Anchor drilling machine with integrated water jet system and construction method
Through the integrated water jet system, the anchor excavation and integrated machine is transformed. The cooperation of the water jet nozzle and the cutting roller is used to solve the problems of low efficiency and serious wear of the anchor excavation and integrated machine in the hard rock layer, and efficient excavation and support are achieved. Improves tunnel stability and equipment life.
Patent Information
- Application Number
- CN202110704366.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-06-24
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2041-06-24
AI Technical Summary
When encountering hard rock layers, the anchor excavation machine has low excavation efficiency, severe equipment wear, and faces problems such as complex anchoring rock structure, high stress in the deep tunnel, and gas outbursts.
Integrated water jet system, including water jet drilling device and palm surface cutting device, the sandwich layer is cut horizontally through the water jet spray head, and the palm surface is cut in combination with the cutting roller, and the shear resistance of the gangue layer is used. The strength is lower than the compressive strength, which can achieve rapid breaking and peeling of rock layers, improve excavation efficiency and reduce equipment wear.
It effectively improves the excavation and support operation effect of the anchor integrated machine, reduces the deformation of the tunnel space and gas protrusion, improves the stability of the tunnel, extends the service life of the tooth cutting tool, and reduces construction costs.
Smart Images

Figure CN113266348B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of all-in-one digging and anchoring machines, and in particular to an all-in-one digging and anchoring machine with an integrated water jet system and a construction method. Background Art
[0002] Compared with the use of comprehensive excavation machines or blasting to excavate underground coal mine tunnels, the one-step tunnel anchoring technology of the anchoring machine not only improves the safety of the production environment, but also greatly improves the operating efficiency. However, when encountering hard interlayers, the anchoring machine has problems such as low excavation efficiency and severe equipment wear.
[0003] In addition, when supporting the tunnel, the drilling and anchoring machine faces problems such as complex anchoring rock structure, high stress deep in the tunnel, and gas outburst.
[0004] In summary, there is an urgent need for an integrated anchor drilling machine and construction method with an integrated water jet system to solve the problems existing in the prior art. Summary of the invention
[0005] The purpose of the present invention is to provide an integrated digging and anchoring machine with an integrated water jet system, which aims to solve the problems of low digging efficiency, severe equipment wear, complex anchoring rock structure, high stress in deep tunnels, gas outburst, etc. when the digging and anchoring machine encounters hard rock formations. The specific technical solution is as follows:
[0006] A drilling and anchoring machine integrated with a water jet system comprises the drilling and anchoring machine and a water jet system arranged on the drilling and anchoring machine, the drilling and anchoring machine comprises a cutting drum for constructing a tunnel face, the water jet system comprises a water jet drilling device and a tunnel face slitting device both arranged on the drilling and anchoring machine, the tunnel face slitting device is used for slitting the tunnel face, and the water jet drilling device is used for drilling or drilling and slitting operations.
[0007] Preferably in the above technical solution, the tunnel face cutting device includes a water jet nozzle and a nozzle multi-degree-of-freedom arm, the water jet nozzle is arranged on the nozzle multi-degree-of-freedom arm, and the nozzle multi-degree-of-freedom arm is arranged on the drilling and anchoring machine.
[0008] Preferably, in the above technical solution, the cutting drum is arranged on the anchor-mining machine body through a cutting arm, and the nozzle multi-degree-of-freedom arm is arranged on the cutting arm.
[0009] Preferably, in the above technical solution, the tunnel face cutting device further comprises a cover shell, the water jet nozzle is arranged in the cover shell, and the central hole of the cover shell is arranged corresponding to the nozzle of the water jet nozzle.
[0010] Preferably, in the above technical scheme, the water jet drilling device includes a rotating platform, a drilling rig multi-degree-of-freedom boom and a water jet drilling rig, the water jet drilling rig is arranged on the rotating platform through the drilling rig multi-degree-of-freedom boom, and the rotating platform is arranged on the main body of the drilling and anchoring machine; drilling or drilling and slitting operations are achieved by replacing different drill bits on the water jet drilling rig.
[0011] Preferably in the above technical solution, a detachable connection is adopted between the drilling rig multi-degree-of-freedom boom and the water jet drilling rig.
[0012] Preferably in the above technical scheme, the water jet drilling device includes a water jet drill rod and a drilling rig, the water jet drill rod is detachably arranged on the drilling rig, a water jet drill rod warehouse is provided on one side of the drilling rig, and water jet drill rods of different specifications are arranged in the water jet drill rod warehouse.
[0013] Preferably in the above technical scheme, the water jet system also includes a working medium providing device for providing the working medium required for the water jet; the working medium providing device includes a high-pressure water pump, a branch valve and a pressure regulating valve, the high-pressure water pump is used to provide pressurized working medium, the branch valve distributes the working medium from the high-pressure water pump to the water jet drilling device and the tunnel face cutting device, and the pressure regulating valve is used to adjust the working pressure of the water jet system.
[0014] The present invention also provides a construction method of an integrated anchoring and digging machine using the above-mentioned integrated water jet system:
[0015] When there is no interlayer of gangue, the cutting drum advances normally and the face cutting device does not work;
[0016] When encountering the interlayer of rock, first control the nozzle multi-degree-of-freedom arm to make the water jet nozzle close to the interlayer of rock, and make a horizontal slit on the interlayer of rock. After the slit is completed, the cutting drum starts cutting from the top of the interlayer of rock, and cuts downward after the cutting drum advances to the slit depth until the interlayer of rock is cut. Then, the cutting drum cuts the entire tunnel face from top to bottom, thereby completing the cutting of the entire tunnel face. At this time, the excavation depth of the cutting drum is the slit depth.
[0017] The number of the transverse slits is at least one.
[0018] The preferred technical solution is to use a water jet drilling device to perform drilling or drilling slit cutting operations on the tunnel side wall and / or the tunnel face to meet the needs of gas extraction, anchor support, grouting fire prevention or stress relief operations;
[0019] A water jet drilling device is used to drill and cut holes in the side wall of the tunnel to obtain anchor holes. The grouting anchor is installed in the anchor hole by an anchor drilling rig and grouting is completed to achieve the installation of the grouting anchor.
[0020] The application of the technical solution of the present invention has the following beneficial effects:
[0021] By integrating the water jet system into the drilling and anchoring machine for excavation and anchoring operations, the excavation and support operation effects of the drilling and anchoring machine can be effectively improved in terms of face excavation and tunnel support.
[0022] Taking advantage of the fact that the shear strength of the gangue layer (i.e. the interlayer) is much lower than the compressive strength, the face slitting device is used to perform slitting operations on the face to weaken the rock strength, and the cutting drum of the integrated miner and anchor machine is used to cut the face. The cooperation of the water jet nozzle and the cutting drum can achieve rapid crushing and stripping of the gangue layer, improve the excavation efficiency, reduce the loss of the pick, increase the service life of the pick tool, and reduce the construction cost. The face slitting device is effectively integrated with the integrated miner and anchor machine to simplify the process and improve the operation efficiency.
[0023] The water jet nozzle makes transverse cuts in the interlayer (i.e., cuts in a direction perpendicular to the height of the tunnel), and the rock strength is effectively weakened after the cutting is completed; secondly, the cutting drum cuts from top to bottom (i.e., the cutting direction of the cutting drum is perpendicular to the cutting direction). Due to the existence of the cutting, the interlayer is equivalent to a cantilever beam. When the cutting drum acts on the far end of the cantilever beam fulcrum, the deep part of the interlayer is subjected to great stress, which facilitates the cutting drum to crush the rock and improves the excavation efficiency.
[0024] The use of water jet drilling rigs for drilling or drilling cutting operations can meet the needs of anchor support, grouting for fire prevention and fire extinguishing, stress relief, gas extraction and other operations; effectively reduce tunnel space deformation and gas outbursts, achieve multi-channel support, and improve tunnel stability.
[0025] In addition to the above-described objects, features and advantages, the present invention has other objects, features and advantages. The present invention will be further described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] The drawings constituting a part of this application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0027] Figure 1 is a schematic diagram of the overall structure of the anchoring and digging machine with integrated water jet system in Example 1;
[0028] Figure 2a This is a schematic diagram of cutting from above the interlayer;
[0029] Figure 2b It is a schematic diagram of cutting the interlayer;
[0030] Figure 2cThis is a schematic diagram of cutting from above the tunnel face;
[0031] Figure 2d This is a schematic diagram of the completed tunnel face cutting;
[0032] Figure 3 It is a schematic diagram of the structure of the drill bit of the drilling rig;
[0033] Figure 4 is a schematic diagram of the structure of a slotting drill bit;
[0034] Figure 5 It is a schematic diagram of the tunnel drilling and cutting;
[0035] Figure 6 is a schematic diagram of the overall structure of the anchoring and digging machine with integrated water jet system in Example 2;
[0036] Among them, 1. Anchor drilling machine, 2. Transport device, 3. High-pressure water pump, 4. Rotating platform, 5. Drilling rig multi-degree-of-freedom boom, 6. Water jet drilling rig, 7. Anchor drilling rig, 8. Cutting boom, 9. Cutting drum, 10. Coal seam, 11. Face cutting, 12. Gangue layer, 13. Water jet nozzle, 14. Nozzle multi-degree-of-freedom boom, 15. Loading device, 16. Water jet drill rod, 17. Drilling bit, 17.1. First channel, 17.2. First outlet, 18. Cutting drill bit, 18.1. Second channel, 18.2. Second outlet, 19. Stress relief cutting, 20. Tunnel, 21. Grouting anchor cutting, 22. Anchor, 23. Grouting fire prevention and extinguishing cutting. DETAILED DESCRIPTION
[0037] In order to facilitate the understanding of the present invention, the present invention will be described more comprehensively below, and preferred embodiments of the present invention are provided. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the understanding of the disclosure of the present invention more thorough and comprehensive.
[0038] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used in the specification of the present invention herein are only for the purpose of describing specific embodiments and are not intended to limit the present invention. Embodiment 1:
[0039] See also Figure 1-Figure 5A digging and anchoring machine with an integrated water jet system, specifically used for coal excavation, includes a digging and anchoring machine 1 and a water jet system arranged on the digging and anchoring machine 1, the digging and anchoring machine 1 includes a cutting drum 9 for constructing a tunnel face, the water jet system includes a water jet drilling device and a tunnel face slitting device both arranged on the digging and anchoring machine 1, the tunnel face slitting device is used for slitting the tunnel face, and the water jet drilling device is used for drilling or drilling and slitting operations.
[0040] The tunnel face slitting device includes a water jet nozzle 13 and a nozzle multi-degree-of-freedom arm 14, the water jet nozzle 13 is arranged on the nozzle multi-degree-of-freedom arm 14, and the nozzle multi-degree-of-freedom arm 14 is arranged on the integrated miner and anchor machine 1. The tunnel face slitting device also includes a cover shell, the water jet nozzle 13 is arranged in the cover shell, the central hole of the cover shell is arranged corresponding to the nozzle of the water jet nozzle 13, and the cover shell mainly protects the water jet nozzle.
[0041] The cutting drum 9 is arranged on the anchor-mining machine body through the cutting arm 8, and the nozzle multi-degree-of-freedom arm 14 is arranged on the cutting arm 8; preferably, the tunnel face cutting device is located below the cutting drum 9.
[0042] See also Figure 1 The integrated mining and anchoring machine further includes a loading device 15 and a transport device 2. The loading device 15 is arranged below the cutting drum 9, and the transport device 2 is arranged behind the integrated mining and anchoring machine. The loading device 15 and the transport device 2 are both used for transporting rock chips.
[0043] See also Figure 1 The water jet drilling device comprises a rotary platform 4, a drilling rig multi-degree-of-freedom boom 5 and a water jet drilling rig 6. The water jet drilling rig 6 is arranged on the rotary platform 4 through the drilling rig multi-degree-of-freedom boom 5. The rotary platform 4 is arranged on the main body of the anchoring and digging machine. The drilling or drilling slit operation is achieved by replacing different drill bits of the water jet drilling rig 6. The drill bits include a drilling drill bit 17 and a slit drill bit 18.
[0044] See also Figure 3 The drilling bit 17 is used for drilling holes. A first channel 17.1 for the working medium to flow is provided inside the drilling bit 17. A plurality of first outlets 17.2 are provided on the cutting end face of the drilling bit 17. The first outlets 17.2 are connected to the first channel 17.1. The working medium is ejected from the first outlets to achieve drilling.
[0045] See also Figure 4The slitting drill bit 18 is used for drilling holes and slitting. A second channel 18.1 for the circulation of a working medium is provided inside the slitting drill bit 18. A plurality of second outlets 18.2 are provided behind the cutting end of the slitting drill bit 18. The axis of the second outlets 18.2 is perpendicular to the propulsion direction of the slitting drill bit 18. The cutting end of the slitting drill bit 18 realizes drilling, and the working medium ejected from the second outlets is used for slitting the inner wall of the drill hole.
[0046] Furthermore, by replacing drill rods of different sizes, the drilling speed can be increased and the construction efficiency can be improved.
[0047] The slewing platform 4 is preferably driven by a cylinder to rotate, and the specific structure of the slewing platform belongs to the prior art and will not be further described here. Preferably, the drilling rig multi-degree-of-freedom boom and the nozzle multi-degree-of-freedom boom are both mechanical arms, and the degrees of freedom of the drilling rig multi-degree-of-freedom boom and the nozzle multi-degree-of-freedom boom can be designed according to actual needs to meet the movement requirements of telescopic, rotating, swinging, etc.
[0048] See also Figure 1 The integrated mining and anchoring machine 1 also includes an anchor drill 7 arranged on the integrated mining and anchoring machine body. The water jet drilling device and the anchor drill 7 are both arranged on the top of the integrated mining and anchoring machine body and located on the side close to the tunnel face.
[0049] Preferably, a detachable connection is adopted between the drilling rig multi-degree-of-freedom boom 5 and the water jet drilling rig 6. The advantage of the detachable connection of the water jet drilling rig is that when construction is required in a place that the drilling rig multi-degree-of-freedom boom cannot reach, the water jet drilling rig can be disassembled and moved separately to the place where construction is required.
[0050] The water jet system also includes a working medium supply device for providing the working medium required for the water jet; the working medium supply device includes a high-pressure water pump 3, a branch valve and a pressure regulating valve, the high-pressure water pump 3 is used to provide pressurized working medium, the branch valve distributes the working medium from the high-pressure water pump 3 to the water jet drilling machine 6 and the water jet nozzle 13, and the pressure regulating valve is used to adjust the working pressure of the water jet system. The working medium is pure water or pure water with abrasive, so as to form a high-pressure water jet or a high-pressure abrasive water jet.
[0051] See also Figure 1 The high-pressure water pump 3 is arranged at the rear end of the anchoring and digging machine body. In this embodiment, the high-pressure water pump 3, the branch valve and the pressure regulating valve are integrated together. The working medium providing device is connected to the water jet nozzle 13 and the water jet drilling rig 6 by a high-pressure hose. The high-pressure hose can be arranged on the anchoring and digging machine according to actual conditions; the components in the water jet system are arranged in a split manner (i.e., arranged separately) at different positions of the anchoring and digging machine, and are installed in accordance with the original structure of the anchoring and digging machine.
[0052] Through the high-pressure water manifold valve and pressure regulating valve, the pressure flow is reasonably distributed, the cutting width is reduced and the cutting depth is increased, and the power of the pump station is used more efficiently. At the same time, the high-pressure water pump can realize the separate or synchronous water supply of the face cutting and the drilling cutting through the manifold valve and the pressure regulating valve, which is flexible in operation and high in pump station utilization efficiency. By reducing the lateral movement speed of the water jet nozzle, the depth and width of the cutting can also be increased within a certain range.
[0053] This embodiment also provides a construction method of the above-mentioned integrated water jet system drilling and anchoring machine:
[0054] When the interlayer 12 is not encountered, the cutting drum 9 advances normally, and the face cutting device does not work (the water jet nozzle is in a retracted state);
[0055] When encountering the interlayer 12, first control the nozzle multi-degree-of-freedom arm 14 to make the water jet nozzle 13 close to the interlayer (the water jet nozzle is in an extended state), and perform transverse slitting on the interlayer. After the slitting is completed, the cutting drum 9 starts cutting from the top of the interlayer (the water jet nozzle is retracted before cutting). After the cutting drum 9 is excavated to the slitting depth, it cuts downward until the interlayer is cut. Then, the cutting drum 9 cuts the entire tunnel face from top to bottom, thereby completing the cutting of the entire tunnel face. At this time, the excavation depth of the cutting drum 9 is the slitting depth. Figure 2a-2d shown.
[0056] Preferably, the number of transverse cuts is at least one. When the interlayer is thick, multiple transverse cuts can be made to reduce the thickness of the interlayer cut in a single time, improve the excavation efficiency at the interlayer and reduce wear.
[0057] The side wall and / or the tunnel face of the tunnel 20 are drilled or cut by a water jet drilling device to meet the needs of gas extraction, anchor support, grouting fire prevention or stress relief operations; see Figure 5 , Figure 5 The stress relief cut 19, the grouting anchor cut 21 and the grouting fire prevention cut 23 are schematically shown.
[0058] The anchor drill rig 7 that is an all-in-one excavator and anchor machine can complete the installation of ordinary anchor rods 22. When it is necessary to install grouting anchor rods, a water jet drilling device and an anchor drill rig can be used in combination. Specifically, a water jet drilling device is used to drill and cut the side walls of the tunnel 20 to obtain anchor holes. The anchor drill rig 7 installs the grouting anchor rods into the anchor holes and then completes the grouting, thereby realizing the installation of the grouting anchor rods.
[0059] When using the integrated mining and anchoring machine of this embodiment to excavate coal, the water jet nozzle can complete the trajectory cutting of the designated area through the movement of the multi-degree-of-freedom boom and the cutting boom. The water jet nozzle can be used to perform transverse cutting operations on the hard rock layer (specifically the interlayer of gangue) at the face of the tunnel to form a face cutting seam 11, so as to reduce the strength of the rock layer and form a cantilever beam in the interlayer of gangue. The cutting drum can be used to cut the coal seam 10 at the face of the tunnel. The cooperation of the water jet nozzle and the cutting drum can realize the rapid crushing and stripping of the gangue layer, thereby improving the excavation efficiency and reducing the loss of the cutting teeth.
[0060] The water jet nozzle makes transverse cuts in the interlayer (i.e., cuts in a direction perpendicular to the height of the tunnel), and after the cutting is completed, the rock strength is effectively weakened; secondly, the cutting drum cuts from top to bottom. Due to the existence of the cuts, the interlayer is equivalent to a cantilever beam. When the cutting drum acts on the far end of the cantilever beam fulcrum, the deep part of the interlayer is subjected to great stress, which makes it easier for the cutting drum to crush the rock and improves the excavation efficiency.
[0061] Taking advantage of the fact that the shear strength of the gangue layer is much lower than its compressive strength, the use of water jet nozzles to cut slits in the interlayer can greatly improve the excavation efficiency. It should be noted that, based on the actual working conditions of the interlayer, the nozzle type, cutting depth and direction, as well as pressure, flow rate and other parameters can be selected according to needs.
[0062] After the face is cut, the water jet drilling device performs drilling or drilling cutting operations, which can meet the needs of anchor support, grouting fire prevention and extinguishing, stress relief, gas extraction, etc., and improve the support effect. Embodiment 2:
[0063] See also Figure 6 The difference between this embodiment and embodiment 1 is that the water jet drilling device is different. The water jet drilling device in this embodiment includes a water jet drill rod 16 and a drilling rig. The water jet drill rod 16 is detachably arranged on the drilling rig. A water jet drill rod warehouse is arranged on one side of the drilling rig. The water jet drill rod warehouse is provided with water jet drill rods of different specifications. The drilling rig is provided by the anchor mining machine. By replacing the original drill rod with a water jet drill rod, the drilling or drilling slit operation can also be achieved. The end of the water jet drill rod is connected to the high-pressure hose through a swivel joint to achieve normal operation. According to the existing structure of the anchor mining machine, the drilling rig is arranged on the cutting arm 8 through a sliding platform and a swivel platform. The advantage of this improvement is that the cost is low and the original drilling rig of the anchor mining machine can be used.
[0064] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A construction method of a drilling and anchoring machine using an integrated water jet system, characterized in that: A drilling and anchoring machine with an integrated water jet system is used, the drilling and anchoring machine with an integrated water jet system comprising a drilling and anchoring machine (1) and a water jet system arranged on the drilling and anchoring machine (1), the drilling and anchoring machine (1) comprising a cutting drum (9) for constructing a tunnel face, the water jet system comprising a water jet drilling device and a tunnel face slitting device both arranged on the drilling and anchoring machine (1), the tunnel face slitting device being used to perform slitting operations on the tunnel face, and the water jet drilling device being used for drilling holes or drilling and slitting operations; The water jet drilling device comprises a rotary platform (4), a drilling rig multi-degree-of-freedom boom (5) and a water jet drilling rig (6); the water jet drilling rig (6) is arranged on the rotary platform (4) via the drilling rig multi-degree-of-freedom boom (5); and the rotary platform (4) is arranged on a main body of the drilling and anchoring machine; drilling or drilling slit operations are achieved by replacing different drill bits on the water jet drilling rig (6); The tunnel face cutting device comprises a water jet nozzle (13) and a nozzle multi-degree-of-freedom arm (14); the water jet nozzle (13) is arranged on the nozzle multi-degree-of-freedom arm (14), and the nozzle multi-degree-of-freedom arm (14) is arranged on the drilling and anchoring machine (1); The drill bit comprises a drilling drill bit (17) and a slotting drill bit (18); The drilling bit (17) is used for drilling holes, a first channel (17.1) through which a working medium flows is provided inside the drilling bit (17), a plurality of first outlets (17.2) are provided on the cutting end face of the drilling bit (17), the first outlets (17.2) are connected to the first channel (17.1), and the working medium is ejected from the first outlets to achieve drilling; The slitting drill bit (18) is used for drilling holes and slitting, a second channel (18.1) for the circulation of a working medium is provided inside the slitting drill bit (18), a plurality of second outlets (18.2) are provided behind the cutting end of the slitting drill bit (18), the axes of the second outlets (18.2) are perpendicular to the propulsion direction of the slitting drill bit (18), the cutting end of the slitting drill bit (18) realizes drilling, and the working medium ejected from the second outlets is used for slitting the inner wall of the drill hole; The construction method includes the following steps: When no interlayer (12) is encountered, the cutting drum (9) advances normally, and the face cutting device does not work; When encountering an interlayer (12), the nozzle multi-degree-of-freedom arm (14) is first controlled to move the water jet nozzle (13) close to the interlayer, and the interlayer is cut horizontally. After the cutting is completed, the cutting drum (9) starts cutting from the top of the interlayer, and the cutting drum (9) cuts downward after excavating to the cutting depth until the interlayer is cut. Then, the cutting drum (9) cuts the entire tunnel face from top to bottom, thereby completing the cutting of the entire tunnel face. At this time, the excavation depth of the cutting drum (9) is the cutting depth. The number of the transverse slits is at least one.
2. The construction method of the anchoring and drilling machine using the integrated water jet system according to claim 1, characterized in that: The cutting drum (9) is arranged on the main body of the anchor-digger machine via a cutting arm (8), and the nozzle multi-degree-of-freedom arm (14) is arranged on the cutting arm (8).
3. The construction method of the anchoring machine using the integrated water jet system according to claim 1, characterized in that: The tunnel face cutting device also includes a cover shell, the water jet nozzle (13) is arranged in the cover shell, and the central hole of the cover shell is arranged corresponding to the nozzle of the water jet nozzle (13).
4. The construction method of the anchoring machine using the integrated water jet system according to claim 1, characterized in that: The drilling rig multi-degree-of-freedom boom (5) and the water jet drilling rig (6) are detachably connected.
5. The construction method of the anchoring and drilling machine using the integrated water jet system according to claim 1, characterized in that: The water jet drilling device further comprises a water jet drill rod (16), wherein the water jet drill rod (16) is detachably mounted on the water jet drilling rig (6), and a water jet drill rod warehouse is provided on one side of the water jet drilling rig (6), wherein the water jet drill rod warehouse is provided with water jet drill rods (16) of different specifications.
6. The construction method of the anchoring and digging machine using the integrated water jet system according to claim 1, characterized in that: The water jet system further comprises a working medium supply device for supplying working medium required for the water jet; the working medium supply device comprises a high-pressure water pump (3), a branch valve and a pressure regulating valve, the high-pressure water pump (3) being used to supply pressurized working medium, the branch valve distributing the working medium from the high-pressure water pump (3) to the water jet drilling device and the face cutting device, and the pressure regulating valve being used to adjust the working pressure of the water jet system.
7. The construction method of the anchoring and digging machine using the integrated water jet system according to claim 1, characterized in that: Drilling or cutting holes on the side wall or / and the tunnel face of the tunnel (20) by means of a water jet drilling device to meet the needs of gas extraction, anchor support, grouting fire prevention or stress relief operations; A water jet drilling device is used to drill and cut holes in the side wall of the tunnel (20) to obtain anchor holes, and a grouting anchor is installed in the anchor hole by an anchor drilling machine to complete grouting, thereby achieving installation of the grouting anchor.