A supercritical carbon dioxide circulation system and a compressor and turbine hot start method
Through the linkage adjustment of the main loop heater power, compressor speed, anti-surge valve and turbine valve in the supercritical carbon dioxide cycle system, the problem of unstable pressure and temperature regulation during the startup and rush process of the system is solved, and the problem is improved. improve the security and efficiency of the system.
Patent Information
- Application Number
- CN202110582018.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-05-27
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2041-05-27
AI Technical Summary
The existing supercritical carbon dioxide cycle power generation system has unstable pressure and temperature regulation during the startup and rush processes, which affects the safety and efficiency of the system.
Through the linkage adjustment of the main circuit heater power, compressor speed, anti-surge valve opening, turbine inlet regulating valve opening and turbine bypass valve opening, the hot start and surge of the compressor and turbine are realized. transfer process.
It effectively adjusts the temperature, pressure and flow rate of the working fluid at the turbine inlet, improves the safety, economy and operability of the system, and ensures the stable operation of the carbon dioxide cycle unit.
Smart Images

Figure CN113137287B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of supercritical carbon dioxide circulation power generation, and in particular to a supercritical carbon dioxide circulation system and a compressor and a turbine hot state starting method. Background Art
[0002] With the development of power generation technology in recent years, studies have shown that the use of supercritical carbon dioxide instead of water vapor as a circulating working fluid in power generating units has the advantages of high circulation efficiency, compact equipment structure, and small initial infrastructure investment within a certain power range. Therefore, the supercritical carbon dioxide circulation power generation system is a very promising power generation method. Summary of the invention
[0003] Based on the above considerations, the object of the present invention is to provide a supercritical carbon dioxide circulation system and a method for hot starting of a compressor and a turbine, by means of linkage adjustment of the main circuit heater power, the speed of the compressor, the opening of the anti-surge valve, the opening of the turbine inlet regulating valve and the opening of the turbine bypass valve, to complete the hot starting process of the compressor and the turbine.
[0004] In order to achieve the above object, the technical solution adopted by the present invention is:
[0005] A supercritical carbon dioxide circulation system, comprising a compressor and an auxiliary regulating system, a turbine and an auxiliary regulating system, a high-pressure storage loop system, a low-pressure storage loop system, and a heat exchange and flow control system;
[0006] The compressor and auxiliary regulating system include a compressor inlet valve 1, a compressor dry gas seal flow control valve 2, a compressor variable frequency motor 3, a compressor 4, a compressor anti-surge circuit cooler 5, a compressor anti-surge valve 6, a compressor outlet valve 7 and a compressor drain valve 31; the compressor and auxiliary regulating system are used to compress the cold working medium in the supercritical carbon dioxide circulation system and increase the pressure; the compressor variable frequency motor 3 can adjust the compressor speed according to the frequency instruction to adjust the compressor output; the compressor anti-surge valve 6 automatically acts according to the position of the compressor operating point to prevent surge or actively acts as a compressor output adjustment; the compressor anti-surge circuit cooler 5 is used to control the compressor 4 inlet temperature during operation; the compressor dry gas seal flow control valve 2 is used to control the dry gas seal gas flow; the compressor drain valve 31 is used to adjust the internal chamber pressure of the compressor during startup and emergency shutdown;
[0007] The turbine and auxiliary regulating system includes a turbine inlet regulating valve 15, a turbine cranking motor 16, a turbine 17, a generator 18, a turbine bypass regulating valve 19, a turbine dry gas sealing control valve 20, a turbine outlet check valve 21 and a turbine drain valve 30; the turbine inlet regulating valve 15 controls the turbine output power by regulating the flow of the turbine inlet working medium; the turbine cranking motor 16 is used to crank the turbine at a low speed before the turbine is started and after the turbine is shut down; the turbine 17 drives the generator 18 to rotate and generate electricity; the turbine bypass regulating valve 19 is used to regulate the mass flow of the hot working medium passing through the turbine; the turbine dry gas sealing control valve 20 is used to control the flow of the dry gas sealing gas; the turbine outlet check valve 21 is used to prevent the turbine outlet working medium from flowing back into the turbine; the turbine drain valve 30 is used to regulate the internal chamber pressure of the turbine during the start-up and emergency shutdown process;
[0008] The high-pressure storage loop system includes a high-pressure storage loop inlet valve 9, a high-pressure storage loop cooler 10, a high-pressure working fluid storage tank 11, a high-pressure storage loop heater 12 and a high-pressure storage loop outlet valve 13, wherein the high-pressure storage loop inlet valve 9 and the high-pressure storage loop outlet valve 13 are used to control the flow rate of the working fluid flowing into or out of the high-pressure working fluid storage tank 11; the high-pressure storage loop cooler 10 and the high-pressure storage loop heater 12 are used to control the temperature of the working fluid flowing into or out of the high-pressure working fluid storage tank 11; the high-pressure working fluid storage tank 11 is used to store the high-pressure working fluid at the outlet of the compressor during the shutdown or load reduction stage;
[0009] The low-pressure storage loop system includes a low-pressure storage loop inlet valve 24, a working fluid replenishment inlet control valve 23, a low-pressure storage loop cooler 25, a low-pressure working fluid storage tank 26, a low-pressure storage loop heater 27 and a low-pressure storage loop outlet valve 28, wherein the low-pressure storage loop inlet valve 24 and the low-pressure storage loop outlet valve 28 are used to control the flow rate of the working fluid flowing into or out of the low-pressure working fluid storage tank 26; the working fluid replenishment inlet control valve 23 is used to control the flow rate when the low-pressure working fluid storage tank 26 replenishes the working fluid before starting; the low-pressure storage loop cooler 25 and the low-pressure storage loop heater 27 are used to control the temperature of the working fluid flowing into or out of the low-pressure working fluid storage tank 26; the low-pressure working fluid storage tank 26 is used to store the working fluid before starting, and to control the inlet pressure of the compressor 4 during the startup or load adjustment stage;
[0010] The heat exchange and flow control system includes a main heater inlet control valve 8, a main circuit heater 14, a main circuit cooler 22, a main cooler outlet control valve 29 and a regenerator 32, wherein the main heater inlet control valve 8 and the main cooler outlet control valve 29 are used to control the flow of the working medium in the main circuit, and the regenerator 32 is used to perform heat exchange between the cold working medium at the outlet of the compressor 4 and the hot working medium at the outlet of the turbine 17, to heat the cold working medium at the outlet of the compressor 4, and to cool the hot working medium at the outlet of the turbine 17; the function of the main circuit heater 14 is to further heat and increase the temperature of the working medium at the outlet of the cold side of the regenerator 32; the function of the main circuit cooler 22 is to further cool and reduce the temperature of the working medium at the outlet of the hot side of the regenerator 32;
[0011] The specific connection relationship of each component in the supercritical carbon dioxide circulation system is as follows:
[0012] The compressor inlet valve 1 is connected to the compressor 4 inlet and the compressor anti-surge circuit cooler 5 outlet respectively after the valve; the compressor dry gas seal flow control valve 2 is connected to the dry gas seal gas source before the valve, and is connected to the inner cavity of the compressor 4 after the valve; the compressor emptying valve 31 is connected to the inner cavity of the compressor 4 before the valve, and is directly connected to the atmosphere after the valve; the compressor variable frequency motor 3 and the compressor 4 are connected by a coupling; the compressor 4 outlet is connected to the compressor anti-surge valve 6 before the valve and the compressor outlet valve 7 before the valve; the compressor anti-surge valve 6 is connected to the compressor anti-surge circuit cooler 5 inlet after the valve; the compressor outlet valve 7 is connected to the high-pressure storage circuit inlet valve 9 before the valve and the main heater inlet control valve 8 before the valve The high-pressure storage circuit inlet valve 9 is connected to the inlet of the high-pressure storage circuit cooler 10; the outlet of the high-pressure storage circuit cooler 10 is connected to the inlet of the high-pressure working fluid storage tank 11; the outlet of the high-pressure working fluid storage tank 11 is connected to the inlet of the high-pressure storage circuit heater 12; the outlet of the high-pressure storage circuit heater 12 is connected to the front of the high-pressure storage circuit outlet valve 13; the main heater inlet control valve 8 and the high-pressure storage circuit outlet valve 13 are both connected to the cold side inlet of the regenerator 32; the cold side outlet of the regenerator 32 is connected to the inlet of the main circuit heater 14; the outlet of the main circuit heater 14 is respectively connected to the front of the turbine inlet regulating valve 15 and the front of the turbine bypass regulating valve 19 The turbine inlet regulating valve 15 is connected to the inlet of the turbine 17 after the valve; the turbine 17 is connected to the generator 18 by a coupling; the turbine turning motor 16 and the turbine 17 are connected by a clutch; the turbine dry gas seal control valve 20 is connected to the dry gas seal gas source before the valve, and is connected to the inner cavity of the turbine 17 after the valve; the turbine exhaust valve 30 is connected to the inner cavity of the turbine 17 before the valve, and is directly connected to the atmosphere after the valve; the turbine 17 outlet is connected to the turbine outlet check valve 21 before the valve; the turbine outlet check valve 21 after the valve and the turbine bypass regulating valve 19 after the valve are both connected to the hot side inlet of the regenerator 32; the hot side outlet of the regenerator 32 is connected to the inlet of the main circuit cooler 22; the outlet of the main circuit cooler 22 is connected to the main circuit cooler 22 outlet The front of the low-pressure storage circuit inlet valve 24 and the front of the main cooler outlet control valve 29 are respectively connected; the front of the working fluid supplement inlet control valve 23 is connected to the working fluid storage tank, and the back of the valve is respectively connected to the back of the low-pressure storage circuit inlet valve 24 and the inlet of the low-pressure storage circuit cooler 25; the outlet of the low-pressure storage circuit cooler 25 is connected to the inlet of the low-pressure working fluid storage tank 26; the outlet of the low-pressure working fluid storage tank 26 is connected to the inlet of the low-pressure storage circuit heater 27; the outlet of the low-pressure storage circuit heater 27 is connected to the front of the low-pressure storage circuit outlet valve 28; the back of the low-pressure storage circuit outlet valve 28 and the back of the main cooler outlet control valve 29 are both connected to the front of the compressor inlet valve 1;
[0013] Among them: the outlet of the compressor 4, the cold side of the regenerator 32, the main circuit heater 14, the turbine 17, the hot side of the regenerator 32, the main circuit cooler 22 and the inlet of the compressor 4 are connected in sequence to form a main circuit.
[0014] The main loop heater 14 is a coal-fired boiler, a gas boiler, an electric heater, a solar thermal heater or a nuclear fusion primary loop heater; the cooling medium of the main loop cooler 22 is factory cooling water or cooling air.
[0015] The compressor 4 and turbine 17 use carbon dioxide as the dry gas sealing gas. During the startup phase, a low-pressure working medium storage tank 26 is used to supply gas. During the operation phase, the compressor 4 outlet working medium is used to supply gas. Before the dry gas sealing gas enters the compressor and turbine, it is heated to the design temperature of 60°C to 180°C by a heater.
[0016] In the hot start method of the compressor and turbine of the supercritical carbon dioxide circulation system, during the power generation cycle, the carbon dioxide working medium is compressed and pressurized by the compressor 4, heated by the regenerator 32, heated again by the main circuit heater 14, expanded by the turbine 17 to do work, and generated by the generator 18, cooled by the regenerator 32, and cooled again by the main circuit cooler 22, and then returns to the inlet of the compressor 4 to complete a power cycle;
[0017] Before starting the unit, open the working fluid replenishment inlet control valve 23 and the low-pressure storage loop cooler 25 to charge a sufficient amount of carbon dioxide working fluid into the low-pressure working fluid storage tank 26 to ensure that the pressure in the low-pressure working fluid storage tank 26 is between 5MPa and 8MPa and higher than the design pressure of the compressor 4 inlet;
[0018] After the working fluid is replenished, open the compressor dry gas seal flow control valve 2 to fill the dry gas seal gas into the internal chamber of the compressor, keep the compressor exhaust valve 31 in a small opening state, and keep the dry gas seal gas flow at 50Nm 3 / h~300Nm 3 / h, the temperature is maintained at 60℃~120℃;
[0019] Keep the dry gas sealing gas continuously charged into the compressor 4, and gradually close the compressor drain valve 31. When the pressure in the internal chamber of the compressor 4 exceeds 4MPa, open the low-pressure storage circuit outlet valve 28, the compressor inlet valve 1 and the compressor anti-surge valve 6 in sequence, and open the low-pressure storage circuit heater 27 and the compressor anti-surge circuit cooler 5 in sequence;
[0020] Start the compressor variable frequency motor 3 and set the minimum operating frequency to 20 Hz; open the compressor outlet valve 7, the main heater inlet control valve 8, the turbine bypass regulating valve 19 and the main cooler outlet control valve 29 in sequence, open the main circuit cooler 22, and keep the compressor inlet pressure and temperature stable;
[0021] By closing the compressor anti-surge valve 6 to 50% to 30%, increasing the operating frequency of the compressor variable frequency motor 3 to 30Hz to 40Hz, keeping the compressor inlet valve 1 fully open, increasing the main circuit working medium mass flow, and maintaining the working medium cold circulation; at the same time, keeping the compressor inlet pressure and temperature stable;
[0022] Open the turbine dry gas seal control valve 20, fill the dry gas seal gas into the internal chamber of the turbine, keep the turbine exhaust valve 30 in a small opening state, and maintain the dry gas seal gas flow rate of 200Nm 3 / h~600Nm 3 / h, the temperature is maintained at 80℃~150℃;
[0023] When the pressure in the turbine chamber reaches above 2MPa, the turbine cranking motor 16 is started to drive the turbine 17 and the generator 18 to rotate at a low speed. The rated speed range of the turbine cranking motor 16 is 5% to 15% of the turbine design speed.
[0024] Turn on the main circuit heater 14 and slowly increase the heating power to raise the working medium temperature before the turbine inlet regulating valve 15 to the first target temperature of 250-300°C, while keeping the compressor inlet pressure and temperature stable;
[0025] Open the turbine dry gas seal control valve 20 to maintain the dry gas seal gas flow rate at 400 Nm 3 / h~800Nm 3 / h; gradually close the turbine drain valve 30 to increase the pressure in the internal chamber of the turbine 17 to a level higher than the working fluid pressure before the turbine inlet regulating valve 15;
[0026] The first target speed of turbine 17 is set to 16% to 20% of its rated speed, and the relative speed increase rate is 0.005 to 0.015 N. td / min,N td For the design speed of the turbine, slowly open the turbine inlet regulating valve 15, slowly close the turbine bypass regulating valve 19, gradually increase the turbine 17 to the first target speed, and keep the compressor inlet pressure and temperature stable;
[0027] Increase the heating power of the main circuit heater 14, slowly increase the heating power, and raise the working medium temperature before the turbine inlet regulating valve 15 to the second target temperature of 350-400°C; by closing the compressor anti-surge valve 6 to 40%-20%, control the compressor variable frequency motor 3 to operate at 30Hz-50Hz, and at the same time slowly close the turbine inlet regulating valve 15, slowly open the turbine bypass regulating valve 19, keep the turbine 17 stable at the first target speed, and keep the compressor inlet pressure and temperature stable;
[0028] The second target speed of turbine 17 is set to 40% to 50% of its rated speed, and the relative acceleration rate is 0.005 to 0.015 N.td / min, slowly open the turbine inlet regulating valve 15 through the system automatic control system, slowly close the turbine bypass regulating valve 19, gradually increase the turbine 17 to the second target speed, and keep the compressor inlet pressure and temperature stable;
[0029] Increase the heating power of the main circuit heater 14, slowly increase the heating power to raise the working medium temperature before the turbine inlet regulating valve 15 to the third target temperature of 450-500°C, close the compressor anti-surge valve 6 by 30%-10%, control the operating frequency of the compressor variable frequency motor 3 to 30Hz-50Hz, and at the same time slowly close the turbine inlet regulating valve 15, slowly open the turbine bypass regulating valve 19, keep the turbine 17 stable at the second target speed, and keep the compressor inlet pressure and temperature stable;
[0030] The third target speed of turbine 17 is set to 70% to 80% of its rated speed, and the relative speed increase rate is 0.005 to 0.015 N. td / min; but when crossing the critical speed range of the generator and turbine, the relative speed increase rate is increased to 0.05~0.15N td / min; slowly open the turbine inlet regulating valve 15, slowly close the turbine bypass regulating valve 19, gradually increase the turbine 17 to the third target speed, and keep the compressor inlet pressure and temperature stable;
[0031] Increase the heating power of the main circuit heater 14, slowly increase the heating power to raise the working medium temperature before the turbine inlet regulating valve 15 to the fourth target temperature of 550°C to 600°C, close the compressor anti-surge valve 6 to 20% to 5%, control the operating frequency of the compressor variable frequency motor 3 to 30Hz to 50Hz, and slowly close the turbine inlet regulating valve 15, slowly open the turbine bypass regulating valve 19, keep the turbine 17 stable at the third target speed, and keep the compressor inlet pressure and temperature stable;
[0032] The fourth target speed of turbine 17 is set to 100% of its rated speed, and the relative speed increase rate is 0.005-0.015N. td / min, slowly open the turbine inlet regulating valve 15, slowly close the turbine bypass regulating valve 19, gradually increase the turbine 17 to the fourth target speed, and keep the compressor inlet pressure and temperature stable;
[0033] After the turbine 17 reaches its rated speed, gradually close the opening of the compressor anti-surge valve 6 to 0%, gradually close the opening of the turbine bypass regulating valve 19 to 0%, stabilize the working medium temperature before the turbine inlet regulating valve 15 between 550℃ and 600℃, gradually open the opening of the turbine inlet regulating valve 15 and maintain it at 70% to 100%, and gradually reduce the operating frequency of the compressor variable frequency motor 3 to maintain it at 30Hz to 50Hz.
[0034] During the turbine run-up process, the compressor inlet temperature and pressure are monitored at all times, and the compressor 4 inlet working fluid pressure is maintained between 4MPa and 7MPa and the temperature is maintained between 35°C and 45°C by jointly adjusting the low-pressure storage circuit outlet valve 28, the low-pressure storage circuit heater 27, and the main circuit cooler 22.
[0035] During the process of heating the working fluid and increasing the turbine speed, the temperature difference between the inner and outer walls of the turbine 17 cylinder is monitored and maintained within a range of 20°C to 50°C by controlling the valve opening and the speed increase rate. If the temperature difference exceeds the upper limit of the temperature range, the heating of the working fluid and the turbine speed increase operation are suspended until the temperature difference drops to the acceptable range and then the heating and speed increase operations are continued; after the working fluid temperature and turbine speed reach the new target temperature and target speed, they must run stably for 30min to 60min before the next operation can be carried out.
[0036] During the turbine run-up process, 3 to 6 working fluid target temperatures and turbine target speeds are set to increase the working fluid temperature and turbine speed in a step-by-step manner. During the run-up process, the turbine speed is gradually increased by the following method: "First increase the working fluid temperature and stabilize it for 30 to 60 minutes, then increase the turbine speed and stabilize it for 30 to 60 minutes."
[0037] Beneficial effects of the invention: The invention proposes a supercritical carbon dioxide circulation system compressor and turbine hot start method, which ensures the safety and reliability of the carbon dioxide circulation unit turbine during the start-up process. The advantage of the invention is that during the hot start process, the compressor variable frequency motor 3, the compressor anti-surge valve 6, the turbine inlet regulating valve 15, the turbine bypass regulating valve 19, and the main circuit heater 14 are jointly regulated to achieve effective regulation of the turbine inlet working medium temperature, pressure and flow rate. The actual field verification shows that the method is safe, economical and highly operable. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] Figure 1 It is a system flow chart of the present invention. DETAILED DESCRIPTION
[0039] The present invention will be further described in detail below in conjunction with the accompanying drawings.
[0040] The present invention proposes a supercritical carbon dioxide circulation system. The equipment numbers in the system are shown in Figure 1 As shown. During the cycle, the carbon dioxide working fluid is compressed and pressurized by the compressor 4, heated by the regenerator 32, heated again by the main circuit heater 14, expanded by the turbine 17 to do work and generated by the generator 18, cooled by the regenerator 32, cooled again by the main circuit cooler 22, and then returns to the compressor inlet to complete a complete work cycle. The system operation process is as follows:
[0041] 1) During the power generation cycle, the carbon dioxide working fluid is compressed and pressurized by the compressor 4, heated by the regenerator 32, heated again by the main circuit heater 14, expanded by the turbine 17 to do work, and generated by the generator 18, cooled by the regenerator 32, and cooled again by the main circuit cooler 22, and then returns to the inlet of the compressor 4, completing a power cycle;
[0042] 2) Before starting the unit, open the working fluid replenishment inlet control valve 23 and the low-pressure storage loop cooler 25 to charge a sufficient amount of carbon dioxide working fluid into the low-pressure working fluid storage tank 26 to ensure that the pressure in the low-pressure working fluid storage tank 26 is between 5MPa and 8MPa and higher than the design pressure of the compressor 4 inlet;
[0043] 3) After the working fluid is replenished, open the compressor dry gas seal flow control valve 2 to fill the dry gas seal gas into the internal chamber of the compressor, keep the compressor exhaust valve 31 in a small opening state, and keep the dry gas seal gas flow at 50Nm 3 / h~300Nm 3 / h, the temperature is maintained at 60℃~120℃;
[0044] 4) Keep the dry gas sealing gas continuously charged into the compressor 4, and gradually close the compressor drain valve 31. When the pressure in the internal chamber of the compressor 4 exceeds 4MPa, open the low-pressure storage circuit outlet valve 28, the compressor inlet valve 1 and the compressor anti-surge valve 6 in sequence, and open the low-pressure storage circuit heater 27 and the compressor anti-surge circuit cooler 5 in sequence;
[0045] 5) Start the compressor variable frequency motor 3 and set the minimum operating frequency to 20 Hz; open the compressor outlet valve 7, the main heater inlet control valve 8, the turbine bypass regulating valve 19 and the main cooler outlet control valve 29 in sequence, open the main circuit cooler 22, and keep the compressor inlet pressure and temperature stable;
[0046] 6) By closing the compressor anti-surge valve 6 to 50% to 30%, increasing the operating frequency of the compressor variable frequency motor 3 to 30Hz to 40Hz, keeping the compressor inlet valve 1 fully open, increasing the main circuit working medium mass flow, and maintaining the working medium cold circulation; at the same time, keeping the compressor inlet pressure and temperature stable;
[0047] 7) Open the turbine dry gas seal control valve 20, fill the dry gas seal gas into the internal chamber of the turbine, keep the turbine exhaust valve 30 in a small opening state, and maintain the dry gas seal gas flow rate of 200Nm 3 / h~600Nm 3 / h, the temperature is maintained at 80℃~150℃;
[0048] 8) When the pressure in the turbine chamber reaches above 2MPa, the turbine cranking motor 16 is started to drive the turbine 17 and the generator 18 to rotate at a low speed. The rated speed range of the turbine cranking motor 16 is 5% to 15% of the turbine design speed;
[0049] 9) Turn on the main circuit heater 14 and slowly increase the heating power to raise the working medium temperature before the turbine inlet regulating valve 15 to the first target temperature of 250-300°C, while keeping the compressor inlet pressure and temperature stable;
[0050] 10) Open the turbine dry gas seal control valve 20 to maintain the dry gas seal gas flow rate at 400 Nm 3 / h~800Nm 3 / h; gradually close the turbine drain valve 30 to increase the pressure in the internal chamber of the turbine 17 to a level higher than the working fluid pressure before the turbine inlet regulating valve 15;
[0051] 11) Set the first target speed of turbine 17 to 16% to 20% of its rated speed, and the relative acceleration rate to 0.005 to 0.015 N td / min,N td For the design speed of the turbine, slowly open the turbine inlet regulating valve 15, slowly close the turbine bypass regulating valve 19, gradually increase the turbine 17 to the first target speed, and keep the compressor inlet pressure and temperature stable;
[0052] 12) Increase the heating power of the main circuit heater 14, slowly increase the heating power, and raise the working medium temperature before the turbine inlet regulating valve 15 to the second target temperature of 350-400°C; by closing the compressor anti-surge valve 6 to 40%-20%, control the operating frequency of the compressor variable frequency motor 3 to 30Hz-50Hz, and at the same time slowly close the turbine inlet regulating valve 15, slowly open the turbine bypass regulating valve 19, keep the turbine 17 stable at the first target speed, and keep the compressor inlet pressure and temperature stable;
[0053] 13) Set the second target speed of turbine 17 to 40% to 50% of its rated speed, and the relative acceleration rate to 0.005 to 0.015 N. td / min, slowly open the turbine inlet regulating valve 15 through the system automatic control system, slowly close the turbine bypass regulating valve 19, gradually increase the turbine 17 to the second target speed, and keep the compressor inlet pressure and temperature stable;
[0054] 14) Increase the heating power of the main circuit heater 14, slowly increase the heating power to raise the working medium temperature before the turbine inlet regulating valve 15 to the third target temperature of 450-500°C, close the compressor anti-surge valve 6 by 30%-10%, control the operating frequency of the compressor variable frequency motor 3 to 30Hz-50Hz, and at the same time slowly close the turbine inlet regulating valve 15, slowly open the turbine bypass regulating valve 19, keep the turbine 17 stable at the second target speed, and keep the compressor inlet pressure and temperature stable;
[0055] 15) Set the third target speed of turbine 17 to 70% to 80% of its rated speed, and the relative acceleration rate to 0.005 to 0.015 N. td / min; but when crossing the critical speed range of the generator and turbine, the relative speed increase rate is increased to 0.05~0.15N td / min; slowly open the turbine inlet regulating valve 15, slowly close the turbine bypass regulating valve 19, gradually increase the turbine 17 to the third target speed, and keep the compressor inlet pressure and temperature stable;
[0056] 16) Increase the heating power of the main circuit heater 14, slowly increase the heating power to raise the working medium temperature before the turbine inlet regulating valve 15 to the fourth target temperature of 550°C to 600°C, close the compressor anti-surge valve 6 by 20% to 5%, control the operating frequency of the compressor variable frequency motor 3 to 30Hz to 50Hz, and slowly close the turbine inlet regulating valve 15, slowly open the turbine bypass regulating valve 19, keep the turbine 17 stable at the third target speed, and keep the compressor inlet pressure and temperature stable;
[0057] 17) Set the fourth target speed of turbine 17 to 100% of its rated speed, and the relative speed increase rate to 0.005-0.015N td / min, slowly open the turbine inlet regulating valve 15, slowly close the turbine bypass regulating valve 19, gradually increase the turbine 17 to the fourth target speed, and keep the compressor inlet pressure and temperature stable;
[0058] 18) After the turbine 17 reaches its rated speed, gradually reduce the opening of the compressor anti-surge valve 6 to 0%, gradually reduce the opening of the turbine bypass regulating valve 19 to 0%, stabilize the working medium temperature before the turbine inlet regulating valve 15 between 550℃ and 600℃, gradually increase the opening of the turbine inlet regulating valve 15 and maintain it at 70% to 100%, and gradually reduce the operating frequency of the compressor variable frequency motor 3 to maintain it at 30Hz to 50Hz.
Claims
1. A supercritical carbon dioxide circulation system, characterized in that: Including compressor and auxiliary regulation system, turbine and auxiliary regulation system, high pressure storage loop system, low pressure storage loop system, and heat exchange and flow control system; The compressor and auxiliary regulating system comprises a compressor inlet valve (1), a compressor dry gas sealing flow control valve (2), a compressor variable frequency motor (3), a compressor (4), a compressor anti-surge circuit cooler (5), a compressor anti-surge valve (6), a compressor outlet valve (7) and a compressor drain valve (31); the compressor and auxiliary regulating system are used to compress the cold working medium in the supercritical carbon dioxide circulation system and increase the pressure; the compressor variable frequency motor (3) can adjust the compressor speed according to the frequency instruction to adjust the compressor output; The compressor anti-surge valve (6) automatically operates according to the position of the compressor operating point to prevent surge or actively operates as a compressor output adjustment; The compressor anti-surge circuit cooler (5) is used to control the compressor (4) inlet temperature during operation; the compressor dry gas seal flow control valve (2) is used to control the dry gas seal gas flow; the compressor drain valve (31) is used to adjust the compressor internal chamber pressure during startup and emergency shutdown; The turbine and auxiliary regulating system comprises a turbine inlet regulating valve (15), a turbine cranking motor (16), a turbine (17), a generator (18), a turbine bypass regulating valve (19), a turbine dry gas seal control valve (20), a turbine outlet check valve (21) and a turbine drain valve (30); the turbine inlet regulating valve (15) controls the turbine output power by regulating the flow rate of the turbine inlet working medium; the turbine cranking motor (16) is used to crank the turbine at a low speed before the turbine is started and after the turbine is shut down; the turbine (17) drives the generator (18) to rotate and generate electricity; the turbine bypass regulating valve (19) is used to regulate the mass flow rate of the hot working medium passing through the turbine; the turbine dry gas seal control valve (20) is used to control the flow rate of the dry gas seal gas; the turbine outlet check valve (21) is used to prevent the turbine outlet working medium from flowing back into the turbine; the turbine drain valve (30) is used to regulate the internal chamber pressure of the turbine during the start-up and emergency shutdown process; The high-pressure storage loop system comprises a high-pressure storage loop inlet valve (9), a high-pressure storage loop cooler (10), a high-pressure working fluid storage tank (11), a high-pressure storage loop heater (12) and a high-pressure storage loop outlet valve (13), wherein the high-pressure storage loop inlet valve (9) and the high-pressure storage loop outlet valve (13) are used to control the flow rate of working fluid flowing into or out of the high-pressure working fluid storage tank (11); the high-pressure storage loop cooler (10) and the high-pressure storage loop heater (12) are used to control the temperature of working fluid flowing into or out of the high-pressure working fluid storage tank (11); and the high-pressure working fluid storage tank (11) is used to store high-pressure working fluid at the outlet of the compressor during shutdown or load reduction stages; The low-pressure storage circuit system comprises a low-pressure storage circuit inlet valve (24), a working fluid replenishment inlet control valve (23), a low-pressure storage circuit cooler (25), a low-pressure working fluid storage tank (26), a low-pressure storage circuit heater (27) and a low-pressure storage circuit outlet valve (28), wherein the low-pressure storage circuit inlet valve (24) and the low-pressure storage circuit outlet valve (28) are used to control the flow rate of the working fluid flowing into or out of the low-pressure working fluid storage tank (26); the working fluid replenishment inlet control valve (23) is used to control the flow rate when the low-pressure working fluid storage tank (26) replenishes the working fluid before starting; the low-pressure storage circuit cooler (25) and the low-pressure storage circuit heater (27) are used to control the temperature of the working fluid flowing into or out of the low-pressure working fluid storage tank (26); the low-pressure working fluid storage tank (26) is used to store the working fluid before starting, and to control the inlet pressure of the compressor (4) during the start-up or load adjustment stage; The heat exchange and flow control system comprises a main heater inlet control valve (8), a main circuit heater (14), a main circuit cooler (22), a main cooler outlet control valve (29) and a regenerator (32), wherein the main heater inlet control valve (8) and the main cooler outlet control valve (29) are used to control the flow of the working fluid in the main circuit, and the regenerator (32) is used to perform heat exchange between the cold working fluid at the outlet of the compressor (4) and the hot working fluid at the outlet of the turbine (17), to heat the cold working fluid at the outlet of the compressor (4) and to cool the hot working fluid at the outlet of the turbine (17); the function of the main circuit heater (14) is to further heat and increase the temperature of the working fluid at the outlet of the cold side of the regenerator (32); and the function of the main circuit cooler (22) is to further cool and reduce the temperature of the working fluid at the outlet of the hot side of the regenerator (32); The specific connection relationship of each component in the supercritical carbon dioxide circulation system is as follows: The compressor inlet valve (1) is connected to the compressor (4) inlet and the compressor anti-surge circuit cooler (5) outlet respectively after the valve; the compressor dry gas seal flow control valve (2) is connected to the dry gas seal gas source before the valve, and is connected to the compressor (4) inner cavity after the valve; the compressor exhaust valve (31) is connected to the compressor (4) inner cavity before the valve, and is directly connected to the atmosphere after the valve; the compressor variable frequency motor (3) and the compressor (4) are connected by a coupling; the compressor (4) outlet is connected to the compressor anti-surge valve (6) before the valve, and the compressor outlet valve (7) before the valve; the compressor anti-surge valve (6) after the valve is connected to the compressor anti-surge circuit cooler (5) inlet; the compressor outlet valve (7) after the valve is connected to the high-pressure storage circuit inlet valve (9) before the valve, The inlet control valve (8) of the main heater is connected before the valve; the inlet valve (9) of the high-pressure storage circuit is connected after the valve to the inlet of the high-pressure storage circuit cooler (10); the outlet of the high-pressure storage circuit cooler (10) is connected to the inlet of the high-pressure working fluid storage tank (11); the outlet of the high-pressure working fluid storage tank (11) is connected to the inlet of the high-pressure storage circuit heater (12); the outlet of the high-pressure storage circuit heater (12) is connected before the valve of the high-pressure storage circuit outlet valve (13); the inlet control valve (8) of the main heater and the outlet valve (13) of the high-pressure storage circuit are both connected to the cold side inlet of the regenerator (32); the cold side outlet of the regenerator (32) is connected to the inlet of the main circuit heater (14); the outlet of the main circuit heater (14) is respectively connected to the regenerator (32) and the outlet of the regenerator (32). The front of the turbine inlet regulating valve (15) and the front of the turbine bypass regulating valve (19) are connected; the rear of the turbine inlet regulating valve (15) is connected to the inlet of the turbine (17); the turbine (17) and the generator (18) are connected by a coupling; the turbine turning motor (16) and the turbine (17) are connected by a clutch; the front of the turbine dry gas seal control valve (20) is connected to the dry gas seal gas source, and the rear of the valve is connected to the inner cavity of the turbine (17); the front of the turbine exhaust valve (30) is connected to the inner cavity of the turbine (17), and the rear of the valve is directly connected to the atmosphere; the turbine (17) outlet is connected to the front of the turbine outlet check valve (21); the rear of the turbine outlet check valve (21) and the rear of the turbine bypass regulating valve (19) are both connected to the hot side inlet of the regenerator (32). ; The hot side outlet of the regenerator (32) is connected to the inlet of the main circuit cooler (22); the outlet of the main circuit cooler (22) is respectively connected to the front of the low-pressure storage circuit inlet valve (24) and the front of the main cooler outlet control valve (29); the front of the working fluid replenishment inlet control valve (23) is connected to the working fluid storage tank, and the back of the valve is respectively connected to the back of the low-pressure storage circuit inlet valve (24) and the inlet of the low-pressure storage circuit cooler (25); the outlet of the low-pressure storage circuit cooler (25) is connected to the inlet of the low-pressure working fluid storage tank (26); the outlet of the low-pressure working fluid storage tank (26) is connected to the inlet of the low-pressure storage circuit heater (27); the outlet of the low-pressure storage circuit heater (27) is connected to the front of the low-pressure storage circuit outlet valve (28);The valve rear of the low-pressure storage circuit outlet valve (28) and the valve rear of the main cooler outlet control valve (29) are both connected to the valve front of the compressor inlet valve (1); Wherein: the compressor (4) outlet, the cold side of the regenerator (32), the main circuit heater (14), the turbine (17), the hot side of the regenerator (32), the main circuit cooler (22) and the compressor (4) inlet are sequentially connected to form a main circuit; The main loop heater (14) is a coal-fired boiler, a gas boiler, an electric heater, a solar thermal heater or a nuclear fusion primary loop heater; the cooling medium of the main loop cooler (22) is factory cooling water or cooling air; The dry gas sealing gas of the compressor (4) and the turbine (17) adopts carbon dioxide as the working medium. During the startup phase, the gas is supplied by a low-pressure working medium storage tank (26). During the operation phase, the gas is supplied by the working medium at the outlet of the compressor (4). Before the dry gas sealing gas enters the compressor and the turbine, it is heated to a design temperature of 60°C to 180°C by a heater.
2. The method for hot starting a compressor and a turbine of a supercritical carbon dioxide circulation system according to claim 1, characterized in that: During the power generation cycle, the carbon dioxide working fluid is compressed and pressurized by the compressor (4), heated by the regenerator (32), heated again by the main circuit heater (14), expanded by the turbine (17) to generate power, and then cooled by the generator (18), cooled by the regenerator (32), and cooled again by the main circuit cooler (22), and then returns to the inlet of the compressor (4), completing a power generation cycle. Before starting the unit, the working fluid replenishment inlet control valve (23) and the low-pressure storage circuit cooler (25) are opened to charge a sufficient amount of carbon dioxide working fluid into the low-pressure working fluid storage tank (26) to ensure that the pressure in the low-pressure working fluid storage tank (26) is between 5MPa and 8MPa and is higher than the design pressure of the compressor (4) inlet; After the working fluid is replenished, the compressor dry gas seal flow control valve (2) is opened to fill the dry gas seal gas into the internal chamber of the compressor, and the compressor exhaust valve (31) is kept in a small opening state to maintain the dry gas seal gas flow rate at 50Nm 3 / h~300Nm 3 / h, the temperature is maintained at 60℃~120℃; Keep the dry gas sealing gas continuously charged into the compressor (4), and gradually close the compressor drain valve (31). When the pressure in the internal chamber of the compressor (4) exceeds 4 MPa, open the low-pressure storage circuit outlet valve (28), the compressor inlet valve (1) and the compressor anti-surge valve (6) in sequence, and open the low-pressure storage circuit heater (27) and the compressor anti-surge circuit cooler (5) in sequence; Start the compressor variable frequency motor (3) and set the minimum operating frequency to 20 Hz; open the compressor outlet valve (7), the main heater inlet control valve (8), the turbine bypass regulating valve (19) and the main cooler outlet control valve (29) in sequence, start the main circuit cooler (22), and keep the compressor inlet pressure and temperature stable; By closing the compressor anti-surge valve (6) to 50% to 30%, the operating frequency of the compressor variable frequency motor (3) is increased to 30Hz to 40Hz, the compressor inlet valve (1) is kept fully open, the main circuit working medium mass flow is increased, and the working medium is kept in a cold state circulation; at the same time, the compressor inlet pressure and temperature are kept stable; Open the turbine dry gas seal control valve (20) to fill the dry gas seal gas into the internal chamber of the turbine, keep the turbine exhaust valve (30) in a small opening state, and maintain the dry gas seal gas flow rate of 200Nm 3 / h~600Nm 3 / h, the temperature is maintained at 80℃~150℃; When the pressure in the inner chamber of the turbine reaches above 2MPa, the turbine cranking motor (16) is started to drive the turbine (17) and the generator (18) to rotate at a low speed. The rated speed range of the turbine cranking motor (16) is 5% to 15% of the design speed of the turbine. Turn on the main circuit heater (14) and slowly increase the heating power to raise the working fluid temperature before the turbine inlet regulating valve (15) to a first target temperature of 250-300° C., while keeping the compressor inlet pressure and temperature stable; Open the turbine dry gas seal control valve (20) to maintain the dry gas seal gas flow rate at 400 Nm 3 / h~800Nm 3 / h; gradually closing the turbine drain valve (30) to increase the pressure of the internal chamber of the turbine (17) to a level higher than the working fluid pressure before the turbine inlet regulating valve (15); The first target speed of the turbine (17) is set to 16% to 20% of its rated speed, and the relative speed increase rate is 0.005 to 0.015 N. td / min,N td For the design speed of the turbine, slowly open the turbine inlet regulating valve (15), slowly close the turbine bypass regulating valve (19), gradually increase the turbine (17) to the first target speed, and keep the compressor inlet pressure and temperature stable; The heating power of the main circuit heater (14) is increased, and the heating power is gradually increased to raise the working medium temperature before the turbine inlet regulating valve (15) to a second target temperature of 350-400° C.; the compressor anti-surge valve (6) is closed to 40%-20% to control the operating frequency of the compressor variable frequency motor (3) to 30 Hz-50 Hz, and the turbine inlet regulating valve (15) is slowly closed, and the turbine bypass regulating valve (19) is slowly opened to keep the turbine (17) stable at the first target speed, and at the same time keep the compressor inlet pressure and temperature stable; The second target speed of the turbine (17) is set to 40% to 50% of its rated speed, and the relative speed increase rate is 0.005 to 0.015 N. td / min, slowly opening the turbine inlet regulating valve (15) and slowly closing the turbine bypass regulating valve (19) through the system automatic control system, gradually increasing the turbine (17) to the second target speed, while keeping the compressor inlet pressure and temperature stable; The heating power of the main circuit heater (14) is increased, and the heating power is slowly increased to raise the working medium temperature before the turbine inlet regulating valve (15) to the third target temperature of 450-500° C., and the compressor anti-surge valve (6) is closed to 30%-10%, and the operating frequency of the compressor variable frequency motor (3) is controlled to be 30 Hz-50 Hz. At the same time, the turbine inlet regulating valve (15) is slowly closed, and the turbine bypass regulating valve (19) is slowly opened to keep the turbine (17) stable at the second target speed, and at the same time, the compressor inlet pressure and temperature are kept stable; The third target speed of the turbine (17) is set to 70% to 80% of its rated speed, and the relative speed increase rate is 0.005 to 0.015 N. td / min; but when crossing the critical speed range of the generator and turbine, the relative speed increase rate is increased to 0.05~0.15N td / min; slowly open the turbine inlet regulating valve (15), slowly close the turbine bypass regulating valve (19), gradually increase the turbine (17) to the third target speed, and keep the compressor inlet pressure and temperature stable; The heating power of the main circuit heater (14) is increased, and the heating power is slowly increased to raise the working medium temperature before the turbine inlet regulating valve (15) to a fourth target temperature of 550°C to 600°C. By closing the compressor anti-surge valve (6) to 20% to 5%, the operating frequency of the compressor variable frequency motor (3) is controlled to be 30Hz to 50Hz, and at the same time, the turbine inlet regulating valve (15) is slowly closed, and the turbine bypass regulating valve (19) is slowly opened to keep the turbine (17) stable at the third target speed, and at the same time, the compressor inlet pressure and temperature are kept stable; The fourth target speed of the turbine (17) is set to 100% of its rated speed, and the relative speed increase rate is 0.005-0.015N. td / min, slowly open the turbine inlet regulating valve (15), slowly close the turbine bypass regulating valve (19), gradually increase the turbine (17) to the fourth target speed, and keep the compressor inlet pressure and temperature stable; After the turbine (17) reaches its rated speed, the compressor anti-surge valve (6) is gradually closed to 0%, the turbine bypass regulating valve (19) is gradually closed to 0%, the working medium temperature before the turbine inlet regulating valve (15) is stabilized between 550°C and 600°C, the turbine inlet regulating valve (15) is gradually opened to maintain the opening at 70% to 100%, and the operating frequency of the compressor variable frequency motor (3) is gradually reduced to maintain at 30Hz to 50Hz.
3. The method for hot starting a compressor and a turbine according to claim 2, characterized in that: During the turbine run-up process, the compressor inlet temperature and pressure are constantly monitored, and the compressor (4) inlet working fluid pressure is maintained between 4 MPa and 7 MPa, and the temperature is maintained between 35° C. and 45° C. by jointly adjusting the low-pressure storage circuit outlet valve (28), the low-pressure storage circuit heater (27) and the main circuit cooler (22).
4. The method for hot starting a compressor and a turbine according to claim 2, characterized in that: During the process of heating the working fluid and increasing the turbine speed, the temperature difference between the inner and outer walls of the turbine (17) cylinder is monitored and maintained within a range of 20°C to 50°C by controlling the valve opening and the speed increase rate. If the temperature difference exceeds the upper limit of the temperature range, the heating of the working fluid and the speed increase of the turbine are suspended until the temperature difference drops to the acceptable range and then the heating and speed increase operations are continued. After the working fluid temperature and the turbine speed reach the new target temperature and target speed, they are allowed to run stably for 30min to 60min before the next operation can be carried out.
5. The method for hot starting a compressor and a turbine according to claim 2, characterized in that: During the turbine run-up process, 3 to 6 working fluid target temperatures and turbine target speeds are set to increase the working fluid temperature and turbine speed in a step-by-step manner. During the run-up process, the turbine speed is gradually increased by the following method: "first increase the working fluid temperature, stabilize for 30 to 60 minutes, then increase the turbine speed, and stabilize for 30 to 60 minutes."
Citation Information
Patent Citations
Supercritical carbon dioxide circulation system
CN214660394U
Cited By
Supercritical carbon dioxide solar thermal energy storage power generation and heating circulation system and control method
CN120008241A
Supercritical carbon dioxide solar thermal energy storage power generation, heating and refrigeration cycle system and control method
CN120008242A
Supercritical carbon dioxide solar thermal energy storage power generation, heating and refrigeration cycle system and control method
CN120008242B