A method for dynamically calculating the amount of water inflow in a mine based on the principle of the mobile well method

Through the combination of dynamic calculation methods and formulas, the error problem of the conventional "big well method" in the calculation of mine water inrush volume is solved, and the accurate prediction of water inrush volume during the working face propulsion process is achieved and the water prevention and control work is supported.

CN113836742BActive Publication Date: 2024-11-12CHINA UNIV OF MINING & TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111166130.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-09-30
Publication Date
2024-11-12
Estimated Expiration
2041-09-30

AI Technical Summary

Technical Problem

When calculating the water inflow of mines, due to the complex changes in goaf area and water level, the calculation results of the conventional "big well method" are relatively large, making it difficult to accurately predict the water inflow of each stage of the working face.

Method used

Using a dynamic calculation method based on the principle of "mobile large well method", the hydrological geological parameters are statistically integrated, and the 'mobile large well' in the process of promoting the working face is gradually generalized, and the water inflow volume is calculated at each stage using the stable flow and non-stable flow formula, and the water inflow volume in each stage is calculated in the When the water level of the aquifer drops to the top plate, the pressure-free formula is used to dynamically adjust the impact radius and water level, and gradually correct the calculation of the influx volume.

Benefits of technology

It significantly reduces traditional calculation errors, improves the accuracy of water inflow volume in each stage of the working surface, and supports more effective water prevention and control work.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113836742B_ABST
    Figure CN113836742B_ABST
Patent Text Reader

Abstract

The present invention provides a method for dynamically calculating the water inflow of a mine based on the principle of a moving well method, and the steps include: S1, statistically integrating the hydrogeological parameters of the main water-filled aquifer of the mining face; S2, generalizing the "moving well" at different stages in the process of advancing the working face with the collapse step distance as a unit; S3, calculating the water inflow of the working face at the end of the first stage (the initial collapse stage) by using a steady flow formula; S4, using the water inflow of the working face in the initial collapse stage, and using a non-steady flow formula to calculate the water level drop at the center of the generalized well at the end of the second stage mining and before the periodic collapse; S5, after the second stage periodic collapse, using the water level drop formed by the first stage mining, superimposing and calculating the initial water level during the second stage mining, and calculating the water inflow of the working face after the second stage ends and the periodic collapse; S6, repeating the above calculation process, and dynamically calculating the water inflow of each stage in the process of advancing the working face in turn.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of geological exploration, in particular to a method for dynamically calculating the water inflow of a mine based on the principle of a mobile large well method. Background Art

[0002] The hydrogeological conditions in coal mining areas are complex and mine water disasters occur frequently. In order to prevent and reduce the occurrence of water inrush accidents, it is particularly important to carry out water inrush prediction and forecasting work, especially to accurately predict the amount of water inflow in mines. The hydrogeological analogy method, correlation analysis method and conventional analytical method in the calculation method of water inflow in production mines are the more popular methods for calculating water inflow in mines today.

[0003] Usually, when the majority of engineering technicians or researchers use the principle of the conventional "big well method" to calculate the water inflow, they directly generalize the entire working face or mine into a big well, and use the theory and method of steady flow in groundwater dynamics to perform analytical solution calculation of the water inflow, so as to obtain the flow field changes during the recovery of the working face. Some scholars have also optimized the calculation parameters of the "big well method", the conditions of the aquifer, and the calculation method of the influence radius R, or corrected the formula according to the actual water inflow. However, the recovery process of the working face (or mining area) is a gradual process. In the early stage of mining, the area of ​​the mining affected area is small, the water-passing section is limited, and the water volume is relatively small. It is not at the beginning that the goaf is formed in the entire mining range, the water inflow is formed in the entire working face influence range, and the water level drops. Therefore, when the conventional "big well method" is used to calculate the water inflow, the calculation results often have large errors. Summary of the invention

[0004] In order to solve the problems mentioned in the background technology, the present invention provides a method for dynamically calculating the water inflow of a mine based on the principle of the "mobile large well method", which can greatly correct the error of the traditional "large well method" in calculating the water inflow of a mine, and is conducive to the accurate calculation of the water inflow at each stage of the working face advancement project and the implementation of water prevention and control work. The technical solution of the present invention includes the following steps:

[0005] S1. Statistically integrate the hydrogeological parameters of the main water-filled aquifers at the mining face;

[0006] S2, using the collapse step distance as a unit to generalize the "mobile well" at different stages of the working face advancement process;

[0007] S3. Calculate the water inflow from the working face at the end of the first stage (initial collapse stage) using the steady flow formula;

[0008] S4. Using the water inflow from the working face during the initial collapse, the non-steady flow formula is used to calculate the water level drop in the center of the generalized large well before and after the end of the second phase of mining and the periodic collapse;

[0009] S5. After the second stage of periodic collapse, the water level drop caused by the first stage of mining is used to calculate the initial water level during the second stage of mining, and the water inflow from the working face after the second stage ends and the periodic collapse is calculated;

[0010] S6. Repeat the above calculation process and dynamically calculate the water inflow at each stage during the advancement of the working face.

[0011] Furthermore, the steps include:

[0012] S7. When the water level of the aquifer drops below the top plate, the pressure-unpressure formula is used to calculate the water inflow of the working face. By constructing a "moving large well method" mathematical model, the water inflow during the advancement of the working face is dynamically calculated with the collapse step distance as the unit.

[0013] Furthermore, in S1, the hydrogeological parameters obtained include the length and width of the working face, the permeability coefficient, thickness, hydraulic conductivity, water storage coefficient and initial pressure water level height of the aquifer.

[0014] Furthermore, in S2, the initial collapse step or periodic collapse step of the working face is obtained first, and then the collapse step is used as a calculation unit to construct a "moving well" with different advancement distances during the advancement of the working face.

[0015] Furthermore, the “mobile well” with different advancement distances during the advancement of the working face is constructed using the initial collapse step distance as the calculation unit.

[0016] Furthermore, in S3, taking the initial collapse as the first stage, the aquifer forms the first drop funnel, and the water level of the aquifer in the funnel drops. In this stage, the water level of the aquifer is relatively high at the initial stage of mining at the working face, and the aquifer is a confined aquifer at this time;

[0017] Assume that the first stage depth reduction is S1 = λH 0;

[0018] in,

[0019] The method of determining the value of λ includes: using Jacob's formula, calculating the flow rate at the center of the generalized large well of the working face from the depth drop of the long observation hole of the water level of the aquifer adjacent to the working face, and then using Jacob's formula for confined aquifers to reversely calculate the water level drop of the aquifer at the center of the generalized large well according to the flow rate at the center of the generalized large well of the working face, and obtaining λ=S1 / H0;

[0020] Alternatively, according to the mine water inflow caused by the initial collapse of the existing production working face, the water level drop of the aquifer at the center of the large well can be reversed using the Qiubuyi confined aquifer formula, and then λ = S1 / H0 can be obtained;

[0021] At this time, the calculation formula for confined aquifer is used to calculate the first stage water inflow:

[0022] Q1=2.73KMS1 / (lgR1-lgr1),

[0023] in,

[0024]

[0025] In the formula: Q1-estimated mine water inflow in the first stage; K-permeability coefficient m / d; M-thickness of the aquifer; S1-water level drop caused by mine drainage in the first stage; H0-initial pressure water level; R1-reference influence radius of the first stage, R0=r0+R; r1-reference radius of the first stage.

[0026] Furthermore, in S4, when the second stage of mining at the working face is completed, that is, the roof collapses for the second time, and the drop funnel continues to expand, the initial water level at the center of the generalized large well at the end of the second stage of mining can be inferred from the depth reduction formed here by the mine water inflow generated in the first stage;

[0027] The drawdown caused by the water inflow in the first stage is calculated using the Jacob formula, an approximate theoretical formula for unsteady flow:

[0028] Where: T-aquifer conductivity; t1-time required for the first stage of advancement; r1-reference radius of the first stage; μ * - Aquifer storage coefficient.

[0029] Further, in S5, the influence of the first stage is considered to determine the drawdown of the second stage: S2 = λ(H0-S′1);

[0030] Repeat the calculation method of the first stage water inflow to calculate the second stage water inflow:

[0031] Q2=2.73KMS2 / (lgR2-lgr2),

[0032] in,

[0033]

[0034] In the formula: Q2-estimated mine water inflow in the second stage; K-permeability coefficient m / d; M-thickness of the aquifer; S2-water level drop caused by mine drainage in the second stage; R2-reference influence radius of the second stage, R0=r0+R; r2-reference radius of the second stage.

[0035] Furthermore, in S7, as the working face continues to advance, when the water level of the aquifer drops below the top plate, the water inflow of the working face is calculated using the pressure-unpressure formula:

[0036] Qi =(1.366K(2H-M)Mh 2 ) / (lgR i -lgr i );

[0037] Where: H-water head height of the confined aquifer, measured from the bottom of the tunnel; h-height of the water column in the tunnel; K-permeability coefficient m / d; M-thickness of the aquifer; R i - The reference influence radius of the i-th stage; r i - The citation radius of stage i.

[0038] Furthermore, in S7, the water level drawdown is calculated by superimposing the new "initial" water level at each stage using the Jacob's formula, an approximate theoretical formula for unsteady flow.

[0039] The "moving big well method" principle proposed in this invention is a new principle and new method for dynamically calculating the water inflow of mines. The principle of the "moving big well method" is based on the dynamic change process of the goaf area and the water level funnel during the advancement of the working face. A theoretical model of the center position and the influence radius of the "mining big well" moving forward is constructed. The initial (periodic) collapse step is used as the calculation unit and generalized as a "moving big well" to gradually calculate the dynamic water inflow during the advancement of the working face. It can greatly correct the error of the traditional "big well method" in calculating the water inflow of mines, and has important theoretical guiding significance for the prediction of water inflow in the production practice of the working face.

[0040] Compared with the prior art, the method of the present invention has the following advantages: as the working face advances, the mining range and the affected radius (i.e., the "big well" radius) gradually expand, a new drop funnel and water level drop will be formed in each mining stage, and the working face water inflow calculation utilizes the previous mining to drain the aquifer to form a new "initial" water level, which greatly corrects the error of the traditional "big well method" in calculating the water inflow, and is conducive to the accurate calculation of the water inflow at each stage in the working face advancement project and the implementation of water prevention and control work. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0042] Figure 1 The present invention provides a flow chart of a method for dynamically calculating the water inflow of a mine based on the principle of the mobile well method.

[0043] Figure 2 This is a schematic diagram of the first stage descent funnel of the working face.

[0044] Figure 3 Schematic diagram of the changes in the landing funnel when the working face advances to the end of the second stage of mining.

[0045] Figure 4 Schematic diagram of the descending funnel where the water level in the aquifer drops below the top of the aquifer. DETAILED DESCRIPTION

[0046] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0047] Example

[0048] like Figures 1 to 4 As shown, the method for dynamically calculating the water inflow of a mine based on the principle of the mobile well method provided by the present invention comprises the following steps:

[0049] S1. Obtain the hydrogeological parameters of a mine working face and its main water-filled aquifer, including the working face length of 480m, width of 150m, aquifer thickness M = 14m, aquifer permeability coefficient K = 0.08m / d, water storage coefficient μ * =1.8×10 -4 , hydraulic conductivity T = 1.12m 2 / d, initial water level H0=150m.

[0050] S2. During the advancement of the working face or based on the mining experience of the adjacent working face, the initial collapse step distance of the working face is obtained as 15m.

[0051] S3. Taking the initial collapse, that is, the working face advancing 15m as the first stage, the aquifer forms the first drop funnel, and the water level of the aquifer drops. The water level of the aquifer is relatively high at the initial stage of working face exploitation. At this time, the aquifer is a confined aquifer.

[0052] Assuming that the first stage of drawdown is from the top plate to the bottom plate of the aquifer, that is, S1 = λH0, λ = 1 / 10 is obtained based on the actual observed water inflow.

[0053] At this time, the calculation formula for the confined aquifer is used to calculate the first stage water inflow: Q1 = 2.73KMS1 / (lgR1-lgr1);

[0054] in,

[0055] S4. When the second stage of mining (second roof collapse) of the working face is completed, the descent funnel continues to expand and the depth of drawdown decreases relative to the first stage. At this time, the depth of drawdown formed by the water inflow in the first stage can be used to reversely estimate the initial water level in the center of the "big well" at the end of the second stage of mining.

[0056] The drawdown caused by the water inflow in the first stage is calculated using the Jacob formula, an approximate theoretical formula for unsteady flow:

[0057]

[0058] S5. Considering the impact of the first stage, the second stage depth reduction S2 = λ(H0-S′1)

[0059] Repeat the calculation method of the first stage water inflow to calculate the second stage water inflow: Q2 = 2.73KMS2 / (lgR2-lgr2), where

[0060]

[0061] S6. Repeat the above calculation steps to dynamically calculate the water inflow during the advancement of the working face with the collapse step distance as a unit. According to the observed water volume during and after the actual mining process of the working face, λ can be obtained as 1 / 6 and 1 / 3 respectively.

[0062] S7. As the working face continues to advance, when the water level of the aquifer drops below the top plate, the water inflow of the working face is calculated using the pressure-unpressure formula: Q i =(1.366K(2H-M)Mh 2 ) / (lgR i -lgr i ).

[0063] According to the above method, the computer performed multiple sets of calculations, and the data results are shown in Table 1:

[0064] Table 1 Results of dynamic calculation of water yield using the “mobile well method”

[0065]

[0066]

[0067] According to the above calculation method, the dynamic water inflow during the advancement of the working face can be predicted based on the collapse step distance. After verification, it is consistent with the actual water inflow during the production of the working face.

[0068] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for dynamically calculating the amount of water inflow in a mine based on the principle of the mobile well method, characterized in that: The following steps are involved: S1. Statistically integrate the hydrogeological parameters of the main water-filled aquifers at the mining face; S2, using the collapse step distance as a unit to generalize the moving large wells at different stages during the advancement of the working face; S3. Calculate the water inflow from the working face at the end of the first stage using the steady flow formula; S4. Using the water inflow from the working face during the initial collapse, the non-steady flow formula is used to calculate the water level drop in the center of the generalized large well before and after the end of the second phase of mining and the periodic collapse; S5. After the second stage of periodic collapse, the water level drop caused by the first stage of mining is used to calculate the initial water level during the second stage of mining, and the water inflow from the working face after the second stage ends and the periodic collapse is calculated; S6, repeat the above calculation process, and dynamically calculate the water inflow at each stage during the advancement of the working face; In S3, the initial collapse is taken as the first stage, the aquifer forms the first drop funnel, the aquifer water level drops, and the aquifer water level is high at the initial stage of working face exploitation. At this time, the aquifer is a confined aquifer; Assume that the first stage drawdown is S1 = λH0; in, The method of determining the value of λ includes: using Jacob's formula, calculating the flow rate at the center of the generalized large well of the working face from the depth drop of the long observation hole of the water level of the aquifer adjacent to the working face, and then using Jacob's formula for confined aquifers to reversely calculate the water level drop of the aquifer at the center of the generalized large well according to the flow rate at the center of the generalized large well of the working face, and obtaining λ=S1 / H0; Alternatively, according to the mine water inflow caused by the initial collapse of the existing production working face, the water level drop of the aquifer at the center of the large well can be reversed using the Qiubuyi confined aquifer formula, and then λ = S1 / H0 can be obtained; At this time, the calculation formula for confined aquifer is used to calculate the first stage water inflow: Q1=2.73KMS1 / (lgR1-lgr1) in, Where: Q1—the estimated mine water inflow in the first stage; K—permeability coefficient m / d; M—the thickness of the aquifer; S1—the water level drop value caused by mine drainage in the first stage; H0—the height of the initial pressure water level; R1—the reference influence radius in the first stage, R0=r0+R; r1—the reference radius in the first stage; In S4, when the second stage of mining at the working face is completed, that is, the roof collapses for the second time, the descent funnel continues to expand, and the drawdown depth is reduced compared with the first stage. At this time, the initial water level at the center of the generalized large well at the end of the second stage of mining can be inferred from the drawdown depth formed by the water inflow in the first stage. The drawdown caused by the water inflow in the first stage is calculated using the Jacob formula, an approximate theoretical formula for unsteady flow: Where: T-aquifer conductivity; t1-time required for the first stage of advancement; r1-the first stage reference radius; μ*-aquifer storage coefficient; In S5, the influence of the first stage is considered and the drawdown of the second stage is determined: S2 = λ(H0-S'1); Repeat the calculation method of the first stage water inflow to calculate the second stage water inflow: Q2=2.73KMS2 / (lgR2-lgr2) in, In the formula: Q2 is the expected mine water inflow in the second stage; K is the permeability coefficient in m / d; M is the thickness of the aquifer; S2 is the water level drop caused by mine drainage in the second stage; R2 is the reference influence radius in the second stage, R0=r0+R; r2 is the reference radius in the second stage.

2. The method for dynamically calculating the water inflow of a mine based on the principle of the mobile well method according to claim 1 is characterized in that: The steps also include: S7. When the water level of the aquifer drops below the top plate, the pressure-unpressure formula is used to calculate the water inflow of the working face. By constructing a mathematical model of the moving large well method, the water inflow during the advancement of the working face is dynamically calculated with the collapse step distance as the unit.

3. The method for dynamically calculating the water inflow of a mine based on the principle of the mobile well method according to claim 2 is characterized in that: In S1, the hydrogeological parameters obtained include the length and width of the working face, the permeability coefficient, thickness, hydraulic conductivity, water storage coefficient and the initial pressure water level height of the aquifer.

4. The method for dynamically calculating the water inflow of a mine based on the principle of the mobile well method according to claim 1 is characterized in that: In S2, the initial collapse step of the working face is obtained first, and then the collapse step is used as the calculation unit to construct a moving well with different advancement distances during the advancement of the working face.

5. The method for dynamically calculating the water inflow of a mine based on the principle of the mobile well method according to claim 4 is characterized in that: The first collapse step distance is used as the calculation unit to construct a mobile well with different advancement distances during the advancement of the working face.

6. The method for dynamically calculating the water inflow of a mine based on the principle of the mobile well method according to claim 1 is characterized in that: In S7, as the working face continues to advance, when the water level of the aquifer drops below the top plate, the water inflow of the working face is calculated using the pressure-unpressure formula: <h2 style=";text-align:left;direction:ltr">Q<h2 style=";text-align:left;direction:ltr"> i <h2 style=";text-align:left;direction:ltr"> =(1.366K(2H-M)M-h2) / (lgR<h2 style=";text-align:left;direction:ltr"> i <h2 style=";text-align:left;direction:ltr"> -lgr<h2 style=";text-align:left;direction:ltr"> i <h2 style=";text-align:left;direction:ltr"> ); Where: H is the water head height of the confined aquifer, which is measured from the bottom of the tunnel; h is the height of the water column in the tunnel; K is the permeability coefficient in m / d; M is the thickness of the aquifer; R i —The reference influence radius of stage i; r i —The citation radius of stage i.

7. The method for dynamically calculating the water inflow of a mine based on the principle of the mobile well method according to claim 6 is characterized in that: In S7, the water level drawdown is calculated by superimposing the Jacob formula, an approximate theoretical formula for unsteady flow, on the new initial water level at each stage.