Cast-in-place pile construction method for preventing hole collapse in water-rich rubble layer in severe cold area
By using auger drill bits and steel casings in the water-rich breccia layer in severe cold areas combined with brine hydrate chlorination technology, the problem of blockage of pile hole construction in winter construction is solved, and efficient pile foundation construction is achieved, ensuring construction quality and progress .
Patent Information
- Application Number
- CN202411533240.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-31
- Publication Date
- 2024-11-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the water-rich breccia layer in severe cold areas, due to the large permeability coefficient of the formation during construction in winter, the water pressure of the deep hole wall changes during the rotary drilling process, causing hole collapse. The guard casing and the surface frozen soil are frozen, resulting in the inability to go up and down in time in time Move, causing obstacles to pile hole construction.
Use auger drill bit to drill holes in the pile position through the seasonal frozen layer, use a steel casing and form a brine hydrated freezing area inside it, mechanically rotate into the steel casing, combine the combined steel casing and drill bit alloy cutting teeth to gradually complete the pile hole construction , and pull out the steel casing section after concrete pouring.
It effectively avoids hole collapse, improves the quality and speed of pile foundation construction, achieves normal winter construction, and shortens construction period.
Smart Images

Figure CN119041404A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building pile foundation construction, in particular to a cast-in-place pile construction method for preventing hole collapse in a water-rich breccia layer in severe cold regions. Background Art
[0002] In the process of construction, sometimes winter construction work must be carried out due to tight construction schedule. However, there are many problems in winter construction, especially in areas with severe cold climate and high ground permeability coefficient. When using short sleeve construction, the rotary drill will cause changes in the surface water pressure of the deep hole wall during the rotary drilling and up and down movement of the drill bucket, resulting in the loss of fine particles and the collapse of the hole. At the same time, due to the cold climate of winter construction, the casing and the surface frozen soil quickly freeze together, making it impossible to move the casing up and down in time, which leads to the obstruction of pile hole construction and the inability to continue the pile foundation construction. Summary of the invention
[0003] The invention aims to solve the deficiencies of the prior art and provides a cast-in-place pile construction method for preventing hole collapse in a water-rich breccia layer in severe cold regions.
[0004] In order to achieve the above object, the present invention adopts the following technical solutions:
[0005] A method for constructing cast-in-place piles in a water-rich breccia layer in a severe cold region to prevent hole collapse, the specific steps being:
[0006] S1. Lay out and locate the cast-in-place piles, use a spiral drill to drill holes at the pile positions and penetrate the seasonally frozen layer into the brecciated layer to complete the first drilling;
[0007] S2. Screw the first section of steel casing into the first completed pile hole until the bottom end of the first section of steel casing drills into the bottom of the first completed pile hole and exceeds the bottom of the hole by 0.5-1m;
[0008] S3, the spiral drill bit drills in and out of the first section of the steel casing, and continues to drill 0.5-1m to complete the second drilling. Pour salt water around the root of the first section of the steel casing on the surface to form a salt water thawing area, and continue to screw into the first section of the steel casing mechanically until the bottom of the first section of the steel casing exceeds the bottom of the second completed pile hole by 0.5-1m;
[0009] S4, the process of rotating the spiral drill bit to dig out the slag and the first section of the steel casing to follow up, when the top of the first section of the steel casing is 0.3-0.5m away from the ground surface, the second section of the steel casing is connected to the first section of the steel casing to form a combined steel casing, and the spiral drill bit is rotated to dig out the slag and the combined steel casing is rotated in until the combined steel casing reaches the designed elevation of the pile bottom or the stratum where the hole does not collapse, and the pile hole construction is completed;
[0010] S5. Lower the steel cage into the pile hole, pour concrete, and pull up the composite steel casing at the same time until the concrete pouring is completed and the composite steel casing is completely pulled out.
[0011] The bottom of the spiral drill bit has alloy teeth.
[0012] A casing alloy pick is provided at the bottom of the first section of the steel casing.
[0013] In step S1, after the positioning of the cast-in-place pile is completed, before using the spiral drill bit, a manual electric pick or pneumatic pick is used to manually drill a hole downward to form a guide hole.
[0014] In step S5, before lowering the steel cage into the pile hole, the sediment in the pile hole is cleaned.
[0015] In step S5, when pouring concrete, pour from bottom to top, vibrate while pouring, and pull out the composite steel casing from bottom to top at the same time. The bottom of the composite steel casing should be lower than the top surface of the concrete in the pile hole, and the part of the composite steel casing pulled out of the ground is dismantled and preserved in sections.
[0016] In step S5, the pouring of concrete is interrupted during the removal process of the combined steel casing, and the steel casing is removed once every 2-3 sections are pulled out.
[0017] The beneficial effects of the present invention are as follows: the present invention solves the problem that it is difficult to drill holes in the brecciated layer and that the steel casing and the surface soil are frozen, making it impossible to continue lowering the steel casing, and provides a new method for the winter construction of bored piles in high-altitude cold areas and water-rich brecciated layers, effectively improving the quality and speed of pile foundation construction, and realizing the normal construction of pile foundations in winter, thereby accelerating the construction progress and shortening the construction period. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 A schematic diagram of manually drilling a guide hole in step S1 of the present invention;
[0019] Figure 2 It is a schematic diagram of the spiral drill bit drilling through the seasonally frozen layer in step S1 of the present invention;
[0020] Figure 3 It is a schematic diagram of the drilling of the first section of steel casing in step S2 of the present invention;
[0021] Figure 4 Schematic diagram of thawing of brine in step S3 of the present invention;
[0022] Figure 5 A schematic diagram of connecting the first section of steel casing to the second section of steel casing in step S4 of the present invention;
[0023] Figure 6 It is a schematic diagram of the continuous screwing of the combined steel casing in step S4 of the present invention;
[0024] Figure 7 It is a schematic diagram of lowering the steel cage in step S5 of the present invention;
[0025] Figure 8 This is a schematic diagram of the combined steel casing after being pulled out and concrete pouring is completed in step S5 of the present invention;
[0026] In the figure: 1-screw drill bit; 2-first section steel casing; 3-salt water thawing area; 4-second section steel casing; 5-reinforcement cage; 6-concrete; 7-seasonal frozen layer; 8-breccia layer; 9-drill bit alloy pick; 10-casing alloy pick; 11-guide hole;
[0027] The following is a detailed description of the embodiments of the present invention with reference to the accompanying drawings. DETAILED DESCRIPTION
[0028] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The embodiments are only used to explain the present invention and are not used to limit the scope of the present invention. The present invention is described in more detail by way of example with reference to the accompanying drawings in the following paragraphs. The advantages and features of the present invention will become clearer according to the following description. It should be noted that the accompanying drawings are all in a very simplified form and are not in precise proportions, and are only used to facilitate and clearly assist in explaining the purpose of the embodiments of the present invention.
[0029] It should be noted that when a component is referred to as being "fixed to" another component, it may be directly on the other component or there may also be a component centered. When a component is considered to be "connected to" another component, it may be directly connected to the other component or there may also be a component centered. When a component is considered to be "set on" another component, it may be directly set on the other component or there may also be a component centered. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only.
[0030] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which the present invention belongs. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more of the related listed items.
[0031] The present invention will be further described below in conjunction with the accompanying drawings and embodiments:
[0032] A method for constructing cast-in-place piles in a water-rich breccia layer in a severe cold region to prevent hole collapse, the specific steps being:
[0033] S1, such as Figure 1 , Figure 2As shown, after the cast-in-place pile is positioned by laying out the lines, a manual electric pick or pneumatic pick is used to drill a hole downward to form a guide hole 11, and then a spiral drill bit 1 is used to drill a hole at the pile position and penetrate the seasonally frozen layer 7 into the brecciated layer 8 to complete the first drilling;
[0034] Due to freezing, the seasonally frozen layer 7 can maintain the stability of the hole wall in a natural state; the three-dimensional thickness of the seasonally frozen layer 7 is different in different regions;
[0035] The bottom of the spiral drill bit 1 is provided with a drill bit alloy pick 9; the length of the spiral drill bit 1 should not be too long and should be controlled within 2m.
[0036] During winter construction, the surface soil is very strong after freezing, and the drill may jump when drilling directly with the spiral drill bit 1. Before using the spiral drill bit 1 for drilling, an electric pick or pneumatic pick can be used to manually dig and trim a pile hole of 0.5-1m deep, i.e., a guide hole 11, and then the spiral drill bit 1 can be used for drilling;
[0037] S2, such as Figure 3 As shown, the first section of the steel casing 2 is screwed into the first completed pile hole until the bottom end of the first section of the steel casing 2 drills into the bottom of the first completed pile hole and exceeds the bottom of the hole by 0.5-1m; the specific value shall be determined according to the actual conditions of the construction site;
[0038] The bottom of the first section of the steel casing 2 is provided with a casing alloy pick 10;
[0039] S3, such as Figure 4 As shown, the spiral drill bit 1 drills in and out of the first section of the steel casing 2, and continues to drill 0.5-1m to complete the second drilling. Salt water is poured around the root of the first section of the steel casing 2 on the surface to form a salt water thawing area 3. The first section of the steel casing 2 is continued to be screwed into the machine to follow up until the bottom of the first section of the steel casing 2 exceeds the bottom of the pile hole completed for the second time by 0.5-1m.
[0040] When the spiral drill bit 1 is drilling and discharging slag, attention should be paid to controlling the lifting and rotating speed of the drill bit to minimize the disturbance to the soil;
[0041] After the spiral drill bit 1 stops discharging slag, brine is poured around the root of the first section of the steel casing 2 to ensure that the outer surface area of the first section of the steel casing 2 in contact with the seasonally frozen layer 7 is fully poured with brine, and the freezing temperature of the water in the local soil is reduced to eliminate the bonding effect of the seasonally frozen layer 7 on the first section of the steel casing 2, thereby ensuring that the first section of the steel casing 2 is normally screwed downward;
[0042] The concentration of the brine is determined by the temperature. The lower the temperature, the greater the concentration of the brine. The concentration of the brine can be adjusted appropriately according to different climates and temperatures to achieve a wider range of applications and ensure that the first section of the steel casing 2 can be followed up smoothly.
[0043] S4, such as Figure 5 , Figure 6 As shown, the circulating spiral drill bit 1 rotates to dig out the slag and the first section of the steel casing 2 follows up. When the top of the first section of the steel casing 2 is 0.3-0.5m away from the ground surface, the second section of the steel casing 4 is connected to the first section of the steel casing 2 to form a combined steel casing. The spiral drill bit 1 continues to rotate to dig out the slag and the combined steel casing is rotated in until the combined steel casing reaches the designed elevation of the pile bottom or a stratum where no hole collapse occurs, and the pile hole construction is completed;
[0044] When the combined casing is mechanically screwed in for follow-up, the bottom of the combined casing should be 0.5-1m above the bottom of the hole. The specific value is determined by the friction resistance of the breccia layer 8 during the construction process, the working condition of the mechanical equipment, etc.
[0045] The extended casing can be multi-section, and the length should be determined according to the soil conditions exposed in the hole. If the lower brecciated layer 8 contains a high content of clay, its self-stabilizing ability is good, and the length of the extended casing can be appropriately shortened. If the lower brecciated layer 8 contains a high content of sand and soil, its self-stabilizing ability is poor, the length of the extended casing should be appropriately lengthened. The specific adjustment method should be determined based on the actual situation of the on-site construction.
[0046] S5, such as Figure 7 , Figure 8 As shown, the sediment in the pile hole is cleaned, the steel cage 5 is placed in the pile hole, and the concrete 6 is poured from bottom to top. While pouring, the composite steel casing is vibrated, and the bottom of the composite steel casing is pulled out from the bottom to the top. The bottom of the composite steel casing should be lower than the top surface of the concrete 6 in the pile hole. The part of the composite steel casing pulled out of the ground is dismantled and preserved in sections until the concrete 6 is poured and the composite steel casing is completely pulled out;
[0047] The pouring of concrete 6 is interrupted during the removal process of the combined steel casing, and each time 2-3 sections of the steel casing are pulled out, they are removed once.
[0048] In water-rich gravel formations in extremely cold regions, salt water is used to solve the problem of steel casing freezing during winter construction. A spiral drill bit 1 with high-strength drill bit alloy pick teeth 9 is used to drill holes in the steel casing, which greatly reduces the adverse effects on the hole wall. Holes are drilled by small disturbances + timely follow-up of long steel casings, which is easy to operate and can achieve the purpose of constructing pile foundations in extremely cold climates.
[0049] The present invention is described above by way of example in conjunction with the accompanying drawings. It is obvious that the specific implementation of the present invention is not limited to the above-mentioned method. As long as various improvements are made using the method concept and technical solution of the present invention, or are directly applied to other occasions without improvement, they are all within the protection scope of the present invention.
Claims
1. A method for constructing cast-in-place piles in a water-rich breccia layer in a severe cold region to prevent hole collapse, characterized in that: The specific steps are: S1, laying out and positioning the cast-in-place pile, using a spiral drill bit (1) to drill a hole at the pile position and penetrate the seasonally frozen layer (7) into the brecciated layer (8), completing the first drilling; S2, screwing the first section of steel casing (2) into the first completed pile hole until the bottom end of the first section of steel casing (2) drills into the bottom of the first completed pile hole and exceeds the bottom of the hole by 0.5-1m; S3, the spiral drill bit (1) drills in and out of the first section of the steel casing (2), continues to drill 0.5-1m, completes the second drilling, pours salt water around the root of the first section of the steel casing (2) on the surface to form a salt water thawing zone (3), and continues to screw into the first section of the steel casing (2) mechanically until the bottom of the first section of the steel casing (2) exceeds the bottom of the second completed pile hole by 0.5-1m; S4, the process of circulating the spiral drill bit (1) rotating to dig out the slag and the first section of the steel casing (2) following up, when the top of the first section of the steel casing (2) is 0.3-0.5m away from the ground surface, the second section of the steel casing (4) is connected to the first section of the steel casing (2) to form a combined steel casing, and the spiral drill bit (1) is rotated to dig out the slag and the combined steel casing is rotated in until the combined steel casing reaches the designed elevation of the pile bottom or is in a stratum where no hole collapse occurs, and the pile hole construction is completed; S5. Lower the steel cage (5) into the pile hole, pour concrete (6), and pull up the combined steel casing at the same time until the pouring of concrete (6) is completed and the combined steel casing is completely pulled out.
2. A method for constructing cast-in-place piles to prevent hole collapse in a water-rich brecciated layer in a severe cold region according to claim 1, characterized in that: The bottom of the spiral drill bit (1) is provided with a drill bit alloy cutting tooth (9).
3. The method for constructing cast-in-place piles to prevent hole collapse in a water-rich breccia layer in severe cold regions according to claim 1, characterized in that: A casing alloy pick (10) is provided at the bottom of the first section of the steel casing (2).
4. The method for constructing cast-in-place piles to prevent hole collapse in a water-rich breccia layer in severe cold regions according to claim 1, characterized in that: In step S1, after the positioning of the cast-in-place pile is completed, before the spiral drill bit (1) is used, a manual electric pick or pneumatic pick is used to manually drill a hole downward to form a guide hole (11).
5. The method for constructing cast-in-place piles to prevent hole collapse in a water-rich breccia layer in severe cold regions according to claim 1, characterized in that: In step S5, before lowering the steel cage (5) into the pile hole, the sediment in the pile hole is cleaned.
6. A method for constructing cast-in-place piles to prevent hole collapse in a water-rich brecciated layer in severe cold regions according to claim 5, characterized in that: In step S5, when pouring concrete (6), pouring is done from bottom to top, vibrating while pouring, and simultaneously pulling out the combined steel casing from bottom to top. The bottom of the combined steel casing should be lower than the top surface of the concrete (6) in the pile hole, and the part of the combined steel casing pulled out of the ground is removed in sections and preserved.
7. A method for constructing cast-in-place piles to prevent hole collapse in a water-rich brecciated layer in severe cold regions according to claim 6, characterized in that: In step S5, the pouring of concrete (6) is interrupted during the removal process of the combined steel casing, and the steel casing is removed once every 2-3 sections are pulled out.
Citation Information
Patent Citations
Construction method for forming pile through rotary digging of pile casing
CN106836206A
Long spiral improved drilled grouting pile hole-forming construction method
CN109236191A
Seasonally frozen soil area spiral steel pile forming mode
CN117822570A
Drilling-and-driving method for pile foundation erection in permafrost ground
RU2320821C1