The invention discloses a power utilization inspection task automatic generation and
distribution method and
system, and relates to the technical field of power
supply and distribution, and the method comprises the steps: carrying out the data collection of regional nodes, building a regional node
data set, carrying out the power utilization risk recognition, creating M power utilization inspection tasks, and building a first task priority; activating a
backtracking extraction channel, carrying out
electricity consumption information
backtracking extraction, establishing M
electricity consumption information sequences, and establishing a second task priority; and performing multi-agent
adaptation analysis according to the first task priority and the second task priority, and establishing a power utilization inspection task distribution result. The method solves the technical problems of low task execution efficiency and
slow response speed caused by dependence on manual arrangement and lack of intelligent analysis and real-
time response capabilities of the power utilization inspection task in the prior art, and achieves the purposes of automatically generating the power utilization inspection task by fusing multi-
source data, dynamically adjusting the task priority in combination with real-
time data, and improving the efficiency of power utilization inspection. And the task execution efficiency and the response speed are improved.