A hard road front paving mechanism

By installing the pre-laying mechanism on the vehicle, using forward driving method and specific structural components, the problem of adaptability of reversing laying in the prior art is solved in the prior art, and efficient paving is achieved, suitable for beaches and swamps Low-load capacity areas.

CN113373772BActive Publication Date: 2024-11-22CHINA HARZONE IND CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110600166.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-05-31
Publication Date
2024-11-22
Estimated Expiration
2041-05-31

AI Technical Summary

Technical Problem

The existing motorized hard pavement methods mainly use reverse paving, making it difficult to pavement in narrow or uncertain outdoor conditions, especially in low-load bearing areas such as beaches and swamps, which lack adaptability and efficiency.

Method used

A hard road front paving mechanism is designed to be installed on a vehicle, including a front support assembly, a front support rod, an upper guide frame assembly, a bracket assembly, a traction device and a guide rod. Through forward driving laying method, The front paving of the pavement panel is achieved using components such as steering wheels, guide rollers, brackets and hydraulic winches, which are suitable for narrow terrain conditions.

Benefits of technology

It realizes efficient pavement under narrow terrain conditions, saves time and is easy to operate, and the equipment components can be quickly disassembled and assembled, making it easy to replace and repair, and improves the adaptability and efficiency of paving.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113373772B_ABST
    Figure CN113373772B_ABST
Patent Text Reader

Abstract

The present invention discloses a hard road front paving mechanism, comprising: a front bearing assembly, a front support rod, an upper guide frame assembly, a support assembly, a traction device and a guide rod; the front bearing assembly is mounted on the front end of a cab of a vehicle body, and a steering wheel is provided on the front bearing assembly; the middle part of the upper guide frame assembly is mounted on the chassis beam of the vehicle body through the support assembly, and the upper guide frame assembly is located above the cab of the vehicle body; one end of the upper guide frame assembly is mounted on the front bearing assembly through the front support rod, the other end of the upper guide frame assembly is connected to one end of the guide rod, and the other end of the guide rod is connected to a rotary platform for placing a road panel; the upper guide frame assembly is provided with a guide roller for supporting and guiding the road panel and a pulley for guiding the traction rope of the traction device; the traction device is mounted on the chassis beam of the vehicle body; the present invention can adopt a forward driving paving method to pave an emergency mobile road surface, thereby improving the paving adaptability and paving efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of road paving, and in particular relates to a hard road front paving mechanism. Background Art

[0002] When wheeled or tracked motor vehicles are performing field operations and passing through low-bearing areas such as beaches and swamps, they often have to rush to lay temporary pavement on the roadbed to ensure vehicle mobility. The existing methods for laying mobile hard pavement in my country are all reverse laying (i.e. "rear laying"), which requires turning the vehicle head when laying, and has certain space requirements. Due to the uncertainty of field conditions, it is difficult to use the rear laying method for pavement in narrow areas. Summary of the invention

[0003] In view of this, the present invention provides a hard road front paving mechanism, which can use the forward driving paving (ie "front paving") method to pave the emergency mobile road surface, thereby improving the paving adaptability and paving efficiency.

[0004] The present invention is achieved through the following technical solutions:

[0005] A hard road front paving mechanism is installed on a vehicle body, comprising: a front support assembly, a front support rod, an upper guide frame assembly, a bracket assembly, a traction device and a guide rod;

[0006] The front support assembly is installed at the front end of the cab of the vehicle body, and a steering wheel is provided on the front support assembly;

[0007] The middle part of the upper guide frame assembly is installed on the chassis beam of the vehicle body through the bracket assembly, and the upper guide frame assembly is located above the cab of the vehicle body; one end of the upper guide frame assembly is installed on the front support assembly through the front support rod, and the other end of the upper guide frame assembly is connected to one end of the guide rod, and the other end of the guide rod is connected to the rotating platform where the road panel is placed;

[0008] The upper guide frame assembly is provided with guide rollers for supporting and guiding the road panel and a pulley for guiding the traction rope of the traction device;

[0009] The traction device is installed on the chassis beam of the vehicle body. When the front laying mechanism is operating, the traction rope on the traction device passes over the pulley of the upper guide frame assembly from the rear of the vehicle body to the front of the vehicle body, and after crossing the cab of the vehicle body, the traction rope turns at the steering wheel of the front support assembly, returns to the upper guide frame assembly again, and passes over the pulley of the upper guide frame assembly in sequence from the front of the vehicle body to the rear of the vehicle body. Then, the end of the traction rope is connected to the road panel on the revolving platform.

[0010] Furthermore, the connection between the upper guide frame assembly and the bracket assembly, the connection between the upper guide frame assembly and the front support rod, the connection between the upper guide frame assembly and the guide rod, and the connection between the guide rod and the rotating platform are all detachable connections.

[0011] Furthermore, the upper guide frame assembly further comprises: an upper guide frame and a supporting wheel;

[0012] The upper guide frame is a truss structure formed by welding longitudinal beams and transverse beams;

[0013] More than two pulleys are installed in the middle of the upper guide frame, two pulleys form a group, and more than two groups of pulleys are arranged in parallel along the length direction of the upper guide frame;

[0014] Two or more guide rollers are symmetrically mounted on both sides of the upper guide frame;

[0015] More than two supporting wheels are symmetrically installed on both sides of the upper guide frame through a connecting axis.

[0016] Furthermore, both ends of the upper guide frame are bent downward.

[0017] Furthermore, the supporting wheel comprises: a fixed supporting wheel and a flip supporting wheel;

[0018] The fixed supporting wheels are respectively located at the ends of each side of the upper guide frame, and the flip supporting wheels are located in the middle of each side of the upper guide frame, and the height of the flip supporting wheels relative to the ground is higher than the height of the fixed supporting wheels;

[0019] The connecting shaft of the fixed supporting wheel cannot rotate;

[0020] The connecting shaft of the flipping wheel can be flipped downward relative to the upper guide frame; at this time, the connecting shaft of the flipping wheel is the flipping shaft; when the front laying mechanism is in the transport state, the flipping wheel and its flipping shaft are flipped downward; when the front laying mechanism is in the operating state, the flipping wheel and its flipping shaft are reset, that is, the flipping wheel and its flipping shaft are flush with the upper guide frame.

[0021] Furthermore, the front support assembly also includes: an upper roller, a lower roller and a front support rod seat;

[0022] A front support rod seat, an upper roller and a lower roller are respectively installed at both ends of the bumper of the vehicle body, and the upper roller and the lower roller are respectively located at the upper and lower sides of the modified bumper;

[0023] The steering wheel is mounted at the middle of the bumper.

[0024] Further, the bracket assembly includes: a bracket and a lower connecting plate;

[0025] The bracket is a rigid frame structure formed by connecting transverse bars and longitudinal bars. The bottom of the bracket is installed on the chassis beam of the vehicle body through a lower connecting plate. The top of the bracket is provided with more than two upper connecting ears for connecting with the upper guide frame assembly.

[0026] Furthermore, the traction device further comprises: a hydraulic winch;

[0027] The hydraulic winch is fixed to the subframe of the chassis of the vehicle body through a winch mounting seat. One end of the traction rope is wound around the hydraulic winch, and the other end is connected to the road panel on the revolving platform after crossing the cab of the vehicle body.

[0028] Furthermore, the bracket assembly is provided with a fixing ring;

[0029] The guide rod is a folding rod; when the front paving mechanism is in the operating state, the guide rod is in the unfolded state, and the guide rod is unfolded into a long rod; one end of the guide rod is connected to the end of the upper guide frame assembly, and the other end is connected to the rotating platform on which the road panel is placed; when the front paving mechanism is in the transport state, the guide rod is in the folded state, and the guide rod is folded into a short rod; the guide rod is hung on the fixed hanging ring of the bracket.

[0030] Furthermore, a nylon pad is installed on the outer surface of the guide rod.

[0031] Beneficial effects:

[0032] (1) The present invention adopts an assembled truss structure as a whole, which can support and pull the road panel over the cab to achieve the front laying of the road panel, saving time and facilitating operation, and is particularly suitable for narrow terrain conditions.

[0033] (2) Except for the bracket assembly, the other parts of the present invention can be quickly disassembled and assembled, which is convenient for replacement and maintenance.

[0034] (3) The upper roller and the lower roller of the present invention serve to guide the road panel to pass over the cab and turn smoothly downward to the bottom of the vehicle, and the steering wheel serves to guide the steel wire rope of the traction device to turn; the guide roller serves to guide the road panel to move smoothly; the fixed supporting wheel and the flip supporting wheel 15 serve to guide the traction belt at the rear end of the road panel to move smoothly. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Figure 1 It is a structural composition diagram of the present invention;

[0036] Figure 2 for Figure 1 A partial view of the left side view;

[0037] Figure 3 is a schematic diagram of the bracket assembly;

[0038] Figure 4 is a structural diagram of the upper guide frame assembly;

[0039] Figure 5 for Figure 4 Left view of

[0040] Figure 6 The figure is a schematic diagram of the flipping of the flip supporting wheel;

[0041] Figure 7 is a schematic diagram of a traction device;

[0042] Figure 8 It is a working principle diagram of the present invention;

[0043] Among them, 1-front support assembly, 2-front support rod, 3-upper guide frame assembly, 4-bracket assembly, 5-traction device, 6-guide rod, 7-upper roller, 8-lower roller, 9-front support rod seat, 10-modified bumper, 11-steering wheel, 12-upper guide frame, 13-guide roller, 14-fixed supporting roller, 15-flip supporting roller, 16-bracket, 17-upper connecting ear, 18-lower connecting plate, 19-hydraulic winch, 20-traction rope, 21-pulley. DETAILED DESCRIPTION

[0044] The present invention is described in detail below with reference to the accompanying drawings and embodiments.

[0045] This embodiment provides a hard road front paving mechanism, which is installed on the vehicle body, see the attached Figure 1 , including: a front support assembly 1, a front support rod 2, an upper guide frame assembly 3, a bracket assembly 4, a traction device 5 and a guide rod 6;

[0046] See attached Figure 2 The front support assembly 1 is installed at the front end of the cab of the vehicle body, and includes: an upper roller 7, a lower roller 8, a front support rod seat 9, a modified bumper 10 and a steering wheel 11; the modified bumper 10 is partially strengthened on the basis of the original bumper of the vehicle body and reserved for mounting holes for mounting the upper roller 7, the lower roller 8, the front support rod seat 9 and the steering wheel 11; a front support rod seat 9, an upper roller 7 and a lower roller 8 are respectively installed at both ends of the modified bumper 10, and the upper roller 7 and the lower roller 8 are respectively located at the upper and lower sides of the modified bumper 10; a steering wheel 11 is installed in the middle of the modified bumper 10; the upper roller 7, the lower roller 8 and the steering wheel 11 are used for hard road paving guidance; the front support rod seat 9 is used to fix the front support rod 2;

[0047] See attached Figure 3The bracket assembly 4 is used to support the upper guide frame assembly 3, including: a bracket 16 and a lower connecting plate 18; the bracket 16 is a rigid frame structure formed by connecting a cross bar and a longitudinal bar, and the bottom of the bracket 16 is installed on the chassis beam of the vehicle body through the lower connecting plate 18 to transfer the load of the laying process downward; the top of the bracket 16 is provided with more than two upper connecting ears 17; the side of the bracket 16 is provided with a fixed hanging ring;

[0048] See attached Figure 4-6 The upper guide frame assembly 3 is used for support and guidance during the paving process of the hard road surface, and includes: an upper guide frame 12, a guide roller 13, a fixed support wheel 14, a flip support wheel 15 and a pulley 21;

[0049] The upper guide frame 12 is a steel truss structure, that is, it is welded by longitudinal beams and transverse beams; the upper guide frame 12 includes: a first oblique frame section, an intermediate frame section and a second oblique frame section connected in sequence; the dihedral angle between the first oblique frame section and the intermediate frame section and the dihedral angle between the intermediate frame section and the second oblique frame section are both obtuse angles; and the first oblique frame section and the second oblique frame section are both bent in the same direction relative to the intermediate frame section, that is, both are bent downward;

[0050] The middle part of the upper guide frame 12 is equipped with two or more pulleys 21, two pulleys 21 form a group, and the two or more pulleys 21 are arranged in parallel along the length direction of the upper guide frame 12;

[0051] Guide rollers 13 are installed at the ends and both sides of the bend of the upper guide frame 12;

[0052] The fixed supporting wheels 14 are installed on both sides of each end of the upper guide frame 12 through a connecting shaft;

[0053] The flipping supporting wheel 15 is connected to both sides of each bend of the upper guide frame 12 through a flipping shaft pin, and each flipping supporting wheel 15 and its flipping shaft can be flipped downward relative to the middle frame section; the flipping supporting wheel 15 is flippable to ensure that the width limit requirements of train transportation are met when the mechanism is in the transportation state. When the mechanism is in the transportation state, the flipping supporting wheel 15 and its flipping shaft flip downward; when the mechanism is in the operating state, the flipping supporting wheel 15 and its flipping shaft are reset, that is, the flipping supporting wheel 15 and its flipping shaft are flush with the middle frame section and locked by the pin shaft;

[0054] The end of the second oblique frame section of the upper guide frame 12 and the intersection of the middle frame section and the second oblique frame section are pinned to the upper connecting ear 17 at the top of the bracket 16 of the bracket assembly 4 through a pin shaft, forming a load transfer path; and the first oblique frame section and the middle frame section of the upper guide frame 12 are both located above the cab of the vehicle body;

[0055] One end of the front support rod 2 is hinged to the front support rod seat 9, and the other end is hinged to the end of the first oblique frame section of the upper guide frame assembly 3, so as to support the front end of the upper guide frame assembly 3 and assist in bearing the load during the laying process; both ends of the front support rod 2 are hinged and can be quickly disassembled; the cab of the vehicle body is located within the envelope of the front support rod 2 and the upper guide frame assembly 3;

[0056] The guide rod 6 is a folding rod; when the mechanism is in the operating state, the guide rod 6 is in the unfolded state, and the guide rod 6 is unfolded into a long rod; one end of the guide rod 6 is connected to the end of the second oblique frame section of the upper guide frame assembly 3, and the other end is connected to the rotary platform on which the road panel is placed, and is used to support the road panel when the road panel is laid and guide the road panel to move upward; when the mechanism is in the transport state, the guide rod 6 is in the folded state, and the guide rod 6 is folded into a short rod; the guide rod 6 is hung on the fixed hanging ring of the bracket 16; a nylon pad is installed on the outer surface of the guide rod 6 to reduce the friction between the road panel and the guide rod 6;

[0057] See attached Figure 7 The traction device 5 is used to pull the road panel over the cab at the beginning of paving, and includes: a hydraulic winch 19 and a traction rope 20; the hydraulic winch 19 is fixed to the subframe of the chassis of the vehicle body through a winch mounting seat, and the traction rope 20 is wound around the hydraulic winch 19; when the mechanism is in an operating state, the end of the traction rope 20 passes through the pulley 21 of the upper guide frame 12 in sequence from the rear of the vehicle body to the front of the vehicle body, and the traction rope 20 turns at the steering wheel 11 of the front support assembly 1, returns to the upper guide frame assembly 3 again, and passes through the pulley 21 of the upper guide frame 12 in sequence from the front of the vehicle body to the rear of the vehicle body, and the end of the traction rope 20 is connected to the road panel on the revolving platform;

[0058] Working principle: When the mechanism is in transport state, see the attached Figure 6 , the flip support wheel 15 and its flip shaft flip downward to prevent the upper guide frame assembly 3 from being too wide and unable to pass through the train tunnel; the guide rod 6 is in a folded state and hung on the fixed hanging ring of the bracket 16;

[0059] When the mechanism is in operation, the flip support wheel 15 and its flip axis are reset; the guide rod 6 is in an extended state, one end of the guide rod 6 is connected to the end of the second oblique frame section of the upper guide frame assembly 3, and the other end is connected to the rotary platform on which the road panel is placed;

[0060] See attached Figure 8The traction device 5 pulls the road panel through the guide rod 6, the upper guide frame assembly 3, the front support rod 2 and the front support assembly 1 in sequence, and is supported and guided by the guide roller 13, the fixed support roller 14, the flip support roller 15 on the upper guide frame assembly 3 and the upper roller 7 and the lower roller 8 on the front support assembly 1 at the same time, and then the road panel crosses the cab and enters between the wheels of the vehicle body and the ground; while the vehicle is driving forward, the road panel is pressed and laid on the ground in sequence; wherein, the upper roller 7 and the lower roller 8 play the role of guiding the road panel to smoothly pass over the cab and downward The steering wheel 11 guides the traction rope 20 of the traction device 5 to turn to the bottom of the vehicle, that is, after the traction rope 20 passes around the steering wheel 11, the traction direction is changed; the upper guide frame 12 is used to ensure the structural strength and rigidity of the road panel during the front laying process; the guide roller 13 is used for support and guidance during the front laying process of the road panel; the fixed supporting wheel 14 and the flip supporting wheel 15 are used to support and guide the traction belt at the rear of the road panel in the final stage of the front laying of the road panel, and the traction belt pulls the rear end of the road panel to assist the road panel to land smoothly.

[0061] In summary, the above are only preferred embodiments of the present invention and are not intended to limit the protection scope of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A hard road front paving mechanism, installed on the vehicle body, It is characterized in that include: A front support assembly (1), a front support rod (2), an upper guide frame assembly (3), a bracket assembly (4), a traction device (5) and a guide rod (6); The front support assembly (1) is installed at the front end of the cab of the vehicle body, and a steering wheel (11) is provided on the front support assembly (1); The middle part of the upper guide frame assembly (3) is installed on the chassis beam of the vehicle body through the bracket assembly (4), and the upper guide frame assembly (3) is located above the cab of the vehicle body; one end of the upper guide frame assembly (3) is installed on the front support assembly (1) through the front support rod (2), the other end of the upper guide frame assembly (3) is connected to one end of the guide rod (6), and the other end of the guide rod (6) is connected to the rotating platform on which the road panel is placed; The upper guide frame assembly (3) is provided with a guide roller (13) for supporting and guiding the road panel and a pulley (21) for guiding the traction rope of the traction device (5); The traction device (5) is mounted on the chassis beam of the vehicle body. When the front laying mechanism is in operation, the traction rope on the traction device (5) passes over the pulley (21) of the upper guide frame assembly (3) from the rear of the vehicle body to the front of the vehicle body and crosses the cab of the vehicle body. The traction rope (20) turns at the steering wheel (11) of the front support assembly (1) and returns to the upper guide frame assembly (3). After passing over the pulley (21) of the upper guide frame assembly (3) in sequence from the front of the vehicle body to the rear of the vehicle body, the end of the traction rope (20) is connected to the road panel on the revolving platform.

2. A hard road front paving mechanism as claimed in claim 1, It is characterized in that The connection between the upper guide frame assembly (3) and the bracket assembly (4), the connection between the upper guide frame assembly (3) and the front support rod (2), the connection between the upper guide frame assembly (3) and the guide rod (6), and the connection between the guide rod (6) and the rotating platform are all detachable connections.

3. A hard road front paving mechanism as claimed in claim 1, It is characterized in that The upper guide frame assembly (3) further comprises: an upper guide frame (12) and a supporting wheel; The upper guide frame (12) is a truss structure formed by welding longitudinal beams and transverse beams; More than two pulleys (21) are installed in the middle of the upper guide frame (12), two pulleys (21) form a group, and more than two groups of pulleys (21) are arranged in parallel along the length direction of the upper guide frame (12); Two or more guide rollers (13) are symmetrically mounted on both sides of the upper guide frame (12); More than two supporting wheels are symmetrically mounted on both sides of the upper guide frame (12) via a connecting axis.

4. A hard road front paving mechanism as claimed in claim 3, It is characterized in that Both ends of the upper guide frame (12) are bent downward.

5. A hard road front paving mechanism as claimed in claim 4, It is characterized in that The supporting wheels include: a fixed supporting wheel (14) and a tilting supporting wheel (15); The fixed supporting wheels (14) are respectively located at the ends of each side of the upper guide frame (12), the flip supporting wheels (15) are located in the middle of each side of the upper guide frame (12), and the height of the flip supporting wheels (15) relative to the ground is higher than the height of the fixed supporting wheels (14); The connecting shaft of the fixed supporting wheel (14) is non-rotatable; The connecting shaft of the flipping supporting wheel (15) can be flipped downward relative to the upper guide frame (12); at this time, the connecting shaft of the flipping supporting wheel (15) is a flipping shaft; when the front laying mechanism is in a transport state, the flipping supporting wheel (15) and its flipping shaft flip downward; when the front laying mechanism is in an operating state, the flipping supporting wheel (15) and its flipping shaft are reset, that is, the flipping supporting wheel (15) and its flipping shaft are flush with the upper guide frame (12).

6. A hard road pre-paving mechanism as claimed in any one of claims 1 to 5, It is characterized in that The front support assembly (1) further comprises: an upper roller (7), a lower roller (8) and a front support rod seat (9); A front support rod seat (9), an upper roller (7) and a lower roller (8) are respectively installed at both ends of the bumper of the vehicle body, and the upper roller (7) and the lower roller (8) are respectively located on the upper and lower sides of the modified bumper (10); The steering wheel (11) is installed in the middle of the bumper.

7. A hard road pre-paving mechanism as claimed in any one of claims 1 to 5, It is characterized in that The bracket assembly (4) comprises: a bracket (16) and a lower connecting plate (18); The bracket (16) is a rigid frame structure formed by connecting a transverse rod and a longitudinal rod. The bottom of the bracket (16) is mounted on the chassis beam of the vehicle body through a lower connecting plate (18). The top of the bracket (16) is provided with more than two upper connecting ears (17) for connecting with the upper guide frame assembly (3).

8. A hard road pre-paving mechanism as claimed in any one of claims 1 to 5, It is characterized in that The traction device (5) further comprises: a hydraulic winch (19); The hydraulic winch (19) is fixed to the sub-frame of the chassis of the vehicle body through a winch mounting seat, one end of the traction rope (20) is wound around the hydraulic winch (19), and the other end is connected to the road panel on the revolving platform after crossing the cab of the vehicle body.

9. A hard road pre-paving mechanism as claimed in any one of claims 1 to 5, It is characterized in that The bracket assembly (4) is provided with a fixing ring; The guide rod (6) is a folding rod; when the front laying mechanism is in an operating state, the guide rod (6) is in an unfolded state, at which time the guide rod (6) is unfolded into a long rod; one end of the guide rod (6) is connected to the end of the upper guide frame assembly (3), and the other end is connected to the rotating platform on which the road panel is placed; when the front laying mechanism is in a transporting state, the guide rod (6) is in a folded state, at which time the guide rod (6) is folded into a short rod; the guide rod (6) is hung on a fixed hanging ring of the bracket (16).

10. A hard road front paving mechanism as claimed in claim 9, It is characterized in that A nylon pad is installed on the outer surface of the guide rod (6).