A garbage pyrolysis gasification furnace
By designing flue gas combustion devices and slag bearing and ash discharge device in the garbage pyrolysis gasification furnace, the problems of difficulty in flue gas regulation and uneven ash discharge are solved, and efficient and uniform garbage combustion and ash discharge are achieved. Improves the efficiency and effectiveness of garbage disposal.
Patent Information
- Application Number
- CN202111664970.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-31
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2041-12-31
AI Technical Summary
The existing garbage pyrolysis gasifiers have problems such as difficulty in flue gas regulation, low combustion efficiency and poor effect, and the ash slag is uneven, which affects the combustion efficiency and effect of garbage.
A garbage pyrolysis gasification furnace is designed, including a flue gas combustion device and a slag-bearing and ash discharge device. The flue gas is drawn out from different chambers through the flue gas pipe for mixed combustion, and high-temperature and clean combustion is achieved using ignitors and excess oxygen. An elliptical cylindrical slag bearing chamber and ash discharge chamber are arranged at the bottom of the garbage combustion chamber, and a screw slag discharge machine is used to achieve uniform discharge of ash.
The complete combustion of flue gas is achieved, the combustion temperature and efficiency are improved, the clean emission of flue gas is ensured, and the uniform combustion and ash discharge of ash is achieved through the elliptical cylindrical structure and the spiral slag discharge machine is achieved, which improves the garbage disposal. Efficiency and effect.
Smart Images

Figure CN114383136B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of garbage processing equipment, in particular to a garbage pyrolysis gasification furnace. Background Art
[0002] With the continuous improvement of living standards, people's quality of life has made great progress accordingly. At the same time, the amount of domestic waste generated is also increasing. The daily treatment of a large amount of urban and rural domestic waste, especially the small and medium-sized urban and rural domestic waste treatment has become a difficult problem.
[0003] At present, one way to deal with domestic waste is to carry out centralized landfill treatment. However, landfill produces garbage odor and garbage leachate, and it occupies a large amount of land. With people's high demands for the environment, land resources are becoming increasingly scarce, the demand for landfills is increasing, and the landfill method is difficult to sustain. Moreover, landfill is only a temporary treatment method and cannot eliminate garbage.
[0004] One treatment method is the traditional incineration method. Although it can handle a large amount of garbage, it has high requirements for garbage sorting. The garbage needs to stay in the factory and even needs pre-treatment such as crushing and filtering. In addition, due to the focus on power generation, it is difficult to form a high temperature above 850℃ for garbage incineration, which produces a large amount of toxic and harmful gases such as dioxins. Before garbage incineration, a large amount of garbage leachate and garbage odor are also produced. Because it is difficult to form a stable high temperature above 850℃ for garbage incineration, the garbage incineration is not thorough, and the slag also becomes a harmful and hazardous solid waste. Therefore, garbage incineration is highly polluting and it is difficult to achieve truly standard emissions.
[0005] Most of the existing garbage incinerators first dump the garbage into the garbage pool, perform secondary sorting, crushing, filtering and other pre-treatment on the garbage, and then gradually use grab buckets or manual loading. The garbage stays, piles up, stores and pre-processes in the factory, which will inevitably produce garbage leachate and garbage odor. Most of these garbage treatment plants are full of stench, sewage overflows, breed rats, mosquitoes and flies, and have a poor factory production environment. Such garbage treatment plants seriously affect the environmental sanitation of surrounding residents and have become a source of pollution that seriously threatens local ecological security.
[0006] Another existing method of domestic waste treatment is to use a garbage pyrolysis gasification furnace for high-temperature combustion treatment. Through the drying, carbonization and combustion of a continuous garbage high-temperature cracking gasification furnace, the domestic waste is burned at high temperature to form ash and slag, which is then discharged. The discharged ash and slag are sorted and crushed and directly used as building filler. The dust is filtered and cleaned to directly separate small particles and sludge that can be used as fertilizer, achieving the purpose of purification and resource utilization, and therefore has good prospects.
[0007] Of course, there are still some shortcomings in the existing garbage pyrolysis gasification furnace, which is mainly manifested in that it is difficult to completely burn the flue gas during combustion. If part of the unburned flue gas is directly discharged and purified, the processing cost is high and the difficulty is great. Since there is enough combustible gas in these flue gases, a flue gas combustion device (or a secondary combustion chamber) is often provided to burn the flue gas to achieve secondary combustion of the flue gas. The existing flue gas combustion device mainly sets a flue gas pipe at a position of the garbage pyrolysis gasification furnace and introduces the flue gas into the flue gas combustion device through the flue gas pipe for combustion. There are too few smoke outlets. Since there are multiple chambers in the garbage pyrolysis gasification furnace, the flue gas pipe is only set at a certain position, which makes it difficult to regulate the processing of garbage in each chamber of the garbage pyrolysis gasification furnace. On the other hand, since the flue gas temperature and humidity of the drying chamber, pyrolysis chamber and other chambers of the garbage pyrolysis gasification furnace are different, the flue gas temperature in the pyrolysis chamber is high and the humidity is low, and the flue gas temperature in the drying chamber is relatively low and the humidity is high. After a long period of mixing and then burning, the flue gas is difficult to burn, the combustion is not clean, and the efficiency is low.
[0008] At the same time, the existing garbage pyrolysis gasification furnace mainly discharges ash by lateral pushing, spiral pushing or falling by its own weight. These methods directly set the corresponding equipment at the bottom of the existing garbage pyrolysis gasification furnace and the garbage incinerator. There is a main problem, that is, the ash discharge at various positions is uneven. Specifically, the ash discharge at approximately the same horizontal plane is uneven, which makes the garbage at various positions in the existing garbage pyrolysis gasification furnace fall unevenly, thereby causing uneven combustion of garbage in the existing garbage pyrolysis gasification furnace, affecting the garbage combustion efficiency and effect. Summary of the invention
[0009] In view of the above shortcomings, the present invention provides a garbage pyrolysis gasification furnace, which can solve the problems of difficult flue gas regulation, low flue gas combustion efficiency and poor effect of the garbage pyrolysis gasification furnace.
[0010] In order to achieve the above object, the present invention adopts the following technical scheme:
[0011] A garbage pyrolysis gasification furnace comprises a furnace body and a flue gas combustion device, wherein a garbage storage chamber, a garbage drying chamber, a garbage pyrolysis chamber and a garbage combustion chamber are vertically arranged in the furnace body from top to bottom in sequence, and the characteristic is that: the flue gas combustion device comprises a flue gas combustion chamber, the flue gas combustion chamber is equipped with an igniter, and a flue gas outlet is arranged on the flue gas combustion chamber to discharge the flue gas after combustion; the flue gas combustion chamber is connected to the upper end of the garbage pyrolysis chamber through a flue pipe 1, is connected to the upper end of the garbage drying chamber through a flue pipe 2, and is connected to the upper end of the garbage storage chamber through a flue pipe 3, and regulating valves for regulating the flow of flue gas are respectively arranged on the flue pipe 1, the flue pipe 2 and the flue pipe 3.
[0012] Furthermore, a smoke chamber, an oxygen distribution chamber and a dust chamber are provided at the bottom of the smoke combustion chamber, the dust chamber is located at the bottom center of the smoke combustion chamber, the oxygen distribution chamber and the smoke chamber are concentrically arranged on the periphery of the dust chamber from the inside to the outside in sequence, the dust chamber is a cylindrical chamber structure, a sealing flange cover that can be opened and closed is provided at the bottom, the top is open and connected to the interior of the smoke combustion chamber, the smoke chamber and the oxygen distribution chamber are annular cylindrical chamber structures, the smoke chamber is separated by a smoke chamber partition into smoke chamber one and smoke chamber two, the tops of the oxygen distribution chamber, smoke chamber one and smoke chamber two are connected to the interior of the smoke combustion chamber, smoke pipe one is connected to smoke chamber one, and smoke pipe two and smoke pipe three are connected to smoke chamber two.
[0013] Furthermore, a smoke disperser is provided at the top of the smoke cavity to communicate with the interior of the smoke combustion chamber, and the smoke disperser includes a plurality of smoke dispersion pipes distributed around a circle, the lower portion of the smoke dispersion pipe is upright, and the upper portion is inclined at an elevation angle of 30° to 60°, and the vertical projection of the upper tail end of each of the smoke dispersion pipes is located on a tangent line of the circle where the smoke dispersion pipe is located, and the upper tail ends of the plurality of smoke dispersion pipes distributed around the circle are all distributed clockwise or counterclockwise at the same time;
[0014] An oxygen disperser is provided on the top of the oxygen distribution chamber to communicate with the interior of the flue gas combustion chamber. The oxygen disperser includes a plurality of oxygen dispersion tubes distributed around a circle. The lower portion of the oxygen dispersion tubes is uprightly arranged, and the upper portion is inclined at an elevation angle of 30° to 60°. The vertical projection of the upper tail end of each of the oxygen dispersion tubes is located on the tangent line of the circle where the oxygen dispersion tube is located, and the upper tail ends of the plurality of oxygen dispersion tubes distributed around the circle are all distributed clockwise or counterclockwise at the same time.
[0015] Furthermore, an air inlet surround portion surrounding the garbage pyrolysis gasification furnace is arranged at the ends of the flue gas pipe one, the flue gas pipe two and the flue gas pipe three connected to the garbage pyrolysis gasification furnace, and a plurality of air inlet holes connected to the interior of the garbage pyrolysis gasification furnace are opened on the inner circumference of the air inlet surround portion; each of the air inlet surround portions is respectively provided with a flue gas branch pipe connected to the air inlet surround portion on two opposite sides, and the two flue gas branch pipes are symmetrically arranged and merged to connect to the flue pipe one, the flue pipe two or the flue pipe three.
[0016] Furthermore, a heat exchange chamber is arranged on the upper part of the flue gas combustion chamber, and the heat exchange chamber is filled with circulating water; a flue gas collecting chamber and an oxygen heating chamber are arranged on the top of the heat exchange chamber, and the oxygen heating chamber surrounds the periphery of the flue gas collecting chamber; the flue gas combustion chamber is provided with a plurality of flue gas heat exchange pipes passing through the heat exchange chamber and connected to the flue gas collecting chamber, and the flue gas outlet is arranged at the top of the flue gas collecting chamber; a vertical partition is arranged in the oxygen heating chamber to separate the oxygen heating chamber there, and the oxygen heating chamber is provided with an oxygen input port on one side of the partition, and an oxygen output port on the other side of the partition, and the oxygen output port is connected to the oxygen distribution chamber.
[0017] Furthermore, the flue gas pipe 2 and the flue gas pipe 3 are equipped with a condensation and dehydration device for realizing condensation and dehydration of flue gas, the condensation and dehydration device includes a cylinder, a collecting chamber is arranged at the upper part of the cylinder, condensation inlet 1 and condensation inlet 2 are arranged at the top of the collecting chamber, a circulating water chamber is arranged in the middle part of the cylinder, a sewage chamber is arranged at the lower part of the cylinder, a plurality of condensation unit smoke pipes passing through the circulating water chamber are connected between the collecting chamber and the sewage chamber, the collecting chamber is connected with the flue gas pipe 2 through the condensation inlet 1, so that the smoke can enter the collecting chamber from the front smoke pipe 2 and pass through the condensation unit smoke pipe and the sewage chamber in sequence and enter the smoke chamber 2 after going out of the sewage chamber, the collecting chamber is connected with the smoke pipe 3 through the condensation inlet 2, so that the smoke can enter the collecting chamber from the front smoke pipe 3 and pass through the condensation unit smoke pipe and the sewage chamber in sequence and enter the smoke chamber 2 after going out of the sewage chamber.
[0018] Furthermore, a slag receiving and ash discharging device is arranged directly below the garbage combustion chamber, and the slag receiving and ash discharging device includes a slag receiving chamber and an ash discharging chamber, wherein the garbage combustion chamber is an elliptical cylindrical structure, the slag receiving chamber is an inverted quadrangular pyramid chamber shape with a rectangular bottom and top surface, and the ash discharging chamber is a rectangular parallelepiped chamber shape; at least one vertically arranged slag receiving chamber partition is arranged in the slag receiving chamber to divide the slag receiving chamber into more than two slag receiving bins arranged side by side in a transverse manner, and the bottom surface opening of each slag receiving bin is a rectangular shape that is consistent with the bottom opening of the garbage combustion chamber. The bottom opening of the garbage combustion chamber is connected to the slag chamber, and the projection area of the vertical projection of the elliptical cylindrical bottom opening to the top opening of each slag bin is equal; the ash discharge chamber is provided with upright ash discharge chamber partitions whose number is the same as the slag chamber partitions to divide the ash discharge chamber into ash discharge bins which are horizontally arranged side by side and whose number is the same as the slag bins, and the top surface of the ash discharge chamber partition corresponds to the bottom surface of the slag chamber partition one by one; the ash discharge bin is a rectangular chamber structure with the same shape, and a spiral slag discharger is provided in the ash discharge bin for uniformly discharging the ash in each ash discharge bin.
[0019] Furthermore, oxygen supply pipes are arranged on the top of the slag chamber partition and on the furnace wall of the garbage combustion chamber, each oxygen supply pipe is on the same horizontal plane, and multiple oxygen outlets are arranged on the side of the oxygen supply pipe; a cooling water pipe is welded under the oxygen supply pipe, and the cooling water pipe is closely connected to the slag chamber partition.
[0020] Furthermore, a semicircular groove is provided at the bottom of the ash discharge bin, and the two sides of the semicircular groove are in contact with the two side walls of the bottom of the ash discharge bin. The semicircular groove is located below the auger of the spiral slag discharger, and its extension direction is consistent with the extension direction of the auger of the spiral slag discharger.
[0021] Furthermore, an isolation door is arranged between the garbage drying chamber and the garbage storage chamber for temporarily isolating the garbage drying chamber and the garbage storage chamber; a garbage feeding port is arranged on the top of the garbage storage chamber, and a furnace top cover is arranged to temporarily close the garbage feeding port; a feeding platform is arranged on the top of the furnace body, and the feeding platform is located above the garbage storage chamber.
[0022] Compared with the prior art, the present invention has the following beneficial effects:
[0023] 1. The garbage pyrolysis gasification furnace of the present invention is provided with a flue gas pipe 1, a flue gas pipe 2 and a flue gas pipe 3 to respectively lead the flue gas from the garbage pyrolysis chamber, the garbage drying chamber and the garbage storage chamber of the garbage pyrolysis gasification furnace into the flue gas combustion device for combustion, so that the high-temperature dry flue gas and the low-temperature moist flue gas are mixed and burned in the flue gas combustion chamber. After ignition, the flue gas and the excess oxygen are completely burned. The combustion temperature of the flue gas combustion chamber exceeds 1100°C and can reach 1400°C at the highest. The combustion is stable, clean and efficient. Toxic and harmful gases such as dioxins are basically burned out, effectively ensuring that the flue gas meets the clean emission standards;
[0024] 2. The amount of flue gas generated in the garbage combustion chamber that rises to the flue gas pipes at the upper ends of the garbage pyrolysis chamber, garbage drying chamber and garbage storage chamber can be more accurately regulated and controlled, so that the high-temperature combustion of garbage, the pyrolysis and gasification of garbage and the dehydration and drying of garbage can be more efficient and effective; and the flue gas with different temperatures, different oxygen contents and different moisture contents in different chambers is respectively led out to the flue gas combustion device through the flue gas pipe 1, the flue gas pipe 2 and the flue gas pipe 3 arranged at the corresponding positions to be burned, which is conducive to the next step of combustion and purification of the flue gas, and helps to regulate and control the combustion, pyrolysis and drying of garbage in the garbage combustion chamber, the garbage pyrolysis chamber, the garbage drying chamber and the garbage storage chamber of the garbage pyrolysis and gasification furnace;
[0025] 3. The furnace body adopts an elliptical cylindrical furnace structure. Compared with a rectangular body, the elliptical cylindrical furnace can fully increase the heat exchange surface and withstand greater thermal stress, effectively reduce the welding points and difficulty of production, reduce production costs, and avoid and reduce the probability of thermal deformation and water leakage of the furnace body, making the furnace body more durable and improving product quality; compared with a cylindrical furnace body, in order to accommodate a larger garbage capacity, the cylindrical furnace body is often too large in diameter. In this way, the garbage near the furnace core and the garbage in other positions in the furnace are difficult to keep basically consistent in drying, pyrolysis and combustion, and the furnace body with too large a diameter is not convenient for product transportation; when the diameter of the cylindrical furnace body is not suitable for being too large, the elliptical cylindrical furnace body can appropriately increase the length of the major axis of the elliptical cross section, so as to ensure that the elliptical cylindrical furnace body has a suitable capacity; the optimal capacity of the elliptical cylindrical furnace body can better meet the construction capacity needs of small and medium-sized county and township garbage treatment plants;
[0026] 4. A slag receiving and ash discharging device including a slag receiving chamber and an ash discharging chamber is arranged below the garbage combustion chamber, and vertical plates are arranged in the slag receiving and ash discharging chamber to divide the slag receiving chamber and the ash discharging chamber into a plurality of slag receiving bins and ash discharging bins which are arranged side by side in a horizontal manner, and the ash discharging bins correspond to the slag receiving bins one by one, and each ash discharging bin is provided with a spiral slag discharging machine for evenly discharging the ash and slag in each ash discharging bin; the vertical projection of the bottom opening of the garbage combustion chamber to the top opening of each ash discharging bin is equal, so that the ash and slag in the garbage combustion chamber can evenly enter each slag receiving bin, and then evenly enter each ash discharging bin accordingly, so as to realize even ash discharge and ash falling, and then realize even combustion of garbage in the high-temperature gasification furnace, further keep the garbage in the high-temperature gasification furnace falling in equal amounts and evenly, and automatically dry, carbonize, crack and burn out in sequence, so as to ensure the efficiency and effect of garbage combustion;
[0027] 5. A garbage storage room is provided for temporary storage of garbage, so that garbage transported from various places can be temporarily stored in the garbage storage room without setting up an additional storage location, and can preferably solve the problem of seepage of the garbage to be processed, avoiding the generation of garbage odor and garbage seepage polluting the environment; at the same time, it can ensure safety. When personnel or some equipment accidentally fall into the garbage high-temperature cracking gasification furnace, they will first fall into the garbage storage room. Since the temperature in the garbage storage room is relatively low, it provides an environment and possibility for rescue. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for describing the embodiments are briefly introduced below.
[0029] Figure 1 It is a structural schematic diagram of the garbage pyrolysis gasification furnace of the present invention;
[0030] Figure 2 It is a structural schematic diagram of the smoke combustion device of the present invention;
[0031] Figure 3 It is a partial cross-sectional schematic diagram of a smoke chamber, an oxygen distribution chamber and a dust chamber in a smoke combustion device;
[0032] Figure 4 It is a cross-sectional schematic diagram of a smoke chamber, an oxygen distribution chamber and a dust chamber in a smoke combustion device;
[0033] Figure 5 It is a structural schematic diagram of a condensation and dehydration device of a flue gas combustion device;
[0034] Figure 6 This is a schematic diagram of the partial structure of the slag receiving and ash discharging device of the present invention from one viewing angle (the top is completely hollowed out);
[0035] Figure 7 This is a schematic diagram of the partial structure of the slag receiving and ash discharging device of the present invention from another perspective (the top is completely hollowed out);
[0036] Figure 8 It is a cross-sectional schematic diagram of the slag receiving chamber and the ash discharging chamber in the present invention.
[0037] Among them, the marks shown in the figure are: 10-furnace body; 11-garbage drying chamber; 12-garbage pyrolysis chamber; 13-garbage combustion chamber; 14-garbage storage chamber; 15-isolation door; 16-slide rail; 17-garbage feeding port; 18-furnace top cover; 19-feeding platform; 22-oxygen supply pipe; 50-smoke combustion chamber; 503-smoke heat exchange pipe; 504-smoke outlet; 505-heat exchange chamber; 51-smoke pipe one; 52-smoke pipe two; 53-smoke pipe three; 54-smoke cavity; 541-smoke cavity one; 542-smoke cavity two; 543-smoke dispersion pipe; 544-smoke cavity partition; 55-oxygen distribution cavity; 551-oxygen Dispersion pipe; 56-dust chamber; 561-sealing flange cover; 57-condensation and dehydration device; 571-cylinder; 572-collecting chamber; 573-condensation inlet one; 574-condensation inlet two; 575-circulating water chamber; 576-sewage chamber; 577-condensation unit smoke pipe; 58-smoke collecting chamber; 59-oxygen heating chamber; 591-oxygen input port; 592-oxygen output port; 510-air inlet surround; 512-smoke branch pipe; 513-regulating valve; 521-smoke collecting tank; 61-slag chamber; 62-slag chamber vertical plate; 63-slag bin; 64-spiral slag discharger; 65-ash slag conveyor; 66-semicircular trough; 68-ash discharge chamber; 69 ash discharge chamber vertical plate; 610-ash discharge bin. DETAILED DESCRIPTION
[0038] The technical scheme in the embodiment of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiment of the present invention. Obviously, the described embodiment is only a part of the embodiment of the present invention, not all of the embodiments. Based on the embodiment of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0039] In the description of the present invention, it should be noted that the orientation or positional relationship indicated by the term "inside" etc. is based on the orientation or positional relationship shown in the accompanying drawings, or is the orientation or positional relationship in which the product of the invention is usually placed when in use. It is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0040] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "disposed" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0041] Please refer to Figure 1 The preferred embodiment of the present invention provides a garbage pyrolysis gasification furnace, which mainly includes a furnace body 10, a flue gas combustion device and a slag receiving and ash discharging device.
[0042] Please continue to refer to Figure 1 The furnace body 10 is an elliptical cylindrical structure arranged vertically as a whole. The elliptical cylindrical furnace body 10 can effectively reduce welding points, thereby avoiding and reducing the probability of water leakage. The furnace body 10 is vertically arranged with a garbage storage chamber 14, a garbage drying chamber 11, a garbage pyrolysis chamber 12 and a garbage combustion chamber 13 from top to bottom. The furnace body 10 is provided with a water cooling layer surrounding the furnace wall at the furnace wall corresponding to the garbage drying chamber 11, the garbage pyrolysis chamber 12 and the garbage combustion chamber 13. Circulating water is introduced into the water cooling layer to cool the furnace wall to prevent the furnace wall from melting at high temperature. The water used for cooling in the water cooling layer has a certain temperature when it is drawn out, which can be used for bathing or heating, etc., to realize the resource utilization of garbage treatment. The water cooling layer of the cylindrical furnace body 10 at the furnace wall is a double-layer water cooling structure, and the inner layer of the garbage combustion chamber 13 is further provided with a refractory layer structure, which is located at the innermost side. The refractory layer structure is provided in the inner layer of the garbage combustion chamber 13 so that the temperature of the garbage burning in the furnace wall does not drop sharply due to water cooling, and the furnace body is prevented from directly contacting the high temperature of the garbage combustion to achieve the purpose of durability. A furnace door is provided on the two opposite sides of the lower part of the garbage combustion chamber 13.
[0043] An isolation door 15 is provided between the garbage drying chamber 11 and the garbage storage chamber 14 for temporarily isolating the garbage drying chamber 11 from the garbage storage chamber 14. The garbage storage chamber 14 is used to store garbage to be burned. During implementation, the isolation door 15 is closed to isolate the garbage drying chamber 11 from the garbage storage chamber 14, and then the garbage is stored in the garbage storage chamber 14 for further processing. When the garbage needs to be processed, the isolation door 15 is opened to allow the garbage to fall downward into the garbage drying chamber 11 to achieve garbage drying. The garbage storage chamber 14 can achieve many effects. First, it can temporarily store garbage, so that garbage transported from various places can be temporarily stored in the garbage storage chamber 14 without setting up an additional storage location, and can preferably solve the problem of seepage of the garbage to be processed, so that the garbage seepage can directly seep into the garbage drying chamber 11 below, avoiding the generation of garbage odor and garbage seepage polluting the environment; second, it can ensure safety. For example, when garbage is thrown in, if there is no garbage storage chamber 14, if some personnel or some equipment accidentally fall into the garbage high-temperature cracking gasification furnace, then due to the high temperature in the high-temperature gasification furnace, there is basically no opportunity and possibility for rescue. Now that the garbage storage chamber 14 is set, when the garbage is thrown in, since it is pre-thrown in the garbage storage chamber 14 and the temperature of the garbage storage chamber 14 is relatively low, an environment and possibility for rescue are provided. That is, setting the garbage storage chamber 14 also has safety considerations. In this preferred embodiment, a horizontally arranged slide rail 16 is provided at the junction of the garbage storage chamber 14 and the garbage drying chamber 11, and the isolation door 15 is slidably installed on the slide rail 16. The isolation door 15 is in the form of two door panels arranged opposite to each other, and the door panels are driven by hydraulic pressure. When the two door panels move toward each other and contact, the isolation door 15 is closed. At this time, the garbage drying chamber 11 and the garbage storage chamber 14 are temporarily isolated. When the two door panels move in opposite directions, the isolation door 15 is opened. At this time, the garbage drying chamber 11 and the garbage storage chamber 14 are temporarily connected, and the garbage temporarily stored in the garbage storage chamber 14 falls into the garbage drying chamber 11 by its own gravity. The garbage is gradually dehydrated and dried due to the large amount of high-temperature compounds and high-temperature water vapor generated by the carbonization and cracking of the lower layer (performed in the garbage pyrolysis chamber 12). The garbage storage chamber 14 is arranged directly above the garbage drying chamber 11, so that the garbage can fall into the garbage drying chamber 11 by gravity. In this preferred embodiment, a garbage feed port 17 is provided at the top of the garbage storage chamber 14, and a furnace top cover 18 for temporarily closing the garbage feed port 17 is provided. The furnace top cover 18 is driven by an electric rod, one side of which is rotatably connected to the edge of the garbage feed port 17, and the other side is connected to the electric rod. The furnace top cover 18 can be controlled by the electric rod, that is, the opening and closing of the garbage feed port 17 can be achieved. For example, when the furnace top cover 18 is driven to block the garbage feed port 17, the garbage feed port 17 can be temporarily closed.A feeding platform 19 is provided on the top of the high-temperature gasification furnace. The feeding platform 19 is located above the garbage storage chamber 14. The garbage is transported to the feeding platform 19 by the garbage transfer vehicle, and then the furnace top cover 18 is opened to open the garbage feed port 17. At the same time, the isolation door 15 is closed. No other facilities or manual auxiliary transportation are required to achieve the goal of not letting the garbage fall to the ground. The whole truckload of garbage is directly poured into the garbage storage chamber 14 in batches, and then the furnace top cover 18 is closed. The garbage is put into the furnace simply, safely and quickly, effectively avoiding the generation and pollution of garbage odor and garbage leachate. Through the above-mentioned settings, the garbage pyrolysis gasification furnace optimizes the garbage treatment process, so that the garbage does not need to be retained in the factory, sorted again, crushed, filtered, dried and other pre-treatments, so that the garbage does not fall to the ground, and the whole truckload of garbage is directly poured into the furnace for treatment, which not only reduces the risk of garbage treatment polluting the environment, but also reduces the cost of garbage treatment.
[0044] Please refer to Figures 1 to 5The smoke combustion device includes a smoke combustion chamber 50, in which an igniter is provided for ignition to realize smoke combustion. A smoke outlet 504 is provided on the smoke combustion chamber 50 to discharge the smoke after combustion. When in use, the smoke outlet 504 can be connected to an induced draft fan to help lead out the smoke after combustion. A smoke cavity 54, an oxygen distribution cavity 55 and a dust cavity 56 are provided at the bottom of the smoke combustion chamber 50. The smoke combustion chamber 50 is in the shape of a double-layer inverted truncated cone structure, and the truncated cone interlayer is a water-cooled layer filled with circulating cooling water, and a fire-resistant layer is provided on the inner wall. The bottom chamber of the smoke combustion chamber 50 is a conical structure with a large top and a small bottom. The dust cavity 56 is located at the bottom center of the smoke combustion chamber 50, and the oxygen distribution cavity 55 and the smoke cavity 54 are concentrically arranged on the outer periphery of the dust cavity 56 from the inside to the outside. The dust chamber 56 is a cylindrical chamber structure, which is hollow inside. A seal flange cover 561 that can be opened and closed is provided at the bottom so that the bottom of the dust chamber 56 is connected to the outside when the seal flange cover 561 is opened. The top of the dust chamber 56 is open and connected to the inside of the flue gas combustion chamber 50 so that some dust particles and impurities formed during flue gas combustion can temporarily accumulate in the dust chamber 56 when they fall downward. The flue gas chamber 54 and the oxygen distribution chamber 55 are annular cylindrical chamber structures. The flue gas chamber 54 is divided into a flue gas chamber 1 541 and a flue gas chamber 2 542 by a flue gas chamber partition 544. The flue gas chamber 1 541 and the flue gas chamber 2 542 occupy half of the flue gas chamber 54 respectively, that is, a semi-circular chamber structure separated from each other. The tops of the oxygen distribution 55, the flue gas chamber 1 541 and the flue gas chamber 2 542 are connected to the inside of the flue gas combustion chamber 50. The smoke chamber 1 541 and the smoke chamber 2 542 are respectively provided with a smoke inlet for introducing smoke of different temperatures, different oxygen contents and different moisture contents into the garbage pyrolysis gasification furnace. Specifically, the smoke chamber 1 541 is connected to the upper end of the garbage pyrolysis chamber 12 through the smoke inlet through the smoke pipe 1 51, so as to introduce smoke with higher temperature and lower oxygen and moisture contents from the garbage pyrolysis chamber 12; the smoke chamber 2 542 is connected to the upper end of the garbage drying chamber 11 through the smoke inlet through the smoke pipe 2 52, so as to introduce smoke with relatively higher temperature and relatively lower oxygen and moisture contents from the garbage drying chamber 11; the smoke chamber 2 542 is connected to the upper end of the garbage storage chamber 14 through the smoke inlet through the smoke pipe 3 53, so as to introduce smoke with lower temperature and lower oxygen and moisture contents from the garbage storage chamber 14. Regulating valves 513 for regulating the flow of flue gas can be provided on the flue pipe 1 51, the flue pipe 2 52 and the flue pipe 3 53 to assist the operation of the induced draft system for high-temperature pyrolysis and gasification of garbage, regulate and control the combustion, pyrolysis and drying of garbage in the garbage combustion chamber 13, the garbage pyrolysis chamber 12, the garbage drying chamber 11 and the garbage storage chamber 14 of the garbage pyrolysis and gasification furnace, and regulate and control the extraction of flue gas and the entry of flue gas into the flue gas combustion device for combustion.An air inlet surround portion 510 surrounding the furnace body 10 is arranged at the ends of the flue gas pipe 1 51, the flue gas pipe 2 52 and the flue gas pipe 3 53 connected to the furnace body 10. The air inlet surround portion 510 is attached to the outer side of the furnace body 10 and presents an elliptical ring structure. A plurality of evenly distributed air inlet through holes connected to the interior of the furnace body 10 (i.e., corresponding to the garbage pyrolysis chamber 12, the garbage drying chamber 11 and the garbage storage chamber 14) are provided on the inner circumference of the air inlet surround portion 510. By surrounding the garbage pyrolysis gasification furnace with an air inlet surround 510 and setting a plurality of evenly distributed air inlet holes, more and wider entrances to the smoke pipe 1 51, smoke pipe 2 52 and smoke pipe 3 53 are provided for the garbage drying chamber 11, garbage pyrolysis chamber 12 and garbage storage chamber 14 of the garbage pyrolysis gasification furnace, which can help the smoke from the drying chamber, pyrolysis chamber and storage chamber of the garbage pyrolysis gasification furnace to better enter the smoke pipe 1 51, smoke pipe 2 52 and smoke pipe 3 53, improve the efficiency of smoke entry, and help the combustion of smoke. Specifically, each air inlet surround 510 is respectively provided with a smoke branch pipe 512 connected to the air inlet surround 510 on two opposite sides, and the two smoke branch pipes 512 are symmetrically arranged and merged to connect the smoke pipe 1 51 or the smoke pipe 2 52 or the smoke pipe 3 53. The air inlet surrounding part 510 corresponding to the storage chamber is provided with a smoke branch pipe 512 connected to the air inlet surrounding part 510 on two opposite sides, and the two smoke branch pipes 512 are symmetrically arranged and have equal lengths. After merging, they are connected to the smoke pipe 3 53, so as to help the smoke in the storage chamber to enter the air inlet surrounding part 510 evenly; the air inlet surrounding part 510 corresponding to the drying chamber is provided with a smoke branch pipe 512 connected to the air inlet surrounding part 510 on two opposite sides, and the two smoke branch pipes 512 are symmetrically arranged and have equal lengths. After merging, they are connected to the smoke pipe 3 53, so as to help the smoke in the storage chamber to enter the air inlet surrounding part 510 evenly. The pipes 512 are symmetrically arranged with equal lengths, and are connected to the second flue gas pipe 52 after merging, so as to help the flue gas in the drying chamber to enter the air inlet surround 510 evenly; corresponding to the air inlet surround 510 of the pyrolysis chamber, a flue gas branch pipe 512 connected to the air inlet surround 510 is respectively arranged on the opposite sides, and the two flue gas branch pipes 512 are symmetrically arranged with equal lengths, and are connected to the first flue gas pipe 51 after merging, so as to help the flue gas in the pyrolysis chamber to enter the air inlet surround 510 evenly. A plurality of air inlet surrounds 510 are arranged on the garbage pyrolysis gasification furnace, so as to more accurately control the combustion of garbage, pyrolysis gasification of garbage and drying of garbage in the furnace, and to respectively lead out flue gas of different temperatures, different oxygen contents and different moisture contents, which not only effectively improves the processing capacity of the garbage pyrolysis gasification furnace, but also facilitates the purification and combustion treatment of flue gas in the next step, and ensures the efficiency and effect of the pyrolysis gasification treatment of garbage.
[0045] During implementation, the garbage pyrolysis gasification furnace is equipped with an oxygen blower to introduce oxygen required for combustion into the garbage combustion chamber 13, and the flue gas combustion device can be equipped with an induced draft fan to facilitate the introduction of flue gas into the flue gas combustion chamber 50 through the flue pipe 1 51, the flue pipe 2 52 and the flue pipe 3 53 for combustion. When the oxygen blower and the induced draft fan are turned on, since the oxygen pipe of the garbage pyrolysis gasification furnace supplies oxygen upward from the bottom of the garbage combustion chamber 13, the garbage at the bottom of the garbage combustion chamber 13 is burned upward with oxygen; the ratio of the oxygen supply air volume to the induced air volume is limited to the range of 0.3 to 0.4, at this time, the garbage at the bottom of the garbage combustion chamber 13 undergoes a fierce pyrolysis and gasification reaction, generating solid garbage carbon and a variety of gaseous garbage such as gas and oil, which are burned with oxygen; the garbage combustion temperature in the garbage combustion chamber 13 reaches about 1100°C, the highest temperature can reach above 1300°C, and the combustion tail gas reaches a temperature above 900°C.
[0046] Due to the buoyancy of the flue gas and the effect of the induced draft fan, the high-temperature flue gas from the garbage combustion chamber 13 has a temperature of up to 600°C to 900°C when it just rises to the garbage pyrolysis chamber 12 in the lower half of the furnace body; due to the limited oxygen supply, the garbage pyrolysis chamber 12 is in an oxygen-deficient state, and the garbage cannot be burned. At this time, the garbage undergoes a relatively intense pyrolysis and gasification reaction, such as molecular bond breaking, isomerization, small molecule polymerization, etc., to generate a variety of gases, oils and carbon; as the flue gas rises, the garbage undergoes pyrolysis and gasification reaction, and the high temperature of the flue gas decreases; when the flue gas reaches the upper half of the garbage pyrolysis chamber 12, due to the high temperature During the process of burning, the garbage undergoes a relatively rapid pyrolysis and gasification reaction, which makes the garbage form carbonized solid garbage and generates a variety of gases and gaseous garbage such as tar. At this time, due to the pyrolysis and gasification of the garbage and the combustion of the garbage, the volume of the lower garbage is reduced and ash is discharged. Under the action of gravity of the garbage at the upper part, the buoyancy of the flue gas and the action of the induced draft fan, the solid garbage moves downward, and the gaseous garbage flows upward with the flue gas. When the flue gas temperature is between 350°C and 450°C and the flue gas rises to the air inlet surround 510 at the upper end of the garbage pyrolysis chamber 12, part of the flue gas is drawn out from the air inlet surround 510 and enters the flue gas pipe 51.
[0047] Due to the buoyancy of the flue gas and the action of the induced draft fan, part of the flue gas rises to the garbage drying chamber 11, and the temperature of the flue gas from the air inlet surround 510 at the upper end of the garbage pyrolysis chamber to the air inlet surround 510 at the upper end of the garbage drying chamber 11 also reaches 250°C to 350°C. This temperature bakes the garbage in the garbage drying chamber 11, causing the garbage to dehydrate, shrink, and become hard, thereby achieving garbage drying. At this time, the garbage also undergoes partial pyrolysis and gasification reaction, mainly generating dry garbage, and generating part of gas, water vapor, tar, etc. At this time, part of the flue gas is drawn out from the air inlet surround 510 at the upper end of the garbage drying chamber 11 and enters the flue gas pipe 2 52.
[0048] After the garbage is fed in, the furnace top cover 18 is closed, the isolation door between the garbage drying chamber 11 and the garbage storage chamber 14 is opened, and the garbage drying chamber 11 and the garbage storage chamber 14 are in a connected state; due to the buoyancy of the flue gas and the action of the induced draft fan, part of the flue gas water vapor rises to the garbage storage chamber 14, and the garbage between the air inlet surround 510 at the upper end of the garbage drying chamber 11 and the air inlet surround 510 at the upper end of the garbage storage chamber 14 is also baked at a temperature of 150°C to 280°C, and the garbage is gradually dehydrated, and dry garbage is gradually generated, and part of the gas and tar are generated. At this time, the flue gas is drawn out from the air inlet surround 510 at the upper end of the garbage storage chamber 14 and enters the flue gas pipe three 53.
[0049] In the garbage pyrolysis gasification furnace 10, by setting a smoke chamber 1 541 and a smoke chamber 2 542, smoke is drawn out from the garbage pyrolysis chamber 12 through a smoke pipe 1 51 and enters the smoke chamber 1 541, where the smoke temperature is generally 350°C to 450°C, and the smoke is very easy to burn when it meets sufficient oxygen. Smoke is drawn out from the garbage drying chamber 11 through a smoke pipe 2 52 and enters the smoke chamber 2 542, where the smoke temperature is generally 250°C to 350°C, and smoke is drawn out from the garbage storage chamber 14 through a smoke pipe 3 53 and enters the smoke chamber 2 542, where the smoke temperature is generally 150°C to 280°C; the two smoke chambers drawn out from the garbage drying chamber 11 and the garbage storage chamber 14 are connected to the smoke chamber 2 542, where the smoke temperature is generally 150°C to 280°C. The water content of this type of flue gas is relatively high, and direct combustion affects the quality and effect of combustion. However, the temperature of the flue gas introduced into the garbage pyrolysis chamber 11 is relatively high. The flue gas is very easy to burn when it meets sufficient oxygen. It first enters the flue gas cavity 1 541, and then enters the flue gas combustion chamber 50, and enters the flue gas combustion chamber 50 for mixed combustion with the flue gas from the flue gas cavity 2 542. At the same time, excess oxygen is transported to the oxygen distribution cavity 55 through the oxygen distribution fan and enters the flue gas combustion chamber 50. After ignition, the flue gas and excess oxygen are completely burned. The combustion temperature of the flue gas combustion chamber 50 exceeds 1100°C and can reach up to 1400°C. The combustion is stable, clean and efficient. Toxic and harmful gases such as dioxins are basically burned out, effectively ensuring that the flue gas meets the clean emission standards. At the same time, regulating valves 513 for regulating the flow of smoke are respectively provided on the smoke pipe 1 51, the smoke pipe 2 52 and the smoke pipe 3 53. By respectively drawing out smoke from the garbage pyrolysis chamber 12, the garbage drying chamber 11 and the garbage storage chamber 14 and burning them in the smoke combustion chamber 50, and by adjusting the openings of the regulating valves 513 on the smoke pipe 1 51, the smoke pipe 2 52 and the smoke pipe 3 53, smoke regulation can be performed. According to the combustion conditions, the proportion of smoke introduced from the garbage pyrolysis chamber 12, the garbage drying chamber 11 and the garbage storage chamber 14 of the garbage pyrolysis gasification furnace is adjusted to facilitate stable and efficient combustion. In addition, drawing out smoke from the garbage pyrolysis chamber 12, the garbage drying chamber 11 and the garbage storage chamber 14 of the garbage pyrolysis gasification furnace respectively helps to regulate and control the combustion, pyrolysis and drying of garbage in the garbage combustion chamber 13, the garbage pyrolysis chamber 12, the garbage drying chamber 1 and the garbage storage chamber 14 of the garbage pyrolysis gasification furnace.
[0050] In a preferred embodiment, a smoke disperser is provided at the top of the smoke cavity 54 to communicate with the inside of the smoke combustion chamber 50, and the smoke disperser includes a plurality of smoke dispersion pipes 543 distributed around the circumference, the plurality of smoke dispersion pipes 543 are evenly distributed, the lower portion of the smoke dispersion pipes 543 is upright, the upper portion is inclined at a 45° elevation angle, the vertical projection of the upper tail end of each smoke dispersion pipe 543 is located on the tangent line of the circle where the smoke dispersion pipe 543 is located, and the upper tail ends of the plurality of smoke dispersion pipes 543 distributed around the circumference are all distributed clockwise at the same time. By providing the smoke dispersion pipes 543 evenly distributed around the circumference, the smoke in the smoke cavity 1 541 and the smoke cavity 2 542 can enter the smoke combustion chamber 50 through the smoke dispersion pipes 543 respectively. A flue gas disperser is provided at the top of the oxygen distribution chamber 55 to communicate with the inside of the flue gas combustion chamber 50. The oxygen disperser includes a plurality of oxygen dispersion tubes 551 distributed around the circumference. The plurality of oxygen dispersion tubes 551 are evenly distributed. The lower portion of the oxygen dispersion tubes 551 is vertically arranged, and the upper portion is inclined at a 45° elevation angle. The vertical projection of the upper tail end of each oxygen dispersion tube 551 is located on the tangent line of the circle where the oxygen dispersion tube 551 is located. The upper tail ends of the plurality of oxygen dispersion tubes 551 distributed around the circumference are all oriented clockwise at the same time. By providing the oxygen dispersion tubes 551 evenly distributed around the circumference, the oxygen in the oxygen distribution chamber 55 can enter the flue gas combustion chamber 50 through the flue gas dispersion tubes 543 respectively. The tail end of the oxygen dispersion tube 551 is slightly biased toward the flue gas dispersion tube 543, and is on the same horizontal line as the horizontal height of the tail end of the flue gas dispersion tube 543. By setting the smoke dispersion pipe 543 and the oxygen dispersion pipe 551 with the same elevation angle and rotation direction, the smoke and oxygen enter the smoke combustion chamber 50 in the form of a rotating vortex. The smoke and oxygen rotate in the smoke combustion chamber, which not only prolongs the residence time of the smoke in the smoke combustion chamber, but also makes the smoke and oxygen mix and burn better, so that the smoke burns more completely, the combustion temperature is more balanced, and the combustion effect is better.
[0051] A heat exchange chamber 505 is arranged at the upper part of the flue gas combustion chamber 50, and the heat exchange chamber 505 is filled with circulating water; a flue gas collecting chamber 58 and an oxygen heating chamber 59 are arranged at the top of the heat exchange chamber 505, and the oxygen heating chamber 59 surrounds the periphery of the flue gas collecting chamber 58; the flue gas combustion chamber 50 is provided with a plurality of flue gas heat exchange pipes 503 passing through the heat exchange chamber 505 and connected to the flue gas collecting chamber 58, a tee is arranged at the top center position of the flue gas collecting chamber 58, a safety valve is arranged at the vertical upward port, and a flue gas outlet 504 is arranged at the lateral port; a vertical partition is arranged in the oxygen heating chamber 59 to separate the oxygen heating chamber 59 there, and the oxygen heating chamber 59 is provided with an oxygen input port 591 on one side of the partition, and an oxygen output port 592 on the other side of the partition, and the oxygen output port 592 is connected to the oxygen distribution chamber 55. The upper outer side of the flue gas combustion chamber 50 and the lower outer side of the heat exchange chamber 505 are connected by a circulating water pipe. A circulating water inlet pipe is arranged at the lower position of the flue gas combustion chamber 50, and a circulating water outlet pipe is arranged at the upper part of the heat exchange chamber 505. The water outlet pipe is connected to the circulating hot water pool. The heat exchange chamber 505 is filled with circulating water, and a passage for the circulating water to enter and exit is provided to realize the circulation of the circulating water therein and the external water source. When the flue gas combustion chamber 50 realizes the flue gas combustion, the high-temperature flue gas generated is collected into the flue gas collection chamber 58 through the flue gas heat exchange pipe 503, and then goes out from the flue gas outlet 504. When the flue gas passes through the flue gas heat exchange pipe 503, the circulating water in the heat exchange chamber 505 is heated by heat conduction, that is, a form similar to boiler heating is formed to obtain circulating water with a certain temperature. In this way, on the one hand, hot water can be obtained to fully utilize the energy of the flue gas, which plays a role in saving energy and improving energy utilization. On the other hand, the temperature of the flue gas going out of the flue gas combustion chamber 50 can also be reduced, reducing the difficulty of post-processing. At the same time, the oxygen heating chamber 59 surrounds the outer periphery of the flue gas collecting chamber 58. A vertical partition is arranged in the oxygen heating chamber 59 to separate the oxygen heating chamber 59 there. An oxygen input port 591 is arranged on one side of the partition of the oxygen heating chamber 59, and an oxygen output port 592 is arranged on the other side of the partition. The oxygen output port 592 is connected with the oxygen distribution chamber 55. External oxygen first enters the oxygen heating chamber 59 through the oxygen output port 592. Under the action of the partition in the oxygen heating chamber 59, the oxygen can only go around the oxygen heating chamber 59 once before going out through the oxygen output port 592, and enter the flue gas combustion chamber 50 through the oxygen distribution chamber 55 for combustion. When the oxygen goes around the oxygen heating chamber 59 once, it will be heated by the burned fuel gas. The heated oxygen is mixed with the flue gas, making the flue gas easier to burn, thereby facilitating the stable, efficient and thorough combustion of the flue gas.
[0052] For further information, please refer to Figure 2 and Figure 5The second flue gas pipe 52 and the third flue gas pipe 53 are equipped with a condensation and dehydration device 57 for realizing condensation and dehydration of flue gas. The second flue gas pipe 52 and the third flue gas pipe 53 share a condensation and dehydration device 57. The second flue gas pipe 52 and the third flue gas pipe 53 are connected to the condensation and dehydration device 57 respectively, and are connected to the second flue gas chamber 542 through the same flue gas pipe after coming out. Specifically, the condensation and dehydration device 57 includes a cylinder 571, a collecting chamber 572 is arranged on the upper part of the cylinder 571, a condensation inlet 1 573 and a condensation inlet 2 574 are arranged on the top of the collecting chamber 572, a circulating water chamber 575 is arranged in the middle part of the cylinder 571, and a sewage chamber 576 is arranged at the lower part of the cylinder 571. A plurality of condensation unit smoke pipes 577 passing through the circulating water chamber 575 are connected between the collecting chamber 572 and the sewage chamber 576. The collecting chamber 572 is connected to the second flue gas pipe 52 through the condensation inlet 1 573, so that the flue gas can be discharged from the front. The smoke pipe 2 52 enters the collecting chamber 572 and passes through the condensing unit smoke pipe 577 and the sewage chamber 576 in sequence and enters the smoke chamber 2 542 after going out of the sewage chamber 576. The collecting chamber 572 is connected with the smoke pipe 3 53 through the condensing inlet 2 574, so that the smoke can enter the collecting chamber 572 from the front smoke pipe 3 53 and pass through the condensing unit smoke pipe 577 and the sewage chamber 576 in sequence and enter the smoke chamber 2 542 after going out of the sewage chamber 576. The position where the sewage chamber 576 is connected to the rear smoke pipe is located at the top of the sewage chamber 576. During implementation, part of the flue gas enters the collecting chamber 572 from the drying chamber of the garbage pyrolysis gasification furnace through the flue pipe 2 52 and the condensation inlet 1 573, and part of the flue gas enters the collecting chamber 572 from the storage chamber of the garbage pyrolysis gasification furnace through the flue pipe 3 53 and the condensation inlet 2 574, and then enters the sewage chamber 576 through the condensation unit flue pipe 577, and enters the flue gas chamber 2 542 through the rear flue pipe after exiting the sewage chamber 576, condenses and removes part of the water when passing through the condensation unit flue pipe 577, and the water is temporarily stored at the bottom of the sewage chamber 576, and the dehydrated flue gas is burned in the flue gas combustion chamber 50. Although the temperature of the flue gas may drop below 100°C after being dehydrated by the condensation and dehydration device 57, it can still maintain a good combustion efficiency when it enters the flue gas combustion chamber 50 and is mixed and burned with the high-temperature flue gas from the flue pipe 1 51 at the same time.
[0053] A smoke collecting tank 521 is arranged on the pipeline between the condensation and dehydration device 57 and the second smoke chamber 542. The smoke entering after condensation first enters the smoke collecting tank 521 for temporary collection, and then enters the smoke chamber 54, which can temporarily store the smoke on the one hand, and can buffer the smoke on the other hand; the smoke collecting tank 521 can also be connected to the garbage combustion chamber 13 of the garbage pyrolysis gasification furnace by setting a branch pipe and an air induced device. When the garbage has a low calorific value and is difficult to burn, the combustible gas stored in the smoke collecting tank 521 can be guided back to the garbage combustion chamber 13 of the garbage pyrolysis gasification furnace to assist combustion.
[0054] The slag-carrying and ash-discharging device is used to solve the ash-falling and ash-discharging problems of the garbage pyrolysis gasification furnace, so as to achieve uniform ash-falling and ash-discharging. Figure 1 , Figures 6 to 8 , the slag receiving and ash discharging device is located directly below the garbage combustion chamber 13. The slag receiving and ash discharging device includes a slag receiving chamber 61 and an ash discharging chamber 68 which are sequentially distributed from top to bottom, wherein the slag receiving chamber 61 is in the shape of an inverted quadrangular pyramid chamber with a rectangular bottom and top, and the ash discharging chamber 68 is in the shape of a rectangular parallelepiped chamber; two vertically arranged slag receiving chamber partitions 62 are arranged in the slag receiving chamber 61 to divide the slag receiving chamber 61 into three horizontally arranged slag receiving bins 63, and the bottom opening of each slag receiving bin 63 is a rectangular shape with the same shape, and the bottom opening of the garbage combustion chamber 13 is directly connected to the slag receiving chamber 61, and the bottom opening of the elliptical cylindrical garbage combustion chamber 13 is vertically projected to each slag receiving bin 6 3 has an equal projected area of the top opening; the ash discharge chamber 68 is provided with an ash discharge chamber partition 69 which is arranged vertically and the same number as the slag chamber partition 62 to divide the ash discharge chamber 68 into ash discharge bins 610 which are arranged horizontally and the same number as the slag chamber 63, and the top surface of the ash discharge chamber partition 69 corresponds to the bottom surface of the slag chamber partition 62 one by one. At this time, the ash discharge bins 610 correspond to the slag chamber 63 one by one, and the ash discharge bins 610 are rectangular chamber structures with the same shape. The ash discharge bins 610 are provided with spiral slag dischargers 64 of the same type for uniformly discharging the ash and slag in each of the ash discharge bins 610.
[0055] The existing garbage pyrolysis gasification furnace mainly realizes ash discharge by arranging crawler grates, horizontal pushers, spiral pushers or self-weight drop components at the bottom of the combustion chamber. These components directly act on the bottom of the combustion chamber of the garbage high-temperature cracking gasification furnace. Since the existing combustion chamber is mainly cylindrical, the ash discharge at various positions is uneven when the ash is discharged, which makes the garbage at various positions in the garbage high-temperature cracking gasification furnace fall unevenly, thereby causing uneven combustion of the garbage in the high-temperature gasification furnace, affecting the garbage combustion efficiency and effect.
[0056] In the present invention, the top of the slag chamber 61 is directly connected to the bottom of the garbage combustion chamber 13, and no partition is set to allow the ash produced by the combustion of the garbage combustion chamber 13 to directly enter the slag chamber 61. The garbage combustion chamber 13 of the present invention is an elliptical cylindrical structure. Since the elliptical cylindrical garbage combustion chamber 13 has a long side, the internal volume of the elliptical cylindrical garbage combustion chamber 13 is larger and can accommodate more garbage, thereby improving the efficiency of garbage disposal. It can be understood that when the major axis radius of the ellipse is equal to the minor axis radius, the garbage combustion chamber 13 is a cylindrical structure, which can still achieve the effect of the present invention. Therefore, the garbage combustion chamber 13 with a cylindrical structure is a special form of the garbage combustion chamber 13 of the present invention and should not be excluded. The projection area of the bottom opening of the elliptical cylindrical garbage combustion chamber 13 vertically projected onto the top opening of each slag bin 63 of the slag chamber 61 is equal. According to Zu's principle, two solids of the same height have equal volumes if their cross-sectional areas at the same height are equal. Therefore, the volumes of ash distributed above the top openings of each slag bin 63 are equal, so that the volumes of ash that fall from the bottom of the garbage combustion chamber 13 into each slag bin 63 are equal.
[0057] In a preferred embodiment, the bottom area of the elliptical cylindrical garbage combustion chamber 13 is equal to the bottom area of the slag chamber 61 and the bottom area of the ash discharge chamber 68; the top area of the slag chamber 61 is larger than the bottom area of the elliptical cylindrical garbage combustion chamber 14. The four bottom sides of the rectangular bottom surface of the inverted quadrangular pyramid-shaped slag chamber 61, two of which are parallel to the long axis of the bottom ellipse of the elliptical cylindrical garbage combustion chamber 13, and the other two bottom sides are parallel to the short axis of the bottom ellipse of the elliptical cylindrical garbage combustion chamber 13; the long side length of the long-sided top surface of the inverted quadrangular pyramid-shaped slag chamber 61 is equal to the long axis length of the elliptical bottom surface of the garbage combustion chamber 13, and the short ... The length is equal to the short axis length of the elliptical bottom surface of the garbage combustion chamber 13; the garbage combustion chamber 13 is arranged opposite to the slag chamber 61 and the ash discharge chamber 68. Specifically, the intersection of the long axis and the short axis of the elliptical bottom surface of the elliptical cylindrical garbage combustion chamber 14, the intersection of the diagonal of the upper top surface rectangle of the slag chamber 61 and the intersection of the diagonal of the lower bottom surface rectangle of the slag chamber 61, and the intersection of the diagonal of the bottom surface rectangle of the ash discharge chamber 68 are on the same vertical line.
[0058] The area of the bottom opening of the garbage combustion chamber 13 vertically projected to the top opening of each slag bin 63 is equal, so the amount of ash generated by the garbage combustion chamber 13 entering each slag bin 63 is basically the same. Since the ash discharge chamber 68 is provided with ash discharge bins 610 arranged horizontally and side by side in the same number as the slag bins 63, and the top surface of the ash discharge chamber partition 69 corresponds one-to-one to the bottom surface of the slag chamber partition 62, at this time, each ash discharge bin 610 is a narrow and long rectangular chamber structure with the same structure. A spiral slag discharger 64 is provided at the bottom of each ash discharge bin 610 for discharging the ash in each ash discharge bin 610. The spiral slag discharger 64 discharges the ash in each ash discharge bin 610. Each ash discharge bin 610 is opposed to each other and does not affect each other under the separation of the ash discharge chamber partition 69. Therefore, when the ash discharge rates of the spiral slag dischargers 64 in each ash discharge bin 610 are the same, the ash falling and ash discharge of each ash discharge bin 610 are uniform. are consistent, so uniform ash discharge and ash falling can be achieved, and then uniform combustion of garbage in the high-temperature gasification furnace can be achieved, and the garbage in the high-temperature gasification furnace can be further kept falling in equal amounts and evenly, and automatically dried, carbonized, cracked and burned in turn to ensure the efficiency and effect of garbage combustion; since the ash discharge chamber 68 is in the form of a rectangular chamber as a whole, the ash discharge chamber partition 69 separates a plurality of ash discharge bins 610 to form a plurality of separate, narrow ash discharge bins 610, and the narrow ash discharge bins 610 can form a square structure at the bottom of the ash discharge bin 610, which is more compatible with the working form of the spiral slag discharger 64, and is more conducive to slag discharge and ash discharge; at the same time, the slag receiving chamber 61 and the ash discharge chamber 68 are provided, which can be conducive to the gradual cooling of the ash in the slag receiving chamber 61 and the ash discharge chamber 68, so that the ash has a cooling process, and the temperature is relatively low when discharged, so that it is not easy to scald the related components of the subsequent ash treatment. When the spiral slag discharging machine 64 in the ash discharging bin 610 discharges ash, it will not affect the adjacent ash discharging bin 64, and will have little effect on the garbage combustion in the garbage combustion chamber 13. The garbage combustion chamber 13 maintains normal combustion when discharging ash. Due to the uniform ash discharge and uniform ash falling of the garbage pyrolysis gasification furnace, the garbage pyrolysis gasification furnace is uniformly dried, pyrolyzed, gasified and burned in sequence, so that the temperature in the furnace is stabilized at a high temperature above 850°C, which improves the efficiency of garbage treatment and ensures the effect of garbage treatment.
[0059] During implementation, when the spiral slag discharger 64 discharges slag, due to the pressure of the upper garbage and the gravity of the garbage itself, as well as the combustion, pyrolysis, gasification and drying and dehydration of the garbage, the volume of the garbage is reduced, and the solid garbage burned out in the garbage combustion chamber 13 becomes ash and falls into the slag receiving bin 63 and then into the ash discharge bin 610, while the solid garbage in the garbage pyrolysis chamber, garbage drying chamber and garbage storage chamber above the garbage combustion chamber 13 moves downward in turn, and the unburned gaseous garbage rises to the garbage pyrolysis chamber, garbage drying chamber and garbage storage chamber due to the buoyancy of the induced draft fan and the gaseous garbage; the spiral slag discharger 64 discharges slag in small amounts and multiple times at intervals, so that the garbage in the garbage combustion chamber, garbage pyrolysis chamber, garbage drying chamber and garbage storage chamber can be more fully burned, pyrolyzed, gasified and dehydrated in a relatively static state.
[0060] In a preferred embodiment, an oxygen supply pipe 22 is arranged on the top of the slag chamber partition 62 and on the furnace wall of the garbage combustion chamber 13, and each oxygen supply pipe 22 is on the same horizontal plane. A plurality of oxygen outlets are arranged on the side of the oxygen supply pipe 22. The oxygen supply pipe 22 can adopt the oxygen supply pipe 22 of the existing garbage pyrolysis gasification furnace, but the oxygen supply pipe 22 of the present invention is arranged on the top of the slag chamber partition 62 and on the furnace wall of the garbage combustion chamber 13; the oxygen supply pipe 22 is used to supply oxygen to the garbage combustion chamber 76 from the bottom to the top; the oxygen supply pipe 22 is arranged on the top of the slag chamber partition 62 of the slag chamber 61, so that the ash after the garbage combustion passes through the oxygen supply area and then falls into the slag bin 63, so that the incompletely burned solid garbage continues to contact with oxygen and burns when it falls, and the newly burned slag is at a higher temperature. The oxygen passes through the high-temperature slag so that the oxygen is further heated and it is easier to burn with the garbage, so that the garbage burns more thoroughly. A cooling water pipe is welded below the oxygen supply pipe 22, and the cooling water pipe is closely connected to the slag chamber partition 62. The cooling water pipe cools down the oxygen supply pipe 22 to prevent the oxygen supply pipe 22 from melting under high temperature. The oxygen in the oxygen supply pipe 22 is blown into the garbage combustion chamber 13 by the oxygen distribution blower through the pipeline; a furnace door is set on the top of both ends of the slag chamber 63 between the two oxygen supply pipes 22 and the lower part of the garbage combustion chamber 13, which is used to ignite and observe the combustion situation of the furnace, and clean up some things that are difficult to burn or cannot be burned and are not convenient for the spiral slag discharger 64 to discharge.
[0061] A semicircular groove 66 is provided at the bottom of the ash discharge bin 610, and the two sides of the semicircular groove 66 are fitted with the two side walls of the bottom of the ash discharge bin 610. The semicircular groove 66 is located below the auger of the spiral slag discharger 64, and the extension direction is consistent with the extension direction of the auger of the spiral slag discharger 64, that is, consistent with the length direction of the ash discharge bin 610, and the semicircular groove 66 is a semicircular groove, and its inner diameter is about 1 cm larger than the auger diameter of the spiral slag discharger 64, so that under the action of the semicircular groove 66, the spiral slag discharger 64 can completely discharge the ash slag, avoiding that part of the ash slag is accumulated in the bottom dead corner of the ash discharge bin 610 and cannot be discharged by the spiral slag discharger 64, thereby achieving clean ash discharge. The spiral slag discharger 64 adopts a shaftless spiral spiral slag discharger, which is conducive to the smooth discharge of larger ash slag such as iron wire in the ash slag. In a preferred embodiment, an ash conveyor 65 is provided below the end of the spiral slag discharging machine 64, and the ash discharged by the spiral slag discharging machine 64 falls from the end of the spiral slag discharging machine 64 to the ash conveyor 65 and is then transported to a designated place for placement or treatment. The ash conveyor 65 preferably adopts a conveyor belt type conveyor, and the conveyor belt of the ash conveyor 65 is located directly below the end of each spiral slag discharging machine 64. The fallen ash is directly transported to a designated place for placement or treatment by the conveyor belt of the ash conveyor 65, which is convenient and efficient.
[0062] In a preferred embodiment, monitoring and control devices are installed at corresponding positions such as garbage storage chamber, garbage drying chamber, garbage pyrolysis chamber, garbage combustion chamber and slag chamber, slag chamber, as well as various chambers of flue gas combustion device, condensation and dehydration device and various air inlet surrounds, flue gas outlets, various flue gas pipes, cooling tube cavities, and configured blowers. The monitoring data information automatically detected, fed back and collected by the garbage high-temperature pyrolysis and gasification treatment equipment and facilities, such as sensors in various chambers of the equipment, the flow of cooling water and the temperature of cooling water at various positions, the water level and pressure of various chambers of the equipment, the air volume of the fan, etc., are processed by computer and adjusted automatically or manually to realize the operation control of various processes and facilities in the system, such as fan start-up and air volume adjustment, ash and slag removal, water replenishment and supply, electric furnace top cover, water pump and valve opening and closing, etc.; real-time intelligent computer monitoring and control, and network management can be realized to realize system control automation.
[0063] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.
Claims
1. A garbage pyrolysis gasification furnace, comprising a furnace body (10) and a flue gas combustion device, wherein a garbage storage chamber (14), a garbage drying chamber (11), a garbage pyrolysis chamber (12) and a garbage combustion chamber (13) are vertically arranged in order from top to bottom in the furnace body (10), characterized in that: The smoke combustion device comprises a smoke combustion chamber (50), wherein an igniter is provided in the smoke combustion chamber (50), and a smoke outlet (504) is provided on the smoke combustion chamber (50) for discharging smoke after combustion; the smoke combustion chamber (50) is connected to the upper end of the garbage pyrolysis chamber (12) through a smoke pipe 1 (51), connected to the upper end of the garbage drying chamber (11) through a smoke pipe 2 (52), and connected to the upper end of the garbage storage chamber (14) through a smoke pipe 3 (53); and regulating valves (513) for regulating the flow of smoke are respectively provided on the smoke pipe 1 (51), the smoke pipe 2 (52), and the smoke pipe 3 (53); The bottom of the flue gas combustion chamber (50) is provided with a flue gas chamber (54), an oxygen distribution chamber (55) and a dust chamber (56); the dust chamber (56) is located at the bottom center of the flue gas combustion chamber (50); the oxygen distribution chamber (55) and the flue gas chamber (54) are concentrically sleeved on the outer periphery of the dust chamber (56) from the inside to the outside in sequence; the dust chamber (56) is a cylindrical chamber structure; a sealing flange cover (561) that can be opened and closed is provided at the bottom; and an open top is provided and communicated with the inside of the flue gas combustion chamber (50). The air cavity (54) and the oxygen distribution cavity (55) are annular cylindrical cavity structures. The smoke cavity (54) is divided into a smoke cavity one (541) and a smoke cavity two (542) by a smoke cavity partition (544). The tops of the oxygen distribution cavity (55), the smoke cavity one (541) and the smoke cavity two (542) are connected to the interior of the smoke combustion chamber (50). The smoke pipe one (51) is connected to the smoke cavity one (541). The smoke pipe two (52) and the smoke pipe three (53) are connected to the smoke cavity two (542). A smoke disperser is arranged at the top of the smoke cavity (54) so as to communicate with the interior of the smoke combustion chamber (50), the smoke disperser comprising a plurality of smoke dispersion pipes (543) distributed around a circle, the lower portion of the smoke dispersion pipe (543) being arranged upright, and the upper portion being inclined at an elevation angle of 30° to 60°, the vertical projection of the upper tail end of each of the smoke dispersion pipes (543) being located on a tangent line of the circle where the smoke dispersion pipe (543) is located, and the upper tail ends of the plurality of smoke dispersion pipes (543) distributed around the circle are all oriented clockwise or counterclockwise at the same time; An oxygen disperser is arranged at the top of the oxygen distribution chamber (55) so as to communicate with the interior of the flue gas combustion chamber (50), the oxygen disperser comprising a plurality of oxygen dispersion pipes (551) distributed around a circle, the lower portion of the oxygen dispersion pipes (551) being arranged upright, and the upper portion being inclined at an elevation angle of 30° to 60°, the vertical projection of the upper tail end of each of the oxygen dispersion pipes (551) being located on a tangent line of the circle where the oxygen dispersion pipe (551) is located, and the upper tail ends of the plurality of oxygen dispersion pipes (551) distributed around the circle are all oriented clockwise or counterclockwise at the same time; An air inlet surround (510) surrounding the garbage pyrolysis gasification furnace is arranged at the ends of the smoke pipe one (51), the smoke pipe two (52) and the smoke pipe three (53) connected to the garbage pyrolysis gasification furnace, and a plurality of air inlet through holes connected to the interior of the garbage pyrolysis gasification furnace are opened on the inner circumference of the air inlet surround (510); each of the air inlet surrounds (510) is provided with a smoke branch pipe (512) connected to the air inlet surround (510) on two opposite sides, and the two smoke branch pipes (512) are symmetrically arranged and merged to connect the smoke pipe one (51), the smoke pipe two (52) or the smoke pipe three (53).
2. The garbage pyrolysis gasification furnace according to claim 1, characterized in that: A heat exchange chamber (505) is arranged at the top of the flue gas combustion chamber (50), and the heat exchange chamber (505) is filled with circulating water; a flue gas collecting chamber (58) and an oxygen heating chamber (59) are arranged at the top of the heat exchange chamber (505), and the oxygen heating chamber (59) surrounds the periphery of the flue gas collecting chamber (58); the flue gas combustion chamber (50) is provided with a plurality of flue gas heat exchange pipes (503) passing through the heat exchange chamber (505) and communicating with the flue gas collecting chamber (58), and the flue gas outlet (504) is arranged at the top of the flue gas collecting chamber (58); a vertical partition is arranged in the oxygen heating chamber (59) to separate the oxygen heating chamber (59), and the oxygen heating chamber (59) is provided with an oxygen input port (591) on one side of the partition, and an oxygen output port (592) on the other side of the partition, and the oxygen output port (592) is communicated with the oxygen distribution chamber (55).
3. The garbage pyrolysis gasification furnace according to claim 1, characterized in that: The second flue gas pipe (52) and the third flue gas pipe (53) are equipped with a condensation and dehydration device (57) for realizing condensation and dehydration of flue gas. The condensation and dehydration device (57) comprises a cylinder (571). A collecting chamber (572) is arranged at the upper part of the cylinder (571). A condensation inlet one (573) and a condensation inlet two (574) are arranged at the top of the collecting chamber (572). A circulating water chamber (575) is arranged in the middle part of the cylinder (571). A sewage chamber (576) is arranged at the lower part of the cylinder (571). A plurality of condensation unit flue gas pipes (577) passing through the circulating water chamber (575) are connected between the collecting chamber (572) and the sewage chamber (576). The collecting chamber (572) is connected to the second smoke pipe (52) through the first condensation inlet (573), so that smoke can enter the collecting chamber (572) from the second smoke pipe (52) in front and pass through the condensation unit smoke pipe (577) and the sewage chamber (576) in sequence, and then exit from the sewage chamber (576) to enter the second smoke chamber (542); the collecting chamber (572) is connected to the third smoke pipe (53) through the second condensation inlet (574), so that smoke can enter the collecting chamber (572) from the third smoke pipe (53) in front and pass through the condensation unit smoke pipe (577) and the sewage chamber (576) in sequence, and then exit from the sewage chamber (576) to enter the second smoke chamber (542).
4. The garbage pyrolysis gasification furnace according to claim 1, characterized in that: A slag receiving and ash discharging device is arranged directly below the garbage combustion chamber (13), and the slag receiving and ash discharging device comprises a slag receiving chamber (61) and an ash discharging chamber (68), wherein the garbage combustion chamber (13) is an elliptical cylindrical structure, the slag receiving chamber (61) is an inverted quadrangular pyramid chamber whose bottom and top surfaces are rectangular, and the ash discharging chamber (68) is a rectangular parallelepiped chamber; at least one vertically arranged slag receiving chamber partition (62) is arranged in the slag receiving chamber (61) to divide the slag receiving chamber (61) into two or more slag receiving bins (63) arranged side by side in a transverse manner, the bottom opening of each slag receiving bin (63) is a rectangular shape, and the bottom opening of the garbage combustion chamber (13) is directly connected to the slag receiving chamber (61), and The projection areas of the bottom opening of the elliptical cylindrical garbage combustion chamber (13) projected vertically onto the top openings of each slag receiving bin (63) are equal; the ash discharge chamber (68) is provided with vertical ash discharge chamber partitions (69) whose number is the same as the slag receiving bin partitions (62) so as to divide the ash discharge chamber (68) into ash discharge bins (610) whose number is the same as the slag receiving bin (63) and which are arranged side by side in a horizontal direction, and the top surface of the ash discharge chamber partition (69) corresponds to the bottom surface of the slag receiving bin partition (62) in a one-to-one manner; the ash discharge bins (610) are rectangular chamber structures of the same shape; and the ash discharge bins (610) are provided with spiral slag dischargers (64) for uniformly discharging ash and slag from each ash discharge bin (610).
5. The garbage pyrolysis gasification furnace according to claim 4, characterized in that: Oxygen supply pipes (22) are arranged on the top of the slag chamber partition (62) and on the furnace wall of the garbage combustion chamber (13), and each oxygen supply pipe (22) is located on the same horizontal plane. A plurality of oxygen outlets are arranged on the side of the oxygen supply pipe (22); a cooling water pipe is welded below the oxygen supply pipe (22), and the cooling water pipe is closely connected to the slag chamber partition (62).
6. The garbage pyrolysis gasification furnace according to claim 4, characterized in that: A semicircular groove (66) is provided at the bottom of the ash discharge bin (610), and two sides of the semicircular groove (66) are in contact with two side walls of the bottom of the ash discharge bin (610). The semicircular groove (66) is located below the auger of the spiral slag discharger (64), and its extension direction is consistent with the extension direction of the auger of the spiral slag discharger (64).
7. The garbage pyrolysis gasification furnace according to claim 1, characterized in that: An isolation door (15) is provided between the garbage drying chamber (11) and the garbage storage chamber (14) for temporarily isolating the garbage drying chamber (11) and the garbage storage chamber (14); a garbage feeding port (17) is provided at the top of the garbage storage chamber (14), and a furnace top cover (18) for temporarily closing the garbage feeding port (17) is provided; and a feeding platform (19) is provided at the top of the furnace body (10), and the feeding platform (19) is located above the garbage storage chamber (14).