Cable tower and its construction technology
The prefabricated upper beam structure is connected by embedded parts, which solves the problems of low construction efficiency and high safety hazards of the cable tower upper beam structure, and achieves an efficient and safe construction process.
Patent Information
- Application Number
- CN202111360174.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-17
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2041-11-17
AI Technical Summary
The construction process of the upper beam structure of the existing cable tower is a high-altitude operation, and the construction requires formwork installation, steel bar binding, concrete pouring and other processes, resulting in low construction efficiency and large safety hazards.
Embedded parts embedded in the tower columns are used to stably connect the prefabricated upper beam structure between the tower columns. The construction of the upper beam structure is completed through welding or bolting, avoiding the need to build steel brackets and formwork installation between the tower columns. , steel bar binding, concrete pouring and other processes.
It effectively improves construction efficiency, reduces high-altitude working time, reduces safety hazards, and simplifies the construction process of the upper beam structure.
Smart Images

Figure CN114000426B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of cable tower construction, in particular to a cable tower and a construction process thereof. Background Art
[0002] Cable-stayed bridges are one of the most important types of long-span bridges. In order to support the cable-stayed cables on the cable-stayed bridges, cable towers are also required. Existing cable towers usually include tower columns, upper beam structures and lower beam structures. There are usually two tower columns, and the two tower columns are set at intervals. The upper beam structure and the lower beam structure are fixed between the two tower columns, and the upper beam structure is located near the top of the tower column, and the lower beam structure is located near the bottom of the tower column.
[0003] Since the cable tower is usually a reinforced concrete structure, the tower column needs to be divided into a lower tower column, a middle tower column and an upper tower column and then constructed from bottom to top. The lower crossbeam structure is constructed simultaneously during the construction of the lower tower column and the middle tower column, and the upper crossbeam structure is constructed simultaneously during the construction of the upper tower column.
[0004] The construction process of the upper crossbeam structure is an aerial operation, and the processes such as template installation, steel bar binding, and concrete pouring during the construction of the upper crossbeam structure must be carried out on the steel bar support of the upper crossbeam structure. Therefore, the construction efficiency of the upper crossbeam structure of the existing cable tower is low and there are great safety hazards. Summary of the invention
[0005] The purpose of the present invention is to provide a cable tower and a cable tower construction process to alleviate the technical problems that the construction process of the upper crossbeam structure of the cable tower in the prior art is high-altitude operation, and the processes such as template installation, steel bar binding, concrete pouring, etc. performed during the construction of the upper crossbeam structure must be carried out on the steel bar support of the upper crossbeam structure. Therefore, the construction efficiency of the existing cable tower upper crossbeam structure is low and there are great safety hazards.
[0006] In a first aspect, the present invention provides a cable tower, comprising a first tower column, a second tower column and an upper crossbeam structure;
[0007] The first tower column and the second tower column are spaced apart, and both the first tower column and the second tower column are provided with an upper crossbeam pre-installation position, a first embedded part is provided at the upper crossbeam pre-installation position of the first tower column, and a second embedded part is provided at the upper crossbeam pre-installation position of the second tower column;
[0008] The upper crossbeam structure is a prefabricated part, one side of the upper crossbeam structure is connected to the first embedded part, and the other side of the upper crossbeam structure is connected to the second embedded part.
[0009] In an optional embodiment, the upper crossbeam structure is a steel structure.
[0010] In an optional embodiment, the upper crossbeam structure includes a first curved beam and a second curved beam arranged at an interval, the first curved beam protrudes toward the second curved beam, and the second curved beam protrudes toward the first curved beam;
[0011] There are multiple first embedded parts and multiple second embedded parts, and the multiple first embedded parts and the multiple second embedded parts are arranged in one-to-one correspondence; the first curved beam is fixed between at least one group of the first embedded parts and the second embedded parts, and the second curved beam is fixed between at least one group of the first embedded parts and the second embedded parts.
[0012] In an optional embodiment, the upper cross beam structure further includes a connecting rod, and the first curved beam and the second curved beam are sequentially connected to the connecting rod.
[0013] In an optional embodiment, there are multiple connecting rods, and the multiple connecting rods are spaced apart and distributed along the length direction of the first arc beam.
[0014] In an optional embodiment, the upper cross beam structure further includes a connecting rib assembly, wherein the connecting rib assembly is connected between the first curved beam and the second curved beam.
[0015] In an optional embodiment, both the first embedded part and the second embedded part are steel structures.
[0016] In a second aspect, the present invention provides a cable tower construction process, which is used to construct the cable tower described in any one of the aforementioned embodiments, comprising:
[0017] Constructing a first tower column and a second tower column of the cable tower, and at the same time pre-embedding a first embedded part in the first tower column and pre-embedding a second embedded part in the second tower column;
[0018] Lifting the prefabricated upper crossbeam structure between the first embedded part and the second embedded part;
[0019] One side of the upper beam structure is connected to the first embedded part, and the other side is connected to the second embedded part.
[0020] In an optional embodiment, the method further includes the following steps before the step of lifting the prefabricated upper cross beam structure between the first embedded part and the second embedded part:
[0021] Constructing a lower crossbeam structure between the first tower column and the second tower column;
[0022] An upper crossbeam structure is prefabricated on the lower crossbeam structure.
[0023] In an optional embodiment, the method further includes the following steps before the step of lifting the prefabricated upper cross beam structure between the first embedded part and the second embedded part:
[0024] Installing a first support assembly on the top of the first tower column, and installing a second support assembly on the top of the second tower column;
[0025] A lifting device is installed on the first supporting assembly and the second supporting assembly, and an output end of the lifting device is connected to the prefabricated upper crossbeam structure.
[0026] The cable tower provided by the present invention comprises a first tower column, a second tower column and an upper crossbeam structure; the first tower column and the second tower column are arranged at intervals, and the first tower column and the second tower column are both provided with an upper crossbeam pre-installation position, a first embedded part is provided at the upper crossbeam pre-installation position of the first tower column, and a second embedded part is provided at the upper crossbeam pre-installation position of the second tower column; the upper crossbeam structure is a prefabricated part, one side of the upper crossbeam structure is connected to the first embedded part, and the other side is connected to the second embedded part. The first tower column and the second tower column provided by the present invention can both be steel-concrete structures, and the upper crossbeam structure can be a prefabricated steel-concrete structure or a prefabricated steel structure or the like. In the present invention, the upper crossbeam structure is preferably a prefabricated steel structure. When constructing the cable tower, the first tower column and the second tower column can be constructed first, and the first embedded part can be embedded in the process of constructing the first tower column, and the second embedded part can be embedded in the process of constructing the second tower column. Then, the prefabricated upper crossbeam structure can be hoisted between the first embedded part and the second embedded part, and then one side of the upper crossbeam structure can be connected to the first embedded part and the other side of the upper crossbeam structure can be connected to the second embedded part by welding, bolt connection or other connection methods. At this point, the construction process of the upper crossbeam structure can be completed.
[0027] Compared with the prior art, the cable tower provided by the present invention utilizes the first embedded parts embedded in the first tower column and the second embedded parts embedded in the second tower column, so as to stably connect the prefabricated upper cross beam structure between the first tower column and the second tower column, thereby realizing the construction of the upper cross beam structure without the need to sequentially construct the upper cross beam structure steel bar support, formwork installation, steel bar binding, concrete pouring and other processes between the first tower column and the second tower column, which can effectively improve the construction efficiency and reduce the construction time of high-altitude operations, and effectively reduce safety hazards.
[0028] The cable tower construction process provided by the present invention is used to construct the above-mentioned cable tower, including: constructing the first tower column and the second tower column of the cable tower, and at the same time pre-embedding the first embedded part in the first tower column and pre-embedding the second embedded part in the second tower column; hoisting the prefabricated upper crossbeam structure between the first embedded part and the second embedded part; connecting one side of the upper crossbeam structure to the first embedded part, and the other side to the second embedded part. The cable tower construction process provided by the present invention is used to construct the above-mentioned cable tower, and it can also use the first embedded part pre-embedded in the first tower column and the second embedded part pre-embedded in the second tower column to stably connect the prefabricated upper crossbeam structure between the first tower column and the second tower column, so as to realize the construction of the upper crossbeam structure, and it is also unnecessary to sequentially build the upper crossbeam structure steel bar support, template installation, steel bar binding, concrete pouring and other processes between the first tower column and the second tower column, which can effectively improve the construction efficiency and reduce the construction time of high-altitude operations, and effectively reduce safety hazards. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0030] Figure 1 A front view of a cable tower provided in an embodiment of the present invention;
[0031] Figure 2 A side view of a cable tower provided by an embodiment of the present invention;
[0032] Figure 3 Another front view of the cable tower provided by the embodiment of the present invention;
[0033] Figure 4 Another side view of the cable tower provided by the embodiment of the present invention;
[0034] Figure 5 A schematic structural diagram of an upper crossbeam structure provided by an embodiment of the present invention;
[0035] Figure 6 for Figure 5 AA section view in;
[0036] Figure 7 A schematic structural diagram of a first supporting assembly provided in an embodiment of the present invention;
[0037] Figure 8 A flow chart of a cable tower construction process provided by an embodiment of the present invention;
[0038] Fig. 9Another flow chart of the cable tower construction process provided by an embodiment of the present invention.
[0039] Icons: 1-first tower column; 10-first support assembly; 2-second tower column; 20-second support assembly; 3-upper crossbeam structure; 30-first arc-shaped beam; 31-second arc-shaped beam; 32-connecting rod; 33-connecting rib assembly; 330-first connecting rib; 331-second connecting rib; 4-first embedded part; 5-second embedded part; 6-lower crossbeam structure; 60-support frame; 7-lifting device; 70-rope; 8-bolt and nut assembly; 80-abutment plate. DETAILED DESCRIPTION
[0040] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0041] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0042] Some embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. In the absence of conflict, the following embodiments and features in the embodiments can be combined with each other.
[0043] Example:
[0044] like Figure 1-Figure 5 As shown, the cable tower provided in this embodiment includes a first tower column 1, a second tower column 2 and an upper crossbeam structure 3; the first tower column 1 and the second tower column 2 are arranged at intervals, and the first tower column 1 and the second tower column 2 are both provided with an upper crossbeam pre-installation position, a first embedded part 4 is provided at the upper crossbeam pre-installation position of the first tower column 1, and a second embedded part 5 is provided at the upper crossbeam pre-installation position of the second tower column 2; the upper crossbeam structure 3 is a prefabricated part, one side of the upper crossbeam structure 3 is connected to the first embedded part 4, and the other side is connected to the second embedded part 5.
[0045] The first tower column 1 and the second tower column 2 provided in this embodiment can both be steel-concrete structures, and the upper cross beam structure 3 can be a prefabricated steel-concrete structure or a prefabricated steel structure or other prefabricated parts. When constructing the cable tower, the first tower column 1 and the second tower column 2 can be constructed first, and the first embedded part 4 can be embedded in the process of constructing the first tower column 1, and the second embedded part 5 can be embedded in the process of constructing the second tower column 2. Then, the prefabricated upper cross beam structure 3 can be hoisted between the first embedded part 4 and the second embedded part 5, and then one side of the upper cross beam structure 3 is connected to the first embedded part 4 by welding, bolt connection or other connection methods, and the other side of the upper cross beam structure 3 is connected to the second embedded part 5, so that the construction process of the upper cross beam structure 3 can be completed.
[0046] Compared with the prior art, the cable tower provided in this embodiment utilizes the first embedded part 4 embedded in the first tower column 1 and the second embedded part 5 embedded in the second tower column 2, so that the prefabricated upper beam structure 3 can be stably connected between the first tower column 1 and the second tower column 2, thereby realizing the construction of the upper beam structure 3, without the need to sequentially construct the upper beam structure 3 steel bar support, formwork installation, steel bar binding, concrete pouring and other processes between the first tower column 1 and the second tower column 2, that is, the construction process of the upper beam structure 3 can be simplified, thereby effectively improving the construction efficiency and reducing the construction time of high-altitude operations, effectively reducing safety hazards.
[0047] Compared with the steel-concrete structure, the prefabrication process of the steel structure is simpler and more effective, so in this embodiment, the upper crossbeam structure 3 is preferably a prefabricated steel structure.
[0048] Furthermore, the upper crossbeam structure 3 can be formed by connecting existing Q355C steel materials.
[0049] It should be noted that, in the cable tower, the upper cross beam structure 3 bears relatively small load, and thus the steel upper cross beam structure 3 can effectively ensure the overall structural strength of the cable tower without affecting the bearing capacity of the cable tower.
[0050] During the cable tower construction, before the upper beam structure 3 is constructed, the lower beam structure 6 has been completed and is located directly below the upper beam structure 3. Therefore, in order to facilitate the lifting of the upper beam structure 3 and reduce the occupation of the construction site, Figure 1 and Figure 2 As shown, in this embodiment, the upper crossbeam structure 3 is preferably prefabricated on the lower crossbeam structure 6, and after the upper crossbeam structure 3 is formed, as shown in FIG. Figure 3 and Figure 4 As shown, the upper crossbeam structure 3 on the lower crossbeam structure 6 is then hoisted onto the first embedded part 4 and the second embedded part 5 .
[0051] Furthermore, in order to protect the lower crossbeam structure 6 and facilitate the lifting of the upper crossbeam structure 3, as Figure 1 and Figure 3As shown, a support frame 60 may be provided on the lower cross beam structure 6 , and the support frame 60 is used to support the upper cross beam structure 3 .
[0052] like Figure 5 and Figure 7 As shown, in order to facilitate the stable lifting of the upper beam structure 3, the tops of the first tower column 1 and the second tower column 2 can be fixed with a support assembly, and a lifting device 7 such as a jack can be installed on the support assembly, and a rope 70 such as a wire rope can be wound around the output end of the jack, and the rope 70 is used to connect with the upper beam structure 3. When the output end of the jack rises, the rope 70 is driven to rise synchronously, so that the upper beam structure 3 can be pulled up to achieve the lifting of the upper beam structure 3.
[0053] like Figure 1 , Figure 3 and Figure 5 As shown, the upper crossbeam structure 3 includes a first curved beam 30 and a second curved beam 31 which are arranged at intervals, the first curved beam 30 protrudes toward the second curved beam 31, and the second curved beam 31 protrudes toward the first curved beam 30; there are multiple first embedded parts 4 and second embedded parts 5, and the multiple first embedded parts 4 and the multiple second embedded parts 5 are arranged in a one-to-one correspondence; the first curved beam 30 is fixed between at least one group of first embedded parts 4 and the second embedded parts 5, and the second curved beam 31 is fixed between at least one group of first embedded parts 4 and the second embedded parts 5.
[0054] Compared with a straight beam structure, the stress state of the first curved beam 30 protruding toward the second curved beam 31 and the second curved beam 31 protruding toward the first curved beam 30 is more stable, which can effectively improve the supporting strength of the upper cross beam structure 3, thereby improving the structural stability of the cable tower. Therefore, in this embodiment, the upper cross beam structure 3 preferably includes a first curved beam 30 and a second curved beam 31 arranged at intervals.
[0055] Corresponding to the first curved beam 30 and the second curved beam 31 arranged at intervals, there are multiple first embedded parts 4 and second embedded parts 5. Multiple first embedded parts 4 and multiple second embedded parts 5 can effectively improve the connection stability between the first curved beam 30 and the second curved beam 31 and the tower columns on both sides.
[0056] like Figure 5 As shown, the upper cross beam structure 3 further includes a connecting rod 32 , and the first curved beam 30 and the second curved beam 31 are connected to the connecting rod 32 in sequence.
[0057] The connecting rod 32 is used to connect the first curved beam 30 and the second curved beam 31 , so as to improve the connection strength and integrity of the upper cross beam structure 3 .
[0058] The connecting rod 32 may also be made of steel. Specifically, the first curved beam 30 , the second curved beam 31 and the connecting rod 32 may all be made of section steel.
[0059] Further, such as Figure 5 As shown, there are a plurality of connecting rods 32 , and the plurality of connecting rods 32 are distributed at intervals along the length direction of the first curved beam 30 .
[0060] Multiple connecting rods 32 can further enhance the connection strength between the first curved beam 30 and the second curved beam 31, and multiple connecting rods 32 are spaced apart along the length direction of the first curved beam 30, which can effectively enhance the force balance between the first curved beam 30 and the second curved beam 31, thereby further enhancing the structural stability of the upper cross beam structure 3.
[0061] like Figure 5 As shown, the upper cross beam structure 3 further includes a connecting rib assembly 33 , and the connecting rib assembly 33 is connected between the first curved beam 30 and the second curved beam 31 .
[0062] The connecting rib assembly 33 is used to further improve the connection stability between the first curved beam 30 and the second curved beam 31 , and the connecting rib assembly 33 can further improve the strength of the upper beam structure 3 .
[0063] In this embodiment, the connecting rib assembly 33 may also be made of steel.
[0064] Further, such as Figure 5 As shown, the connecting rib assembly 33 may include a first connecting rib 330 and a second connecting rib 331. The first connecting rib 330 and the second connecting rib 331 are both S-shaped, and one end of the first connecting rib 330 is fixed to the first arc beam 30, and the other end is fixed to the middle of the second connecting rib 331; one end of the second connecting rib 331 is fixed to the middle of the first connecting rib 330, and the other end is fixed to the second arc beam 31.
[0065] The S-shaped first connecting rib 330 and the second connecting rib 331 can not only improve the aesthetics of the upper beam structure 3 , but also improve the force stability of the connecting rib assembly 33 , thereby further effectively improving the supporting strength of the upper beam structure 3 .
[0066] The first connecting rib 330 and the second connecting rib 331 may both be made of steel bars.
[0067] Furthermore, there may be multiple connecting rib assemblies 33, which are spaced apart along the length direction of the first curved beam 30. When there are two connecting rods 32 and the two connecting rods 32 are spaced apart, the multiple connecting rib assemblies 33 may be spaced apart between the two connecting rods 32.
[0068] In order to improve the strength of the first curved beam 30 and the second curved beam 31 , the first curved beam 30 and the second curved beam 31 each include two curved strip beams, and the two strip beams are spliced to form the first curved beam 30 or the second curved beam 31 .
[0069] Specifically, the strip beams can be made of channel steel, and the notches of two strip beams are butted against each other to form a hollow first arc beam 30 or a hollow second arc beam 31 .
[0070] like Figure 5 and Figure 6 As shown, the two strip beams can be connected to each other by using a bolt and nut assembly 8. Specifically, the side walls of the two strip beams that are away from each other are abutted with an abutment plate 80. The abutment plate 80 and the strip beam are both provided with through holes, and the through holes of the abutment plate 80 are connected to the through holes of the strip beam. The bolts in the bolt and nut assembly 8 are passed through the through holes of the abutment plate 80 and the through holes of the strip beam, and the nuts abut against the side of the abutment plate 80 that is away from the strip beam, and the nuts are threadedly connected to the bolts.
[0071] The bolt and nut assembly 8 can improve the connection stability between the two beams.
[0072] In this embodiment, the first embedded part 4 and the second embedded part 5 are both steel structures.
[0073] When the first embedded part 4 and the second embedded part 5 are both steel structures, welding between the first embedded part 4 and the upper beam structure 3 and welding between the second embedded part 5 and the upper beam structure 3 can be achieved, thereby effectively ensuring the installation stability of the upper beam structure 3 between the first tower column 1 and the second tower column 2.
[0074] In this embodiment, in order to improve the strength of the first embedded part 4 and the second embedded part 5, the first embedded part 4 and the second embedded part 5 can be formed by splicing a plurality of steel sections.
[0075] like Figure 8 As shown, this embodiment also provides a cable tower construction process, which is used to construct the above-mentioned cable tower, including:
[0076] Step S1: constructing a first tower column 1 and a second tower column 2 of a cable tower, and pre-embedding a first embedded part 4 in the first tower column 1 and pre-embedding a second embedded part 5 in the second tower column 2;
[0077] Step S2: hoisting the prefabricated upper crossbeam structure 3 between the first embedded part 4 and the second embedded part 5;
[0078] Step S3: connecting one side of the upper crossbeam structure 3 to the first embedded part 4 , and the other side to the second embedded part 5 .
[0079] In this embodiment, after step S1, step S2 and step S3, the construction process of the upper crossbeam structure 3 can be realized. The cable tower construction process of this embodiment can also use the first embedded part 4 embedded in the first tower column 1 and the second embedded part 5 embedded in the second tower column 2 to stably connect the prefabricated upper crossbeam structure 3 between the first tower column 1 and the second tower column 2, thereby realizing the construction of the upper crossbeam structure 3. There is no need to sequentially build the steel bar support of the upper crossbeam structure 3, install the template, tie the steel bars, pour concrete, and other processes between the first tower column 1 and the second tower column 2, which can effectively improve the construction efficiency and reduce the construction time of high-altitude operations, and effectively reduce safety hazards.
[0080] Further, such as Fig. 9 As shown, the cable tower construction process of this embodiment also includes the following steps before step S2:
[0081] Step S10: constructing a lower crossbeam structure 6 between the first tower column 1 and the second tower column 2;
[0082] Step S11: prefabricate the upper crossbeam structure 3 on the lower crossbeam structure 6 .
[0083] In the actual construction process of the cable tower, the construction is usually carried out from bottom to top. Since the lower crossbeam structure 6 is located between the first tower column 1 and the second tower column 2 near the bottom of the tower column, it is necessary to construct the lower crossbeam structure 6 first and then construct the upper crossbeam structure 3 near the top of the tower column.
[0084] At this time, in step S10 and step S11, the lower beam structure 6 can be used as the prefabrication site of the upper beam structure 3, which can not only effectively save the construction area of the upper beam structure 3, but also make the prefabricated upper beam structure 3 located directly below the lower beam structure 6, thereby facilitating the upper beam structure 3 to be directly lifted between the first embedded part 4 and the second embedded part 5.
[0085] like Fig. 9 As shown, the cable tower construction process of this embodiment also includes the following steps before step S2:
[0086] Step S12: installing the first support assembly 10 on the top of the first tower column 1, and installing the second support assembly 20 on the top of the second tower column 2;
[0087] Step S13: Install a lifting device on the first supporting assembly 10 and the second supporting assembly 20 , and connect the output end of the lifting device to the prefabricated upper beam structure 3 .
[0088] Step S12 and step S13 are used to cooperate with each other to achieve the installation of the lifting device and the connection between the lifting device and the upper beam structure 3.
[0089] It should be noted that there is no order between step S11 and step S12. Step S12 can be performed after step S11, or step S11 and step S12 can be performed simultaneously.
[0090] The first support assembly 10 and the second support assembly 20 may be formed by splicing steel sections, and both the first support assembly 10 and the second support assembly 20 are used to support the lifting device.
[0091] Furthermore, the first support assembly 10 and the second support assembly 20 may both include a transverse support, a first diagonal support may be fixed between the transverse support of the first support assembly 10 and the first tower column 1, and a second diagonal support may be fixed between the transverse support of the second support assembly 20 and the second tower column 2.
[0092] Among them, the lifting device can include a lifting device 7 such as a jack and a rope 70 such as a wire rope. The above-mentioned lifting device 7 is installed on the first support assembly 10 and the second support assembly 20. The output end of the lifting device 7 is connected to the rope 70, and the rope 70 is used to connect to the upper beam structure 3.
[0093] When the lifting device 7 is started, the output end thereof rises, thereby driving the rope 70 and the upper beam structure 3 to rise, thereby realizing the lifting process of the upper beam structure 3.
[0094] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A cable tower, characterized in that: It comprises a first tower column (1), a second tower column (2) and an upper crossbeam structure (3); The first tower column (1) and the second tower column (2) are arranged at intervals, and both the first tower column (1) and the second tower column (2) are provided with an upper crossbeam pre-installation position, a first embedded part (4) is provided at the upper crossbeam pre-installation position of the first tower column (1), and a second embedded part (5) is provided at the upper crossbeam pre-installation position of the second tower column (2); The upper crossbeam structure (3) is a prefabricated part, one side of the upper crossbeam structure (3) is connected to the first embedded part (4), and the other side of the upper crossbeam structure (3) is connected to the second embedded part (5); The upper crossbeam structure (3) is a steel structure; The upper cross beam structure (3) comprises a first curved beam (30) and a second curved beam (31) which are arranged at an interval, the first curved beam (30) protruding toward the second curved beam (31), and the second curved beam (31) protruding toward the first curved beam (30); There are multiple first embedded parts (4) and multiple second embedded parts (5), and the multiple first embedded parts (4) and the multiple second embedded parts (5) are arranged in a one-to-one correspondence; the first curved beam (30) is fixed between at least one group of the first embedded parts (4) and the second embedded parts (5), and the second curved beam (31) is fixed between at least one group of the first embedded parts (4) and the second embedded parts (5); The upper crossbeam structure (3) further comprises a connecting rod (32), and the first curved beam (30) and the second curved beam (31) are sequentially connected to the connecting rod (32); There are a plurality of connecting rods (32), and the plurality of connecting rods (32) are distributed at intervals along the length direction of the first arc-shaped beam (30); The upper cross beam structure (3) further comprises a connecting rib assembly (33), wherein the connecting rib assembly (33) is connected between the first curved beam (30) and the second curved beam (31); The connecting rib assembly (33) comprises a first connecting rib (330) and a second connecting rib (331), wherein the first connecting rib (330) and the second connecting rib (331) are both S-shaped, and one end of the first connecting rib (330) is fixed to the first arc-shaped beam (30), and the other end is fixed to the middle of the second connecting rib (331); one end of the second connecting rib (331) is fixed to the middle of the first connecting rib (330), and the other end is fixed to the second arc-shaped beam (31); There are a plurality of the connecting rib components (33), and the plurality of the connecting rib components (33) are distributed at intervals along the length direction of the first arc-shaped beam (30); The first curved beam (30) and the second curved beam (31) each comprise two curved strip beams, the strip beams are made of channel steel, and the notches of the two strip beams are butted against each other to form the hollow first curved beam (30) or the hollow second curved beam (31); The two strip beams are connected to each other by using a bolt and nut assembly (8).
2. The cable tower according to claim 1, characterized in that: The first embedded part (4) and the second embedded part (5) are both steel structures.
3. A cable tower construction process, used for constructing the cable tower according to any one of claims 1-2, characterized in that: include: A first tower column (1) and a second tower column (2) of the cable tower are constructed, and at the same time, a first embedded component (4) is pre-embedded in the first tower column (1), and a second embedded component (5) is pre-embedded in the second tower column (2); The prefabricated upper crossbeam structure (3) is hoisted between the first embedded part (4) and the second embedded part (5); One side of the upper crossbeam structure (3) is connected to the first embedded part (4), and the other side is connected to the second embedded part (5).
4. The cable tower construction process according to claim 3, characterized in that: The method further includes the following steps before the step of lifting the prefabricated upper cross beam structure (3) between the first embedded part (4) and the second embedded part (5): A lower crossbeam structure (6) is constructed between the first tower column (1) and the second tower column (2); An upper cross beam structure (3) is prefabricated on the lower cross beam structure (6).
5. The cable tower construction process according to claim 4, characterized in that: The method further includes the following steps before the step of lifting the prefabricated upper cross beam structure (3) between the first embedded part (4) and the second embedded part (5): A first support assembly (10) is installed on the top of the first tower column (1), and a second support assembly (20) is installed on the top of the second tower column (2); A lifting device is installed on the first supporting assembly (10) and the second supporting assembly (20), and the output end of the lifting device is connected to the prefabricated upper crossbeam structure (3).
Citation Information
Patent Citations
Cable tower structure and bridge
CN110241727A
Suspension bridge beam prefabricating and assembling construction process
CN110804952A
Upper cross beam structure of cable bent tower and cable bent tower
CN216663807U