A logistics shuttle robot and cableway system
By introducing clamping components and balance mechanisms into the logistics shuttle robot, the safety hazards caused by the inability to automatically detect the position and the traction rope stress are solved, and higher safety and efficiency are achieved, and improved through instant charging is improved Economic benefits.
Patent Information
- Application Number
- CN202111240745.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-10-25
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2041-10-25
AI Technical Summary
The existing logistics shuttle robot hanging and hoisting mechanism cannot be automatically detected and retracted during movement, resulting in damage to the traction rope and long-term stress caused the traction rope to break.
A logistics shuttle robot including a clamping assembly is designed. The clamping assembly is fixed when the logistics box is lifted, supporting the weight of the object, avoiding direct stress from the traction rope, and improving the robot on the track through a balance mechanism and a guide mechanism. Stability and safety.
It effectively prevents the risk of traction rope breakage and logistics box falling off and shaking, improves work safety, and improves the operating efficiency of logistics shuttle robots through instant charging, and reduces investment costs.
Smart Images

Figure CN113879967B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of logistics and transportation, and in particular to a logistics shuttle robot and a cableway system. Background Art
[0002] At present, with the rapid development of the logistics industry, the transportation logistics method of low-altitude rails or cableways is more time-saving and labor-saving than traditional logistics; logistics shuttle robots are the main carriers of rail or cableway logistics. Since the logistics shuttle robots are fixed on the cableways, and the cableways are generally set at a higher position and ordinary people cannot touch them, the logistics boxes can only be loaded and unloaded at professional logistics base stations, which cannot meet the application scenarios of loading and unloading goods on the go.
[0003] To this end, some businesses have installed a hanging and hoisting mechanism on the logistics shuttle robot, which includes a hook connected to the logistics box, a traction rope connected to the hook, and a winding and unwinding component that drives the traction rope to reel in or release. Therefore, by adjusting the length of the traction rope through the winding and unwinding component, the logistics box can be easily lifted or lowered, thereby facilitating the installation and removal of the logistics box.
[0004] However, the existing hanging and hoisting mechanism still has the following problems during the movement: first, during the rising process of the logistics box, the hoisting mechanism cannot automatically detect the retraction and release status of the traction rope, which will cause excessive retraction and release and damage the traction rope; second, the traditional hanging and hoisting mechanism uses a traction rope for hanging transportation. The traction rope is under stress for a long time, and the vibration, bending and twisting during the transportation process will cause damage to the traction rope. This kind of hanging and transportation method has the safety hazard of the traction rope being under stress for a long time and the rope breaking and falling.
[0005] Therefore, how to provide a logistics shuttle robot that can conveniently load and unload logistics boxes and has high safety is a technical problem that needs to be urgently solved by technical personnel in this field. Summary of the invention
[0006] In order to overcome the defects of the above-mentioned prior art, the present invention provides a logistics shuttle robot and cableway system. By setting a clamping component, the logistics box can be clamped and fixed when it is lifted, and the weight of the object can be supported without directly using the traction rope to bear the force. The risk of the logistics box falling off due to the breakage of the traction rope and the risk of the logistics box shaking violently can be effectively prevented, making the work safer.
[0007] The technical solution adopted by the present invention to solve the problem is:
[0008] A logistics shuttle robot comprises a walking drive mechanism, a connecting frame, a control device and a logistics box, wherein the connecting frame is connected to the walking drive mechanism and the control device respectively, and the control device is provided with a hanging hoisting mechanism for driving the logistics box to rise or fall, wherein:
[0009] The hanging hoisting mechanism includes a hanging rod connected to the logistics box, a traction rope connected to the hanging rod, a winding assembly for driving the traction rope to be wound up or released, and a clamping assembly for clamping the hanging rod;
[0010] The clamping assembly comprises a clamping block for clamping the hanging rod, a locking piece for locking the clamping block, an in-place detector and a controller; the controller is electrically connected to the locking piece and the in-place detector respectively;
[0011] When the hanging rod is stuck by the card block and needs to be untied, the winding and unwinding assembly drives the hanging rod to rise and drives the card block to open outward / inward until the locking member locks the card block, at which time the hanging rod can be lowered;
[0012] When the hanging rod needs to be clamped by the clamping block, it is reset to the bottom of the winding assembly and is detected to be in place by the in-place detector. The in-place detector sends an in-place signal to the controller, and the controller controls the locking member to unlock, and the clamping block is retracted inward / outward and clamps the hanging rod.
[0013] The logistics shuttle robot of the present invention is provided with a clamping assembly. When the logistics box rises into place, its clamping block is retracted inwardly / outwardly and clamps the hanging rod, thereby supporting the weight of the object without directly using the traction rope to bear the force. The risk of the logistics box falling off due to the traction rope breaking and the risk of the logistics box shaking violently is effectively prevented, making the work safer.
[0014] Furthermore, the card block is provided with a card slot for the end of the hanging rod to extend into, and the end of the hanging rod is provided with a first guide slope. When the hanging rod rises, the first guide slope can be driven to abut against the card slot, thereby driving the card block to slide along the first guide slope to open outward / inward; or, the card block is provided with a card slot for the end of the hanging rod to extend into, and when the hanging rod rises, the controller controls the card block to open outward / inward.
[0015] Further, the locking member comprises a main body and a telescopic block arranged on the main body, the telescopic block is provided with a second guiding inclined surface, and the clamping block is provided with a rod body matched with the second guiding inclined surface;
[0016] When the hanging rod rises, it can drive the rod body to slide along the second guiding inclined surface until the rod body is separated from the second guiding inclined surface and the rod body is stuck at the lower end of the telescopic block.
[0017] Furthermore, the locking member further comprises a telescopic spring, and when the rod body slides along the second guide inclined plane, the telescopic block is pushed by the rod body and compresses the telescopic spring until the rod body is separated from the second guide inclined plane, and the telescopic block extends under the elastic force of the telescopic spring and clamps the rod body at its lower end;
[0018] Alternatively, when the rod body slides along the second guiding inclined plane, the controller drives the telescopic block to retract, until the rod body is separated from the second guiding inclined plane, the controller drives the telescopic block to reset, and the rod body is stuck at the lower end of the telescopic block.
[0019] Furthermore, it also includes a first elastic member connected to the clamping block. When the controller drives the telescopic block to retract, the rod body is separated from the telescopic block, and the clamping block is retracted inwardly / outwardly under the elastic force of the first elastic member and clamps the hanging rod.
[0020] Furthermore, it also includes a balancing mechanism arranged in the hanging rod, the balancing mechanism includes a balancing wheel symmetrically arranged along the central axis of the hanging rod, and the traction rope is wound around the balancing wheel.
[0021] Therefore, by setting up a balancing mechanism, when the hanging rod is tilted and raised, the hanging rod will preferentially abut the top edge of the slot as support, and the traction rope at the other end of the hanging rod is adjusted by the balancing mechanism so that the traction ropes at both ends of the hanging rod can continue to be retracted upwards until the other end of the hanging rod also abuts the top edge of the slot, and finally the two ends of the hanging rod are balanced.
[0022] Furthermore, the winding and unwinding assembly includes a first driving device and a rotating shaft, the traction rope is wound around the rotating shaft, and the first driving device drives the rotating shaft to rotate clockwise or counterclockwise to reel or release the traction rope.
[0023] Furthermore, the travel drive mechanism includes a frame, a second drive device installed on the frame, a drive wheel and two second guide mechanisms, the output end of the second drive device is connected to the drive wheel and drives the drive wheel to roll along the track; the two second guide mechanisms are arranged on the front and rear sides of the drive wheel along the rolling direction of the drive wheel, and the second guide mechanism includes two second guide wheels for turning along the track, and the two second guide wheels are arranged in parallel.
[0024] Furthermore, the second guide mechanism also includes a connecting bracket, a support rod, a guide wheel bracket and a second elastic member, one end of the connecting bracket is connected to the frame, and the other end extends out of the frame and is sleeved on the support rod; the bottom end of the support rod is pivotally connected to the guide wheel bracket, and the guide wheel bracket is pivotally matched with the two second guide wheels; the second elastic member is sleeved on the support rod and is located between the connecting bracket and the guide wheel bracket.
[0025] Therefore, by setting up a second guide mechanism, the two second guide wheels on the second guide mechanism can play a good guiding role. On the one hand, the second elastic member on the second guide mechanism can ensure that the second guide wheel is always in close contact with the track when impacted, thereby reducing the bounce caused by the impact; on the other hand, the steering of the second guide wheel can be adjusted under the action of its own torsional force, thereby ensuring the smooth travel of the logistics shuttle robot when turning along the track.
[0026] Furthermore, it also includes a mounting member mounted on the frame and arranged opposite to the connecting frame, a stopper movably connected to the mounting member, a third elastic member with two ends respectively arranged on the mounting member and the stopper, and a locking mechanism partially arranged between the mounting member and the stopper and used to lock the stopper, wherein:
[0027] The locking mechanism locks the moving direction to be perpendicular to the moving plane of the blocking member;
[0028] When the logistics shuttle robot runs to the tower, the tower unlocks the locking mechanism, and the blocker can overcome the elastic force of the third elastic member and rotate to avoid the tower; when the logistics shuttle robot leaves the tower, the third elastic member resets the blocker, and the locking mechanism resets and re-locks the blocker.
[0029] Therefore, by setting the block and the locking mechanism, when the logistics shuttle robot runs to the tower, the tower unlocks the locking mechanism, so that when the logistics shuttle robot passes the tower, the block can be retracted to avoid the tower, ensuring the safety of the logistics shuttle robot when passing the tower; when leaving the tower, the block can be reset and re-locked by the locking mechanism, thereby ensuring the full encirclement of the track and ensuring the safety of the logistics shuttle robot on the track. By setting this mechanical structure, the retraction and reset of the block can be controlled, ensuring the safety of the logistics shuttle robot on the track and reducing the risk of falling.
[0030] Furthermore, the blocker is provided with an installation groove, and the locking mechanism includes a locking rod and a fourth elastic member arranged in the installation groove. The installation member is provided with a locking portion connected to the installation groove. When the locking mechanism locks the blocker, the locking rod is inserted into the locking portion under the elastic force of the fourth elastic member; when the locking mechanism unlocks the blocker, the locking rod overcomes the elastic force of the fourth elastic member and withdraws from the locking portion.
[0031] Furthermore, one end of the locking rod close to the locking portion and one end of the mounting slot away from the locking portion are respectively provided with limiting surfaces of the fourth elastic member, and the fourth elastic member is located between the two limiting surfaces.
[0032] Furthermore, the locking mechanism also includes a locking pin and an unlocking member arranged on the locking rod, and the blocking member is provided with a third guide surface abutting against the locking pin, and the unlocking member can be pushed and rotated by the tower, and drive the locking pin on the locking rod to move along the third guide surface, thereby driving the locking rod to move and exit the locking part.
[0033] Furthermore, it also includes an elastic reset rod that is inserted through the locking rod, a fixing column is provided on the blocking member, and a hook portion that can hook the fixing column is provided on the elastic reset rod.
[0034] In addition, the second aspect of the present invention further provides a cableway system, comprising the above-mentioned logistics shuttle robot, a tower and a track arranged on the tower, and the second driving device in the walking drive mechanism drives the driving wheel to roll along the track.
[0035] Furthermore, the logistics shuttle robot also includes a rechargeable battery, a charging assembly is provided on the track, and the charging assembly includes a charging rail provided on the side wall of the track, and the charging rail is connected to the track through an insulating member;
[0036] The connecting frame is provided with a brush fixing block and a brush arranged on the brush fixing block;
[0037] When the second driving device drives the driving wheel to roll along the track, it can drive the brush on the connecting frame to dock with the charging rail on the track, and the electric energy provided by the charging rail is transmitted to the rechargeable battery through the brush.
[0038] Therefore, through the docking of the brush and the charging rail, the rechargeable battery can be instantly charged, thereby improving the operating efficiency of the logistics shuttle robot; since there is no need for backup batteries and the construction of battery swap stations, the investment capital is reduced and the economic benefits are improved.
[0039] Furthermore, it also includes a power control unit, a power detection unit, a control unit and a positioning unit, and the control unit is electrically connected to the power control unit, the power detection unit, the positioning unit and the second driving device, wherein:
[0040] The power detection unit is used to detect the voltage value of the rechargeable battery and send it to the control unit. When the voltage value is lower than a predetermined value, the control unit outputs a control signal to the positioning unit and obtains positioning information;
[0041] When the positioning information shows that the logistics shuttle robot is not located at the charging rail, the control unit outputs a control signal to the second drive device, and the second drive device drives the drive wheel to move to the charging rail. When the positioning unit detects that the logistics shuttle robot is already located at the charging rail, it sends a signal to the control unit, and the control unit outputs a control signal to the second drive device to control it to stop operating, so that the brush docks with the charging rail;
[0042] The control unit outputs a control signal to the power control unit, and the power control unit controls the power to be output to the charging rail. The brush docks with the charging rail and transmits electric energy to the rechargeable battery.
[0043] Furthermore, it also includes an alarm unit electrically connected to the control unit, the alarm unit is a buzzer and / or an LED light, and the alarm unit is used to issue an alarm when the voltage value is lower than a predetermined value.
[0044] Furthermore, the power detection unit is a battery voltage detector, the control unit is a single-chip microcomputer, the charging rail is made of brass, and the positioning unit is a GPS module or an RFID chip and tag reader / writer combination or a laser sensor combination or an infrared sensor combination.
[0045] Furthermore, the positioning unit is a combination of an RFID code chip and a tag reader / writer, the RFID code chip is arranged above the tower, the RFID code chip is provided with the positioning information, the tag reader / writer is arranged on the logistics shuttle robot for reading and writing the positioning information on the RFID code chip, the tag reader / writer sends the read and written positioning information to the control unit, and the control unit outputs a control signal to the second drive device.
[0046] Furthermore, both ends of the charging rail are provided with inclined guide plates, and the inclination angle of the guide plates is
[0047] Furthermore, a fifth elastic member is provided in the brush, and when the brush is docked with the charging rail, the fifth elastic member is squeezed, and when the logistics shuttle robot slides along the track and leaves the charging rail, the fifth elastic member is reset.
[0048] In summary, the logistics shuttle robot and cableway system of the present invention have the following beneficial effects:
[0049] (1) The logistics shuttle robot of the present invention is provided with a clamping assembly. When the logistics box rises into place, its clamping block is retracted inwardly / outwardly and clamps the hanging rod, thereby supporting the weight of the object without directly using the traction rope to bear the force. The risk of the logistics box falling off due to the traction rope breaking and the risk of the logistics box shaking violently is effectively prevented, making the work safer.
[0050] (ii) The logistics shuttle robot of the present invention is provided with a balancing mechanism. When the hanging rod is tilted upward, the hanging rod preferentially abuts against the top edge of the slot as support. The balancing mechanism is used to adjust the traction rope at the other end of the hanging rod so that the traction ropes at both ends of the hanging rod can continue to be retracted upward until the other end of the hanging rod also abuts against the top edge of the slot, and finally the two ends of the hanging rod are balanced.
[0051] (III) The logistics shuttle robot of the present invention is provided with a second guide mechanism. The two second guide wheels on the second guide mechanism can play a good guiding role. The second elastic member on the second guide mechanism can ensure that the second guide wheel is always in close contact with the track when impacted, thereby reducing the bounce caused by the impact; on the other hand, the second guide wheel can be adjusted in direction under the action of its own torsional force, thereby ensuring the smooth travel of the logistics shuttle robot when turning along the track.
[0052] (IV) The logistics shuttle robot of the present invention is provided with a block and a locking mechanism. When the logistics shuttle robot runs to the tower, the tower unlocks the locking mechanism, so that when the logistics shuttle robot passes the tower, the block can be retracted to avoid the tower, ensuring the safety of the logistics shuttle robot when passing the tower; when leaving the tower, the block can be reset and re-locked by the locking mechanism, thereby ensuring the full encirclement of the track and ensuring the safety of the logistics shuttle robot on the track. By providing this mechanical structure, the retraction and reset of the block can be controlled, ensuring the safety of the logistics shuttle robot on the track and reducing the risk of falling.
[0053] (V) The cableway system of the present invention can realize instant charging of the rechargeable battery through the docking of the brush and the charging rail, thereby improving the operating efficiency of the logistics shuttle robot; since there is no need for backup batteries and the construction of battery replacement stations, the investment capital is reduced and the economic benefits are improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0054] Figure 1 This is a schematic diagram of the structure of the logistics shuttle robot of the present invention with the logistics box hidden;
[0055] Figure 2 This is a schematic diagram of the structure of the hanging and hoisting mechanism of the present invention with the outer shell hidden;
[0056] Figure 3 for Figure 2 A partial enlarged view of the middle A part;
[0057] Figure 4 It is a structural schematic diagram of a clamping block and an articulated seat in a hanging and hoisting mechanism of the present invention;
[0058] Figure 5 It is a structural schematic diagram of a hanging rod and a clamping block in a hanging and hoisting mechanism in another embodiment of the present invention;
[0059] Figure 6 for Figure 2 Schematic diagram of some structures in ;
[0060] Figure 7 This is a schematic diagram of the structure of the travel drive mechanism of the present invention after the machine cover is hidden;
[0061] Figure 8 It is a structural schematic diagram of the connecting bracket of the present invention;
[0062] Fig. 9 This is a schematic diagram of the structure of the logistics shuttle robot of the present invention after hiding the logistics box, the hanging hoisting mechanism and the control device;
[0063] Fig.10 for Fig. 9 A partial enlarged view of part B in the middle;
[0064] Fig.11 for Fig.10 The schematic diagram of the structure after the blocking parts are hidden;
[0065] Fig.12 It is a cross-sectional schematic diagram of a partial structure of the flow shuttle robot of the present invention;
[0066] Fig.13 for Figure 8 A schematic diagram of the structure from another perspective;
[0067] Fig.14 for Fig.13 A partial enlarged view of the middle C part;
[0068] Fig.15 It is a structural schematic diagram of the cableway system of the present invention;
[0069] Fig.16 for Fig.15 A partial enlarged view of the middle D part;
[0070] Fig.17 This is a schematic diagram of the structure of the logistics shuttle robot of the present invention after it runs to the charging rail;
[0071] Fig.18 for Fig.17 Schematic diagram of the structure after hiding the logistics shuttle robot and RFID code chip.
[0072] The meanings of the reference numerals are as follows:
[0073] 1. Suspension winch mechanism; 11. Hanging rod; 111. First guide slope; 12. Traction rope; 131. First driving device; 1311. Driving motor; 1312. Worm gear reducer; 132. Rotating shaft; 133. Mounting bracket; 141. Block; 1411. Slot; 1412. Rod body; 1413. Hinged ear; 142. Locking member; 1421. Main body; 1422. Telescopic block; 14221. Second guide slope; 143. In-place detector; 144. Articulated seat; 15. First elastic member; 16. Balance wheel; 17. First guide mechanism; 171. Guide seat; 172. First guide wheel; 2. Travel driving mechanism; 21. Frame; 22. Second driving device; 23. Driving wheel; 241. First Two guide wheels; 242, connecting bracket; 2421, opening; 243, support rod; 244, guide wheel bracket; 245, second elastic member; 25, hood; 3, connecting frame; 31, brush fixing block; 32, brush; 4, control device; 511, mounting member; 5111, locking portion; 512, blocking member; 5121, third guide surface; 5122, mounting groove; 513, third elastic member; 514, elastic reset rod; 515, fixing column; 516, rotating shaft; 521, locking rod; 5211, limiting surface; 522, fourth elastic member; 523, locking pin; 524, unlocking member; 6, tower; 7, track; 81, charging rail; 82, guide plate; 83, insulating member; 84, RFID code chip; 9, logistics box. DETAILED DESCRIPTION
[0074] For better understanding and implementation, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0075] In the description of the present invention, it should be noted that the terms "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc. indicating directions or positional relationships are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.
[0076] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used in the specification of the present invention herein are only for the purpose of describing specific embodiments and are not intended to limit the present invention.
[0077] Embodiment 1
[0078] See also Figure 1-12The present invention provides a logistics shuttle robot, including a walking drive mechanism 2, a connecting frame 3, a control device 4 and a logistics box 9, the upper end of the connecting frame 3 is connected to the walking drive mechanism 2, and the lower end of the connecting frame 3 is connected to the control device 4; the lower end of the control device 4 is provided with a hanging winch mechanism 1 for driving the logistics box 9 to rise or fall.
[0079] See also Figure 2-5 The hanging and hoisting mechanism 1 includes a hanging rod 11 for hanging with the logistics box 9, a traction rope 12 connected to the hanging rod 11, and a winding and unwinding component for driving the traction rope 12 to be wound or released to drive the hanging rod 11 to rise or fall.
[0080] Specifically, the winding assembly includes a first driving device 131, a rotating shaft 132 and a mounting bracket 133, and the mounting bracket 133 is located above the hanging rod 11. The mounting bracket 133 is two symmetrically arranged U-shaped brackets, and the rotating shaft 132 is horizontally arranged on the U-shaped bracket; the first driving device 131 is arranged between the two U-shaped brackets and is connected to the rotating shaft 132 located on both sides. The first driving device 131 includes a driving motor 1311 and a worm gear reducer 1312, the output end of the driving motor 1311 is connected to the worm (not shown in the figure) in the worm gear reducer 1312, the worm is meshed with the worm wheel (not shown in the figure) for transmission, and the output end of the worm wheel is connected to the rotating shaft 132; the traction rope 12 is wound around the rotating shaft 132.
[0081] Therefore, when the driving motor 1311 drives the rotating shafts 132 on both sides to rotate clockwise or counterclockwise through the worm gear reducer 1312, the traction rope 12 can be wound on the side wall of the rotating shaft 132 or released on the rotating shaft 132, thereby realizing the lifting or lowering of the logistics box 9.
[0082] See also Figure 2-6 The hanging hoist mechanism 1 further comprises a clamping assembly for clamping the hanging rod 11, the clamping assembly comprises a clamping block 141 disposed at both ends of the hanging rod 11 and used to clamp the hanging rod 11, a locking member 142 for locking the clamping block 141, an in-position detector 143 and a controller (not shown in the figure), the controller is electrically connected to the locking member 142 and the in-position detector 143 respectively. The locking member 142 and the in-position detector 143 are both disposed on the mounting bracket 133.
[0083] Specifically, the block 141 includes a slot 1411 for the end of the hanging rod 11 to extend into and a hinge ear 1413 arranged on the slot 1411, the mounting bracket 133 is provided with a hinge seat 144, and the hinge ear 1413 on the block 141 is hinged on the hinge seat 144; the end of the hanging rod 11 is provided with a first guide slope 111 that matches the slot 1411.
[0084] Therefore, when the winding and unwinding assembly drives the hanging rod 11 to rise, it first drives the end of the hanging rod 11 to abut against the bottom of the block 141 and drives the block 141 to open slightly outward, and then the hanging rod 11 continues to rise until the first guide slope 111 on the hanging rod 11 abuts against the top edge of the slot 1411, thereby driving the block 141 to slide along the first guide slope 111 and causing the hinge ear 1413 to rotate along the hinge seat 144 to fully open outward.
[0085] In this embodiment, after the hanging rod 11 is lowered, the block 141 is recovered and is in a non-open state, so the hanging rod 11 will first abut against the bottom of the block 141 after it rises; in other embodiments, after the hanging rod 11 is lowered, the block 141 is still in an open state, so the hanging rod 11 will not abut against the bottom of the block 141 after it rises.
[0086] See also Figure 5 In other embodiments, the two ends of the hanging rod 11 can also be in an inwardly bent structure. When the winding and unwinding assembly drives the hanging rod 11 to rise, it can drive the end of the hanging rod 11 to abut against the bottom of the block 141 and drive the block 141 to open slightly inward. Then the hanging rod 11 continues to rise until the first guide slope 111 on the hanging rod 11 abuts against the top edge of the slot 1411, thereby driving the block 141 to slide along the first guide slope 111, and making the hinge ear 1413 rotate along the hinge seat 144 to fully open inward, the locking piece 142 locks the block 141 to keep it in the inward state, the hanging rod 11 can be lowered or raised, and when the hanging rod 11 needs to be stuck, the locking piece 142 unlocks the block 141 to reset it outward and stick the hanging rod 11.
[0087] In addition, the card block 141 also includes a rod body 1412 arranged above the card slot 1411, and the locking member 142 includes a main body 1421, a telescopic block 1422 arranged on the main body 1421, and a telescopic spring (not shown in the figure), and the telescopic block 1422 is provided with a second guide inclined surface 14221 that cooperates with the rod body 1412.
[0088] Therefore, when the unwinding assembly drives the hanging rod 11 to rise until the first guide slope 111 abuts against the top edge of the card slot 1411, and then drives the card block 141 to slide along the first guide slope 111, it can also drive the rod body 1412 to slide along the second guide slope 14221.
[0089] In this embodiment, the telescopic block 1422 is pushed by the rod 1412 and compresses the telescopic spring until the rod 1412 is separated from the second guide inclined surface 14221. The telescopic block 1422 is extended under the elastic force of the telescopic spring and clamps the rod 1412 at its lower end, so that the rod 1412 cannot be recovered, thereby locking the rod 1412. In other embodiments, when the rod 1412 slides along the second guide inclined surface 14221, the controller drives the telescopic block 1422 to retract until the rod 1412 is separated from the second guide inclined surface 14221. The controller drives the telescopic block 1422 to reset, and the rod 1412 is clamped at the lower end of the telescopic block 1422, so that the rod 1412 cannot be recovered, thereby locking the rod 1412. The in-position detector 143 includes a spring sheet disposed under the mounting bracket 133 . When the hanging rod 11 continues to rise and contacts the spring sheet, the in-position detector 143 sends an in-position signal to the controller, and the controller controls the driving motor 1311 to stop operating.
[0090] In this embodiment, when both ends of the hanging rod 11 are Figure 1 In the structure shown, the locking member 142 and the in-position detector 143 are both located on the inner side of the hinge seat 144; when the two ends of the hanging rod 11 are Figure 4 In the structure shown, the locking member 142 and the in-position detector 143 are both located outside the hinge seat 144. In addition, a first elastic member 15 is also included, one end of which is connected to the hinge ear 1413 of the clamping block 141, and the other end is connected to the mounting bracket 133. When the controller drives the telescopic block 1422 to retract, the rod body 1412 on the clamping block 141 is separated from the telescopic block 1422. At the same time, the controller controls the driving motor 1311 to operate and lower the hanging rod 11 until the first guide slope 111 is separated from the top edge of the clamping slot 1411. The clamping block 141 is retracted inwards and clamps the hanging rod 11 under the elastic force of the first elastic member 15.
[0091] In this embodiment, the controller is a single chip microcomputer, the in-position detector 143 is a micro switch or a travel switch or an infrared switch, the locking member 142 is an electromagnetic lock or a motor, and the first elastic member 15 is a spring.
[0092] In addition, the hanging and hoisting mechanism 1 further comprises a balancing mechanism arranged in the hanging rod 11 , and the balancing mechanism comprises two balancing wheels 16 symmetrically arranged along the central axis of the hanging rod 11 , and the traction rope 12 is wound around the balancing wheels 16 .
[0093] Therefore, by setting up a balancing mechanism, if the hanging rod 11 tilts up, the hanging rod 11 preferentially abuts against the top edge of the slot 1411 as support, and the traction rope 12 at the other end of the hanging rod 11 is adjusted by the balancing mechanism so that the traction ropes 12 at both ends of the hanging rod 11 can continue to be retracted upward until the other end of the hanging rod 11 also abuts against the top edge of the slot 1411, and finally the two ends of the hanging rod 11 reach balance.
[0094] In addition, it also includes a plurality of first guide mechanisms 17 arranged on the mounting bracket 133, the first guide mechanism 17 includes a guide seat 171 and two first guide wheels 172 arranged on the guide seat 171 and opposite to each other, the traction rope 12 passes through between the two first guide wheels 172 and is transmission-connected to the two first guide wheels 172, and the first guide wheel 172 mainly functions to guide the traction rope 12 to move in the vertical direction.
[0095] Therefore, the working principle of the hanging and hoisting mechanism 1 is as follows:
[0096] When the logistics box 9 needs to be lowered, the two ends of the hanging rod 11 at the upper end of the logistics box 9 are stuck by the block 141, and the hanging rod 11 cannot be lowered at this time; then the winding assembly drives the hanging rod 11 to rise, thereby driving the first guide slope 111 to abut against the top edge of the card slot 1411, and the card slot 1411 slides along the first guide slope 111, and at the same time drives the rod body 1412 to slide along the second guide slope 14221, so that the hinge ear 1413 rotates along the hinge seat 144 to open outwards, until the rod body 1412 is separated from the first When the two guiding inclined surfaces 14221 are stuck at the lower end of the telescopic block 1422, the rod body 1412 cannot be recovered. At this time, the block 141 is in a locked state. At this time, the hanging rod 11 can be lowered and drive the logistics box 9 to descend for loading and unloading goods; when the hanging rod 11 descends to below the block 141, the controller drives the telescopic block 1422 to retract and the telescopic block 1422 is reset; the rod body 1412 on the block 141 is separated from the telescopic block 1422, and the block 141 is recovered and reset inwardly under the elastic force of the first elastic member 15.
[0097] When the logistics box 9 needs to be raised, its winding assembly drives the hanging rod 11 to rise and drives the logistics box 9 to rise. The end of the hanging rod 11 abuts against the bottom of the card block 141 and drives the card block 141 to open slightly outward. Then the hanging rod 11 continues to rise until the first guide slope 111 on the hanging rod 11 abuts against the top edge of the card slot 1411, thereby driving the card block 141 to slide along the first guide slope 111 to fully open outward; then the hanging rod 11 continues to rise until the hanging rod 11 contacts the micro switch on the mounting bracket 133, and the micro switch sends a signal The signal is transmitted to the single chip microcomputer, which controls the drive motor 1311 to stop operating. The single chip microcomputer controls the telescopic block 1422 on the electromagnetic lock to retract, so that the rod body 1412 on the card block 141 is disengaged from the telescopic block 1422. At the same time, the single chip microcomputer controls the drive motor 1311 to operate and lower the hanging rod 11 until the first guide slope 111 is disengaged from the top edge of the card slot 1411. The card block 141 is retracted inward and jams the hanging rod 11 under the elastic force of the spring. At this time, the hanging rod 11 cannot descend, thereby realizing the locking of the hanging rod 11, and then realizing the fixation of the logistics box 9.
[0098] Therefore, by setting up a clamping assembly, when the logistics box 9 rises into place, its clamping block 141 is retracted inward and clamps the hanging rod 11, thereby supporting the weight of the object without directly using the traction rope 12 to bear the force. This effectively prevents the risk of the traction rope 12 breaking and the logistics box 9 falling off, and the risk of the logistics box 9 shaking violently, making work safer.
[0099] See also Figure 7 The travel drive mechanism 2 includes a frame 21, a second drive device 22 installed on the frame 21, a drive wheel 23 and two second guide mechanisms. The output end of the second drive device 22 is connected to the drive wheel 23 and drives the drive wheel 23 to roll along the track 7; the two second guide mechanisms are arranged at the front and rear sides of the drive wheel 23 along the rolling direction of the drive wheel 23, and the second guide mechanism includes two second guide wheels 241 for turning along the track 7, and the two second guide wheels 241 are arranged in parallel.
[0100] In this embodiment, the second driving device 22 is a motor, and the output shaft of the motor is connected to the rotating shaft on the driving wheel 23 .
[0101] Therefore, the second guide mechanism can play a good guiding role when the logistics shuttle robot needs to turn along the track 7. In order to improve the flexibility of the second guide wheel 241 in the second guide mechanism, the second guide mechanism also includes a connecting bracket 242, a support rod 243, a guide wheel bracket 244 and a second elastic member 245. One end of the connecting bracket 242 is connected to the frame 21, and the other end extends out of the frame 21 and is sleeved on the support rod 243; the bottom end of the support rod 243 is pivotally connected to the guide wheel bracket 244; the guide wheel bracket 244 is pivotally matched with the two second guide wheels 241. The second elastic member 245 is sleeved on the support rod 243 and its two ends are respectively located between the connecting bracket 242 and the guide wheel bracket 244.
[0102] Thus, the second guide wheel 241 can move up and down with the support rod 243 within the range defined by the connecting bracket 242, and at the same time, the second guide wheel 241 can also drive the support rod 243 to rotate. On the one hand, the second elastic member 245 can cooperate with the pressing force applied by the logistics shuttle robot to the connecting bracket 242 due to its own weight under the action of its own telescopic force, so as to ensure that the second guide wheel 241 is always in close contact with the track 7 during the process of moving up and down relative to the connecting bracket 242; on the other hand, under the action of its own torsional force, the second guide wheel 241 can be adjusted when the second guide wheel 241 turns with the track 7, so that the driving wheel 23 can finally run smoothly along the track 7 under the guidance of the guide mechanism, especially to ensure the smooth running of the logistics shuttle robot when turning along the track 7, thereby further improving the stability of the logistics shuttle robot when turning, so as to ensure the stable operation of the logistics shuttle robot during the track change process.
[0103] See also Figure 8 The connecting bracket 242 is bent, and its two ends are configured as a first connecting portion and a second connecting portion. The first connecting portion is provided with an opening 2421 sleeved on the supporting rod 243, and the second connecting portion is connected to the frame 21.
[0104] In this embodiment, the diameter of the opening 2421 is larger than the diameter of the support rod 243, so the support rod 243 can move up and down along the axis of the opening 2421. When the logistics shuttle robot climbs a slope, the connection bracket 242 located on the front side of the driving wheel 23 gradually descends to the bottom of the support rod 243 and compresses the second elastic member 245, and the connection bracket 242 located on the rear side of the driving wheel 23 gradually rises to the top of the support rod 243 and stretches the second elastic member 245; when the logistics shuttle robot goes downhill, the situation is the opposite, the connection bracket 242 located on the rear side of the driving wheel 23 descends and compresses the second elastic member 245, and the connection bracket 242 located on the front side of the driving wheel 23 rises and stretches the second elastic member 245; when the logistics shuttle robot walks on a horizontal plane, the connection brackets 242 on both sides of the driving wheel 23 are located in the middle of the support rod 243.
[0105] See also Figure 9-13 , further comprising a mounting member 511 mounted on the frame 21 and arranged opposite to the connecting frame 3, a stopper 512 movably connected to the mounting member 511, and a third elastic member 513 having two ends respectively arranged on the mounting member 511 and the stopper 512.
[0106] In this embodiment, the mounting member 511 is a mounting plate, and the third elastic member 513 is a spring, with one end of the spring being hung on the mounting member 511 and the other end being hung on the top of the stopper 512 .
[0107] See also Figure 9-13 , and also includes a locking mechanism partially disposed between the mounting member 511 and the stopper 512 and used to lock the stopper 512, the locking mechanism locking the moving direction to be perpendicular to the moving plane of the stopper 512. Specifically, the locking mechanism includes a mounting groove 5122 disposed on the stopper 512, a locking rod 521 disposed in the mounting groove 5122, and a fourth elastic member 522, the mounting member 511 is provided with a locking portion 5111 connected to the mounting groove 5122; one end of the locking rod 521 close to the locking portion 5111 and one end of the mounting groove 5122 away from the locking portion 5111 are respectively provided with a limiting surface 5211 for limiting the fourth elastic member 522, and the fourth elastic member 522 is located between the two limiting surfaces 5211. Therefore, under the elastic force of the fourth elastic member 522, one end of the locking rod 521 is inserted into the locking portion 5111, so as to realize the clamping and fixing of the stopper 512.
[0108] In this embodiment, the locking portion 5111 is a clamping hole arranged on the mounting member 511; the locking rod 521 is provided with a limiting surface 5211 at one end close to the locking portion 5111; the fourth elastic member 522 is a spring, and one end abuts against the limiting surface 5211, and the other end abuts against the end of the mounting groove 5122 away from the locking portion 5111.
[0109] See also Figure 10-11 The locking mechanism also includes a locking pin 523 that is transversely inserted into the locking rod 521 and an unlocking member 524 that is vertically inserted into the locking rod 521. The blocking member 512 is provided with a third guide surface 5121 that abuts against the locking pin 523, and the third guide surface 5121 is a guiding inclined surface; the unlocking member 524 is a roughly rectangular frame structure formed by multiple bends, and its head end and tail end are both inserted into the locking rod 521.
[0110] Therefore, when the walking drive mechanism 2 drives the driving wheel 23 to slide along the track 7 to the tower 6, the tower 6 first contacts the unlocking piece 524 and drives the unlocking piece 524 to rotate. The rotation of the unlocking piece 524 can drive the locking rod 521 to rotate. The rotation of the locking rod 521 can drive the locking pin 523 to move downward along the third guide surface 5121, and then drive the locking rod 521 to overcome the elastic force of the fourth elastic piece 522 to move and exit the clamping hole, thereby unlocking the blocking piece 512; then the driving wheel 23 continues to move and makes the tower 6 contact the blocking piece 512, and drives the blocking piece 512 to overcome the elastic force of the third elastic piece 513 to rotate to avoid the tower 6; when the logistics shuttle robot leaves the tower 6, the third elastic piece 513 resets the blocking piece 512, and the locking mechanism resets and re-locks the blocking piece 512.
[0111] In this embodiment, the third guide surface 5121 may also be a guide arc surface, which is not limited here.
[0112] See also Fig.10 , and also includes an elastic reset rod 514 vertically penetrated on the locking rod 521, and a fixing column 515 is also penetrated at the end of the stopper 512, and a hook portion that can hook the fixing column 515 is provided on the elastic reset rod 514, and the hook portion is a curved hook set at the bottom of the elastic reset rod 514.
[0113] In this embodiment, the fixing column 515 is a screw, and a threaded hole is formed on the stopper 512 . The fixing column 515 passes through the hook portion of the elastic reset rod 514 and is threadedly connected to the threaded hole.
[0114] Therefore, when the logistics shuttle robot leaves the tower 6, the fourth elastic member 522 resets the locking rod 521 and inserts into the locking portion 5111, while the locking pin 523 moves upward along the third guide surface 5121 and drives the locking rod 521 to rotate and reset.
[0115] In addition, a rotation shaft 516 is also included which penetrates through the mounting member 511 and the blocking member 512 . When the locking mechanism unlocks the blocking member 512 , the blocking member 512 can rotate around the axis of the rotation shaft 516 .
[0116] Therefore, by setting the stopper 512 and the locking mechanism, when the robot runs to the tower 6, the tower 6 unlocks the locking mechanism, so that the stopper 512 can be retracted when the logistics shuttle robot passes the tower 6 to avoid the tower 6, ensuring the safety of the logistics shuttle robot when passing the tower 6; when leaving the tower 6, the stopper 512 can be reset and re-locked by the locking mechanism, thereby ensuring the full encirclement of the track 7 and ensuring the safety of the logistics shuttle robot on the track 7. By setting this mechanical structure, the retraction and reset of the stopper 512 can be controlled, ensuring the safety of the logistics shuttle robot on the track 7 and reducing the risk of falling.
[0117] Embodiment 2
[0118] See also Figure 14-17 The present invention also provides a cableway system, including the above-mentioned logistics shuttle robot, a tower 6 and a track 7 arranged on the tower 6, and the second driving device 22 in the walking drive mechanism 2 drives the driving wheel 23 to roll along the track 7.
[0119] Specifically, the logistics shuttle robot also includes a rechargeable battery (not shown in the figure), and a charging component is provided on the track 7. The charging rail 81 is arc-shaped and is fixed to the side wall of the track 7 by an insulating member 83.
[0120] In this embodiment, there are multiple charging components, and the multiple charging components are evenly arranged along the track 7; the charging rail 81 is made of brass.
[0121] Therefore, when the second driving device 22 drives the driving wheel 23 to slide along the track 7, it can drive the brush 32 on the connecting frame 3 to dock with the charging rail 81 on the track 7. The electric energy provided by the charging rail 81 is transmitted to the rechargeable battery through the brush 32, thereby realizing instant charging of the rechargeable battery, thereby improving the operating efficiency of the logistics shuttle robot.
[0122] In this embodiment, there are two brushes 32, which are spaced apart from each other on the brush fixing block 31 of the connecting frame 3; there are two charging rails 81 in the charging assembly, which are spaced apart from each other on the side wall of the track 7; the two brushes 32 are connected to the two charging rails 81 one by one.
[0123] In addition, a fifth elastic member (not shown in the figure) is provided in the brush 32. When the brush 32 is docked with the charging rail 81, the fifth elastic member is squeezed. When the logistics shuttle robot slides along the track 7 and leaves the charging rail 81, the fifth elastic member is reset. Thus, the brush 32 and the charging rail 81 can be better fitted by the elastic force of the fifth elastic member, thereby improving the charging efficiency.
[0124] In addition, both ends of the charging rail 81 are provided with inclined guide plates 82, and the inclination angle of the guide plates 82 is Thus, the guide plate 82 can guide the brush 32 to enter and dock with the charging rail 81, thereby improving the reliability of docking charging.
[0125] In addition, the cableway system also includes a power control unit (not shown in the figure), a power detection unit (not shown in the figure), a positioning unit (not shown in the figure), an alarm unit (not shown in the figure) and a control unit (not shown in the figure), and the control unit is electrically connected to the power control unit, the power detection unit, the positioning unit, the alarm unit and the second drive device 22.
[0126] Specifically, the positioning unit is used to collect the orientation information and send a signal to the control unit; the power detection unit is used to detect the voltage value of the rechargeable battery and send it to the control unit; the control unit can preset a voltage value, and when the voltage value detected by the power detection unit is lower than the preset value on the control unit, the alarm unit issues a warning, and the control unit outputs a control signal to the positioning unit and obtains the positioning information;
[0127] When the positioning information shows that the logistics shuttle robot is not located at the charging rail 81, the control unit outputs a control signal to the second drive device 22, and the second drive device 22 drives its drive wheel 23 to move to the charging rail 81 and docks the brush 32 with the charging rail 81; when the positioning unit detects that the logistics shuttle robot is in place, it sends a signal to the control unit, and the control unit outputs a control signal to the second drive device 22 to control it to stop operating, and the control unit outputs a control signal to the power control unit, and the power control unit controls the power supply to be output to the charging rail 81, and the brush 32 docks with the charging rail 81 and transmits power to the rechargeable battery;
[0128] When the positioning information shows that the logistics shuttle robot is located on the charging rail 81, the control unit outputs a control signal to the second drive device 22 to control it to stop operating, the logistics shuttle robot is parked on the track 7 and the brush 32 is docked with the charging rail 81; the control unit outputs a control signal to the power control unit, and the power control unit controls the power output to the charging rail 81, the brush 32 is docked with the charging rail 81 and transmits electrical energy to the rechargeable battery.
[0129] In this embodiment, the power detection unit is a battery voltage detector, the control unit is a single chip microcomputer, and the alarm unit is a buzzer and / or an LED light.
[0130] See also Fig.15 The positioning unit is a combination of an RFID code chip 84 and a tag reader / writer (not shown in the figure). The RFID code chip 84 is arranged above the tower 6. The RFID code chip 84 is provided with positioning information. The tag reader / writer is arranged on the logistics shuttle robot to read and write the positioning information on the RFID code chip 84. The tag reader / writer sends the read and written positioning information to the control unit.
[0131] Of course, in other embodiments, the positioning unit may also be a laser sensor combination, an infrared sensor combination, or a GPS module, which is not limited here.
[0132] Therefore, when the power level of the rechargeable battery is lower than the preset value, the second driving device 22 drives the driving wheel 23 to slide along the track 7 and makes the brush 32 on the connecting frame 3 dock with the charging rail 81, thereby realizing instant charging of the rechargeable battery, thereby improving the operating efficiency of the logistics shuttle robot; since there is no need for backup batteries and construction of battery swap stations, the investment capital is reduced and the economic benefits are improved.
[0133] In addition, a machine cover 25 is provided on the frame 21 to protect the second driving device 22 and the driving wheel 23 inside the frame 21 .
[0134] In summary, the logistics shuttle robot and cableway system of the present invention have the following beneficial effects:
[0135] (1) The logistics shuttle robot of the present invention is provided with a clamping assembly. When the logistics box 9 rises into place, its clamping block 141 is retracted inward and clamps the hanging rod 11, thereby supporting the weight of the object without directly using the traction rope 12 to bear the force. The risk of the traction rope 12 breaking and the logistics box 9 falling off and the logistics box 9 shaking violently is effectively prevented, making the work safer.
[0136] (ii) The logistics shuttle robot of the present invention is provided with a balancing mechanism. When the hanging rod 11 is tilted upward, the hanging rod 11 preferentially abuts against the top edge of the slot 1411 as support. The balancing mechanism is used to adjust the traction rope 12 at the other end of the hanging rod 11 so that the traction ropes 12 at both ends of the hanging rod 11 can continue to be retracted upward until the other end of the hanging rod 11 also abuts against the top edge of the slot 1411, and finally the two ends of the hanging rod 11 reach balance.
[0137] (III) The logistics shuttle robot of the present invention is provided with a second guide mechanism. The two second guide wheels 241 on the second guide mechanism can play a good guiding role. On the one hand, under the action of its own telescopic force, the two second guide wheels 241 can cooperate with the pressing force applied to the connecting bracket 242 by the self-weight of the logistics shuttle robot to ensure that the second guide wheel 241 is always in close contact with the track 7 during the up and down movement relative to the connecting bracket 242; on the other hand, under the action of its own torsional force, the second guide wheel 241 can be adjusted when the second guide wheel 241 turns with the track 7, so that the driving wheel 23 can finally run smoothly along the track 7 under the guidance of the guide mechanism.
[0138] (IV) The logistics shuttle robot of the present invention is provided with a stopper 512 and a locking mechanism. When the logistics shuttle robot runs to the tower 6, the tower 6 unlocks the locking mechanism, so that the stopper 512 can be retracted when the logistics shuttle robot passes the tower 6 to avoid the tower 6, thereby ensuring the safety of the logistics shuttle robot when passing the tower 6; when leaving the tower 6, the stopper 512 can be reset and re-locked by the locking mechanism, thereby ensuring the full encirclement of the track 7 and ensuring the safety of the logistics shuttle robot on the track 7. By providing this mechanical structure, the retraction and reset of the stopper 512 can be controlled, ensuring the safety of the logistics shuttle robot on the track 7 and reducing the risk of falling.
[0139] (V) The cableway system of the present invention can realize instant charging of the rechargeable battery through the docking of the brush 32 with the charging rail 81, thereby improving the operating efficiency of the logistics shuttle robot; since there is no need for backup batteries and the construction of battery replacement stations, the investment capital is reduced and the economic benefits are improved.
[0140] The technical means disclosed in the scheme of the present invention are not limited to the technical means disclosed in the above-mentioned implementation mode, but also include technical schemes composed of any combination of the above-mentioned technical features. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention, and these improvements and modifications are also regarded as the protection scope of the present invention.
Claims
1. A logistics shuttle robot, comprising a walking drive mechanism, a connecting frame, a control device and a logistics box, wherein the connecting frame is connected to the walking drive mechanism and the control device respectively, and the control device is provided with a hanging winch mechanism for driving the logistics box to rise or fall. Features: The hanging hoisting mechanism includes a hanging rod connected to the logistics box, a traction rope connected to the hanging rod, a winding assembly for driving the traction rope to be wound up or released, and a clamping assembly for clamping the hanging rod; The clamping assembly comprises a clamping block for clamping the hanging rod, a locking piece for locking the clamping block, an in-place detector and a controller; the controller is electrically connected to the locking piece and the in-place detector respectively; When the hanging rod is stuck by the card block and needs to be untied, the winding and unwinding assembly drives the hanging rod to rise and drives the card block to open outward / inward until the locking member locks the card block, at which time the hanging rod can be lowered; When the hanging rod needs to be clamped by the clamping block, it is reset to the bottom of the winding assembly and is detected to be in position by the in-position detector, and the in-position detector sends an in-position signal to the controller, and the controller controls the locking member to unlock, and the clamping block is retracted inward / outward and clamps the hanging rod; The card block is provided with a card slot for the end of the hanging rod to extend into, and the end of the hanging rod is provided with a first guiding inclined surface. When the hanging rod rises, the first guiding inclined surface can be driven to abut against the card slot, thereby driving the card block to slide along the first guiding inclined surface to open outward / inward; or, the card block is provided with a card slot for the end of the hanging rod to extend into, and when the hanging rod rises, the controller controls the card block to open outward / inward; The locking member comprises a main body and a telescopic block arranged on the main body, the telescopic block is provided with a second guiding inclined surface, and the clamping block is provided with a rod body matched with the second guiding inclined surface; When the hanging rod rises, it can drive the rod body to slide along the second guiding inclined surface until the rod body is separated from the second guiding inclined surface and the rod body is stuck at the lower end of the telescopic block; It also includes a balancing mechanism arranged in the hanging rod, the balancing mechanism includes a balancing wheel symmetrically arranged along the central axis of the hanging rod, and the traction rope is wound around the balancing wheel.
2. The logistics shuttle robot according to claim 1, It is characterized in that The locking member further includes a telescopic spring. When the rod body slides along the second guide inclined surface, the telescopic block is pushed by the rod body and compresses the telescopic spring until the rod body is separated from the second guide inclined surface. The telescopic block extends under the elastic force of the telescopic spring and clamps the rod body at its lower end. Alternatively, when the rod body slides along the second guiding inclined plane, the controller drives the telescopic block to retract, until the rod body is separated from the second guiding inclined plane, the controller drives the telescopic block to reset, and the rod body is stuck at the lower end of the telescopic block.
3. The logistics shuttle robot according to claim 1, It is characterized in that It also includes a first elastic member connected to the clamping block. When the controller drives the telescopic block to retract, the rod body is separated from the telescopic block, and the clamping block is retracted inwardly / outwardly under the elastic force of the first elastic member and clamps the hanging rod.
4. The logistics shuttle robot according to claim 1, It is characterized in that The winding and unwinding assembly includes a first driving device and a rotating shaft, the traction rope is wound around the rotating shaft, and the first driving device drives the rotating shaft to rotate clockwise or counterclockwise to reel in or release the traction rope.
5. The logistics shuttle robot according to claim 1, It is characterized in that The travel drive mechanism includes a frame, a second drive device installed on the frame, a drive wheel and two second guide mechanisms, the output end of the second drive device is connected to the drive wheel and drives the drive wheel to roll along the track; the two second guide mechanisms are arranged on the front and rear sides of the drive wheel along the rolling direction of the drive wheel, and the second guide mechanism includes two second guide wheels for turning along the track, and the two second guide wheels are arranged in parallel.
6. The logistics shuttle robot according to claim 5, It is characterized in that The second guide mechanism also includes a connecting bracket, a support rod, a guide wheel bracket and a second elastic member, one end of the connecting bracket is connected to the frame, and the other end extends out of the frame and is sleeved on the support rod; the bottom end of the support rod is pivotally connected to the guide wheel bracket, and the guide wheel bracket is pivotally matched with the two second guide wheels; the second elastic member is sleeved on the support rod and is located between the connecting bracket and the guide wheel bracket.
7. The logistics shuttle robot according to claim 5 or 6, It is characterized in that The device further comprises a mounting member mounted on the frame and arranged opposite to the connecting frame, a stopper movably connected to the mounting member, a third elastic member with two ends respectively arranged on the mounting member and the stopper, and a locking mechanism partially arranged between the mounting member and the stopper and used to lock the stopper, wherein: The locking mechanism locks the moving direction to be perpendicular to the moving plane of the blocking member; When the logistics shuttle robot runs to the tower, the tower unlocks the locking mechanism, and the blocker can overcome the elastic force of the third elastic member and rotate to avoid the tower; when the logistics shuttle robot leaves the tower, the third elastic member resets the blocker, and the locking mechanism resets and re-locks the blocker.
8. The logistics shuttle robot according to claim 7, It is characterized in that The blocker is provided with an installation groove, and the locking mechanism includes a locking rod and a fourth elastic member arranged in the installation groove. The installation member is provided with a locking portion connected to the installation groove. When the locking mechanism locks the blocker, the locking rod is inserted into the locking portion under the elastic force of the fourth elastic member; when the locking mechanism unlocks the blocker, the locking rod overcomes the elastic force of the fourth elastic member and withdraws from the locking portion.
9. The logistics shuttle robot according to claim 8, It is characterized in that The end of the locking rod close to the locking portion and the end of the mounting slot away from the locking portion are respectively provided with limiting surfaces of the fourth elastic member, and the fourth elastic member is located between the two limiting surfaces.
10. The logistics shuttle robot according to claim 8, It is characterized in that The locking mechanism also includes a locking pin and an unlocking member arranged on the locking rod, and the blocking member is provided with a third guide surface abutting against the locking pin, and the unlocking member can be pushed by the tower to rotate, and drive the locking pin on the locking rod to move along the third guide surface, thereby driving the locking rod to move and exit the locking portion.
11. The logistics shuttle robot according to claim 8, It is characterized in that It also includes an elastic reset rod that is penetrated on the locking rod, a fixing column is arranged on the blocking member, and a hook portion that can hook the fixing column is arranged on the elastic reset rod.
12. A cableway system, It is characterized in that It comprises a logistics shuttle robot as described in any one of claims 5-11, a tower and a track arranged on the tower, and the second driving device in the walking drive mechanism drives the driving wheel to roll along the track.
13. The cableway system according to claim 12, It is characterized in that The logistics shuttle robot also includes a rechargeable battery. A charging assembly is provided on the track. The charging assembly includes a charging rail provided on the side wall of the track. The charging rail is connected to the track through an insulating member. The connecting frame is provided with a brush fixing block and a brush arranged on the brush fixing block; When the second driving device drives the driving wheel to roll along the track, it can drive the brush on the connecting frame to dock with the charging rail on the track, and the electric energy provided by the charging rail is transmitted to the rechargeable battery through the brush.
14. The cableway system according to claim 13, It is characterized in that It also includes a power control unit, a power detection unit, a control unit and a positioning unit, and the control unit is electrically connected to the power control unit, the power detection unit, the positioning unit and the second driving device, wherein: The power detection unit is used to detect the voltage value of the rechargeable battery and send it to the control unit. When the voltage value is lower than a predetermined value, the control unit outputs a control signal to the positioning unit and obtains positioning information; When the positioning information shows that the logistics shuttle robot is not located at the charging rail, the control unit outputs a control signal to the second drive device, and the second drive device drives the drive wheel to move to the charging rail. When the positioning unit detects that the logistics shuttle robot is already located at the charging rail, it sends a signal to the control unit, and the control unit outputs a control signal to the second drive device to control it to stop operating, so that the brush docks with the charging rail; The control unit outputs a control signal to the power control unit, and the power control unit controls the power to be output to the charging rail. The brush docks with the charging rail and transmits electric energy to the rechargeable battery.
15. The cableway system according to claim 14, It is characterized in that It also includes an alarm unit electrically connected to the control unit, the alarm unit is a buzzer and / or an LED light, and the alarm unit is used to issue an alarm when the voltage value is lower than a preset value.
16. The cableway system according to claim 14, It is characterized in that The power detection unit is a battery voltage detector, the control unit is a single chip microcomputer, the charging rail is made of brass, and the positioning unit is a GPS module or an RFID chip and tag reader / writer combination or a laser sensor combination or an infrared sensor combination.
17. The cableway system according to claim 16, It is characterized in that The positioning unit is a combination of an RFID code chip and a tag reader / writer. The RFID code chip is arranged above the tower. The RFID code chip is provided with the positioning information. The tag reader / writer is arranged on the logistics shuttle robot to read and write the positioning information on the RFID code chip. The tag reader / writer sends the read and written positioning information to the control unit, and the control unit outputs a control signal to the second drive device.
18. The cableway system according to claim 13, It is characterized in that Both ends of the charging rail are provided with inclined guide plates, and the inclination angle of the guide plates is 19. The cableway system according to claim 13, It is characterized in that A fifth elastic member is provided in the brush. When the brush is docked with the charging rail, the fifth elastic member is squeezed. When the logistics shuttle robot slides along the track and leaves the charging rail, the fifth elastic member is reset.