A multifunctional branch tunnel boring machine simulation test platform and its use method
By designing a multi-functional branch hole boring machine simulation test platform, using the imitation structure and pipe hoisting mechanism to simulate the formation pressure and branch hole boring process in actual engineering, the problem of difference between scale reduction test and actual engineering in the existing technology is solved, and the problem of the difference between scale reduction test and actual engineering is realized. Tests near real size and widely applicable effects.
Patent Information
- Application Number
- CN202111445593.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-29
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2041-11-29
AI Technical Summary
The simulation test devices in the existing vertical top pipe technology are all scaled tests, which cannot truly feedback the problems in actual engineering, resulting in large differences between the actual engineering and the test results.
Design a multi-functional branch tunnel boring machine simulation test platform, including the main tunnel model, branch tunnel model and excavation equipment, simulate the formation pressure through the imitation structure, realize the near-real size test, simplify the main tunnel form, highlight the stress characteristics, And the assembly process of branch hole excavation is realized through the pipe hoisting mechanism and the stop-retreat mechanism.
No scale is required for testing, and can truly feedback the performance parameters of the equipment or structure, have high applicability and wide testing range, can guide the optimization of design plans, reduce test costs, and achieve multi-directional simulated branch hole excavation.
Smart Images

Figure CN114216708B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of tunneling, and in particular to a multifunctional branch tunnel boring machine simulation test platform and a use method thereof. Background Art
[0002] With the rapid development of urban construction in my country, the sudden occurrence of natural disasters, and the goals of carbon neutrality and carbon peak have stimulated the construction of underground spaces such as urban underground pipelines, power tunnels, and drainage channels.
[0003] Vertical pipe jacking technology is a new construction method with immature construction technology. Similar technologies include vertical jacking method, upward tunneling shield method and horizontal pipe jacking method. Among them, the vertical jacking method is mainly used in coastal and riverside drainage pipeline projects, and has high requirements on soil properties. The upward tunneling shield method has a larger diameter and is limited by the cross-section of the main tunnel. Traditional shaft construction mostly adopts the forward shaft method, reverse shaft method, etc., but there are disadvantages such as disturbing the urban environment and difficulty in excavation in some areas.
[0004] The existing vertical pipe jacking technology is still in the research and exploration stage. There is very little experience in actual branch tunnel excavation projects. Most of them use empirical judgment, numerical simulation, theoretical estimation and other means to judge the soil disturbance characteristics, the stress characteristics of the segment structure, the construction process and other aspects. However, the actual project is very complicated and needs to be verified in combination with relevant test platforms.
[0005] The simulation test devices in the prior art are all scaled tests, which are very different from actual projects and cannot truly reflect the problems that occur in actual projects. Summary of the invention
[0006] In view of the above-mentioned technical problems, the present invention proposes a multifunctional branch tunnel boring machine simulation test platform and a method of using the same, so as to solve the problem in the prior art that the scaled test is quite different from the actual test.
[0007] In order to achieve the above object, the technical solution of the present invention is achieved as follows:
[0008] A multifunctional branch tunnel boring machine simulation test platform, comprising:
[0009] The main tunnel model comprises a stand and a composite segment arranged on the stand, wherein a cutting opening is arranged on the composite segment;
[0010] A branch cave model is arranged on the cutting edge, and the branch cave model comprises a pressure-simulating structure for simulating formation pressure and a starting sleeve arranged at the bottom of the pressure-simulating structure;
[0011] The excavation equipment is set below the starting sleeve and is used to carry out branch tunnel excavation construction in the branch tunnel model. By intercepting the stress-bearing part of the main tunnel and connecting it with the gantry, the main tunnel form is simplified and the stress characteristics are highlighted; through the starting sleeve close to the actual size, the performance parameters of the equipment or structure can be obtained without the need for scaled testing, and the problems encountered in the actual project can be more realistically fed back; through the simulated pressure structure, the soil burial depth pressure during the excavation process is simulated to achieve the simulation of the excavation and assembly process of branch tunnels with different burial depths.
[0012] Preferably, the imitation pressure structure comprises an imitation pressure shell connected to the upper side of the cutting opening and a pressure body arranged in the imitation pressure shell, and a pressure control device is provided on the imitation pressure shell for controlling the pressure.
[0013] Preferably, the tunneling equipment is a pipe jacking mechanism for jacking the pipe section into the starting sleeve; the pressure-simulating shell includes an outer cylinder, an outer cover plate arranged at the upper end of the outer cylinder and an inner cover plate arranged at the lower end of the outer cylinder, and the inner cover plate is located at the top of the pipe section.
[0014] Preferably, a stop mechanism is provided in cooperation with the pipe jacking mechanism to prevent the pipe section from withdrawing from the starting sleeve.
[0015] Preferably, the anti-retraction mechanism comprises an anti-retraction frame arranged on the platform, and a retractable thrust rod is circumferentially arranged on the anti-retraction frame for inserting into the hoisting hole of the pipe segment to realize the anti-retraction function.
[0016] Preferably, a sealing assembly is connected to the lower end of the launching sleeve for sealing the gap between the launching sleeve and the pipe section or the tunneling equipment.
[0017] Preferably, the sealing assembly comprises an annular structure detachably connected to the starting sleeve and a wire brush arranged on the inner side of the annular structure for closely contacting the pipe joint or the excavation equipment.
[0018] Preferably, bent bolts are provided between the composite pipe segments and the pipe segments for supporting the pipe segments.
[0019] Preferably, a water-stop steel plate is provided between the starting sleeve and the pipe joint for sealing the gap between the starting sleeve and the pipe joint and supporting the pipe joint.
[0020] A method for using the multifunctional branch tunnel boring machine simulation test platform as described in any one of the above items comprises the following steps:
[0021] S1. Hoist and assemble the test platform;
[0022] S2. Retract the pipe jacking mechanism, assemble the pipe segments into a ring and connect it to the working end of the pipe jacking mechanism, connect the inner cover plate to the pipe segment and perform a sealing treatment, and then use the pipe jacking mechanism to push the pipe segment to fit the wire brush tightly until the pipe segment completely blocks the starting sleeve;
[0023] S3. The pressure body is delivered to the imitation pressure shell to the set pressure through the pressure control device, and then the pipe section is pushed through the jacking mechanism until the lifting hole of the pipe section is aligned with the stop rod, and after the stop rod is pushed into the lifting hole, the connection between the jacking mechanism and the pipe section is removed, and the jacking mechanism is retracted;
[0024] S4. Assemble the next pipe segment into a ring and connect it to the jacking mechanism, push the assembled pipe segment through the jacking mechanism until it is staggered and closely attached to the previous pipe segment, then pull out the stop rod, and then push the assembled pipe segment through the jacking mechanism to align it with the lifting hole and the stop rod, push the stop rod into the lifting hole, remove the connection between the jacking mechanism and the pipe segment, and retract the jacking mechanism;
[0025] S5. Repeat step S4 until multiple pipe sections are pushed into the starting sleeve in sequence;
[0026] S6. Push the last pipe section through the jacking mechanism until the bottom edge of the previous pipe section is aligned with the inner starting sleeve-shaped port, then fix the jacking mechanism, control the device to extract all the pressure bodies to simulate the completion of grouting and water stopping in the formation, connect the composite pipe segment with the previous pipe section through bent bolts, and retract the jacking mechanism to pull back the last pipe section;
[0027] S7. Remove the sealing assembly, weld the water-stop steel plate to connect the starting sleeve and the previous pipe section, and then remove the last pipe section;
[0028] S8. Connect the jacking mechanism to the pipe section in the starting sleeve, then retract the jacking mechanism to apply the required tension, simulate the effect of the branch tunnel on the permanent structure of the main tunnel, and record the data.
[0029] Beneficial effects of the present invention:
[0030] 1. The present invention uses a branch tunnel boring machine simulation test platform to achieve no need for on-site in-situ testing. The branch tunnel size is close to the actual size, and no scaled-down testing is required to obtain the performance parameters of the equipment or structure, which can be used to guide the optimization design scheme;
[0031] 2. According to different test purposes, composite segments with or without cutting parts, with or without equipment excavation, etc. are used. The device is simple, highly applicable and has a wide test range;
[0032] 3. Intercept the stress-bearing part of the main tunnel and connect it with the gantry to simplify the form of the main tunnel and highlight the stress-bearing characteristics;
[0033] 4. By injecting different pressure bodies, the buried depth pressure of the soil during the excavation process is simulated, and the last few rings of the branch tunnel are spliced to simulate the excavation and assembly process of branch tunnels with different buried depths;
[0034] 5. When the branch tunnel structure is completed, the jacking mechanism applies a reaction force to the pipe section to simulate the stress characteristics of the permanent structure connecting the branch tunnel and the main tunnel. The pressure body is extracted to protect the safety of personnel;
[0035] 6. The pressure-simulating shell is pressurized, and the filling medium is diversified, which can be mud, water, soil, stone or a combination to simulate the formation pressure;
[0036] 7. By setting up an annular stop rod, the main tunnel space can be fully utilized and work in coordination with the oil cylinder to ensure orderly excavation and assembly of branch tunnels.
[0037] 8. The form of the test bench can be changed to meet the simulation test of branch tunnel boring machines in different directions. It can be recycled and reused, reducing the test cost and realizing multi-directional simulation of branch tunnel excavation. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0039] Figure 1 This is a schematic diagram of the structure of the main tunnel model of Example 1 of the present invention;
[0040] Figure 2 It is a structural schematic diagram of a stand, a pipe jacking mechanism and a stop mechanism according to Embodiment 1 of the present invention;
[0041] Figure 3 This is a schematic diagram of the structure of Embodiment 1 of the present invention;
[0042] Figure 4 for Figure 2 A top view of
[0043] Figure 5 This is a schematic diagram of the installation of the first pipe section (without pressure) of Example 1 of the present invention;
[0044] Figure 6 This is a schematic diagram of the installation of the first pipe section (under pressure) of Example 1 of the present invention;
[0045] Figure 7 Schematic diagram of the installation of the second ring pipe joint (under pressure) of Example 1 of the present invention Figure 1 ;
[0046] Figure 8 Schematic diagram of the installation of the second ring pipe joint (under pressure) of Example 1 of the present invention Figure 2 ;
[0047] Fig. 9 This is a schematic diagram of the installation of the third ring pipe joint (under pressure) of Example 1 of the present invention;
[0048] Fig.10It is a schematic structural diagram of the third ring pipe segment (without pressure) and the bent bolts of Example 1 of the present invention;
[0049] Fig.11 The structure diagram of the third ring pipe joint (without pressure), bent bolts and water stop steel plate of Example 1 of the present invention is shown in FIG. Figure 1 ;
[0050] Fig.12 The structure diagram of the third ring pipe joint (without pressure), bent bolts and water stop steel plate of Example 1 of the present invention is shown in FIG. Figure 2 ;
[0051] Fig.13 It is a partial enlarged view of the anti-retraction mechanism of Example 1 of the present invention;
[0052] Fig.14 It is a structural schematic diagram of a vertical upward construction simulation test platform for a tunnel boring machine according to Embodiment 2 of the present invention;
[0053] Fig.15 It is a structural schematic diagram of a horizontal construction simulation starting test platform for a tunnel boring machine according to Embodiment 2 of the present invention;
[0054] Fig.16 This is a structural schematic diagram of a horizontal construction simulation receiving test platform for a tunnel boring machine according to Embodiment 2 of the present invention;
[0055] Fig.17 It is a structural schematic diagram of a vertical downward construction simulation test platform for a tunnel boring machine according to Embodiment 2 of the present invention;
[0056] Fig.18 This is a schematic structural diagram of a tunnel boring machine oblique construction simulation test platform according to Embodiment 2 of the present invention;
[0057] Fig.19 This is a schematic diagram of the structure of Example 3 of the present invention. DETAILED DESCRIPTION
[0058] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0059] like Figure 1 to Figure 13As shown, a multifunctional branch tunnel boring machine simulation test platform described in Example 1 of the present invention includes a main tunnel model, the main tunnel model includes a stand 2 and a composite pipe segment 1 arranged on the stand 2, the composite pipe segment 1 is symmetrically fixed on the stand 2, the connection between the stand 2 and the composite pipe segment 1 corresponds to the cross-sectional opening of the composite pipe segment 1, so that the stand 2 has a better supporting force for the composite pipe segment 1, and a cutting opening 101 is provided on the steel pipe segment 102 of the composite pipe segment 1, and the cutting opening 101 is arranged in the middle of the steel pipe segment 102; the test platform also includes a branch tunnel The branch tunnel model is arranged on the cutting edge 101. The branch tunnel model includes a pressure-simulating structure for simulating formation pressure and a starting sleeve 5 arranged at the bottom of the pressure-simulating structure. The pressure-simulating structure is used to simulate the formation pressure in the actual process. The starting sleeve 5 simulates the starting sleeve of the actual branch tunnel. It is sealed and waterproof during the construction process. When the construction is completed, the starting sleeve is retained as a permanent structure to support the branch tunnel structure. The test platform also includes an excavation equipment arranged below the starting sleeve 5, which is used to enter the starting sleeve 5 and carry out branch tunnel excavation construction in the pressure-simulating structure.
[0060] Preferably, if Figure 6~Figure 11 As shown, the pressure-simulating structure includes a pressure-simulating shell 4 connected to the upper side of the cutting opening 101 and a pressure body 9 disposed in the pressure-simulating shell 4. A pressure control device 8 is disposed on the pressure-simulating shell 4 to control the pressure. In this embodiment, the pressure body 9 is a fluid, and the pressure-simulating shell 4 is filled with fluid or extracted with fluid by the pressure control device 8 to change the pressure formed by the pressure-simulating shell on the lower side, thereby simulating the pressure generated by different tunnel burial depths.
[0061] Preferably, if Figure 5~Figure 12 As shown, the excavation equipment is a pipe jacking mechanism 12 for pushing the pipe segment 7 into the starting sleeve 5. In this embodiment, the pipe jacking mechanism 12 is an oil cylinder; the pressure-simulating shell 4 includes an outer cylinder 402, an outer cover plate 401 arranged at the upper end of the outer cylinder 402, and an inner cover plate 404 arranged at the lower end of the outer cylinder 402. The inner cover plate 404 is located at the top of the pipe segment 7. The outer cover plate 401 is provided with a pressure delivery port 403, and the pressure control device 8 is connected to the pressure delivery port 403. The lower end of the outer cylinder 402 is provided with a saddle-shaped port that matches the cutting port 101 of the composite pipe segment 1, and the saddle-shaped port is connected to the outer surface of the steel pipe segment 102, and the circular port of the outer cylinder 402 is connected to the outer cover plate 401.
[0062] Preferably, if Figure 3~Figure 12 As shown, a stop mechanism is provided in cooperation with the pipe jacking mechanism 12, which is used to prevent the pipe segment 7 pushed into the starting sleeve 5 from exiting the starting sleeve 5. The stop mechanism and the pipe jacking mechanism 12 are both fixed on the stand 2. In this embodiment, a cushion block 201 is also provided on the stand 2 at the bottom of the stop mechanism and the pipe jacking mechanism 12. The pipe jacking mechanism 12 is located directly below the starting sleeve 5, and the stop mechanism is arranged circumferentially around the outer ring of the pipe jacking mechanism 12, so as not to hinder the pipe jacking mechanism 12 from pushing the pipe segment 7 into the starting sleeve 5.
[0063] Preferably, if Figure 3~Figure 13 As shown, the anti-retreat mechanism includes an anti-retreat frame 3 arranged on the platform 2, and the anti-retreat frame 3 includes a circumferential auxiliary frame 302 and support legs 303. The auxiliary frame 302 is supported and fixed on the platform 2 by the support legs 303, and retractable thrust rods 301 are evenly arranged circumferentially on the auxiliary frame 302 of the anti-retreat frame 3 for inserting into the lifting hole 701 set on the pipe segment 7 to realize the anti-retreat function.
[0064] Preferably, if Figure 6~Figure 12 As shown, the upper end of the starting sleeve 5 is provided with a saddle-shaped opening that fits with the cutting edge 101 of the composite pipe segment 1, and is connected to the inner surface of the steel pipe segment 102 through the saddle-shaped opening. The circular opening at the lower end of the starting sleeve 5 is connected with an annular sealing assembly 6 for sealing the gap between the pipe segment 7 and the starting sleeve 5.
[0065] Preferably, if Figure 6~Figure 12 As shown, the sealing assembly 6 includes an annular structure 602 detachably connected to the starting sleeve 5 and a wire brush 601 arranged on the inner side of the annular structure 602 for tightly contacting the pipe segment 7 or the excavation equipment. In this embodiment, the longitudinal section of the annular structure 602 is a "[" shape with the opening facing outward, and the upper and lower edges of the structure are convenient for connection with the starting sleeve 5 and the wire brush 601; and the wire brush 601 is tightly contacted with the pipe segment 7 to ensure the sealing performance during the jacking process. In addition, the sealing assembly 6 may also include other sealing components arranged in the starting sleeve 5 for sealing the gap between the pipe segment 7 and the starting sleeve 5.
[0066] Preferably, if Figure 10~Figure 12 As shown, a bent bolt 10 is provided between the composite pipe segment 1 and the pipe segment 7 , and the bent bolt 10 fixes the pipe segment 7 to the composite pipe segment 1 for supporting the pipe segment 7 .
[0067] Preferably, if Fig.11 and Fig.12 As shown, a water-stopping steel plate 11 is provided between the lower end of the starting sleeve 5 and the pipe segment 7 for sealing the gap between the lower end of the starting sleeve 5 and the pipe segment 7 and supporting the pipe segment 7; the bent bolts 10 and the water-stopping steel plate 11 are permanent structures.
[0068] A method for using a multifunctional branch tunnel boring machine simulation test platform comprises the following steps:
[0069] S1. First, according to the size of the main tunnel segment, the corresponding size of the bench 2, the pressure-simulating shell 4, the starting sleeve 5, the pipe segment 7, etc. are customized, and the bench 2, the composite segment 1, the pressure-simulating shell 4, the starting sleeve 5, the pipe segment 7 and other related components and equipment are transported to the test site; the bench 2 is hoisted to the designated test area, and then the cushion block 201 and the jacking mechanism 12 are placed at the corresponding position, and then the anti-retraction frame 3 is hoisted to the corresponding position and fixed, the steel segment 102 in the composite segment 1 is spliced, and the front side is placed on the ground, and the circular opening of the starting sleeve 5 is connected to the sealing component 6, and the connection is completed. After completion, it is hoisted to the bottom of the steel pipe segment 102, the saddle-shaped mouth of the starting sleeve 5 corresponds to the inner side of the cut mouth 101 of the composite pipe segment 1, and the leaking weld is quickly welded and repaired. After the pressure-simulating shell 4 is sealed, it is hoisted to the top of the steel pipe segment 102, and the saddle-shaped mouth of the pressure-simulating shell 4 corresponds to the cut outer side of the composite pipe segment 1, and the leaking weld is quickly welded and repaired. After completion, the steel pipe segment 102 is hoisted to the top of the stand 2, and the cross-section of the steel pipe segment 102 corresponds to the connection of the stand. After aligning the position, it is quickly fixed. After ensuring that the connection is correct, the hoisting is released, and the test platform is assembled;
[0070] S2. Retract the jacking mechanism 12, assemble the pipe section 7 into a ring and connect it to the working end of the jacking mechanism 12, connect the inner cover plate 404 to the pipe section 7 and seal it, and then push the pipe section 7 to close to the wire brush 601 through the jacking mechanism 12 until the pipe section 7 completely blocks the starting sleeve 5;
[0071] S3. The pressure delivery hole 403 is opened, and the pressure body 9 is delivered to the pressure simulation housing 4 through the pressure control device 8 to a set pressure, and then the pipe section 7 is pushed by the pipe jacking mechanism 12 until the lifting hole 701 of the pipe section 7 is aligned with the stop rod 301, and the stop rod 301 is radially pushed to insert into the lifting hole 701 until all the lifting holes 701 are inserted into the stop rod 301, and then the connection between the pipe jacking mechanism 12 and the pipe section 7 is removed, and the pipe jacking mechanism 12 is retracted;
[0072] S4. Assemble the pipe section 7 of the next section into a ring and connect it to the jacking mechanism 12, push the pipe section 7 assembled in this step through the jacking mechanism 12 until it is staggered and close to the pipe section 7 of the previous section, then pull out the stop rod 301, and then push the pipe section 7 assembled in this step through the jacking mechanism 12 to align with the stop rod 301 to the lifting hole 701, push the stop rod 301 into the lifting hole 701, remove the connection between the jacking mechanism 12 and the pipe section 7 of this step, and retract the jacking mechanism 12;
[0073] S5. Repeat step S4 until the multiple tube sections 7 are sequentially pushed into the starting sleeve 5;
[0074] S6. Push the last pipe segment 7 through the jacking mechanism 12 until the bottom edge is aligned with the last pipe segment 7, i.e., the pipe segment 7 at the bottom end that has been pushed into the starting sleeve 5. Then fix the jacking mechanism 12, and extract all the pressure bodies 9 through the control device 8 to simulate the water-free grouting situation of the formation after the branch tunnel segment support is completed, and better simulate the stress condition of the main tunnel. Then connect the composite segment 1 with the last pipe segment 7, i.e., the pipe segment 7 that has been pushed into the starting sleeve 5 and located at the bottom end, through the bent bolts 10, and retract the jacking mechanism 12 to pull back the last pipe segment 7 pushed in this step;
[0075] S7. Remove the sealing assembly 6 for recycling, and then weld the water-stop steel plate 11 to connect the starting sleeve 5 with the previous section of the pipe section 7, that is, the pipe section 7 at the bottom of the starting sleeve 5, and then remove the last section of the pipe section 7, that is, the pipe section 7 pulled back in step S6;
[0076] S8. Connect the jacking mechanism 12 to the pipe section 7 in the starting sleeve 5, then retract the jacking mechanism 12 to apply the required tension to simulate the effect of the branch tunnel on the permanent structure of the main tunnel, and record the data; finally, release the pressure in the cylinder to complete the test.
[0077] Embodiment 2, as Figure 14~Figure 18 As shown, the difference between it and Example 1 is that the excavation equipment is a tunnel boring machine 13, the inner cover plate 404 of the pressure-simulating shell 4 is omitted, the working end of the tunnel boring machine 13 is inserted into the starting sleeve 5, and the wire brush 601 of the sealing assembly 6 is closely attached to the working end of the tunnel boring machine 13 to play a sealing role to prevent the pressure body 9 from flowing out; by injecting the pressure body 9 into the pressure-simulating shell 4, the performance of the tunnel boring equipment at different burial depths can be checked, the specific tunneling parameters of the equipment can be obtained, and the shortcomings of the equipment can be optimized. In addition, by changing the form of the bench, it can meet the simulation test of branch tunnel boring machines in different directions, and can be recycled and reused, reducing the test cost, and realizing multi-directional simulation of branch tunnel excavation.
[0078] Embodiment 3, as Fig.19 As shown, the difference between it and Example 1 is that the outer cylinder 402 of the pressure-simulating shell 4 and the starting sleeve 5 are combined into a straight sleeve 15 which is passed through the cutout 102 of the composite pipe segment 1, and the inner wall of the circular port at the bottom of the cutout 102 is provided with a plurality of water-stop sealing components 14, which reduces the manufacturing difficulty, prevents the problem of special-shaped interfaces being unable to be welded and sealed, and makes the device simpler and the test more convenient.
[0079] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A multifunctional branch tunnel boring machine simulation test platform, It is characterized in that include: A main tunnel model comprises a stand (2) and a composite pipe segment (1) arranged on the stand (2), wherein a cutting opening (101) is provided on the composite pipe segment (1); A branch cave model is arranged on the cutting opening (101), the branch cave model comprising a pressure-simulating structure for simulating formation pressure and an initial sleeve (5) arranged at the bottom of the pressure-simulating structure; A tunneling device is arranged below the starting sleeve (5) and is used for performing branch tunneling construction in the branch tunnel model; The excavation equipment is a pipe jacking mechanism (12) used to push a pipe segment (7) into a starting sleeve (5); a back-stop mechanism is provided in cooperation with the pipe jacking mechanism (12) to prevent the pipe segment (7) from backing out of the starting sleeve (5); the back-stop mechanism comprises a back-stop frame (3) arranged on a stand (2); a retractable thrust rod (301) is circumferentially arranged on the back-stop frame (3) to be inserted into a hoisting hole (701) of the pipe segment (7) to realize a back-stop function.
2. The multifunctional branch tunnel boring machine simulation test platform according to claim 1, It is characterized in that The imitation pressure structure comprises an imitation pressure shell (4) connected to the upper side of the cutting opening (101) and a pressure body (9) arranged in the imitation pressure shell (4). A pressure control device (8) is provided on the imitation pressure shell (4) for controlling pressure.
3. The multifunctional branch tunnel boring machine simulation test platform according to claim 2, It is characterized in that The pressure-simulating shell (4) comprises an outer cylinder (402), an outer cover plate (401) arranged at the upper end of the outer cylinder (402), and an inner cover plate (404) arranged at the lower end of the outer cylinder (402), wherein the inner cover plate (404) is located at the top of the pipe section (7).
4. The multifunctional branch tunnel boring machine simulation test platform according to claim 3, It is characterized in that The launching sleeve (5) is connected to a sealing assembly (6) for sealing a gap between the launching sleeve (5) and a pipe joint (7) or excavation equipment.
5. The multifunctional branch tunnel boring machine simulation test platform according to claim 4, It is characterized in that The sealing assembly (6) comprises an annular structure (602) detachably connected to the starting sleeve (5) and a wire brush (601) arranged on the inner side of the annular structure (602) for closely contacting the pipe joint (7) or the excavation equipment.
6. The multifunctional branch tunnel boring machine simulation test platform according to any one of claims 3 to 5, It is characterized in that Bent bolts (10) are provided between the composite pipe segment (1) and the pipe segment (7) for supporting the pipe segment (7).
7. The multifunctional branch tunnel boring machine simulation test platform according to claim 6, It is characterized in that A water-stop steel plate (11) is provided between the starting sleeve (5) and the pipe joint (7) for sealing the gap between the starting sleeve (5) and the pipe joint (7) and supporting the pipe joint (7).
8. A method for using the multifunctional branch tunnel boring machine simulation test platform as claimed in any one of claims 2 to 7, It is characterized in that The steps include: S1. Hoist and assemble the test platform; S2. Retract the pipe jacking mechanism (12), assemble the pipe section (7) into a ring and connect it to the working end of the pipe jacking mechanism (12), connect the inner cover plate (404) to the pipe section (7) and perform a sealing process, and then push the pipe section (7) to fit closely to the wire brush (601) through the pipe jacking mechanism (12) until the pipe section (7) completely blocks the starting sleeve (5); S3. The pressure body (9) is conveyed into the pressure-simulating housing (4) to a set pressure through the pressure control device (8), and then the pipe section (7) is pushed through the pipe jacking mechanism (12) until the lifting hole (701) of the pipe section (7) is aligned with the stop rod (301), and after the stop rod (301) is pushed and inserted into the lifting hole (701), the connection between the pipe jacking mechanism (12) and the pipe section (7) is removed, and the pipe jacking mechanism (12) is retracted; S4. Assemble the next pipe segment (7) into a ring and connect it to the jacking mechanism (12), push the assembled pipe segment (7) through the jacking mechanism (12) until it is staggered and closely attached to the previous pipe segment (7), then pull out the stop rod (301), and then push the assembled pipe segment (7) through the jacking mechanism (12) to align the stop rod (301) with the lifting hole (701), push the stop rod (301) into the lifting hole (701), remove the connection between the jacking mechanism (12) and the pipe segment (7), and retract the jacking mechanism (12); S5. Repeat step S4 until the multiple tube sections (7) are sequentially pushed into the starting sleeve (5); S6. The last pipe segment (7) is pushed forward by the pipe jacking mechanism (12) until the bottom edge of the previous pipe segment (7) is aligned with the circular port of the starting sleeve (5), and then the pipe jacking mechanism (12) is fixed. The control device (8) withdraws all the pressure bodies (9) to simulate the completion of grouting and water stopping in the formation, and the composite pipe segment (1) is connected to the previous pipe segment (7) by the bent bolts (10). The pipe jacking mechanism (12) is retracted to pull back the last pipe segment (7); S7. Remove the sealing assembly (6), then weld the water stop steel plate (11) to connect the starting sleeve (5) and the previous pipe section (7), and then remove the last pipe section (7); S8. Connect the jacking mechanism (12) to the pipe section (7) in the starting sleeve (5), then retract the jacking mechanism (12) to apply the required tension, simulate the effect of the branch tunnel on the permanent structure of the main tunnel, and record the data.
