An argon blowing system for ladle air permeable upper water inlet seat brick and its installation method
Through the design of new argon blowing pipelines and high-performance check valves, the existing technology problems of complex installation of ladle ventilation nozzle bricks and low recirculation rate are solved, achieving efficient air cleaning effects and long-life ladle ventilation. The water outlet is made of bricks.
Patent Information
- Application Number
- CN202110704169.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-06-24
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2041-06-24
AI Technical Summary
The installation process of the existing brick argon blowing system for the steel ladle ventilation nozzle is complicated and prone to air leakage. Moreover, due to the difficulty in disassembly and assembly due to welding construction and the low recirculation rate, it cannot meet the air cleaning needs under high-temperature operating conditions.
The new argon blowing pipeline and high-performance check valve are used, and the rotary connection pipe fittings and detachable connection design are used to simplify the installation process, ensure sealing performance, prevent gas backflow under high temperature conditions, and improve the recirculation rate.
Significantly improves the recirculation rate of the steel ladle venting upper nozzle seat brick, shortens the installation time, extends the service life, and reduces material and maintenance costs.
Smart Images

Figure CN113444858B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of steelmaking process in iron and steel metallurgy, and in particular to an argon blowing system for ladle air permeable upper water inlet seat bricks and an installation method thereof. Background Art
[0002] The argon blowing metallurgical technology of the breathable upper water inlet brick of the ladle during the pouring process of the continuous casting ladle forms a ring-shaped microbubble air curtain barrier around the upper water inlet. These microbubbles wash the molten steel flowing to the upper water inlet of the ladle, promote the floating removal of inclusions, and at the same time promote the circulation of the molten steel, eliminate the temperature gradient formed during the static process of the continuous casting ladle, and overcome the common industry problems such as temperature stratification, uneven composition, and slag under the converging vortex in the continuous casting ladle, thereby improving the cleanliness and homogeneity of the molten steel.
[0003] Chinese patent document CN 201678699 U (application number 201020145666.3) discloses a ladle anti-seepage argon blowing system, including a gas source, which is connected to the argon gas inlet of the ladle air brick through a gas buffer tank and a one-way air inlet valve in turn. By setting a gas buffer tank and a one-way valve, when the gas source is closed and the argon blowing is stopped, the pipe section after the pipeline valve is positively pressurized, so that the one-way valve is closed, so as to prevent the molten steel from entering the slit of the air brick due to negative pressure, so that the air brick will not be corroded by the seepage, and the steel leakage accident of the ladle is avoided. However, the connection construction of the argon blowing inlet pipeline of this device is relatively difficult. When the air brick in the ladle is infiltrated with steel, the re-opening rate of the air brick is low due to the blockage of the air permeable working surface of the air brick; and the prior art is difficult to disassemble and assemble due to the welding construction, and the various connections of the pipeline are also prone to leakage due to the welding construction, resulting in unsatisfactory argon blowing effect and failure to meet the gas washing conditions in the ladle. Summary of the invention
[0004] The purpose of the present invention is to overcome the deficiencies of the above-mentioned prior art and to provide an argon blowing system for a ladle air-permeable upper water inlet seat brick and an installation method thereof. By setting a new argon blowing pipeline and setting a high-performance check valve on the pipeline, the installation process of the argon blowing air inlet pipeline is simplified, the problems of pipeline leakage and "gas backflow" are solved, the re-opening rate of the ladle air-permeable upper water inlet seat brick is significantly improved, and the recycling utilization of the argon blowing air inlet pipeline is realized.
[0005] To achieve the above object, the present invention adopts the following technical solutions:
[0006] An argon blowing system for a ladle air-permeable upper nozzle seat brick comprises a ladle, wherein the ladle is provided with a ladle air-permeable upper nozzle seat brick, wherein the ladle air-permeable upper nozzle seat brick is provided with an air inlet pipe, the argon blowing system further comprises a rotating connecting pipe fitting, a connecting pipe, a high-temperature check valve, an external pipe, and a quick connector connected in sequence, wherein the connection between the connecting pipe and the quick connector is a detachable connection;
[0007] The rotary connecting pipe fitting includes a first rotary female port, a first joint plug rod, an internal pipe, a second joint plug rod and a second rotary female port which are connected in sequence, wherein the first rotary female port is connected to the air inlet pipe, and the second rotary female port is connected to the connecting pipe, and the first rotary female port and the air inlet pipe provided with the air permeable upper water inlet seat brick of the ladle, and the second rotary female port and the connecting pipe are also detachably connected.
[0008] By setting a high-temperature check valve, it is ensured that when the argon blowing system stops introducing argon, the air-permeable upper water inlet seat brick will not be unable to resume circulation due to steel infiltration due to "gas backflow" in the air inlet pipeline. The use of detachable connections in many places in the pipeline of the argon blowing system simplifies the connection process and greatly shortens the installation and disassembly time of the entire system. The detachable connection also ensures the sealing performance of various places in the pipeline.
[0009] The inner pipe is L-shaped, the first articulated plug rod is horizontal, the second articulated plug rod is vertical, and the rotating connecting pipe fitting is L-shaped as a whole, so as to realize the transformation of the airflow from vertical to horizontal, meet the adaptation of the argon blowing pipeline and the existing commonly used nozzle seat bricks, and effectively broaden the application scope of the argon blowing system.
[0010] The connecting pipe is L-shaped, the high-temperature check valve, external pipe and quick connector are all arranged outside the ladle and arranged in the horizontal direction, the ladle is provided with a positioning hole, the connecting pipe passes through the positioning hole and is connected to the high-temperature check valve. Ensure that the sliding gate mechanism is arranged in parallel with the air inlet end of the argon blowing system, so as to facilitate the connection between the pipeline and the external gas source when blowing argon.
[0011] The connection between the connecting pipe and the quick connector is a threaded connection, and the first screw-in female port and the air inlet pipe and the second screw-in female port and the connecting pipe are both threaded connections. All important parts of the argon blowing system are threaded, which not only ensures the sealing effect, but also facilitates the maintenance of various components in the system during use.
[0012] The connecting pipe is fixed with a first positioning plate and a second positioning plate, both of which are fixed between the connecting pipe and the ladle, and the spacing between the first positioning plate and the second positioning plate is equal to 2 / 3 to 3 / 4 of the length of the horizontal section of the connecting pipe. Furthermore, the second positioning plate is fixed at the bend of the connecting pipe, and the first positioning plate is located between the second positioning plate and the high-temperature check valve. The two positioning plates are used to effectively limit the pipeline and the ladle in the argon blowing system to prevent relative displacement between the pipeline and the ladle during use, thereby affecting the argon blowing metallurgical effect.
[0013] The first positioning plate and the second positioning plate are both made of Q235, and have a thickness of 20mm-30mm, which effectively ensures the reinforcement effect of the pipeline.
[0014] The high-temperature check valve has excellent properties such as high temperature resistance, i.e. ≥650°C, hard sealing structure, low opening pressure, i.e. ≤0.1bar, and low leakage rate. The high-temperature check valve with model specification of PN25FBSP3 / 4 inches from Swiss FC-Technik Company is selected; the materials of the external pipe, connecting pipe, internal pipe and rotating connecting pipe fittings are all heat-resistant stainless steel. The use of heat-resistant stainless steel ensures the service life of each component in the argon blowing system, so that the system can be repeatedly recycled.
[0015] The present invention also provides a method for installing an argon blowing system for a ladle air permeable upper water inlet seat brick in a primary ladle.
[0016] The primary ladle refers to the ladle bottom working lining, including slag line magnesia carbon bricks, ladle wall castables, and ladle bottom castables, which are all used for the first time after replacement or casting.
[0017] The specific installation steps are as follows:
[0018] S1. Measure the required length of the connecting pipe and thread both ends of it. Connect one end of the connecting pipe to the high-temperature check valve, external pipe and quick connector in sequence. Insert the other end of the connecting pipe into the ladle to construct the permanent lining of the ladle and the working lining of the ladle bottom.
[0019] S2. After the permanent lining of the ladle and the working lining of the ladle bottom are completed, the air-permeable upper water inlet seat brick of the ladle is hoisted, and the first swivel female port in the swivel connecting pipe is connected to the air inlet pipe, and the second swivel female port is connected to one end of the connecting pipe inserted into the ladle;
[0020] S3. Connect the quick connector to the argon gas source and conduct a leak test. After confirming that the connected argon blowing pipeline is leak-free, a waterproof sticker is pasted on the air-permeable surface of the ladle air-permeable upper nozzle seat brick to prevent the mud in the castable from penetrating into the air holes through the air-permeable surface, affecting the air permeability of the ladle air-permeable upper nozzle seat brick, and thus affecting the effect of argon blowing metallurgy;
[0021] S4. Install the ventilation water inlet bricks of the pouring ladle in the pit, and after curing and baking the ladle, it can be put into use.
[0022] The present invention also provides a method for installing an argon blowing system for a ladle air permeable upper water inlet seat brick in a secondary ladle.
[0023] The secondary ladle is a ladle installed with an argon blowing pipeline. It is put into production for 45 to 50 furnaces before it is taken offline for minor repairs. The minor repairs include replacing magnesia carbon bricks in the slag line, air-permeable upper water inlet seat bricks, and repairing the working lining at the bottom of the ladle.
[0024] The specific installation steps are as follows:
[0025] S1. After the ladle is put into production for 45-50 furnaces, it is taken offline for minor repairs. The used slag line magnesium carbon bricks are removed by a bag unpacking machine, and the castables in the pit are installed by a pneumatic pick to clean the air permeable upper water inlet bricks of the ladle;
[0026] S2. Remove the rotating connecting pipe first, and then remove the used ladle air permeable upper water inlet seat brick;
[0027] S3. Install a new ladle air-permeable upper water inlet seat brick in the installation pit, connect the first rotary female port of the rotary connection pipe to the air inlet pipe, and connect the second rotary female port to the connecting pipe inserted into one end of the ladle;
[0028] S4. Connect the quick connector to the argon gas source and perform a leak test. After confirming that the connected argon blowing system is leak-free, stick a waterproof sticker on the air-permeable surface of the ladle air-permeable upper water inlet seat brick;
[0029] S5. Install the pit for pouring the air-permeable upper water inlet bricks of the ladle, repair the working lining of the bottom of the ladle, lay the slag line magnesia carbon bricks, and put the ladle into use after curing and baking.
[0030] The waterproof sticker is in a circular shape, and its size is the same as the air permeable surface size of the air permeable upper water inlet seat brick of the ladle, and is made of commercially available circular waterproof stickers or waterproof self-adhesive label paper cut out.
[0031] The beneficial effects of the present invention are:
[0032] 1) The argon blowing system provided by the present invention uses a rotating connecting pipe fitting, and the connection points at both ends thereof are detachable, the connection method is simple, the disassembly and assembly are convenient, the connection sealing performance is good, and the installation time of the entire argon blowing inlet pipeline is shortened. The high-temperature check valve used effectively solves the sealing failure problem caused by the conventional check valve and one-way valve selected in the existing argon blowing inlet pipeline due to the lack of high temperature resistance (operating temperature < 400°C), and breaks through the industry common problem of steel seepage of the ladle air permeable upper water inlet seat brick due to "gas backflow" after the argon gas source is disconnected in the argon blowing inlet pipeline under high temperature working conditions (400°C to 600°C), and achieves a 100% re-opening rate of the ladle air permeable upper water inlet seat brick, thereby shortening the oxygen burning and cleaning time of the ladle air permeable upper water inlet seat brick and increasing the average life of the ladle air permeable upper water inlet seat brick;
[0033] 2) The part of the pipeline provided by the present invention located outside the ladle, that is, the part from the bend of the connecting pipe to the quick connector and the sliding gate mechanism is arranged in parallel, which is beneficial to realize the connection and disconnection operation of the quick connector and the hanging and unhooking operation of the oil cylinder of the sliding gate mechanism synchronously, simplifies the operation steps, and reduces the operation difficulty of the operator;
[0034] 3) All pipelines used in the present invention are made of heat-resistant stainless steel, which is not easy to deform, thus achieving the repeated recycling of the entire pipeline, reducing material costs and maintenance costs, and reducing the use costs for the enterprise while ensuring the use effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1 It is a schematic diagram of the installation and connection of the argon blowing pipeline and the air permeable upper water inlet seat brick of the ladle in an embodiment of the present invention;
[0036] Figure 2 is a schematic structural diagram of a rotary connecting pipe fitting according to an embodiment of the present invention;
[0037] Figure 3 1 is a schematic diagram of the structure of a screw-on female port in an embodiment of the present invention, wherein (a) is a front view, and (b) is a cross-sectional view taken along line AA in (a);
[0038] Among them, 1. quick connector; 2. external pipe; 3. high-temperature check valve; 4. connecting pipe; 5. first positioning plate; 6. rotating connecting pipe fitting; 7. positioning hole; 8. second positioning plate; 9. air inlet pipe; 10. air-permeable upper water inlet seat brick; 11. ladle bottom shell; 12. installation pit; 13. ladle permanent lining; 14. ladle bottom working lining; 15. waterproof sticker; 16. first rotary female mouth; 17. first movable plug rod; 18. internal pipe; 19. second movable plug rod; 20. second rotary female mouth. DETAILED DESCRIPTION
[0039] The present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0040] The structures, proportions, sizes, etc. illustrated in the drawings of this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the limiting conditions for the implementation of the present invention, so they have no substantial technical significance. Any modification of the structure, change of the proportional relationship or adjustment of the size, without affecting the effects and purposes that can be achieved by the present invention, should still fall within the scope of the technical contents disclosed by the present invention. At the same time, the terms such as "upper", "lower", "left", "right", "middle" and "one" quoted in this specification are only for the convenience of description, and are not used to limit the scope of the implementation of the present invention. The change or adjustment of their relative relationship should also be regarded as the scope of the implementation of the present invention without substantially changing the technical contents.
[0041] Embodiment 1:
[0042] like Figure 1As shown, an argon blowing system for a ladle air-permeable upper water inlet seat brick comprises a ladle, a ladle air-permeable upper water inlet seat brick 10 is arranged in the ladle, an air inlet pipe 9 is arranged in the ladle air-permeable upper water inlet seat brick 10, and further comprises a rotating connecting pipe 6, a connecting pipe 4, a high-temperature check valve 3, an external pipe 2, and a quick connector 1 which are connected in sequence, and the quick connector 1 is connected to an external argon gas source; the high-temperature check valve 3 has excellent properties such as high temperature resistance, i.e. ≥650°C, hard sealing structure, low opening pressure, i.e. ≤0.1bar, and low leakage rate. A high-temperature check valve with a model specification of PN25FBSP3 / 4 inches from Swiss FC-Technik Company is selected. The high-temperature check valve 3 is used to ensure unidirectional flow of gas in the argon blowing pipeline to prevent molten steel from infiltrating into the water inlet seat brick due to "gas backflow" in the air inlet pipeline after the argon gas source is cut off.
[0043] like Figure 2 As shown, the rotary connecting pipe fitting 6 includes a first rotary female port 16, a first joint plug rod 17, an internal pipe 18, a second joint plug rod 19 and a second rotary female port 20 which are connected in sequence, wherein the first rotary female port 16 is connected to the air inlet pipe 9, and the second rotary female port 20 is connected to the connecting pipe.
[0044] The internal pipe 18 is L-shaped, the first joint plug rod 17 is horizontal, and the second joint plug rod 19 is vertical; the connecting pipe 4 is L-shaped, the high-temperature check valve 3, the external pipe 2, and the quick connector 1 are all arranged outside the ladle and arranged in the horizontal direction. The ladle is provided with a positioning hole 7, and the positioning hole 7 is arranged at the bottom shell 11 of the ladle and vertically penetrates the bottom shell 11 of the ladle. The connecting pipe 4 passes through the positioning hole 7 and is connected to the high-temperature check valve 3. The connection between the connecting pipe and the quick connector 1 is a detachable connection, and the first rotary female port 16 and the air inlet pipe 9 of the ladle air permeable upper water inlet seat brick 10 and the second rotary female port 20 and the connecting pipe 4 are also detachable connections. Preferably, the detachable connection is a threaded connection. Threaded connections are used for all important parts in the argon blowing pipeline, which not only ensures the sealing effect, but also facilitates the maintenance of each component in the pipeline during use.
[0045] The first screw-on female port 16 and the first joint plug rod 17 are respectively identical to the second screw-on female port 20 and the second joint plug rod 19. The joint plug rod is T-shaped as a whole, including a rod head and a rod body, and has a through hole for gas circulation inside; Figure 3As shown, the screw-in female port is in the shape of a regular hexagonal prism as a whole and has an opening at one end for the joint plug rod to pass through. The rod body of the joint plug rod passes through the opening of the screw-in female port, and the rod head matches the inner cavity size of the screw-in female port and is stuck inside the opening. The rod body of the joint plug rod is inserted into the internal pipe 18, and the outer diameter of the rod body matches the inner diameter of the internal pipe 18. The connection between the rod body and the internal pipe 18 is welded for sealing and reinforcement. When the screw-in female port is threadedly connected with the air inlet pipe 9 or the connecting pipe 4 of the ladle air inlet seat brick, the air inlet pipe or the connecting pipe 4 of the ladle air inlet seat brick is tightened inwardly, and the rod head of the joint plug rod is pressed against the opening of the screw-in female port to ensure a good seal between the joint plug rod and the screw-in female port.
[0046] The material of the external pipe 2, the connecting pipe 4, the internal pipe 18 and the rotating connecting pipe fitting 6 is heat-resistant stainless steel, among which the outer diameter of the external pipe and the connecting pipe is 21.34mm, the wall thickness is 2mm, the outer diameter of the internal pipe is 26.67mm, the wall thickness is 2mm, the internal thread specification model of the rotating female port is M30*2, and the size of the joint plug rod is selected to match the rotating female port.
[0047] The first positioning plate 5 and the second positioning plate 8 are fixed on the connecting pipe, and the first positioning plate 5 and the second positioning plate 8 are both fixed between the connecting pipe 4 and the ladle, and the spacing between the first positioning plate 5 and the second positioning plate 8 is equal to 2 / 3 to 3 / 4 of the length of the horizontal section of the connecting pipe 4. Preferably, the second positioning plate 8 is fixed at the bend of the connecting pipe 4, and the first positioning plate 5 is located between the second positioning plate 8 and the high-temperature check valve 3. The two positioning plates are used to effectively limit the entire pipeline and the ladle in which it is located, to prevent relative displacement between the argon blowing pipeline and the bottom shell 11 of the ladle during use. The first positioning plate 5 and the second positioning plate 8 are both made of Q235, and the thickness is 25 mm, which effectively ensures the reinforcement effect of the pipeline.
[0048] Embodiment 2:
[0049] The installation method of the argon blowing system for the ladle air permeable upper nozzle seat brick as described in Example 1, the specific installation method comprises the following steps:
[0050] S1. Measure the required length of the connecting pipe 4 on site and thread both ends of it, bend the connecting pipe 4 into an L shape, connect one end of the connecting pipe 4 in the horizontal direction to the high-temperature check valve 3, the external pipe 2 and the quick connector 1 in sequence, insert the vertical part of the connecting pipe 4 into the ladle through the positioning hole 7 opened at the bottom end of the ladle, i.e., the ladle bottom shell 11, weld and fix the first positioning plate 5 and the second positioning plate 8 between the connecting pipe 4 and the ladle, so that the position of the connecting pipe 4 and the ladle is relatively fixed, and construct the permanent lining 13 of the ladle and the working lining 14 of the ladle bottom;
[0051] S2. After the construction of the permanent lining 13 and the bottom lining 14 of the ladle is completed, the air-permeable upper water inlet block 10 of the ladle is hoisted, the first rotary female port 16 of the rotary connecting pipe 6 is connected to the air inlet pipe 9, and the second rotary female port 20 is connected to the vertical port of the connecting pipe 4;
[0052] S3. Connect the quick connector 1 to the argon gas source, perform a leak test according to the existing method, and after confirming that the connected argon blowing pipeline is leak-free, stick a waterproof sticker 15 on the air-permeable surface of the ladle air-permeable upper water inlet seat brick 10 to prevent the mud in the castable from penetrating into the air hole through the air-permeable surface, affecting the air permeability of the ladle air-permeable upper water inlet seat brick 10, and thus affecting the effect of argon blowing metallurgy;
[0053] S4. Use the existing technology to cast the ladle air-permeable upper water inlet seat brick to install the pit 12. According to the existing technology, the ladle can be put into use after curing and baking.
[0054] The waterproof sticker 15 used in step S3 is in a circular shape, and its size is the same as the air permeable surface size of the ladle air permeable upper water inlet seat brick 10, and is made of commercially available circular waterproof stickers or waterproof self-adhesive label paper cut out.
[0055] Embodiment 3:
[0056] As described in Example 1, the installation method of the argon blowing system for the air-permeable upper water inlet seat brick of the ladle is described. This embodiment is a method for disassembling and assembling the argon blowing system when the ladle (i.e., the primary ladle) installed in Example 2 has worked for a period of time and becomes a secondary ladle. The method specifically includes the following steps:
[0057] S1. After the ladle is put into production for 45-50 furnaces, it is taken offline for minor repairs. The used slag line magnesium carbon bricks are removed by a bag unpacking machine, and the ladle air permeable upper water inlet bricks are cleaned by a pneumatic pick to install the castables in 12 parts of the pit;
[0058] S2 first remove the rotating connecting pipe 6, after the removal of the ladle air-permeable upper inlet block brick 10;
[0059] S3. Install a new ladle air inlet brick installation pit 12 in the ladle air inlet brick installation pit 10, connect the first rotary female port 16 of the rotary connection pipe 6 to the ladle air inlet brick seat with the air inlet pipe 9, and connect the second rotary female port 20 to the vertical port of the connecting pipe 4;
[0060] S4. Connect the quick connector 1 to the argon gas source, perform a leak test according to the existing method, and after confirming that the argon blowing pipeline is leak-free after being connected, stick a waterproof sticker 15 on the air-permeable surface of the ladle air-permeable upper water inlet seat brick 10. The waterproof sticker 15 is the same as the waterproof sticker 15 used in Example 2;
[0061] S5. Use existing technology to repair the ladle bottom working lining 14, pour the ladle air-permeable upper water inlet seat brick installation pit 12, lay slag line magnesia carbon bricks, and cure and bake the ladle according to existing technology before it can be put into use.
[0062] Comparative Example 1:
[0063] Chinese patent document CN 109732074 A discloses a ladle diffusion ring air-permeable upper water inlet seat brick and an argon blowing metallurgical method thereof, wherein a structure and connection method of an argon blowing pipeline are provided.
[0064] Comparative Example 2:
[0065] Chinese patent document CN 111774559 A discloses a device and application method for improving the blowing rate of ladle bottom blowing air-permeable bricks, which also provides a structure and connection method of an argon blowing pipeline.
[0066] Experimental example:
[0067] The argon blowing pipelines described in Examples 1-3 and Comparative Examples 1 and 2 were respectively applied to the 2#130tLF refining ladle air-permeable upper water inlet seat bricks of the steelmaking plant of Laiwu Iron and Steel Group Yinshan Steel Co., Ltd., and other conditions were controlled to be the same (such as the ladle air-permeable upper water inlet, argon blowing flow rate, argon blowing time, ladle bottom working lining and repair process, etc.), and the application comparison is shown in Table 1:
[0068] Table 1
[0069]
[0070] By comparing the data in Table 1, it can be seen that the argon blowing pipeline connection method provided by the present invention is simple, and is convenient to disassemble and assemble (the installation time is short), which solves the application technical problem of the argon blowing air inlet pipeline given in Comparative Example 1 (CN 109732074 A) and Comparative Example 2 (CN 111774559 A) that the disassembly and assembly are difficult due to welding construction, and the installation time of the argon blowing air inlet pipeline is greatly shortened; the recycling of the argon blowing air inlet pipeline is realized, and the problem of the inability to completely restore the steel permeable upper water inlet seat brick due to steel seepage caused by "gas backflow" in the air inlet pipeline is solved; the restoration rate of the steel permeable upper water inlet seat brick 10 of the steel ladle is achieved to be 100%, thereby shortening the oxygen burning and cleaning time of the steel permeable upper water inlet seat brick of the steel ladle, and improving the average life of the steel permeable upper water inlet seat brick 10 of the steel ladle.
[0071] Although the above describes the specific implementation mode of the present invention in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present invention. Those skilled in the art should understand that various modifications or variations that can be made by those skilled in the art on the basis of the technical solution of the present invention without creative work are still within the scope of protection of the present invention.
Claims
1. An argon blowing system for a ladle air-permeable upper nozzle seat brick, comprising a ladle, wherein a ladle air-permeable upper nozzle seat brick (10) is arranged in the ladle, and an air inlet pipe (9) is arranged in the ladle air-permeable upper nozzle seat brick (10), characterized in that: It also includes a rotating connecting pipe (6), a connecting pipe (4), a high-temperature check valve (3), an external pipe (2), and a quick connector (1) which are connected in sequence, wherein the connection between the connecting pipe (4) and the quick connector (1) is a detachable connection; The rotary connection pipe member (6) comprises a first rotary female opening (16), a first joint plug rod (17), an internal pipe (18), a second joint plug rod (19) and a second rotary female opening (20) which are connected in sequence, wherein the first rotary female opening (16) is connected to the air intake pipe (9), and the second rotary female opening (20) is connected to the connecting pipe (4), and the first rotary female opening (16) and the air intake pipe (9), and the second rotary female opening (20) and the connecting pipe (4) are both detachably connected; The inner pipe (18) is L-shaped, the first joint plug rod (17) is in a horizontal direction, and the second joint plug rod (19) is in a vertical direction; the connecting pipe (4) is L-shaped, the high-temperature check valve (3), the outer pipe (2), and the quick connector (1) are all arranged outside the ladle and in a horizontal direction, the ladle is provided with a positioning hole (7), and the connecting pipe (4) passes through the positioning hole (7) and is connected to the high-temperature check valve (3); A first positioning plate (5) and a second positioning plate (8) are fixed on the connecting pipe; The first positioning plate (5) and the second positioning plate (8) are both fixed between the connecting pipe (4) and the ladle, and the distance between the first positioning plate (5) and the second positioning plate (8) is equal to 2 / 3 to 3 / 4 of the length of the horizontal section of the connecting pipe (4).
2. The argon blowing system for ladle air-permeable upper nozzle seat bricks according to claim 1, characterized in that: The connection between the connecting pipe (4) and the quick connector (1) is a threaded connection, and the first screw-on female port (16) and the air inlet pipe (9) and the second screw-on female port (20) and the connecting pipe (4) are both threaded connections.
3. The argon blowing system for ladle air-permeable upper nozzle seat bricks according to claim 1, characterized in that: The second positioning plate (8) is fixed at the bend of the connecting pipe (4), and the first positioning plate (5) is located between the second positioning plate (8) and the high-temperature check valve (3).
4. The argon blowing system for ladle air-permeable upper nozzle seat bricks according to claim 1, characterized in that: The high-temperature check valve (3) is a PN25FBSP3 / 4 type high-temperature check valve (3); the external pipe (2), the connecting pipe (4), the internal pipe (18) and the rotating connecting pipe (6) are all made of heat-resistant stainless steel; the first positioning plate (5) and the second positioning plate (8) are both made of Q235, and have a thickness of 20 mm to 30 mm.
5. The method for installing the argon blowing system in a primary package according to any one of claims 1 to 4, characterized in that: The first ladle refers to the ladle bottom working lining (14), including the slag line magnesia carbon bricks, ladle wall castables, and ladle bottom castables, which are all used for the first time. The specific installation steps are as follows: S1. Measure the required length of the connecting pipe and thread both ends of the connecting pipe, connect one end of the connecting pipe (4) to the high-temperature check valve (3), the external pipe (2) and the quick connector (1) in sequence, insert the other end of the connecting pipe (4) into the ladle, and construct the permanent lining (13) of the ladle and the working lining (14) of the ladle bottom; S2. After the construction of the permanent lining (13) and the working lining (14) of the ladle bottom is completed, the air-permeable upper water inlet brick (10) of the ladle is hoisted, the first swivel female port (16) of the swivel connecting pipe (6) is connected to the air inlet pipe (9), and the second swivel female port (20) is connected to the connecting pipe (4) inserted into one end of the ladle; S3. Connect the quick connector (1) to the argon gas source and perform a leak test. After confirming that the argon blowing system is leak-free after the connection, a waterproof sticker (15) is pasted on the air-permeable surface of the ladle air-permeable upper water inlet seat brick (10) to prevent the mud in the castable from penetrating into the air hole through the air-permeable surface, affecting the air permeability of the ladle air-permeable upper water inlet seat brick (10), thereby affecting the effect of argon blowing metallurgy; S4. The ventilation upper water inlet seat brick of the pouring ladle is installed in the pit (12), and the ladle is cured and baked before it can be put into use.
6. The method for installing the argon blowing system in a secondary package according to any one of claims 1 to 4, characterized in that: The secondary ladle is a ladle equipped with an argon blowing system that has been put into production for 45 to 50 furnaces before being taken offline for minor repairs. The minor repairs include replacing the slag line magnesia carbon bricks, the ladle air permeable upper water inlet seat bricks (10), and repairing the ladle bottom working lining (14). The specific installation steps are as follows: S1. After the ladle is put into production for 45~50 furnaces, it is taken offline for minor repairs. The used slag line magnesium carbon bricks are removed by a bag unpacking machine, and the castables in the pit (12) are cleaned by a pneumatic pick. S2. First remove the rotating connecting pipe (6), then remove the used ladle air-permeable upper water inlet seat brick (10); S3. Install a new ladle air-permeable upper water inlet seat brick (10) in the installation pit (12), connect the first rotary female port (16) of the rotary connecting pipe (6) to the air inlet pipe (9), and connect the second rotary female port (20) to the connecting pipe (4) inserted into one end of the ladle; S4. Connect the quick connector (1) to the argon gas source for leak detection. After confirming that the argon blowing system is not leaking after connection, a waterproof sticker (15) is pasted on the air-permeable surface of the ladle air inlet seat brick (10); S5. Cast the ventilation upper water inlet brick of the ladle and install the pit (12), repair the working lining (14) of the ladle bottom, lay the slag line magnesia carbon bricks, and cure and bake the ladle before it can be put into use.
7. The installation method according to any one of claims 5 or 6, characterized in that: The waterproof sticker (15) is in the shape of a ring and has the same size as the air permeable surface size of the air permeable upper water inlet seat brick (10) of the ladle. It is made by cutting a commercially available ring-shaped waterproof sticker (15) or waterproof self-adhesive label paper.
