The application discloses a kind of anti-
chlorine salt
erosion rubber modified
asphalt pavement pit slot repair
composite process, in view of the interface peeling caused by
chlorine salt
erosion in traditional repair process, short repair life problem, innovatively proposes the three-stage repair
system of "debridement-interface activation-bionic filling": (1) rough interface is formed by using high-pressure
cyclone debridement device to remove loose debris;(2) spray anti-
chloride bonding layer containing nano-
silane coupling agent, the
depth of penetration reaches 3-5mm, forms chemical barrier;(3) layered filling rubber modified
asphalt mixture, the gradient compaction is implemented in 30-50Hz of adjustable frequency vibrating road roller.The application improves the interface strength by molecular bonding and mechanical
interlocking dual action, realizes the dual anchoring of chemical bonding and mechanical engagement effect of repair layer and original pavement, improves the
interface bonding strength, prolongs the service life of repair layer, effectively solves the technical problem that pit slot repair layer is easy to debond and fails in
chlorine salt environment, and is suitable for the rapid repair of pavement diseases in coastal areas and road sections where deicing agent is used a lot in winter.