A black start path recovery optimization method under compound disaster scenarios
By combining typhoon and landslide disaster models, the failure rate of distribution network lines is evaluated, and the network frame reconstruction objective function is constructed, and the path with the lowest risk is selected for recovery. The problem of inaccurate risk assessment of black start paths under compound disasters is solved, and the problem of inaccurate risk assessment of black start paths under compound disasters is improved. Reliability and speed of power distribution network failure recovery.
Patent Information
- Application Number
- CN202111568349.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-21
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2041-12-21
AI Technical Summary
In compound disaster scenarios, during the failure recovery of distribution network, the risk assessment of the black start path is not accurate enough and is prone to pass through high-risk lines, resulting in safety hazards and recovery failures.
The Rankine typhoon disaster model and landslide fault partition model are adopted, and the line topology structure and node load characteristics are combined to construct the microgrid grid reconstruction objective function. The risk of the black startup path is evaluated through the improved entropy weight method, and the path with the lowest risk is selected for the recover.
Improves the selection accuracy and recovery success rate of the black startup path, ensures recovery speed and reliability, and reduces the risks during the failure recovery process.
Smart Images

Figure CN114386673B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power supply restoration under distribution network fault conditions, and in particular to a black start path restoration optimization method under a compound disaster scenario. Background Art
[0002] As a leading industry in the national economic system, the power system has an increasingly wide demand for electricity. As an important link in the power network, the distribution network plays the role of transmitting electricity to users such as industry, commerce and households, which directly affects the quality of power supply to users. Power outages not only cause huge economic losses to all walks of life in society, but also bring inconvenience to people's lives, cause social disorder, and even cause serious consequences such as national defense security and social unrest. According to statistics, more than 80% of power outages are caused by distribution network failures. When a distribution system fails, some section switches in the distribution system can be opened to isolate the fault, and some contact switches can be closed to transfer part or all of the load on the faulty line to other lines, so as to achieve the purpose of quickly isolating the fault and restoring power supply, so as to improve the reliability of power supply. Therefore, how to quickly and accurately restore power supply to users, reduce power outage time, reduce the scope of fault impact, reduce the losses caused by power outages, and improve the reliability of power supply of the distribution network is of great significance.
[0003] There are several types of faults in distribution networks, such as single faults, developing faults, multiple faults, and cascading faults. The consequences and repair strategies of each fault are different. For multiple faults, it is impossible to repair all faults at the same time, but they are all required to be repaired as soon as possible and restore power supply in time to improve the reliability of distribution network power supply and reduce user dissatisfaction. Therefore, before the fault repair, it is necessary to analyze the factors affecting the repair strategy and repair efficiency, such as load type, fault geographical distance, load level, daily load demand, and power loss load recovery amount. These complex situations make it difficult to formulate a reasonable repair strategy based on human experience alone. During the repair process, if the output of distributed power sources in the power grid is insufficient, the capacity of the energy storage system is limited, and new sudden faults occur, the power grid structure will change, and the repair strategy that has been formulated must be dynamically planned or adjusted.
[0004] The research on fault repair of distribution network involves both the emergency repair of faults of lines, equipment, etc. and the restoration of power supply of power-lost loads. In the process of fault repair, emergency repair and power supply restoration are both independent processes and coordinated and alternating processes. Therefore, the emergency repair strategy and restoration strategy at each stage also affect each other, that is, it is a dynamic emergency repair and reconstruction process. However, at present, after multiple faults occur in the distribution network, the line failure rate under disaster conditions has a great impact on the black start. Different paths selected during the black start process will lead to different risk levels of different restoration schemes. After multiple faults occur in the distribution network, it is easy to cause the black start process to pass through high-risk lines, and path recovery in this way will have great safety hazards. Therefore, how to more accurately evaluate the line failure rate and avoid the black start path through high-risk lines for path recovery is a problem that needs to be solved urgently. Summary of the invention
[0005] The purpose of the present invention is to overcome the defects of the above-mentioned prior art and provide a black start path recovery optimization method under complex disaster scenarios.
[0006] The purpose of the present invention can be achieved by the following technical solutions:
[0007] A black start path restoration optimization method under a compound disaster scenario, the method comprising:
[0008] S1: Use the Rankine typhoon disaster model to determine the typhoon movement route. By calculating the typhoon movement speed and impact radius, determine the disaster risk range and the tower failure rate within the disaster risk range.
[0009] The expression of the typhoon disaster model is:
[0010]
[0011] Where: v o is the wind speed at point o in the typhoon system; r o is the distance between point o and the typhoon center; R max is the maximum impact wind speed radius of the typhoon system; v max It is the maximum wind speed in a typhoon system.
[0012] The specific contents of determining the scope of disaster risk are as follows:
[0013] Assuming that the wind speed of the tower remains constant within a span of 10 minutes, each hour is divided into 6 periods, and the total impact period is rounded to obtain the time t that the tower is within the risk range. risk :
[0014]
[0015] n=[6trisk ]
[0016] Where: T is the total time of typhoon movement, n is the number of time segments during the disaster period;
[0017] Tower failure rate P within the disaster risk range tower1,i The expression is:
[0018]
[0019] Where: n is the number of time segments during the disaster period, I i,r represents the fatigue damage degree of the rth time period at tower i, and Δt is the length of each time segment.
[0020] S2: Construct a landslide fault zoning model, calculate the cumulative effective rainfall, and calculate the landslide tower failure rate in the event of a landslide disaster by constructing a tower impact resistance model.
[0021] The expression of the landslide fault partition model is:
[0022]
[0023] Where: N f 、N max are the number of historical landslide disaster points in grid f and the maximum number of landslide disasters within the risk range; V max are the earthwork volume of the δth landslide point in grid f and the maximum earthwork volume of landslide in the unit grid, respectively. a and b are weight coefficients, both of which are 0.5.
[0024] The calculation formula for the failure rate of tower collapse caused by landslide disaster is:
[0025] P tower2,i =P slide ×P slide,tower
[0026] Where P slide,tower is the landslide failure rate of the tower, P slide is the probability of tower landslide;
[0027] The probability of tower landslide P slide The expression is:
[0028]
[0029] In the formula: c1 is 0.0035, c2 is 0.026, c is 0.1183, L m The maximum critical rainfall is 208 mm, L eff is the predicted effective rainfall;
[0030] The landslide failure rate of the tower P slidetower The expression is:
[0031]
[0032] Where: F is the kinetic energy borne by the tower.
[0033] S3: Calculate the tower failure rate based on the tower failure rate within the disaster risk range obtained in S1 and the tower collapse failure rate due to landslide disasters obtained in S2.
[0034] S4: Calculate the importance of the line by quantifying the topological structure of the line in the network and the characteristics of the line itself. Specifically:
[0035] The importance of the line is calculated by first calculating the line weight and then comprehensively considering the topology. The line weight is determined by the line recovery time and line failure rate:
[0036]
[0037] Where: L wr is the weight of line r; l tr is the recovery time of line r; P risk,r is the failure rate of line r; A and B are l tr , P risk,r The adjustment coefficient of
[0038] Get the line betweenness J that reflects the topological characteristics of the line i :
[0039]
[0040] Where: represents the sum of the shortest paths from any node u to v in the black start grid; Represents the sum of the number of routes r passed in the shortest path from any node u to v.
[0041] S5: Calculate the node importance by calculating the load and load level carried by the node.
[0042] Furthermore, the load levels are divided into three categories, namely primary, secondary and tertiary loads, and the node importance is defined as:
[0043] G u =w u Ω u
[0044] Where: G u is the importance of node u, w u is the weight of the load level of node u, and the three levels of weights are 1, 0.1, and 0.01 respectively. Ωk The amount of load that the node carries.
[0045] S6: Construct the microgrid grid reconstruction objective function, and obtain the reconstructed network by solving the objective function. Specifically, the importance of the lines and nodes in the grid is used to evaluate the reconstructed grid, and the average sum of the importance is used as the final objective function:
[0046]
[0047] Where: ψ, E are the sets of all lines and nodes respectively; J r is the line betweenness, G u is the node importance, J and G are the number of lines and nodes in the reconstructed grid.
[0048] S7: Evaluate the black start capability of distributed power sources, determine the unit start-up sequence, and obtain the recovery path by constructing the recovery path objective function.
[0049] Furthermore, the improved entropy weight method is used to evaluate the black start capability of the power supply, and the recovery path is determined with the maximum power generation capacity per unit time as the objective function, that is:
[0050]
[0051] Where: W is the power generation capacity restored per unit time; P Gs is the sth generator to be restored; T s The time required to restore the sth generator.
[0052] S8: Calculate the line risk of the restoration plan and compare different methods, and select the path with the lowest risk for restoration during the black start process. Specifically:
[0053] During the black start process, the path with the lowest risk is selected for recovery. The risk of the solution is defined as:
[0054]
[0055] P plan =1-(1-P risk,1 )(1-P risk,2 )…(1-P risk,r )
[0056] Where: R is the risk of the recovery path plan, which is used to reflect the reliability of the recovery path plan, P plan The total failure rate of the recovery path is determined by the product of the failure rates of each line included in the path involved in the scheme, P risk,r is the failure rate of line r.
[0057] The black start path restoration optimization method under a complex disaster scenario provided by the present invention has at least the following beneficial effects compared with the prior art:
[0058] 1) The method of the present invention comprehensively considers the impact of various disasters on microgrid lines, making the disaster situation closer to reality and being able to more accurately evaluate the line failure rate;
[0059] 2) The objective function of grid reconstruction in the present invention combines the importance of line topology, adds line charging time, line topology importance, line failure rate, node load and load importance, and determines the reconstructed grid structure, so that it can ensure the reliability of line recovery in addition to the recovery speed. The black start path is avoided through high-risk lines, and the success rate of black start is improved. This method is of great significance for the formulation of black start plans and post-disaster recovery. BRIEF DESCRIPTION OF THE DRAWINGS
[0060] Figure 1 It is a flow chart of a black start path restoration optimization method in a compound disaster scenario in an embodiment;
[0061] Figure 2 IEEE30 nodes and typhoon influence diagram in the embodiment;
[0062] Figure 3 Typhoon path and tower location map
[0063] Figure 4 The grid division result of the power grid area in the embodiment;
[0064] Figure 5 It is a 30-node grid structure diagram in the embodiment;
[0065] Figure 6 4 is a comparison chart of the risks obtained by different methods in the embodiment. DETAILED DESCRIPTION
[0066] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work should belong to the scope of protection of the present invention.
[0067] Example
[0068] After multiple faults occur in the distribution network, it is very important to formulate an efficient and scientific fault repair strategy to restore load power supply, reduce social and economic losses, and improve the quality of life and production of the people. It has both theoretical value and practical significance. However, in the case of compound disasters, there is currently no effective solution to more accurately assess the line failure rate and avoid black start paths and restore paths through high-risk lines.
[0069] To this end, an embodiment of the present invention provides a black start path recovery optimization method in a complex disaster scenario. To further illustrate the method of the present invention, this embodiment uses IEEE30 nodes to verify the failure rate model under extreme weather conditions. Figure 2 As shown. The tower is set to be made of Q345 steel, and the distance between towers is set to 1km. Since the typhoon wind speed changes little per kilometer, the wind speed is set to be the same every 5km. The coordinate system is established with node 15 as the origin. The starting position of the typhoon is (-60km, 180km) and moves in the southeast direction at 45°. a=1.924 9×10 -7 , b=0.0055, R max =83km, v max =50m / s, v0=20m / s, v m =20m / s, center pressure P c .
[0070] Figure 1 The specific flow chart of the black start path restoration optimization method under the composite disaster scenario provided by this embodiment is shown. Figure 1 The specific process of the method includes the following steps:
[0071] Step 1: Construct a typhoon disaster model.
[0072] Different wind speeds at different points during a typhoon disaster will have different effects on the transmission line, and the wind speed at a certain point is related to the typhoon intensity level, the center location of the typhoon, and the typhoon's impact radius. The Rankine typhoon disaster model is used to model the typhoon's movement route, and the affected area and tower failure rate are determined by calculating the typhoon's movement speed and impact radius. The expression of the typhoon disaster model is:
[0073]
[0074] Where: v o is the wind speed at point o in the typhoon system; r o is the distance between point o and the typhoon center; R max is the maximum impact wind speed radius of the typhoon system; v max It is the maximum wind speed in a typhoon system.
[0075] Since the moving speed of the typhoon center in a high-level typhoon is much lower than the circulation wind speed, it is assumed that the wind speed borne by the tower within a span of 10 minutes remains unchanged. In this way, each hour is divided into 6 periods, and the total impact period is rounded, that is:
[0076]
[0077] n=[6t risk ]
[0078] Where: (x0, y0), (x1, y1), (x2, y2), (x e ,y e ) are the typhoon's starting movement center, the typhoon center when it starts to affect the tower, the typhoon center when it ends to affect the tower, and the typhoon center at the end of the predicted path. Figure 3 As shown. risk is the time that the tower is within the risk range, T is the total typhoon movement time, and n is the number of time segments during the disaster period.
[0079] The failure rate of towers within the risk range of tower collapse will increase with the increase of typhoon action time. Since Poisson distribution can satisfy the failure rate model of tower collapse, the failure rate model of towers within the risk range can be expressed as:
[0080]
[0081] Where: P tower1,i is the probability of tower i collapsing, n is the number of time segments during the disaster period, Δt is the length of each time segment, and the preferred value is 10 min. i,r represents the fatigue damage degree of the tower i in the rth period. The high-risk line failure rate is finally obtained as shown in Table 1.
[0082] Table 1 High-risk line failure rate
[0083]
[0084] Step 2: Construct a landslide fault zoning model, calculate the cumulative effective rainfall, and calculate the tower failure rate by constructing a tower impact resistance model. The fault zoning model is formulated as follows:
[0085]
[0086] Where: N f 、N max are the number of historical landslide disaster points in grid f and the maximum number of landslide disasters within the risk range; V maxare the earthwork volume of the δth landslide point in grid f and the maximum earthwork volume of the landslide in the unit grid, respectively. a and b are weight coefficients, both of which are 0.5. Figure 4 As shown, the power grid area is divided into grids of 1km×1km in size. The dark areas in the figure represent rainfall areas in the power grid.
[0087] Before the rain comes, the meteorological center will release a rainfall forecast. Except for the effective rainfall on the first day, which is directly obtained from the forecast of the meteorological center, the effective rainfall on the jth day includes the predicted rainfall on the day and the effective rainfall of the previous j-1 days. The longer it is from the jth day, the weaker the rainfall accumulation effect is, and the more obvious the attenuation is, that is:
[0088]
[0089] Where: L eff,j , L pre,j are the predicted effective rainfall and predicted rainfall on the jth day respectively; L act,q is the actual rainfall on the qth day; k is the loss coefficient affected by geographical conditions and evaporation rate.
[0090] The probability of landslide occurring is P slide It has an exponential relationship with the effective rainfall, that is:
[0091]
[0092] In the formula: c1 is 0.0035, c2 is 0.026, c is 0.1183, which is the coefficient obtained by data fitting, L m The maximum critical rainfall is 208 mm. eff is the predicted effective rainfall.
[0093] In addition, during the sliding process, the friction between the soil and the slope will produce friction, which will reduce the impact of the landslide on the tower to a certain extent, namely:
[0094]
[0095] Where: F is the kinetic energy borne by the tower, m and h are the mass and height of the landslide respectively; μ is the friction coefficient of sliding, and θ is the angle between the slope and the horizontal plane.
[0096] The landslide failure rate of the tower P slide,tower It depends on the ratio of the impact to the maximum impact capacity of the tower. When the landslide impact on the tower is greater than the maximum bearing capacity, the tower will inevitably fall, that is:
[0097]
[0098] Where: P slide,tower is the landslide failure rate of the tower, Wmax The maximum impact resistance of the tower, F is the kinetic energy that the tower bears. Considering that there is a certain difference in the occurrence time of rainfall and landslide disasters, it can be considered that there is a temporal relationship. Therefore, rainfall and landslide are treated as independent events. Therefore, the landslide tower failure rate P of the tower i that suffers a landslide disaster after rainfall tower2,i for:
[0099] P tower2,i =P slide ×P slide,tower
[0100] Where: P slide is the probability of landslide, P slide,tower is the landslide failure rate of the tower.
[0101] Step 3: Natural disasters often have mutual influence factors. If you want to calculate the line failure rate, you must consider the influence of different disasters. Although the coupling relationship between different disasters is relatively complex, as long as each disaster model considers the influence of environmental factors under the disaster and the parameters used are accurate enough, then various disaster models can be processed separately and calculated as independent events. Therefore, the failure rate of tower i is:
[0102] P tower,i =1-(1-P tower1,i )(1-P tower2,i )
[0103] A line consists of multiple towers. If any tower collapses, the line cannot work normally. Therefore, the failure rate of the microgrid transmission line is P. risk for:
[0104] P risk =1-(1-P tower,1 )(1-P tower,2 )…(1-P tower,i )
[0105] Step 4: Calculate the importance of the line. The importance of the line represents the importance of the line in the reconstructed network. The more important the line is, the more likely it is to become a component line of the reconstructed network. The importance of the line is mainly determined by the topological structure of the line in the network and the characteristics of the line itself.
[0106] The importance of a line is calculated by first calculating the line weight and then comprehensively considering the topology. The line weight is determined by the line recovery time and line failure rate.
[0107]
[0108] Where: L wr is the weight of line r; l tris the recovery time of line r; P risk,r is the failure rate of line r; A and B are their adjustment coefficients. Since the main purpose of grid reconstruction is to restore the fault as soon as possible, the shorter the line recovery time, the faster the fault recovery. Therefore, A and B are 0.6 and 0.4 respectively.
[0109] The topology of the line reflects the importance of the line in the network. Selecting a line with appropriate topological conditions helps speed up the black start process. Therefore, the line betweenness is used to reflect the topological characteristics of the line. The higher the line betweenness, the greater the importance of the line in the black start network, that is:
[0110]
[0111] Where: represents the sum of the shortest paths from any node u to v in the black start grid; Represents the sum of the number of routes r passed in the shortest path from any node u to v.
[0112] Step 5: Calculate the importance of the node. The importance of a node is related to the load it carries. The greater the load the node carries and the higher the load level, the higher the importance of the node. The load levels are divided into three categories: primary, secondary, and tertiary loads. The importance of a node is defined as:
[0113] G u =w u Ω u
[0114] Where: G u is the importance of node u, w u is the weight of the load level of node u, and the three levels of weights are 1, 0.1, and 0.01 respectively. Ω u The amount of load that the node carries.
[0115] Step 6: Construct the microgrid grid reconstruction objective function and solve the objective function to obtain the reconstructed network.
[0116] The importance of lines and nodes in the grid is used to evaluate the reconstructed grid, and the average sum of the importance is used as the final objective function:
[0117]
[0118] Where: ψ, E are the sets of all lines and nodes respectively; J r is the line betweenness, G u is the node importance, J and G are the number of lines and nodes in the reconstructed grid.
[0119] The IEEE30 nodes are solved by genetic algorithm to obtain the reconstructed network as follows Figure 5 As shown. Since there is no guarantee that the solved grid is an interconnected topological structure, isolated areas need to be connected. The present invention uses the shortest path method to solve the connection path, but the shortest path algorithm is only applicable to the solution between nodes and the algorithm needs to be adjusted: for the selected interconnected areas, the weighted distance between different nodes is regarded as 0; for the selected areas that are not interconnected, the weighted distance between nodes remains unchanged; for the unconnectable areas, the weighted distance between nodes is set to an infinite parameter.
[0120] The reconstructed network connects all DGs except the black start power supply, taking into account factors such as line topology, risk, line recovery time, node load importance and load volume, ensuring that the reconstructed network can maintain global importance as well as speed and security.
[0121] In this step, it is also necessary to define the constraints of the power grid operation. The power grid operation constraints mainly include generator output constraints, line flow constraints, node voltage constraints, and starting power constraints, as follows:
[0122] (1) Generator output constraints:
[0123]
[0124] Where: are the minimum values of active and reactive power output of the sth generator respectively; are the maximum values of active and reactive power output of the sth generator respectively.
[0125] (2) Line flow constraints:
[0126] L∈ψ
[0127] Where: P L , are the active power and maximum active power flowing through the line respectively, and ψ is the set of all lines.
[0128] (3) Node voltage constraints:
[0129] V u min <V u <V u max , i∈E
[0130] Where: V u min 、V u max are the minimum and maximum node voltages, and E is the set of all nodes.
[0131] (4) Startup power constraint:
[0132]
[0133] Where: is the output power of the restored unit; n G is the number of restored units; The starting power required for the unstarted unit.
[0134] Step 7: Evaluate the black start capability of distributed generation (DG) and determine the DG start sequence. Construct the recovery path objective function to obtain the recovery path.
[0135] The goal of black start is to restore the load in the shortest possible time, that is, the power generation capacity and recovery time at the initial stage of black start are the basis for determining the recovery path. Preferably, the improved entropy weight method is used to evaluate the black start capability of the power supply. In order to restore the maximum load in a short time, the recovery path is determined with the maximum power generation capacity per unit time as the goal, that is:
[0136]
[0137] Where: W is the power generation capacity restored per unit time; P Gs is the sth generator to be restored; T s is the time required to restore the sth generator. The path recovery results are shown in Table 2.
[0138] Table 2 DG startup sequence
[0139]
[0140]
[0141] Step 8. Calculate the line risk of the restoration plan and compare different methods.
[0142] Different paths selected during the black start process will lead to different risk levels of different recovery plans. During the black start process, the path with low risk should be selected as much as possible for recovery. In order to more intuitively express the risk level of the plan, the risk level of the plan is defined as:
[0143]
[0144] P plan =1-(1-P risk,1 )(1-P risk,2 )…(1-P risk,r )
[0145] Where: R is the risk of the recovery path solution, reflecting the reliability of the solution, Pplan The total failure rate of the recovery path is determined by the failure rate P of each line included in the path involved in the solution. risk The product of is determined.
[0146] The risk level and grid connection time of the restoration plan path are shown in Table 3:
[0147] Table 3 DG recovery path
[0148]
[0149] The risk comparison results of different methods are as follows Figure 6 , where the comparative literature is a recovery strategy method that only considers the line charging time. The comparison shows that the line risk of the method of the present invention is much lower than the comparative solution that only considers the line charging time to determine the recovery strategy.
[0150] The method of the present invention comprehensively considers the impact of various disasters on microgrid lines, making the disaster situation closer to reality and being able to more accurately evaluate the line failure rate; the objective function of the grid reconstruction in the present invention combines the line topology importance, adds the line charging time, line topology importance, line failure rate, node load and load importance, and determines the reconstructed grid structure, so that it can not only ensure the recovery speed but also the reliability of line recovery. The black start path avoids passing through high-risk lines, and the success rate of black start is improved. This method is of great significance for the formulation of black start plans and post-disaster recovery.
[0151] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person familiar with the technical field can easily think of various equivalent modifications or substitutions within the technical scope disclosed by the present invention, and these modifications or substitutions should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.
Claims
1. A black start path recovery optimization method under compound disaster scenarios, It is characterized in that include: 1) Use the Rankine typhoon disaster model to determine the typhoon movement route, and determine the disaster risk range and the tower failure rate within the disaster risk range by calculating the typhoon movement speed and impact radius; 2) Construct a landslide fault zoning model, calculate the cumulative effective rainfall, and calculate the landslide tower failure rate in the event of a landslide disaster by constructing a tower impact resistance model; 3) calculating the tower failure rate according to the tower failure rate within the disaster risk range obtained in step 1) and the tower failure rate due to landslide disaster obtained in step 2); 4) Calculate the importance of the line by quantifying the topological structure of the line in the network and the characteristics of the line itself; 5) Calculate the node importance by calculating the load and load level carried by the node; 6) Construct a microgrid grid reconstruction objective function and obtain the reconstructed network by solving the objective function; 7) Evaluate the black start capability of distributed power sources, determine the unit start-up sequence, and obtain the recovery path by constructing the recovery path objective function; 8) Calculate the line risk of the restoration plan and compare different methods, and select the path with the lowest risk for restoration during the black start process; The expression of the landslide fault partition model is: Where: N f 、N max are the number of historical landslide disaster points in grid f and the maximum number of landslide disasters within the risk range; V max are the earthwork volume of the δth landslide point in grid f and the maximum earthwork volume of landslide in the unit grid, respectively; a and b are weight coefficients, both of which are 0.5; The specific content of step 4) is: The importance of the line is calculated by first calculating the line weight and then comprehensively considering the topology. The line weight is determined by the line recovery time and line failure rate: Where: L wr is the weight of line r; l tr is the recovery time of line r; P risk,r is the failure rate of line r; A and B are l tr , P risk,r The adjustment coefficient of Ji: The specific content of step 5) is: The load levels are divided into three categories, namely primary, secondary and tertiary loads, and the node importance is defined as: G u =w u Oh u Where: G u is the importance of node u, w u is the weight of the load level of node u, and the three levels of weights are 1, 0.1, and 0.01 respectively. k The amount of load that the node carries; The specific content of step 6) is: The importance of the lines and nodes in the grid is used to evaluate the reconstructed grid, and the average sum of the importance is used as the final objective function: Where: ψ, E are the sets of all lines and nodes respectively; J r is the line betweenness, G u is the node importance, J and G are the number of lines and nodes in the reconstructed grid.
2. The black start path restoration optimization method under a complex disaster scenario according to claim 1, It is characterized in that The expression of the typhoon disaster model is: Where: v o is the wind speed at point o in the typhoon system; r o is the distance between point o and the typhoon center; R max v is the maximum impact wind speed radius of the typhoon system; max It is the maximum wind speed in a typhoon system.
3. The black start path restoration optimization method under a complex disaster scenario according to claim 1, It is characterized in that The specific contents of determining the scope of disaster risk are as follows: Assuming that the wind speed of the tower remains constant within a span of 10 minutes, each hour is divided into 6 periods, and the total impact period is rounded to obtain the time t that the tower is within the risk range. risk : Where: T is the total time of typhoon movement, n is the number of time segments during the disaster period; Tower failure rate P within the disaster risk range tower1,i The expression is: Fatigue damage degree, Δt is the length of each time segment.
4. The black start path restoration optimization method under a complex disaster scenario according to claim 1, It is characterized in that The calculation formula for the failure rate of tower collapse caused by landslide disaster is: P tower2,i =P slide ×P slide,tower Where: F is the kinetic energy borne by the tower.
5. The black start path restoration optimization method under a complex disaster scenario according to claim 1, It is characterized in that In step 7), the improved entropy weight method is used to evaluate the black start capability of the power supply, and the recovery path is determined with the maximum power generation capacity per unit time as the objective function, that is: Where: W is the power generation capacity restored per unit time; P Gs is the sth generator to be restored; T s The time required to restore the sth generator.
6. The black start path restoration optimization method under a complex disaster scenario according to claim 1, It is characterized in that The specific content of step 8) is: During the black start process, the path with the lowest risk is selected for recovery. The risk of the solution is defined as: P plan =1-(1-P risk,1 )(1-P risk,2 )…(1-P risk,r ) Where: R is the risk of the recovery path plan, which is used to reflect the reliability of the recovery path plan, P plan The total failure rate of the recovery path is determined by the product of the failure rates of each line included in the path involved in the scheme, P risk,r is the failure rate of line r.