods pull the left blade and the right blade to rotate outward around the long axis through the two groups of rotating shafts respectively. At this time, the left blade and the right blade gradually separate, and then continue to pull the pull rope until the left blade and the right blade rotate to the same plane, stop pulling the pull rope and fix the pull rope, and the bottom of the pipe pile is in a closed state.

[0025] The terms "front", "rear", "left", "right" and the like are used herein for descriptive purposes only.

[0026] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A large diameter steel pipe pile, characterized in that: The invention comprises a pipe pile (1), a long axis (2), a fixed axis (3), a left blade (4), a right blade (5), two groups of pull rods (6), two groups of rotating shafts (7) and a pull rope (10). The bottom end of the pipe pile (1) is penetrated by a through hole. The front end and the rear end of the long axis (2) are respectively connected to the front end and the rear end bottom area of ​​the through hole. The bottom ends of the left blade (4) and the right blade (5) are both rotatably connected to the long axis (2). The inner ends of the left blade (4) and the right blade (5) are tightly attached. The bottom areas of the left and right ends of the through hole of the pipe pile (1) are respectively connected and provided with two groups of long holes. The left and right ends of the fixed axis (3) are respectively fixedly mounted on the two groups of long holes. The fixed axis (3) is located at the lower side of the long axis (2). The axial direction of the fixed axis (3) and the axial direction of the long axis (2) are perpendicular to each other. The front ends of the two groups of rotating shafts (7) are connected to the long axis (2). Two groups of front mounting plates and two groups of rear mounting plates are respectively provided at the front and rear ends, the inner ends of the two groups of front mounting plates and the two groups of rear mounting plates are respectively connected to the left end of the left blade (4) and the middle of the right end of the right blade (5), the top ends of the two groups of pull rods (6) are respectively hinged to the two groups of rotating shafts (7), the left end of the fixed shaft (3) is penetrated by a T-slot, the bottom ends of the two groups of pull rods (6) are respectively provided with two groups of sliders, the two groups of sliders are respectively slidably clamped with the left area and the right area of ​​the T-slot, the lower side of the pull rope (10) is provided with two groups of output ends, the two groups of output ends of the pull rope (10) are respectively inserted into the T-slot from the left and right sides of the T-slot of the fixed shaft (3), the two groups of output ends of the pull rope (10) are respectively connected to the outer ends of the two groups of sliders, and the input end of the pull rope (10) is located on the outer side of the top of the pipe pile (1).

2. A large diameter steel pipe pile as claimed in claim 1, characterized in that: It also includes two groups of elastic columns (8) and two groups of springs (9), two groups of limiting cavities are respectively arranged inside the left and right sides of the middle area at the bottom end of the T-shaped slot, the top ends of the two groups of limiting cavities are respectively connected to the left and right areas of the T-shaped slot and are provided with two groups of limiting holes, the top ends of the two groups of elastic columns (8) slide through the two groups of limiting holes from the two groups of limiting cavities and extend into the T-shaped slot, the bottom ends of the two groups of elastic columns (8) are respectively provided with two groups of baffles, the top edge areas of the two groups of baffles are respectively tightly attached to the top ends of the two groups of limiting cavities, the bottom ends and top ends of the two groups of springs (9) are respectively tightly attached to the bottom ends of the two groups of limiting cavities and the bottom ends of the two groups of baffles, and the top ends of the two groups of elastic columns (8) are both arranged as hemispherical surfaces.

Citation Information

Patent Citations

  • Methods for eliminating odor and discharging water for sewer

    CN101591935A

  • Rapid pile core sand drawing-out device

    CN110195436A

  • Precast tubular pile with W-type heat exchange tube and construction method thereof

    CN110438977A

  • Pan-head valve pile toe of tube-sinking cast-in-place pile

    CN201538966U

  • Valve pile toe with super-front pile casing

    CN203403411U