Efficient power station stable combustion peak regulation system and control method

By heating the secondary air and boiler feed water by bypass main steam, using the molten salt heat storage system, the problems of stable combustion of the boiler under deep peak-shaving operation and stable operation of the SCR reactor are solved, and the energy cascade utilization and denitrification system are realized The working range is widened, reducing energy waste and increasing turbine power generation load.

CN118912489APending Publication Date: 2024-11-08INNER MONGOLIA JINGNENG SHENGLE THERMAL POWER CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410952525.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The prior art cannot ensure the stable combustion of the boiler under deep peak regulating operation conditions and the stable operation of the SCR reactor in the denitrification system at the same time, and the heat required for the two items at different depth regulating depths is disproportionate, resulting in energy waste.

Method used

By heating the secondary air and boiler water by the bypass main steam, the molten salt heat storage system can achieve accurate and efficient utilization of the heat of the bypass main steam, ensuring stable combustion of the boiler under deep peak-shaving operation, and widening the SCR reactor The working range is to reduce energy waste caused by mismatch in required flow.

Benefits of technology

The stable combustion of the boiler under deep peak-shaving operation and the activity of the SCR reactor are achieved, the working range of the denitrification system is broadened, energy waste is avoided, and the efficiency of the turbine power generation load is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118912489A_ABST
    Figure CN118912489A_ABST
Patent Text Reader

Abstract

The invention relates to an efficient power station stable combustion peak regulation system and a control method. The system comprises a power station boiler, a steam turbine main steam bypass pipeline adjusting valve, a high-temperature heat storage adjusting valve, a steam-flue gas heat exchanger, a boiler secondary air system, a medium-temperature heat storage adjusting valve, a steam turbine No.1 high-pressure heater, a steam turbine high-pressure cylinder, a fused salt heat storage system, an SCR reactor, a flow controller and a heated secondary air temperature measuring point. And an SCR flue gas temperature measuring point and a steam turbine one-section steam extraction pipeline are arranged. By means of the mode that secondary air and boiler feed water are heated through bypass main steam, stable combustion of the boiler under the deep peak regulation operation working condition is guaranteed, and the working range of the SCR reactor in a denitration system under the boiler deep peak regulation operation working condition is widened. By the adoption of the fused salt heat storage system, accurate and efficient utilization of bypass main steam heat is achieved, energy waste caused by mismatching of needed flow is avoided, and fused salt can be used for storing heat to heat a deaerator to supply water to a boiler so as to save steam extraction of a steam turbine.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of thermal power generation, and in particular relates to a high-efficiency stable combustion peak-shaving system and a control method for a power station. Background Art

[0002] With the continuous increase in the total installed capacity of new energy, the peak-shaving time of thermal power generating units is getting longer and longer, and the peak-shaving depth is getting deeper. Under such an operating environment, the stable combustion of the boiler and the stable operation of the SCR denitrification system have become major factors affecting the deep peak-shaving of the unit.

[0003] The existing partial transformation cannot simultaneously ensure the stable combustion of the boiler under deep peak-shaving operation conditions and the working range of the SCR reactor in the denitrification system under deep peak-shaving operation conditions of the boiler. Moreover, the heat required for these two contents at different deep regulation depths is disproportionate, which easily leads to energy waste. Summary of the invention

[0004] The purpose of the present invention is to provide a high-efficiency power station stable combustion peak-shaving system and control method, which ensures the stable combustion of the boiler under deep peak-shaving operation conditions by heating the secondary air and boiler feed water through the bypass main steam and broadens the working range of the SCR reactor in the denitrification system under the deep peak-shaving operation conditions of the boiler. The molten salt heat storage system is used to achieve accurate and efficient use of the bypass main steam heat, avoiding energy waste caused by mismatching the required flow. In addition, when the turbine power generation load is high, the molten salt stored heat can be used to heat the deaerator to feed the boiler water to save steam turbine extraction and increase the turbine power generation load.

[0005] The present invention provides a high-efficiency power station stable combustion peak-shaving system, including a power station boiler, a turbine main steam bypass pipeline regulating valve, a high-temperature heat storage regulating valve, a steam-flue gas heat exchanger, a boiler secondary air system, a medium-temperature heat storage regulating valve, a turbine No. 1 high-pressure heater, a turbine high-pressure cylinder, a molten salt heat storage system, an SCR reactor, a flow controller, a temperature measuring point of the heated secondary air, a temperature measuring point of the flue gas entering the SCR, and a first-stage steam extraction pipeline of the turbine;

[0006] The power station boiler is connected to the steam turbine high pressure cylinder through the steam turbine main steam bypass pipeline regulating valve; the steam turbine high pressure cylinder is connected to the steam turbine No. 1 high pressure heater through the steam turbine first section extraction pipeline; the steam turbine No. 1 high pressure heater is connected to the power station boiler;

[0007] The power plant boiler is connected to the SCR reactor, and the SCR inlet flue gas temperature measuring point is provided on the pipeline between the power plant boiler and the SCR reactor;

[0008] The main steam bypass pipeline regulating valve of the steam turbine is connected to the steam-flue gas heat exchanger through the high-temperature heat storage regulating valve; the steam-flue gas heat exchanger is connected to the power station boiler through the boiler secondary air system in one way, and is connected to the No. 1 high-pressure heater of the steam turbine through the medium-temperature heat storage regulating valve in the other way; the pipeline between the steam-flue gas heat exchanger and the boiler secondary air system is provided with the heated hot secondary air temperature measuring point; the steam-flue gas heat exchanger is connected to the hot secondary air pipeline;

[0009] The high-temperature heat storage regulating valve is connected to the molten salt heat storage system; the medium-temperature heat storage regulating valve is connected to the molten salt heat storage system; the molten salt heat storage system is provided with a first pipeline, a second pipeline and a third pipeline, the first pipeline receives boiler feed water from the deaerator, the second pipeline heats the feed water from the deaerator, and the third pipeline goes to the boiler feed water;

[0010] The flow controller is connected to the SCR inlet flue gas temperature measuring point, the heated secondary air temperature measuring point, the high-temperature heat storage regulating valve and the medium-temperature heat storage regulating valve.

[0011] The present invention also provides a control method for the high-efficiency power station stable combustion peak-shaving system, comprising:

[0012] When the power generation load is deeply peaked under the pure condensing operation state of the steam turbine, the power station boiler sends out the main steam, bypasses part of the main steam through the regulating valve of the main steam bypass pipe of the steam turbine, enters the main steam bypass pipe of the steam turbine, and adjusts the steam through the high-temperature heat storage regulating valve to enter the molten salt heat storage system or the steam-flue gas heat exchanger. The steam entering the molten salt heat storage system exchanges heat with the molten salt for cooling, and then enters the deaerator to heat the boiler feed water. After entering the steam-flue gas heat exchanger, the steam heats the hot secondary air of the boiler, and then enters the first steam extraction pipe of the steam turbine or the molten salt heat storage system through the medium-temperature heat storage regulating valve. The steam entering the first steam extraction pipe of the steam turbine is merged into the first steam extraction of the steam turbine to heat the boiler feed water. After entering the molten salt heat storage system, the steam exchanges heat with the molten salt for cooling, and then enters the deaerator to heat the boiler feed water. The hot secondary air to be heated is heated by part of the main steam through the steam-flue gas heat exchanger, and then re-enters the boiler secondary air system to promote boiler combustion.

[0013] Furthermore, the control method further includes:

[0014] The flue gas passes through the outlet of the power station boiler economizer and enters the SCR reactor for flue gas denitrification. The flow controller controls the opening of the high-temperature heat storage regulating valve and the medium-temperature heat storage regulating valve by monitoring the temperatures of the two measuring points: the hot secondary air temperature measuring point after heating and the flue gas temperature measuring point entering the SCR, to ensure the stable combustion of the boiler hot secondary air and the stable operation of the SCR. The excess steam enters the molten salt heat storage system through the regulation of the high-temperature heat storage regulating valve and the medium-temperature heat storage regulating valve. At high load, the molten salt heat storage system uses the heat in it to heat the deaerator to feed the boiler water to save steam extraction from the steam turbine.

[0015] Furthermore, the control method further includes:

[0016] The steam after heating the boiler secondary air enters the No. 1 high-pressure heater of the steam turbine to increase the temperature of the feed water entering the boiler, thereby increasing the inlet flue gas temperature of the SCR reactor under the deep peak-shaving operation condition of the boiler.

[0017] Furthermore, the control method further includes:

[0018] When the steam turbine needs deep peak regulation or the boiler hot secondary air temperature is low or the SCR inlet flue gas temperature is low, open the steam turbine main steam bypass pipeline regulating valve; when the hot secondary air temperature reaches 350°C, open the high-temperature heat storage regulating valve and send the excess heat to the heat storage system; when the SCR inlet flue gas temperature reaches 300°C, open the medium-temperature heat storage regulating valve and send the excess heat to the heat storage system; when the steam turbine power generation load increases, close the steam turbine main steam bypass pipeline regulating valve, high-temperature heat storage regulating valve and medium-temperature heat storage regulating valve according to temperature requirements.

[0019] Through the above scheme, through the high-efficiency power station stable combustion peak-shaving system and control method, part of the main steam heat is used to heat the boiler secondary air, increase the temperature of the boiler hot secondary air, and ensure the stable combustion of the boiler under the deep peak-shaving operation condition; at the same time, the steam after heating the boiler secondary air enters the No. 1 high-pressure heater of the turbine, which can increase the temperature of the boiler feed water, thereby increasing the inlet flue gas temperature of the SCR reactor under the deep peak-shaving operation condition of the boiler, ensuring the activity of the SCR catalyst under the deep peak-shaving operation condition, broadening the working range of the denitrification system under the deep peak-shaving operation condition of the boiler, and also realizing the step-by-step utilization of the bypass main steam energy; in addition, bypassing part of the main steam is also conducive to reducing the power generation load of the turbine, further realizing the deep peak-shaving of the turbine. Further, the temperature measuring point is used to monitor the temperature of the hot secondary air after heating and the temperature of the flue gas entering the SCR. When the two temperatures meet the use requirements respectively, the excess heat is used to heat the molten salt respectively, and while further deep peak-shaving is achieved, the accurate and efficient utilization of the bypass main steam heat is realized, avoiding energy waste caused by mismatch of required flow. When the power generation load of the steam turbine is high, the heat stored in the molten salt can be used to heat the deaerator to feed the boiler water to save steam extraction from the steam turbine and increase the power generation load of the steam turbine.

[0020] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention and implement it according to the contents of the specification, the following is a detailed description of the preferred embodiments of the present invention in conjunction with the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a structural schematic diagram of a high-efficiency stable combustion peak-shaving system for a power station according to the present invention.

[0022] Numbers in the figure:

[0023] 1-power station boiler; 2-steam turbine main steam bypass pipeline regulating valve; 3-high-temperature heat storage regulating valve; 4-steam-flue gas heat exchanger; 5-boiler secondary air system; 6-medium-temperature heat storage regulating valve; 7-steam turbine No. 1 high-pressure heater; 8-steam turbine high-pressure cylinder; 9-molten salt heat storage system; 10-SCR reactor; 11-flow controller; 12-temperature measuring point of hot secondary air after heating; 13-temperature measuring point of flue gas entering SCR; 14-steam turbine first section steam extraction pipeline. DETAILED DESCRIPTION

[0024] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

[0025] Ginseng Figure 1 As shown, this embodiment provides a high-efficiency power station stable combustion peak-shaving system, including a power station boiler 1, a turbine main steam bypass pipeline regulating valve 2, a high-temperature heat storage regulating valve 3, a steam-flue gas heat exchanger 4, a boiler secondary air system 5, a medium-temperature heat storage regulating valve 6, a turbine No. 1 high-pressure heater 7, a turbine high-pressure cylinder 8, a molten salt heat storage system 9, an SCR reactor 10, a flow controller 11, a heated hot secondary air temperature measuring point 12, an SCR inlet flue gas temperature measuring point 13, a turbine first section extraction pipeline 14 and its connection system; the power station boiler 1 is connected to the turbine high-pressure cylinder 8 through the turbine main steam bypass pipeline regulating valve 2; the turbine high-pressure cylinder 8 is connected to the turbine No. 1 high-pressure heater 7 through the turbine first section extraction pipeline 14; the turbine No. 1 high-pressure heater 7 is connected to the power station boiler 1; the power station boiler 1 is connected to the SCR reactor 10, and the pipeline between the power station boiler 1 and the SCR reactor 10 is provided with the SCR inlet flue gas. The steam-flue gas temperature measuring point 13; the turbine main steam bypass pipeline regulating valve 2 is connected to the steam-flue gas heat exchanger 4 through the high-temperature heat storage regulating valve 3; the steam-flue gas heat exchanger 4 is connected to the power station boiler 1 through the boiler secondary air system 5, and the other way is connected to the turbine No. 1 high-pressure heater 7 through the medium-temperature heat storage regulating valve 6; the pipeline between the steam-flue gas heat exchanger 4 and the boiler secondary air system 5 is provided with the heated hot secondary air temperature measuring point 12; the steam-flue gas heat exchanger 4 and the hot secondary air Pipeline connection; high-temperature heat storage regulating valve 3 is connected to molten salt heat storage system 9; medium-temperature heat storage regulating valve 6 is connected to molten salt heat storage system 9; molten salt heat storage system 9 is provided with a first pipeline, a second pipeline and a third pipeline, the first pipeline receives boiler feed water from the deaerator, the second pipeline deaerator heats the feed water, and the third pipeline goes to the boiler feed water; the flow controller 11 is connected to the SCR inlet flue gas temperature measuring point 13, the heated secondary air temperature measuring point 12, the high-temperature heat storage regulating valve 3 and the medium-temperature heat storage regulating valve 6.

[0026] When the power generation load is deeply peaked under the pure condensing operation state of the steam turbine, the power station boiler 1 sends out the main steam, bypasses part of the main steam through the turbine main steam bypass pipeline regulating valve 2, enters the turbine main steam bypass pipeline, and is regulated by the high-temperature heat storage regulating valve 3 to enter the molten salt heat storage system 9 or the steam-flue gas heat exchanger 4. The steam entering the molten salt heat storage system 9 exchanges heat with the molten salt for cooling, then enters the deaerator to heat the boiler feed water, enters the steam-flue gas heat exchanger 4 to heat the boiler hot secondary air, and then passes through the medium-temperature heat storage regulating valve 6. Enter the steam extraction pipeline 14 of the first section of the steam turbine or enter the molten salt heat storage system 9. The steam entering the steam extraction pipeline 14 of the first section of the steam turbine is merged into the steam extraction pipeline of the first section of the steam turbine to heat the boiler feed water. The steam entering the molten salt heat storage system 9 heats up with the molten salt and then enters the deaerator to heat the boiler feed water. The hot secondary air to be heated passes through the steam-flue gas heat exchanger 4 and is heated by part of the main steam before re-entering the boiler secondary air system 5 to promote boiler combustion. The flue gas passes through the outlet of the economizer of the boiler 1 and enters the SCR reactor 4 for flue gas denitrification. The flow controller 11 controls the opening of the high-temperature heat storage regulating valve 3 and the medium-temperature heat storage regulating valve 6 by monitoring the temperature of the two measuring points 12 of the hot secondary air temperature after heating and the temperature measuring point 13 of the flue gas entering the SCR, so as to ensure the stable combustion of the boiler hot secondary air and the stable operation of the SCR. The excess steam enters the molten salt heat storage system 9 through the regulation of the high-temperature heat storage regulating valve 3 and the medium-temperature heat storage regulating valve 6. At high load, the molten salt heat storage system 9 can utilize the heat therein to heat the deaerator to feed water to the boiler to save steam extraction from the steam turbine.

[0027] Under deep peak-shaving operation conditions, part of the main steam heat is used to heat the boiler secondary air and increase the temperature of the boiler hot secondary air, ensuring stable combustion of the boiler under deep peak-shaving operation conditions; at the same time, the steam after heating the boiler secondary air enters the No. 1 high-pressure heater of the steam turbine, which can increase the temperature of the feed water entering the boiler, thereby increasing the inlet flue gas temperature of the SCR reactor under the deep peak-shaving operation conditions of the boiler, ensuring the activity of the SCR catalyst under the deep peak-shaving operation conditions, broadening the working range of the denitrification system under the deep peak-shaving operation conditions of the boiler, and also realizing the cascade utilization of the bypass main steam energy; in addition, bypassing part of the main steam is also conducive to reducing the power generation load of the steam turbine, further realizing the deep peak-shaving of the steam turbine.

[0028] In this embodiment, the temperature measuring points are used to monitor the temperature of the hot secondary air after heating and the temperature of the flue gas entering the SCR. When the two temperatures meet the use requirements, the excess heat is used to heat the molten salt respectively. While further deep peak regulation is achieved, the heat of the bypass main steam is accurately and efficiently utilized, avoiding energy waste caused by mismatch of required flow.

[0029] The specific control method is that when the steam turbine needs deep peak regulation or the boiler hot secondary air temperature is low or the SCR inlet flue gas temperature is low, the turbine main steam bypass pipeline regulating valve is opened; when the hot secondary air temperature reaches 350°C, the high-temperature heat storage regulating valve is opened, and the excess heat is sent to the heat storage system; when the SCR inlet flue gas temperature reaches 300°C, the medium-temperature heat storage regulating valve is opened, and the excess heat is sent to the heat storage system. When the turbine power generation load increases, these valves need to be closed according to the above temperature.

[0030] When the power generation load of the steam turbine is high, the heat stored in the molten salt can be used to heat the deaerator to feed the boiler water to save steam extraction from the steam turbine and increase the power generation load of the steam turbine.

[0031] Taking a 350MW supercritical generator set as an example, compared with the original 30% operating condition, the feed water temperature can be stably increased by about 30°C, the SCR inlet flue gas temperature can be increased from 250°C to above 300°C, and the hot secondary air temperature can be increased by about 50°C, ensuring the stable combustion of the boiler and the activity of the SCR catalyst under deep peak-shaving operating conditions. By increasing the main steam bypass flow into the molten salt heat storage system, the power generation load can be further reduced to 20% or below. The use of a flow controller in conjunction with a molten salt heat storage device can save about 0.6g / kWh of standard coal.

[0032] Through the high-efficiency power station stable combustion peak-shaving system and control method, part of the main steam heat is used to heat the boiler secondary air, increase the temperature of the boiler hot secondary air, and ensure the stable combustion of the boiler under the deep peak-shaving operation condition; at the same time, the steam after heating the boiler secondary air enters the No. 1 high-pressure heater of the turbine, which can increase the temperature of the boiler feed water, thereby increasing the inlet flue gas temperature of the SCR reactor under the deep peak-shaving operation condition of the boiler, ensuring the activity of the SCR catalyst under the deep peak-shaving operation condition, broadening the working range of the denitrification system under the deep peak-shaving operation condition of the boiler, and also realizing the step-by-step utilization of the bypass main steam energy; in addition, bypassing part of the main steam is also conducive to reducing the power generation load of the turbine, further realizing the deep peak-shaving of the turbine. Furthermore, the temperature measuring point is used to monitor the temperature of the hot secondary air after heating and the temperature of the flue gas entering the SCR. When the two temperatures meet the use requirements, the excess heat is used to heat the molten salt respectively. While further deep peak-shaving, the accurate and efficient utilization of the bypass main steam heat is realized, avoiding energy waste caused by mismatch of required flow. When the power generation load of the steam turbine is high, the heat stored in the molten salt can be used to heat the deaerator to feed the boiler water to save steam extraction from the steam turbine and increase the power generation load of the steam turbine.

[0033] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. It should be pointed out that a person skilled in the art can make several improvements and modifications without departing from the technical principles of the present invention, and these improvements and modifications should also be regarded as within the scope of protection of the present invention.

Claims

1. A high-efficiency stable combustion peak-shaving system for power plants, characterized in that: It includes a power station boiler (1), a steam turbine main steam bypass pipeline regulating valve (2), a high-temperature heat storage regulating valve (3), a steam-flue gas heat exchanger (4), a boiler secondary air system (5), a medium-temperature heat storage regulating valve (6), a steam turbine No. 1 high-pressure heater (7), a steam turbine high-pressure cylinder (8), a molten salt heat storage system (9), an SCR reactor (10), a flow controller (11), a temperature measuring point of the heated secondary air after heating (12), a temperature measuring point of the flue gas entering the SCR (13), and a first-stage steam extraction pipeline of the steam turbine (14); The power station boiler (1) is connected to the steam turbine high-pressure cylinder (8) via the steam turbine main steam bypass pipeline regulating valve (2); the steam turbine high-pressure cylinder (8) is connected to the steam turbine No. 1 high-pressure heater (7) via the steam turbine first-stage extraction pipeline (14); the steam turbine No. 1 high-pressure heater (7) is connected to the power station boiler (1); The power station boiler (1) is connected to the SCR reactor (10), and the SCR inlet flue gas temperature measuring point (13) is provided on the pipeline between the power station boiler (1) and the SCR reactor (10); The steam turbine main steam bypass pipeline regulating valve (2) is connected to the steam-flue gas heat exchanger (4) through the high-temperature heat storage regulating valve (3); the steam-flue gas heat exchanger (4) is connected to the power station boiler (1) through the boiler secondary air system (5) on one side, and is connected to the steam turbine No. 1 high-pressure heater (7) through the medium-temperature heat storage regulating valve (6) on the other side; the pipeline between the steam-flue gas heat exchanger (4) and the boiler secondary air system (5) is provided with the heated hot secondary air temperature measuring point (12); the steam-flue gas heat exchanger (4) is connected to the hot secondary air pipeline; The high-temperature heat storage regulating valve (3) is connected to the molten salt heat storage system (9); the medium-temperature heat storage regulating valve (6) is connected to the molten salt heat storage system (9); the molten salt heat storage system (9) is provided with a first pipeline, a second pipeline and a third pipeline, the first pipeline receives boiler feed water from a deaerator, the second pipeline heats feed water from the deaerator, and the third pipeline goes to boiler feed water; The flow controller (11) is connected to the SCR inlet flue gas temperature measuring point (13), the heated hot secondary air temperature measuring point (12), the high-temperature heat storage regulating valve (3) and the medium-temperature heat storage regulating valve (6).

2. A control method for the high-efficiency power plant stable combustion peak-shaving system according to claim 1, characterized in that: include: When the power generation load is deeply peaked under the pure condensing operation state of the steam turbine, the power station boiler (1) sends out main steam, bypasses part of the main steam through the main steam bypass pipeline regulating valve (2) of the steam turbine, enters the main steam bypass pipeline of the steam turbine, and is regulated by the high-temperature heat storage regulating valve (3) to enter the molten salt heat storage system (9) or the steam-flue gas heat exchanger (4). The steam entering the molten salt heat storage system (9) exchanges heat with the molten salt for cooling, and then enters the deaerator to heat the boiler feed water, and enters the steam-flue gas heat exchanger (4) to heat the boiler heat. The secondary air then passes through the medium-temperature heat storage regulating valve (6) and enters the first stage steam extraction pipeline (14) of the steam turbine or enters the molten salt heat storage system (9). The steam entering the first stage steam extraction pipeline (14) of the steam turbine is merged into the first stage steam extraction pipeline of the steam turbine and then heats the boiler feed water. The steam entering the molten salt heat storage system (9) exchanges heat with the molten salt for cooling and then enters the deaerator to heat the boiler feed water. The hot secondary air to be heated passes through the steam-flue gas heat exchanger (4) and is heated by part of the main steam and then re-enters the boiler secondary air system (5) to promote boiler combustion.

3. The control method according to claim 2, characterized in that: Also includes: The flue gas passes through the outlet of the economizer of the power station boiler (1) and enters the SCR reactor (4) for flue gas denitration; the flow controller (11) controls the opening of the high-temperature heat storage regulating valve (3) and the medium-temperature heat storage regulating valve (6) by monitoring the temperatures of the two measuring points, the temperature measuring point (12) of the hot secondary air after heating and the temperature measuring point (13) of the flue gas entering the SCR, to ensure the stable combustion of the hot secondary air of the boiler and the stable operation of the SCR, and the excess steam enters the molten salt heat storage system (9) through the regulation of the high-temperature heat storage regulating valve (3) and the medium-temperature heat storage regulating valve (6); when the load is high, the molten salt heat storage system (9) uses the heat therein to heat the deaerator to feed water to the boiler to save steam extraction from the steam turbine.

4. The control method according to claim 3, characterized in that: Also includes: The steam after heating the boiler secondary air enters the No. 1 high-pressure heater (7) of the steam turbine to increase the temperature of the feed water entering the boiler, thereby increasing the inlet flue gas temperature of the SCR reactor under the deep peak regulation operation condition of the boiler.

5. The control method according to claim 4, characterized in that: Also includes: When the steam turbine needs deep peak regulation or the boiler hot secondary air temperature is low or the SCR inlet flue gas temperature is low, the steam turbine main steam bypass pipeline regulating valve (2) is opened; when the hot secondary air temperature reaches 350°C, the high-temperature heat storage regulating valve (3) is opened, and the excess heat is sent to the heat storage system; when the SCR inlet flue gas temperature reaches 300°C, the medium-temperature heat storage regulating valve (6) is opened, and the excess heat is sent to the heat storage system; when the steam turbine power generation load increases, the steam turbine main steam bypass pipeline regulating valve (2), the high-temperature heat storage regulating valve (3), and the medium-temperature heat storage regulating valve (6) are closed according to temperature requirements.

Citation Information

Cited By

  • Hot air water supply flue gas and steam coupling deep peak regulation system

    CN120969813A