Underground mine unloading station

By setting up a buffer pit on the sloped side wall of the unloading chute and filling it with waste rock, the problem of impact on the unloading chute when the bottom-side unloading mine car is unloading is solved, improving the safety of the unloading station and reducing infrastructure costs.

CN112960427BActive Publication Date: 2024-10-22CHINA ENFI ENG CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110240701.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-03-04
Publication Date
2024-10-22
Estimated Expiration
2041-03-04

AI Technical Summary

Technical Problem

The impact of the bottom-side unloading mine car on the unloading chute when unloading ore causes its damage, affecting the safety and infrastructure costs of the entire mine transportation system.

Method used

A buffer pit is set up on the sloped side wall of the unloading chute and filled with waste rock to reduce the direct impact of the ore on the side wall. The buffer zone and reinforcement layer are used to improve the stability of the structure and eliminate the need for lining boards.

Benefits of technology

It effectively avoids damage to the unloading chute, improves the safety and reliability of the unloading station, reduces infrastructure costs, and saves lining consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112960427B_ABST
    Figure CN112960427B_ABST
Patent Text Reader

Abstract

The present invention discloses an underground mine unloading station. It comprises: a mine car running track, an unloading chute located below the running track, and an unloading chute located at the end of the unloading chute, wherein the unloading chute comprises: side wall foundations on both sides of the running track, and a first sloped side wall located on the car inlet side and a second sloped side wall located on the car outlet side, the first sloped side wall and the second sloped side wall are inclined downward to the unloading chute; the first sloped side wall protrudes from the inside to the outside to form a buffer pit, and the buffer pit is filled with waste rock. This structure can reduce the impact of ore on the side wall of the unloading chute, reduce the degree of damage to the unloading chute, improve the safety and reliability of the unloading station, and save the cost of reinforcing measures for the side wall of the unloading chute.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of mine construction equipment, in particular to an underground mine unloading station. Background Art

[0002] The bottom-side unloading mine car is a common type of mine car in underground mine transportation. It is named because the ore is unloaded from the side of the mine car bottom plate. When unloading, the ore has a great impact on the unloading station foundation, that is, the unloading chute. Although wear-resistant lining is used to reinforce it in the design, the damage of the unloading chute is still difficult to avoid. The unloading station is the throat project of the underground mine. The damage of the unloading chute will have a serious impact on the transportation system of the entire mine. The bottom-side unloading mine car is divided into 4m 3 、6m 3 and 10m 3 wait.

[0003] The bottom-side unloading mine car cooperates with the unloading curved rail and the supporting wheel structure in the unloading station. When sliding through the unloading station, the mine car is lifted by the supporting wheel structure, and the bottom plate of the mine car gradually opens along with the unloading curved rail. At this time, the ore falls from the mine car into the unloading chute. As the mine car continues to move forward, the unloading curved rail gradually closes, thus completing the entire unloading process. During this unloading process, the ore will have a huge impact on the unloading chute, and long-term huge impact often causes damage to the unloading chute. Summary of the invention

[0004] The object of the present invention is to provide an underground mine unloading station, which reduces the impact damage of ore on the unloading chute by changing the structure of the unloading chute, improves the safety and reliability of the unloading station, and reduces the capital construction cost of the unloading station.

[0005] The above object of the present invention is achieved through the following technical solutions:

[0006] According to one aspect of the present invention, an underground mine unloading station provided by the present invention comprises: a mine car running track, an unloading chute located below the running track, and an unloading chute located at the end of the unloading chute, wherein:

[0007] The unloading chute comprises: side foundations on both sides of the running track, and a first sloped side wall located on the vehicle inlet side and a second sloped side wall located on the vehicle outlet side, wherein the first sloped side wall and the second sloped side wall are inclined downward to the unloading chute;

[0008] The first sloped side wall protrudes from the inside to the outside to form a buffer pit, and the buffer pit is filled with waste rock.

[0009] Preferably, the first sloped side wall protrudes from the inside to the outside at a right angle to form a buffer pit.

[0010] Preferably, the buffer pit is located at the lower part of the unloading chute.

[0011] Preferably, the buffer pit divides the first sloped side wall into two inclined sections, including: a first inclined section higher than the buffer pit, and a second inclined section lower than the buffer pit and connected to the unloading chute.

[0012] Preferably, the buffer pit is provided with a reinforcement layer at the connecting portion between the first inclined section and the second inclined section.

[0013] Preferably, the side support foundation expands from the inside to the outside of the unloading chute to form a buffer zone.

[0014] Preferably, the buffer zone is located at the upper portion of the unloading chute.

[0015] Preferably, the buffer zone is located on the side wall foundation on the vehicle entry side and is arranged along the running track direction. The first end of the buffer zone is aligned with the first end of the buffer pit, and the end of the second end of the buffer zone is located directly above the second sloped side wall.

[0016] Preferably, a lining plate is provided on the second sloped side wall.

[0017] Preferably, the first sloped side wall and the second sloped side wall are inclined downward to the unloading chute at an angle of 46 degrees.

[0018] Compared with the prior art, the underground mine unloading station of the present invention changes the structure of the unloading chute, and sets a buffer pit filled with waste rock on the sloped side wall of the unloading chute, so that the ore directly impacts the buffer pit, avoiding the direct impact of the ore on the side wall, preventing the damage of the unloading chute, improving the safety and reliability of the unloading station, and also eliminating the lining plate set on the side wall, thereby reducing the consumption of the lining plate. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a schematic diagram of the structure of the underground mine unloading station of the present invention (also Figure 2 II-II view in the middle);

[0020] Figure 2 yes Figure 1 View at center II;

[0021] Figure 3 yes Figure 2 View from III-III in the middle.

[0022] Figure 1-Figure 3Among them, 100 running track, 200 unloading chute, 300 unloading chute, 400 chamber, 500 supporting wheel structure, 600 unloading curved rail, 700 mine car, 210 side wall foundation, 211 buffer zone, 231 first inclined section, 232 buffer pit, 233 second inclined section, 240 second sloped side wall, 241 lining. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. The following description of at least one exemplary embodiment is actually only illustrative and is by no means intended to limit the present invention and its application or use. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0024] In the present invention, a bottom-side unloading mine car is taken as an example, and the entire unloading process is completed by the mine car 700 in the chamber 400 in cooperation with the unloading curved rail 600 and the supporting wheel structure 500. Figure 1-Figure 3 The specific structure of the underground mine unloading station of the present invention is schematically shown.

[0025] like Figure 1-3 As shown, the present invention provides an underground mine unloading station, comprising: a running track 100 of a mine car 700, an unloading chute 200 located below the running track 100, and an unloading chute 300 located at the lower end of the unloading chute 200. The present invention improves the structure of the unloading chute 200 in the unloading station, thereby avoiding the problem of damaging the unloading chute 200 due to direct impact of ore on the unloading chute 200, ensuring the safety and reliability of the unloading station, and reducing the consumption of the lining plate 241 inside the unloading chute 200.

[0026] The unloading chute 200 includes: side foundations 210 below both sides of the running track 100, and a first sloped side wall on the vehicle entry side and a second sloped side wall 240 on the vehicle exit side; the first sloped side wall and the second sloped side wall 240 are inclined downward to the unloading chute 300; the first sloped side wall protrudes from the inside to the outside to form a buffer pit 232, and the buffer pit 232 is filled with waste rock. The side foundation 210 is a concrete foundation. 3 Taking the bottom side unloading station as an example, the downward inclination angle of the first sloped side wall and the second sloped side wall 240 can be about 46 degrees. The length of the upper opening of the unloading chute 200 (along the running track 100) can be 24800mm. The distance from the upper opening of the unloading chute 200 to the top of the unloading chute 300 can be 10719mm.

[0027] The buffer pit 232 is located at the lower part of the unloading chute 200, thus solving the problem of repeated impact of ore on the lower structure of the unloading chute 200. The buffer pit 232 can be formed by the first sloped sidewall protruding from the inside to the outside at an angle or an arc.

[0028] The angle may be one of an acute angle, a right angle, and an obtuse angle. Preferably, the angle is a right angle or an obtuse angle, and the buffer pit 232 in the form of an angle is more convenient to operate. More preferably, the first sloped sidewall protrudes from the inside to the outside at a right angle to form the buffer pit 232. The right-angle buffer pit 232 is more convenient to fill with waste rock and can effectively buffer the unloading chute 200. The distance between the outermost side of the buffer pit 232 and the center line of the unloading chute 300 may be 10400 mm.

[0029] The arc shape can be a major arc or a minor arc, which can be determined according to the amount of unloading. For example, when the unloading amount is large, it can be set to a major arc to increase the area of ​​filling waste rock; when the unloading amount is small, it can be set to a minor arc. The arc-shaped buffer pit 232 can avoid dead corners in the unloading chute 200, and can further ensure that the inner and outer sides of the side wall are firm.

[0030] In the present invention, the buffer pit 232 divides the first sloped side wall into two inclined sections, including: a first inclined section 231 higher than the buffer pit 232, and a second inclined section 233 lower than the buffer pit 232 and connected to the unloading chute 300. The ore falls on the waste rock in the buffer pit 232, and slides to the unloading chute through the second inclined section 233 after buffering, thereby avoiding the direct impact of the ore on the inner wall of the unloading chute 200. Preferably, the connection part between the buffer pit 232 and the first inclined section 231 and the second inclined section 233 can also be chamfered to facilitate the ore to slide to the unloading chute 300, and the chamfering can also improve the firmness of the unloading chute 200. Alternatively, in order to further reduce the impact of the ore on the inner wall of the first slope and avoid the occurrence of collapse at the corner of the buffer pit 232, a reinforcement layer can be provided at the portion where the buffer pit 232 is connected to the first inclined section 231 and the second inclined section 233. Specifically, the reinforcement layer can extend from the edge of the buffer pit 232 to the first inclined section 231 or the second inclined section 233. The material of the reinforcement layer is not limited, and can be the same as the material of the liner 241, can be a wear-resistant material, or can be a concrete structure layer.

[0031] In an optional embodiment, the side support foundation 210 can also be expanded from the inside of the unloading chute 200 to the outside to form a buffer zone 211. The specific structure of the buffer zone 211 is not specifically limited, and can be a long strip, etc., as long as it can play a buffering role. The buffer zone 211 is located at the upper part of the unloading chute 200, so that the ore can repeatedly impact the upper structure of the unloading chute 200.

[0032] Furthermore, the buffer zone 211 is located on the side support foundation 210 on the vehicle entry side, for example, Figure 2 As shown, it is located on the left side of the running track 100 and is arranged along the running track 100. According to the unloading angle, the first end of the buffer zone 211 can be aligned with the first end of the buffer pit 232; in order to better buffer the unloading chute 200, the second end of the buffer zone 211 is set beyond the unloading chute 300, as shown in FIG. Figure 1 As shown, the end of the second end of the buffer zone 211 is located directly above the second sloped side wall 240, and the distance from the second end of the buffer zone 211 to the center line of the unloading chute 300 can be 2500mm. Preferably, a wear-resistant lining plate 241 can also be provided on the side foundation 210 to reinforce the side foundation 210.

[0033] In the present invention, a wear-resistant lining plate 241 can be provided on the second sloped side wall 240 to reinforce the side. Since the buffer pit 232 is provided on the first sloped side wall, it is unnecessary to provide the lining plate 241 on the side wall, thereby reducing the engineering cost. According to calculations, each unloading station can save about 100,000 yuan in material costs due to the reduction in the use of the lining plate 241.

[0034] The above embodiment avoids the impact of ore on the upper structure of the unloading chute 200 by setting a buffer zone 211 at the side foundation 210, and avoids the impact of ore on the lower structure of the unloading chute 200 by setting a buffer pit 232 filled with waste rock on the first sloped side wall, thereby ensuring the quality of the unloading chute 200 structure, improving the safety and reliability of the unloading station, ensuring the normal unloading and transportation of ore, and saving engineering costs.

[0035] The description of the present invention is given for the purpose of illustration and description, and is not intended to be exhaustive or to limit the invention to the disclosed form. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments are selected and described in order to better illustrate the principles and practical applications of the present invention and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for particular uses.

Claims

1. An underground mine unloading station, It is characterized in that include: A mine car running track, an unloading chute located below the running track, and an unloading chute located at the end of the unloading chute, wherein: The unloading chute comprises: side foundations on both sides of the running track, and a first sloped side wall located on the vehicle inlet side and a second sloped side wall located on the vehicle outlet side, wherein the first sloped side wall and the second sloped side wall are inclined downward to the unloading chute; The first sloped side wall protrudes from the inside to the outside at a right angle to form a buffer pit, and the buffer pit is filled with waste rock; the buffer pit is located at the lower part of the unloading chute, and the first sloped side wall is divided into two inclined sections, including a first inclined section higher than the buffer pit and a second inclined section lower than the buffer pit and connected to the unloading chute; the connecting parts of the buffer pit and the first inclined section and the second inclined section are both provided with a reinforcement layer.

2. The underground mine unloading station according to claim 1, It is characterized in that The side support foundation expands from the inside to the outside of the unloading chute to form a buffer zone.

3. The underground mine unloading station according to claim 2, It is characterized in that The buffer zone is located at the upper portion of the unloading chute.

4. The underground mine unloading station according to claim 3, It is characterized in that The buffer zone is located on the side wall foundation of the vehicle entry side and is arranged along the running track direction. The first end of the buffer zone is aligned with the first end of the buffer pit, and the end of the second end of the buffer zone is located above the second sloped side wall.

5. The underground mine unloading station according to claim 1, It is characterized in that A lining plate is arranged on the second sloped side wall.

6. The underground mine unloading station according to claim 1, It is characterized in that The inclination angle of the first sloped side wall and the second sloped side wall is 46 degrees.