A recyclable anchored prestressed hanging pile support structure and construction method
By adopting a recyclable anchor-type prestressed suspended foot pile support structure in the soil-rock composite foundation pit, the removable design and prestressing technology of the anchor rods are used to solve the problems of steel waste and construction complexity, and the cost reduction is achieved and environmental protection.
Patent Information
- Application Number
- CN202110742634.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-07-01
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2041-07-01
AI Technical Summary
The existing foundation pit support structure has problems in steel waste and construction complexity, especially in soil-rock composite foundation pits, the cost of stilt piles entering the rock is high and the construction period is long, and the conventional support structure cannot be recycled after completion, resulting in Waste of steel.
Recyclable anchor-type prestressed suspended foot pile support structure, the suspended foot pile is installed on the airside side of the soil, the anchor rod is installed in the suspended foot pile and the rock body is installed downward, combining the removable anchor assembly and pre- Stress technology to realize the recycling and reuse of anchor rods.
The cost of stilt piles entering the rock is reduced, the construction process is simplified, the foundation pit deformation control capability is improved, and the pollution to the surrounding environment and steel waste is reduced.
Smart Images

Figure CN113389205B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of foundation pit support, and in particular to a recoverable anchored prestressed hanging pile support structure and a construction method. Background Art
[0002] With the development of the national economy and the acceleration of urbanization, the scale of underground space development is getting larger and larger, and the excavation of foundation pits is getting larger and deeper. In coastal, hilly and mountainous areas with thin soil cover, there are more and more foundation pits with soil on the upper part and rock on the lower part of the excavation surface, that is, soil-rock combined foundation pits. Commonly used support forms for this type of foundation pits are hanging piles, composite soil nail walls and conventional support piles. Among them, hanging piles generally use hanging piles + trapezoidal rock shoulder protection + anchor locking feet. The width of the rock shoulder and the quality of the locking anchor determine the success or failure of the support structure, and the safety level is low. The width of the rock shoulder is difficult to control during the rock blasting excavation process. For deeper foundation pits, the width of the rock shoulder is limited, so the support depth is limited, and the pile bottom needs to be embedded in the rock shoulder to a certain depth, so the drilling progress is slow and the cost is high. The composite soil nail wall structure generally uses micro piles + soil nails + anchor rods, which is only suitable for foundation pits with simple surrounding environment and shallow excavation depth; conventional support piles need to embed the bottom of the pile into the bottom of the pit to a certain depth. For foundation pits with high rock surface, the cost is high and the construction period is long. The above commonly used support structure for foundation pits is a temporary structure. After the underground structure is completed, it will be completed and left underground with the foundation pit backfill, resulting in a large waste of steel. Summary of the invention
[0003] The purpose of the present invention is to provide a recyclable anchored prestressed hanging pile support structure and a construction method to solve the problems of steel waste and complex construction.
[0004] To achieve this object, the present invention adopts the following technical solutions:
[0005] The present invention provides a recyclable anchored prestressed hanging pile support structure, which is arranged in a soil-rock combined foundation pit. The recyclable anchored prestressed hanging pile support structure comprises:
[0006] The hanging pile is arranged on the air-facing side of the soil mass, and the bottom end of the hanging pile is arranged on the rock mass;
[0007] Anchor rods, wherein a plurality of anchor rods are provided, and the plurality of anchor rods are divided into two groups, wherein the anchor rods of the first group are vertically arranged in the hanging piles and penetrate downwardly in the rock mass, and the anchor rods of the second group are obliquely penetrated in the hanging piles and the soil mass, and / or obliquely penetrated in the hanging piles and the rock mass;
[0008] The anchor rod comprises an anchor bar and an anchor assembly. The anchor assembly is arranged at the bottom end of the anchor bar located in the soil or rock mass. The anchor assembly and the anchor bar are detachably connected.
[0009] Optionally, the anchoring assembly comprises:
[0010] A bearing platform, wherein the bearing platform is provided with a central through hole, and the central through hole is a truncated cone hole;
[0011] There are at least two wedge-shaped pressing pieces, at least two of which surround the bottom end of the anchor bar and are threadedly connected to the bottom end of the anchor bar, and the wedge-shaped pressing pieces are passed through the central through hole and fixed;
[0012] There are at least two wedge-shaped ejectors, at least two of which are arranged on the end surface of the bottom end of the anchor bar, at least two wedge-shaped slideways are arranged at the bottom end of the anchor bar, the wedge-shaped ejectors are arranged corresponding to the wedge-shaped slideways, and the wedge-shaped ejectors can slide into the wedge-shaped slideways to separate the wedge-shaped pressing sheet from the anchor bar;
[0013] An ejector sleeve, wherein the ejector sleeve is sleeved on the outside of at least two of the wedge-shaped ejectors;
[0014] A sealing cover is provided with the wedge-shaped ejector pin and the ejector pin sleeve and is fixed on the bearing platform, and the ejector pin sleeve and the wedge-shaped ejector pin are both fixedly connected to the sealing cover.
[0015] Optionally, the anchor rod further includes a locking assembly, which includes a pad and a locking nut. The top end of the anchor bar is penetrated by the hanging pile and the pad and is locked with the locking nut to fix and tighten the anchor bar.
[0016] Optionally, the anchor rod further includes an isolation bracket, and a plurality of the isolation brackets are provided. The plurality of isolation brackets are spaced apart along the long axis direction of the anchor bar, and the anchor bar is passed through the isolation brackets for limiting position.
[0017] Optionally, the anchor rod further comprises a grouting pipe, and the grouting pipe is passed through the isolation bracket to limit the position.
[0018] Optionally, the hanging pile includes longitudinal reinforcement, stirrups and support steel bars, a plurality of the stirrups are spaced apart in the long axis direction of the longitudinal reinforcement, a plurality of the longitudinal reinforcements are spaced apart close to the inner wall of the stirrups, both ends of the support steel bars are respectively connected to the inner wall of the stirrups to divide the plane where the stirrups are located into a semicircular area facing the soil and a semicircular area facing the air, and the anchor bars are arranged in the semicircular area facing the soil.
[0019] Optionally, the arc segment of the anchor bar in the semicircular area near the soil is close to the inner wall of the stirrup and is alternately arranged with the longitudinal reinforcement, and the straight segment of the anchor bar in the semicircular area near the soil is close to the support steel bars and is arranged at intervals.
[0020] Optionally, the anchor rod further comprises an isolating sleeve, wherein the isolating sleeve is sleeved on the anchor bar, and the bottom end of the isolating sleeve stops above the bearing platform.
[0021] The present invention also provides a construction method of a recyclable anchored prestressed hanging pile support structure, comprising the following steps:
[0022] S1, arranging an anchor assembly at the bottom end of the anchor bar to form an anchor rod;
[0023] S2, drilling anchor holes in the soil and rock mass respectively, and then passing the anchor rod through the hanging pile and the anchor hole in the soil mass, and / or passing the anchor rod through the hanging pile and the anchor hole in the rock mass, and finally grouting;
[0024] S3, after the construction of the rock shoulder in the foundation pit is completed, the anchor bars are pulled out to realize anchor rod recovery.
[0025] Optionally, the specific process of anchor rod recovery is as follows:
[0026] S31, applying an upward pulling force to the anchor bar to separate the locking nut from the pad, and removing the locking nut;
[0027] S32, applying an axial downward impact force to the anchor bar, so that the bottom end of the anchor bar slides into the ejector sleeve, and the wedge-shaped ejector slides into the wedge-shaped slideway, so that the wedge-shaped pressing sheet is separated from the bottom end of the anchor bar;
[0028] S33, pulling out the anchor bar upwards to achieve recovery.
[0029] Beneficial effects of the present invention:
[0030] The present invention provides a recyclable anchored prestressed stilt pile support structure, in which the stilt pile is set on the rock mass but not inserted into the rock. The stilt pile is fixed by an anchor rod set in the stilt pile and penetrated downward into the rock mass. The anchor rod and the stilt pile are fixed as a whole, which not only ensures the stability of the overall structure, but also reduces the cost of inserting the stilt pile into the rock, and the construction is simple. By setting two groups of anchor bars vertically and obliquely, the deformation of the foundation pit can be effectively controlled by applying prestress, and the fixing strength between the stilt pile and the soil, and between the stilt pile and the rock mass is improved. By setting a detachable anchoring assembly at the bottom of the anchor bar, it is convenient to recover the anchor bar after the construction is completed, so that the anchor bar can be recovered for reuse, which not only reduces the cost but also reduces the pollution to the surrounding environment.
[0031] The invention discloses a construction method for a recyclable anchored prestressed stilt pile support structure. By arranging an anchor assembly at the bottom end of the anchor rod, the anchor bar can be reclaimed after the construction is completed, which not only reduces the cost but also reduces the pollution to the surrounding environment. In the construction method of the invention, by respectively passing the anchor rod through the stilt pile and the soil, and the stilt pile and the rock mass, the stilt pile is fixed to the rock mass and the soil mass as a whole through the anchor rod, which not only ensures the stability of the overall structure, but also reduces the cost of inserting the stilt pile into the rock, and the construction is simple. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 It is a schematic diagram of the arrangement of a recyclable anchored prestressed hanging pile support structure in a foundation pit according to the present invention;
[0033] Figure 2 It is a structural schematic diagram of an anchor rod in a recyclable anchored prestressed hanging pile support structure of the present invention;
[0034] Figure 3 It is a schematic diagram of the top fixing structure of the anchor rod in a recoverable anchored prestressed hanging pile support structure of the present invention;
[0035] Figure 4 yes Figure 2 Schematic diagram of the middle AA section;
[0036] Figure 5 yes Figure 2 Schematic diagram of the middle BB section;
[0037] Figure 6 It is a structural schematic diagram of an isolation bracket in a recyclable anchored prestressed hanging pile support structure of the present invention;
[0038] Figure 7 yes Figure 1 Schematic diagram of the CC section.
[0039] In the figure:
[0040] 100. Soil; 200. Rock mass; 300. Crown beam; 400. Waist beam; 500. Rock shoulder;
[0041] 41. Suspension piles; 11. Longitudinal reinforcement; 12. Stirrups; 13. Support reinforcement;
[0042] 42. Anchor rod; 21. Anchor bar; 22. Anchor assembly; 221. Bearing platform; 222. Wedge-shaped pressure plate; 223. Wedge-shaped ejector pin; 224. Ejector pin sleeve; 225. Cover; 226. Temporary fixing plate; 227. Temporary screw; 23. Locking assembly; 231. Pad; 232. Locking nut; 24. Isolation bracket; 241. Center through hole; 242. Grouting pipe hole; 25. Grouting pipe; 26. Grouting body; 27. Isolation sleeve. DETAILED DESCRIPTION
[0043] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only parts related to the present invention, rather than all structures, are shown in the accompanying drawings.
[0044] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0045] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0046] In the description of this embodiment, the terms "upper", "lower", "right", etc., directions or positional relationships are based on the directions or positional relationships shown in the drawings, and are only for the convenience of description and simplification of operation, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.
[0047] The present invention first provides a recyclable anchored prestressed stilt pile support structure, which aims to solve the problems of steel waste and complex construction in the existing soil-rock combined foundation pit support structure, and provides a stilt pile support structure that avoids steel waste, reduces costs and is easy to construct for soil-rock combined foundation pits with complex surrounding environments, deep depths and large excavation areas. Figure 1As shown, it is arranged in a soil-rock combination foundation pit, wherein the rock mass 200 is below the soil mass 100, and the recyclable anchored prestressed stilt pile support structure comprises a stilt pile 1 and an anchor rod 2, wherein the stilt pile 1 is arranged on the air side of the soil mass 100 in the foundation pit, and the bottom end of the stilt pile 1 is arranged on the rock mass 200; there are multiple anchor rods 2, and the multiple anchor rods 2 are divided into two groups, the first group of anchor rods 2 are vertically arranged in the stilt pile 1 and downwardly penetrated in the rock mass 200, and the second group of anchor rods 2 obliquely penetrate the stilt pile 1 and the soil mass 100, and / or obliquely penetrate the stilt pile 1 and the rock mass 200; wherein the anchor rod 2 comprises an anchor bar 21 and an anchor assembly 22, the anchor assembly 22 is arranged at the bottom end of the anchor bar 21 located in the soil mass 100 or the rock mass 200, and the anchor assembly 22 and the anchor bar 21 are detachably connected.
[0048] Combination Figure 1 In the present invention, the stilt pile 1 is arranged on the rock mass 200 but not inserted into the rock. The anchor rod 2 is arranged in the stilt pile 1 and penetrates the rock mass 200 downward to fix the stilt pile 1. The anchor rod 2 and the stilt pile 1 are fixed as a whole, which not only ensures the stability of the overall structure, but also reduces the cost of inserting the stilt pile 1 into the rock, and the construction is simple. In this embodiment, by setting the anchor bar 21 into two groups, vertical and oblique, respectively penetrate the stilt pile 1 and the soil 100, and the stilt pile 1 and the rock mass 200, the deformation of the foundation pit can be effectively controlled by applying prestress on the outside of the stilt pile 1, the fixing strength between the stilt pile 1 and the soil 100 and the stilt pile 1 and the rock mass 200 is improved, the support structure is stable and reliable, and the construction is convenient. By arranging a detachable anchoring assembly 22 at the bottom of the anchor bar 21, it is convenient to recycle the anchor bar 21 after the construction is completed, so that the anchor rod 2 can be recycled for reuse, which not only reduces the cost but also reduces the pollution to the surrounding environment.
[0049] It should be noted that the first group of anchor rods 2 and the second group of anchor rods 2 have the same structure, but the anchoring angles are different. The spacing between the multiple anchor rods 2 is set according to actual calculations. In some embodiments, the bottom end of the first group of anchor rods 2 is inserted into the rock mass 200 and is lower than the bottom end of the rock shoulder 500 to achieve a better anchoring effect. The oblique anchoring angle of the second group of anchor rods 2 in the soil 100 is 15°-35°, and the oblique anchoring angle in the rock mass 200 is 10°-15°. The specific length of each anchor rod 2 is determined based on the load calculation.
[0050] Alternatively, if Figure 2 As shown, the anchoring assembly 22 includes a bearing platform 221, a wedge-shaped pressing sheet 222, a wedge-shaped ejector pin 223, an ejector pin sleeve 224 and a cover 225, wherein:
[0051] The supporting platform 221 is provided with a central through hole, which is a truncated cone hole; the aperture of the top hole of the truncated cone hole is smaller than the aperture of the bottom hole.
[0052] There are at least two wedge-shaped pressing pieces 222, at least two of which surround the bottom end of the anchor bar 21 and are threadedly connected to the bottom end of the anchor bar 21, and the wedge-shaped pressing pieces 222 are inserted into the central through hole and fixed; wherein the bottom end of the anchor bar 21 is threaded with an external thread. Figure 4 As shown, two wedge-shaped pressing pieces 222 are combined into a truncated cone and the internal threads are processed to match the external threads at the bottom of the anchor bar 21. At the same time, the truncated cone formed by the two wedge-shaped pressing pieces 222 can be inserted into the central through hole of the bearing platform 221 and form an integral body with it. In this embodiment, a temporary fixing piece 226 and a temporary fixing screw 227 are provided at the joint between the bottom of the wedge-shaped pressing piece 222 and the bearing platform 221. The temporary fixing piece 226 covers the joint and is fixed to the bearing platform 221 by the temporary fixing screw 227, so that the two are fixed as one. In order to facilitate later recycling, the temporary fixing piece 226 is made of plastic material or other materials that are easy to shear and break.
[0053] There are at least two wedge-shaped ejector pins 223, which are arranged on the end surface of the bottom end of the anchor bar 21. At least two wedge-shaped slideways 211 are arranged at the bottom end of the anchor bar 21. The wedge-shaped ejector pins 223 are arranged corresponding to the wedge-shaped slideways 211. The wedge-shaped ejector pins 223 can slide into the wedge-shaped slideways 211 to separate the wedge-shaped pressing sheet 222 from the anchor bar 21. Figure 5 , the wedge-shaped ejector pin 223 is provided with three Figure 4 As shown in the figure, the three wedge-shaped slideways 211 are arranged correspondingly on the anchor bar 21, and when the anchor bar 21 moves downward, the wedge-shaped ejector pin 223 can slide into the wedge-shaped slideway 211 and spread the two wedge-shaped pressing pieces 222, so that the wedge-shaped pressing pieces 222 are separated from the anchor bar 21, which is convenient for the recovery of the anchor bar 21. It can be understood that the dimensions of the wedge-shaped ejector pin 223, the wedge-shaped slideway 211 and the wedge-shaped pressing piece 222 must be designed and calculated in advance to meet the above recovery requirements.
[0054] The ejector sleeve 224 is sleeved on the outside of at least two wedge-shaped ejector pins 223; Figure 2 and Figure 5 The ejector sleeve 224 is an annular sleeve such as a steel pipe. The inner diameter of the ejector sleeve 224 is larger than the outer diameter of the anchor bar 21 to facilitate the movement of the anchor bar 21 and to limit the movement of the anchor bar 21 in the axial direction. The ejector sleeve 224 is sleeved on the outer circumference of the three wedge-shaped ejector pins 223 to limit the positions of the three wedge-shaped ejector pins 223. When the wedge-shaped ejector pins 223 slide into the wedge-shaped slideway 211, the ejector sleeve 224 can limit the circumferential displacement of the wedge-shaped ejector pins 223 to ensure the vertical sliding of the anchor bar 21, and ensure that the wedge-shaped pressing sheet 222 is smoothly separated from the anchor bar 21.
[0055] The cover 225 covers the wedge-shaped ejector pin 223 and the ejector pin sleeve 224 and is fixed on the support platform 221 . The ejector pin sleeve 224 and the wedge-shaped ejector pin 223 are both fixedly connected to the cover 225 .
[0056] like Figure 2 As shown, the cover 225 adopts a groove structure with an opening upward, and the opening can be covered with a wedge-shaped ejector pin 223 and an ejector pin sleeve 224 and then fixed to the bottom surface of the bearing platform 221 to seal the wedge-shaped ejector pin 223 and the ejector pin sleeve 224. At the same time, the wedge-shaped ejector pin 223 and the ejector pin sleeve 224 are fixed to the inner side wall of the bottom end of the cover 225 to achieve the bottom end of the anchor rod 2, which is convenient for tensioning and pre-tightening with the top end. Unless otherwise specified, the fixing methods involved in the present invention are all welding fixing, and the metal parts such as steel bars used are all welded and fixed.
[0057] Optionally, the anchor rod 2 further includes a locking assembly 23, which includes a pad 231 and a locking nut 232. The top end of the anchor bar 21 is penetrated by the hanging pile 1 and the pad 231 and is locked with the locking nut 232 to fix and tighten the anchor bar 21.
[0058] Take the first group of anchor rods 2 as an example. Figure 3 The top of the anchor bar 21 is passed through the hanging pile 1 and the crown beam 300 in turn, and the pad 231 is set at the top of the crown beam 300. The top of the anchor bar 21 is passed through the pad 231 and connected with the locking nut 232, which can provide tension prestressing for the anchor rod 2, which is convenient for fixing and pouring. When recovering the anchor rod 2, a hydraulic jack is used to apply tension to the anchor bar 21, so that the locking nut 232 is separated from the pad 231, and then the locking nut 232 is removed to facilitate the later extraction of the anchor bar 21. For the second group of anchor rods 2, the top of the anchor bar 21 is fixed to the outer wall of the hanging pile 1 through the locking assembly 23.
[0059] Optionally, the anchor rod 2 further includes an isolation bracket 24, and a plurality of isolation brackets 24 are provided. The plurality of isolation brackets 24 are spaced apart along the long axis direction of the anchor bar 21, and the anchor bar 21 is passed through the isolation brackets 24 to limit the position.
[0060] Optionally, the anchor rod 2 further includes a grouting pipe 25, and the grouting pipe 25 is passed through the isolation bracket 24 to limit the position.
[0061] like Figure 2 and Figure 6 As shown, the isolation bracket 24 is a flat plate, and a central through hole 241 and a grouting pipe hole 242 are provided on the isolation bracket 24. There are two grouting pipe holes 242. The grouting pipe 25 includes a high-pressure grouting pipe and a normal-pressure grouting pipe. The anchor bar 21 is inserted into the central through hole 241, and the grouting pipe 25 is inserted into multiple grouting pipe holes 242. The verticality of the anchor bar 21 and the grouting pipe 25 can be maintained by the multiple isolation brackets 24 arranged longitudinally, ensuring the smooth extraction and recovery of the anchor bar 21. During construction, cement slurry is first injected into the hole mouth through the normal-pressure grouting pipe, and secondary grouting is performed through the high-pressure grouting pipe within 2 hours after the cement slurry is finally set, with a pressure of not less than 2MPa, to form a grouting body 26.
[0062] Optionally, the hanging pile 1 includes longitudinal reinforcement 11, stirrups 12 and support reinforcement 13, a plurality of stirrups 12 are arranged at intervals in the long axis direction of the longitudinal reinforcement 11, a plurality of longitudinal reinforcements 11 are arranged at intervals close to the inner wall of the stirrups 12, both ends of the support reinforcement 13 are respectively connected to the inner wall of the stirrups 12 to divide the plane where the stirrups 12 are located into a semicircular area facing the soil and a semicircular area facing the air, and the anchor bar 21 is arranged in the semicircular area facing the soil.
[0063] Combination Figure 1 and Figure 7 , on a stirrup 12 plane, the stirrup 12 is in a circular ring shape, and the two ends of the support steel bar 13 are connected to the stirrup 12 to divide the ring into two areas, the semicircular area near the soil ( Figure 7 The upper middle area) and the semicircular area facing the sky ( Figure 7 The height of the support reinforcement 13 is preferably one-quarter of the diameter of the circular ring, so that the anchor bar 21 can be arranged on the soil side to improve the anchoring strength. The longitudinal reinforcement 11, the stirrups 12 and the support reinforcement 13 are welded and fixed to each other to form a reinforcement cage, which is convenient for falling on the rock mass 200 to be cast.
[0064] Optionally, the arc section of the anchor bar 21 in the semicircular area near the soil is close to the inner wall of the stirrup 12 and is alternately arranged with the longitudinal bars 11, and the straight section of the anchor bar 21 in the semicircular area near the soil is close to the support steel bars 13 and is arranged at intervals.
[0065] like Figure 7 Taking the first group of anchor rods 2 as an example, in the semicircular area near the soil, the anchor bars 21 are arranged close to the inner wall of the stirrups 12 and the inner wall of the support reinforcement 13, respectively forming a semicircular radial arrangement and a linear arrangement of anchor bar groups, and the specific number of anchor bars 21 is determined according to the load calculation. Preferably, the anchor bars 21 are arranged at even intervals, and the longitudinal bars 11 are arranged at even intervals. In this embodiment, seven anchor bars 21 are arranged on the inner wall of the stirrups 12, and three anchor bars 21 are arranged on the inner side of the support reinforcement 13. The depth of each anchor bar 21 anchored into the rock mass in the length direction is not less than 6m to provide sufficient anchoring strength.
[0066] Optionally, the anchor rod 2 further includes an isolation sleeve 27 , which is sleeved on the anchor bar 21 , and the bottom end of the isolation sleeve 27 stops above the bearing platform 221 .
[0067] like Figure 2 The isolation sleeve 27 is sleeved on the outside of the anchor bar 21 to isolate the anchor bar 21 and the grouting body, so as to facilitate the later extraction and recovery of the anchor bar 21. The isolation sleeve 27 is made of a plastic corrugated tube or a metal corrugated tube. Before installing the isolation sleeve 27, it is necessary to apply rust preventive agent and butter on the outside of the anchor bar 21 to ensure sufficient lubricity and facilitate the recovery of the anchor bar 21.
[0068] It should be noted that lubricating oil such as butter is applied between the isolation sleeve 27 and the anchor bar 21, between the ejector sleeve 224 and the wedge-shaped ejector 223, between the wedge-shaped pressing piece 222 and the supporting platform 221, and between the wedge-shaped pressing piece 222 and the anchor bar 21 to facilitate the recovery of the anchor rod 2.
[0069] A recyclable anchored prestressed stilt pile support structure of the present invention is described below through a specific embodiment.
[0070] Embodiment 1:
[0071] like Figure 1-Figure 7A recyclable anchored prestressed stilt pile support structure, the first group of anchor rods 2 are recyclable prestressed anchor rods for the pile body, the second group of anchor rods 2 are recyclable prestressed anchor rods for the soil (rock) body, and the structures of the two groups of anchor rods 2 are the same. The anchor bar 21 is made of prestressed threaded steel, with threaded bottom and 2mm chamfered at the bottom end. The threaded length is the thickness of the bearing platform 221 + 10mm, and the strength and diameter are determined according to the load calculation. The isolation sleeve 27 can be made of plastic bellows or metal bellows, and the grouting body 26 is formed by grouting of pure cement slurry. The bearing platform 221 is a cylinder made of Q345 steel with a thickness of not less than 50mm and a diameter slightly smaller than the borehole diameter. A truncated cone hole is opened in the center of the cylinder. The upper bottom surface diameter of the truncated cone hole is the anchor bar 21 diameter + 10mm, and the lower bottom surface diameter is the upper bottom surface diameter + the bearing platform 221 thickness × tan25° × 2; the wedge-shaped pressing piece 222 is made of Q345 steel, and the internal thread is connected to the anchor bar. 11 is threaded at the bottom, two wedge-shaped pressing pieces 222 form a hollow truncated cone which can be threaded with the bottom of the anchor bar 21, and the outer size of the truncated cone is slightly smaller than the size of the truncated cone hole in the middle of the bearing platform 221; the wedge-shaped slide 211 is formed by planing and milling after threading the bottom of the anchor bar 21 (the deepest depth of the wedge-shaped slide 211 is 1 / 5 of the diameter of the anchor bar 21 and not less than 5mm), the temporary fixing piece 226 is made of hard plastic (the length covers 1 / 5 of the wedge-shaped pressing piece 222 and exceeds the temporary fixing screw 227), and the temporary fixing screw 227 is a common screw with a diameter of 6mm; the ejector sleeve 224 is made of seamless steel pipe (the inner diameter is slightly larger than the outer diameter of the bottom of the anchor bar 21 after threading), and the wedge-shaped ejector 223 is made of Q345 steel The cover 225 is made of Q235 steel plate (with the outer dimensions matching the wedge-shaped slideway 211), the ejector sleeve 224, the wedge-shaped ejector 223 and the cover 225 are connected by welding, the pad 231 is made of Q345 steel plate (250mm×250mm×20mm, with a hole in the middle, and the hole diameter is larger than the anchor bar 21 diameter + 40mm), the locking nut 232 is a finished nut matching the threaded steel of the anchor bar 21, the isolation bracket 24 is made of polyethylene material (with a diameter slightly smaller than the drilled hole diameter and a thickness of not less than 15mm, the central through hole 241 is used as the anchor bar hole, and the diameter is not less than the outer diameter of the anchor bar 21 after the isolation sleeve 27 is covered + 10mm, and the grouting pipe 25 is wrapped The normal pressure grouting pipe and the high pressure grouting pipe are included. Correspondingly, the grouting pipe hole 242 includes the normal pressure grouting pipe hole and the high pressure grouting pipe hole, wherein the inner diameter of the normal pressure grouting pipe hole is not less than the outer diameter of the normal pressure grouting pipe + 10mm, and the inner diameter of the high pressure grouting pipe hole is not less than the outer diameter of the high pressure grouting pipe + 10mm. The normal pressure grouting pipe adopts PE plastic pipe (outer diameter 25mm, pressure bearing not less than 1MPa, bottom open), and the high pressure grouting pipe adopts PE plastic pipe (outer diameter 25mm, pressure bearing not less than 4MPa, bottom sealed, with a diameter of 5mm set on the pipe body, not less than 5 circumferentially, and an axial spacing of not more than 15cm). The first group of anchor rods 2 are arranged radially in the semicircular area of the pile body facing the soil as tensile longitudinal reinforcement and anchoring reinforcement, such as Figure 7 As shown, the number of anchor bars 21 is determined according to the load calculation and is not less than 7; at least 3 anchor bars are arranged in a straight line in the 1 / 4 area on the air side of the pile body; the length of the anchor rod 2 anchored in the rock mass at the bottom of the pit is not less than 6m.
[0072] In the hanging foot pile 1, the longitudinal reinforcement 11 is made of hot-rolled ribbed steel bars (the strength and diameter are determined by the load calculation), the spiral hoop reinforcement 12 is made of hot-rolled round steel bars (the strength and diameter are determined by the load calculation), the concrete is commercial concrete (the specifications are determined by the load calculation), and the support reinforcement 13 is made of HRB400 20mm diameter steel bars (vertical intervals are 2m, used to fix the anchor hole embedded pipe). The bottom of the hanging foot pile 1 can fall on the flat rock surface of the rock mass 200 without entering the rock, such as Figure 1 The crown beam 300 and the waist beam 400 adopt conventional reinforced concrete structure.
[0073] The number of second group anchor rods 2 set in the vertical direction is set according to the excavation depth of the foundation pit. Generally, the first anchor rod 2 is located at the bottom of the crown beam 300, and then arranged downward at a spacing of 2.5 to 3.5 m, and the last anchor rod 2 is set at the bottom of the hanging pile 1 to form a locking anchor rod. The incident angle of the anchor rod 2 in the soil 100 is selected from 15° to 35° according to the soil conditions, and the incident angle of the anchor rod 2 in the rock mass 200 is selected from 10° to 15°. The length of each anchor rod 2 is determined according to the load calculation. The width of the rock shoulder 500 is flush with the outer edge of the waist beam 400 and is not less than 300 mm. In the above-mentioned recyclable anchored prestressed hanging pile support structure, the hanging pile 1 does not enter the rock, and the construction is simple; the anchor rod 2 is recyclable, saving steel costs.
[0074] The present invention also provides a construction method for a recyclable anchored prestressed hanging pile support structure, such as Figure 1 , including the following steps:
[0075] S1, an anchor assembly 22 is arranged at the bottom end of the anchor bar 21 to form an anchor rod 2;
[0076] S2, drilling anchor holes in the soil 100 and the rock mass 200 respectively, and then passing the anchor rod 2 through the hanging pile 1 and the anchor hole in the soil 100, and / or passing the anchor rod 2 through the hanging pile 1 and the anchor hole in the rock mass 200, and finally grouting;
[0077] S3, after the construction of the rock shoulder 500 in the foundation pit is completed, the anchor bar 21 is pulled out to recover the anchor rod 2.
[0078] The construction method of a recyclable anchored prestressed stilt pile support structure of the present invention, by setting an anchor assembly 22 at the bottom end of the anchor bar 21, the anchor bar 21 can be reclaimed after the construction is completed, which not only reduces the cost but also reduces the pollution to the surrounding environment. In the construction method of the present invention, by respectively passing the anchor rod 2 through the stilt pile 1 and the soil 100, and the stilt pile 1 and the rock mass 200, the stilt pile 1 is respectively fixed to the rock mass 200 and the soil 100 as a whole through the anchor rod 2, which not only ensures the stability of the overall structure, but also reduces the cost of inserting the stilt pile 1 into the rock, and the construction is simple.
[0079] Optionally, combined Figure 2 and Figure 3 The specific process of anchor rod 2 recovery is as follows:
[0080] S31, applying an upward pulling force to the anchor bar 21 to separate the locking nut 232 and the pad 231, and removing the locking nut 232;
[0081] S32, applying an axial downward impact force to the anchor bar 21, so that the bottom end of the anchor bar 21 slides into the ejector sleeve 224, and the wedge-shaped ejector 223 slides into the wedge-shaped slideway 211, so that the wedge-shaped pressing piece 222 is separated from the bottom end of the anchor bar 21;
[0082] S33, pulling out the anchor bar 21 upwards to achieve recovery.
[0083] It can be understood that when the anchor rod 2 is recovered, the top fixing structure of the anchor bar 21 is first unlocked, and then the detachable connection between the anchor bar 21 and the anchor assembly 22 is used to unlock the anchor assembly 22, so that the anchor bar 21 is unlocked, and finally the anchor bar 21 is lifted up for recovery. The anchor bar 21 can be reused, saving the cost of steel bar materials. The unlocking process of lifting and pressing down is simple and easy to implement, and the construction is simple and convenient.
[0084] Embodiment 2:
[0085] The following describes in detail a construction method of a recyclable anchored prestressed hanging pile support structure of the present invention through a specific embodiment, including anchoring of the anchor rod 2 and recovery of the anchor rod 2, as follows:
[0086] (1) Installation of anchor rod 2:
[0087] The bottom end of the anchor bar 21 is threaded, and then milled to form a wedge-shaped slideway 211, and butter is applied to the threaded position.
[0088] The wedge-shaped pressing piece 222 (with internal thread matching the thread at the bottom end of the anchor bar 21 ) is coated with butter on the outside and combined with the anchor bar 21 . It is then passed through the support platform 221 and pressed tightly, and fixed by a temporary fixing piece 226 and a temporary fixing screw 227 .
[0089] After welding the ejector sleeve 224 (with grease applied inside for lubrication), the wedge-shaped ejector 223 (with grease applied outside for lubrication), and the cover 225 together, weld the whole to the supporting platform 221; during the installation process, the central axis of the anchor bar 21 should coincide with the central axis of the ejector sleeve 224 and the wedge-shaped ejector 223 should be aligned with the wedge-shaped slide 211.
[0090] Apply rust preventive agent and butter to the outside of the anchor bar 21 and then put the isolation sleeve 27 on the outside;
[0091] The anchor bars 21 and the grouting pipes 25 (including normal pressure grouting pipes and high pressure grouting pipes) are placed in parallel, and then the isolation brackets 24 are installed every 1.5 m and fixed by binding wires.
[0092] (2) Implementation method of the integral support structure:
[0093] The site is leveled and the stilt pile 1 is positioned and laid out.
[0094] The rotary drilling rig drills into the flat rock surface of the rock mass 200 to form a pile hole.
[0095] The longitudinal reinforcement 11, spiral stirrups 12 and support reinforcement 13 are assembled and installed to form a reinforcement cage, and a PVC pipe with the same hole diameter as the anchor rod 2 (select 60-100mm according to the pile diameter and foundation pit characteristics) is buried at the anchor reinforcement 21. The inside of the PVC pipe is filled with water and the two ends are sealed and tied to the reinforcement cage, with the bottom flush with the pile bottom and the top flush with the top of the crown beam 300.
[0096] Install the steel cage into the pile hole and pour concrete to form the hanging pile 1.
[0097] Excavate the first layer of soil in the foundation pit to the bottom of the crown beam 300, and remove the pile head to construct the crown beam 300.
[0098] A top drive drill is used to drill into the reserved PVC pipe position on the pile body to form the pile body anchor hole.
[0099] Anchor rod 2 is installed to the anchor hole of the pile body, and then cement slurry is injected through the normal pressure grouting pipe until the hole mouth overflows. After the cement slurry is finally set, secondary grouting (pressure not less than 2MPa) is performed through the high-pressure grouting pipe within 2 hours to form a grouting body 26.
[0100] The backing plate 231 is installed, and a hydraulic jack is used to apply prestress to the anchor bar 21 , and then the locking nut 232 is installed to lock the prestress, and finally the first group of anchor rods 2 is formed.
[0101] Excavate the second layer of soil in the foundation pit to the bottom of the first waist beam at 400m.
[0102] A top drive drill is used to drill soil (rock) anchor holes between piles (selected between 120 and 200 mm according to the depth of the foundation pit and the characteristics of the rock and soil), and then grouting, construction of the waist beam 400, and tensioning and locking are performed to form the first anchor 2 in the second group of anchors 2; the grouting and tensioning and locking processes are the same as those of the first group of anchors 2.
[0103] Excavate the third layer of soil in the foundation pit to the bottom of the second waist beam 400, and construct the anchor rod 2 and waist beam 400 at the corresponding position. ... Excavate the foundation pit to the bottom of the last waist beam 400, and construct the anchor rod 2 and waist beam 400 at the corresponding position.
[0104] The stone is excavated by blasting to the bottom of the foundation pit, and the stone near the pile edge is formed into a rock shoulder of 500 by controlled static blasting.
[0105] (3) Anchor rod 2 recovery implementation method:
[0106] A hydraulic jack is used to apply tension to the anchor bar 21 to separate the locking nut 232 from the backing plate 231 , and then the locking nut 232 is removed.
[0107] By hammering, an impact force coincident with the center axis of the anchor bar 21 is applied to the anchor bar 21 , so that the bottom end of the anchor bar 21 slides into the ejector sleeve 224 , and the wedge-shaped ejector 223 slides into the wedge-shaped slideway 211 , thereby separating the wedge-shaped pressing piece 222 from the bottom end of the anchor bar 21 .
[0108] The anchor bar 21 is pulled out to a certain length by a hydraulic jack, and then the anchor bar 21 is pulled out by a lifting machine or a vibrating hammer.
[0109] The above construction method is suitable for the support structure of the soil-rock combination foundation pit. The construction process is safe and reliable. The main component anchor bar 21 is recyclable, and the anchoring method of the anchor bar 21 can effectively control the deformation of the foundation pit. After being anchored, the anchor rod 2 can be fixed with the soil 100 and the rock mass 200 as a whole, which not only improves the stability of the overall structure, but also reduces the cost of the pile 1 of the hanging pile 1 into the rock, and simplifies the construction. The anchor rod 2 serves as the main force-bearing bar and horizontal support structure of the hanging pile 1, and the deformation of the foundation pit can be effectively controlled by constructing prestress. The reuse of the anchor bar 21 after recovery not only reduces the material cost, but also reduces the pollution to the surrounding environment.
[0110] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, various obvious changes, readjustments and substitutions can be made without departing from the protection scope of the present invention. It is not necessary and impossible to list all the embodiments here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.
Claims
1. A recyclable anchored prestressed hanging pile support structure, arranged in a foundation pit of soil-rock combination, characterized in that: The recyclable anchored prestressed hanging pile support structure comprises: A hanging pile (1) is arranged on the air-facing side of the soil body (100), and the bottom end of the hanging pile (1) is arranged on the rock body (200); Anchor rods (2), wherein a plurality of anchor rods (2) are provided, and the plurality of anchor rods (2) are divided into two groups, wherein the anchor rods (2) of the first group are vertically arranged in the stilt piles (1) and penetrate downwards into the rock mass (200), and the anchor rods (2) of the second group are obliquely penetrated in the stilt piles (1) and the soil mass (100), and / or obliquely penetrated in the stilt piles (1) and the rock mass (200); The anchor rod (2) comprises an anchor bar (21) and an anchor assembly (22); the anchor assembly (22) is arranged at the bottom end of the anchor bar (21) located in the soil (100) or the rock mass (200); the anchor assembly (22) and the anchor bar (21) are detachably connected; The anchor assembly (22) comprises: A bearing platform (221), wherein the bearing platform (221) is provided with a central through hole, and the central through hole is a truncated cone hole; There are at least two wedge-shaped pressing pieces (222), at least two of which surround the bottom end of the anchor bar (21) and are threadedly connected to the bottom end of the anchor bar (21), and the wedge-shaped pressing pieces (222) are inserted into the central through hole and fixed; There are at least two wedge-shaped ejector pins (223), at least two of which are arranged on the end surface of the bottom end of the anchor bar (21), at least two wedge-shaped slideways (211) are arranged at the bottom end of the anchor bar (21), the wedge-shaped ejector pins (223) are arranged corresponding to the wedge-shaped slideways (211), and the wedge-shaped ejector pins (223) can slide into the wedge-shaped slideways (211) to separate the wedge-shaped pressing sheet (222) from the anchor bar (21); An ejector sleeve (224), wherein the ejector sleeve (224) is sleeved on the outside of at least two of the wedge-shaped ejectors (223); A sealing cover (225), wherein the sealing cover (225) covers the wedge-shaped ejector pin (223) and the ejector pin sleeve (224) and is fixed on the supporting platform (221), and the ejector pin sleeve (224) and the wedge-shaped ejector pin (223) are both fixedly connected to the sealing cover (225); The anchor rod (2) further comprises an isolation bracket (24), a plurality of the isolation brackets (24) are provided, and the plurality of isolation brackets (24) are arranged at intervals along the long axis direction of the anchor bar (21), and the anchor bar (21) is passed through the isolation bracket (24) to limit the position.
2. The recyclable anchored prestressed hanging pile support structure according to claim 1 is characterized in that: The anchor rod (2) further comprises a locking assembly (23), wherein the locking assembly (23) comprises a pad (231) and a locking nut (232); the top end of the anchor bar (21) is penetrated by the hanging pile (1) and the pad (231) and is locked with the locking nut (232) to fix and tighten the anchor bar (21).
3. The recyclable anchored prestressed hanging pile support structure according to claim 1 is characterized in that: The anchor rod (2) further comprises a grouting pipe (25), and the grouting pipe (25) is passed through the isolation bracket (24) to limit the position.
4. The recyclable anchored prestressed hanging pile support structure according to claim 1 is characterized in that: The hanging pile (1) comprises longitudinal reinforcement (11), stirrups (12) and support reinforcement (13); a plurality of stirrups (12) are arranged at intervals in the long axis direction of the longitudinal reinforcement (11); a plurality of longitudinal reinforcements (11) are arranged at intervals close to the inner wall of the stirrups (12); two ends of the support reinforcement (13) are respectively connected to the inner wall of the stirrups (12) to divide the plane where the stirrups (12) are located into a semicircular area facing the soil and a semicircular area facing the air; and the anchor bar (21) is arranged in the semicircular area facing the soil.
5. The recyclable anchored prestressed hanging pile support structure according to claim 4 is characterized in that: The arc section of the anchor bar (21) in the semicircular area near the soil is close to the inner wall of the stirrup (12) and is arranged alternately with the longitudinal reinforcement (11), and the straight section of the anchor bar (21) in the semicircular area near the soil is close to the support reinforcement (13) and is arranged at intervals.
6. The recyclable anchored prestressed hanging pile support structure according to claim 1 is characterized in that: The anchor rod (2) further comprises an isolating sleeve (27), wherein the isolating sleeve (27) is sleeved on the anchor bar (21), and the bottom end of the isolating sleeve (27) abuts against the top of the bearing platform (221).
7. A construction method for the recyclable anchored prestressed hanging pile support structure according to any one of claims 1 to 6, characterized in that: The steps include: S1, arranging an anchor assembly (22) at the bottom end of an anchor bar (21) to form an anchor rod (2); S2, respectively drilling anchor holes on the soil (100) and the rock mass (200), then allowing the anchor rod (2) to penetrate the stilt pile (1) and the anchor hole on the soil (100), and / or allowing the anchor rod (2) to penetrate the stilt pile (1) and the anchor hole on the rock mass (200), and finally grouting; S3, after the construction of the rock shoulder (500) in the foundation pit is completed, the anchor bar (21) is pulled out to recover the anchor rod (2).
8. The construction method of the recyclable anchored prestressed hanging pile support structure according to claim 7 is characterized in that: The specific process of recovering the anchor rod (2) is as follows: S31, applying an upward pulling force to the anchor bar (21) to separate the locking nut (232) and the pad (231), and removing the locking nut (232); S32, applying an axial downward impact force to the anchor bar (21), so that the bottom end of the anchor bar (21) slides into the ejector sleeve (224), and at the same time the wedge-shaped ejector (223) slides into the wedge-shaped slideway (211), so that the wedge-shaped pressing sheet (222) is separated from the bottom end of the anchor bar (21); S33, pulling out the anchor bar (21) upwards to achieve recovery.