A kind of mining tunnel secondary lining embedded chute fixing structure and application method
Through the embedded chute, anchor section and screw structure, the problem of the anchor end being unable to be disassembled and the difficulty in positioning in the tunnel embedded chute fixation technology is solved, the chute can be installed quickly and accurately, and the construction efficiency and quality are improved.
Patent Information
- Application Number
- CN202111484951.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-07
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2041-12-07
AI Technical Summary
The existing tunnel pre-embedded chute fixation technology has problems such as the PVC jacket at the anchor end of the chute cannot be removed, difficulty in personnel entering the steel frame, and poor positioning accuracy, resulting in low construction efficiency and poor quality.
The structure of pre-embedded chute, anchoring section and screw rod is used. The position of the chute is determined through on-site measurement. The positioning holes and anchor rods on the template are used to achieve internal and external positioning. The screw rod goes deep into the anchoring section to fix the chute, preventing people from entering the steel frame and simplifying the installation process. .
It achieves rapid and precise installation of the chute, reduces construction time and manpower investment, improves construction efficiency and quality, and simplifies on-site construction operations.
Smart Images

Figure CN114396293B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of railway, highway, municipal and other tunnel construction, and specifically relates to a second lining pre-buried chute fixing structure of a mining method tunnel and an application method thereof. Background Art
[0002] In the current tunnel construction process, in order to facilitate the installation of tunnel cables, water pipes, contact networks, lighting facilities and other equipment in the later stage, the slideway is often pre-buried in advance during the tunnel secondary lining construction process, so the slideway construction is an important part of the tunnel construction. At present, the tunnel pre-buried slideway construction mainly fixes the slideway on the steel mold trolley or the combined steel mold template surface. The above method can realize the pre-buried slideway construction, but there are many problems in the construction using the above process.
[0003] In the prior art, the secondary lining trolley template is divided into five blocks in the annular direction, and there are three pre-embedded slide slots in the annular direction, which are designed to cross the annular joints of the template. Therefore, when the slide slot is directly fixed on the template, the trolley template must be fully unfolded in the ring to install the slide slot or move forward with the slide slot. The total length of the slide slot body and the anchor end of the slide slot is much longer than the main reinforcement protective layer, which hinders the forward movement and makes it impossible to install. In order to solve this problem, the first method used is to fix the slide slot on the steel bar skeleton, which has extremely poor positioning accuracy, and the slide slot is directly connected to the steel bar, which easily causes steel bar corrosion; the second method is to set a PVC jacket at the anchor end of the slide slot with a built-in spring. After the secondary lining trolley is positioned and the template is unfolded, a person enters from the secondary lining steel bar, rotates the PVC sleeve, and activates the spring to make the slide slot close to the secondary lining template.
[0004] The Chinese patent application number is 201710679899.8, which provides a fixing device and application for the installation of a tunnel embedded chute, including a positioning tube, a positioning plate, an adjusting nut, and a chute; the positioning plate is sleeved on the outer diameter of the positioning tube, the adjusting nuts are placed on both sides of the positioning plate, the anchor ends on the chute are placed inside the positioning tube, a spring is provided inside the positioning tube, the anchor on the chute contacts the spring and is fixed to the positioning tube through an insulating sleeve and an insulating gasket, and there is an insulating sleeve inside the positioning tube, between the positioning tube and the chute anchor. The construction is convenient and rapid, the installation quality is high, the precision is high, the chute is firmly fixed, and the fixing device can well play the role of fixing and insulation, and saves material and labor input, saving construction time and economic investment. However, the following disadvantages still exist:
[0005] 1. The PVC outer sleeve at the anchor end of the slideway cannot be removed, and the PVC sleeve and spring will remain inside the concrete structure, forming a weak point in quality;
[0006] 2. It is difficult for personnel to enter the secondary lining steel bars. Affected by the spacing between the secondary lining main bars and the hook bars (plum blossom arrangement) between the main bars, it is difficult for construction personnel to enter the steel skeleton, which takes a long time and is difficult to install the slideway; the longitudinal and circumferential positioning accuracy of the slideway is extremely poor;
[0007] 3. The positioning of the slide is greatly affected by the installation position of the secondary lining steel bars. Some slides cannot be tightly attached to the secondary lining formwork due to the large positioning error of the secondary lining steel bars, which affects the positioning of the slide. Summary of the invention
[0008] The present invention provides a mining tunnel secondary lining embedded chute fixing structure and an application method, which has a short installation process, is easy to install, and has accurate positioning.
[0009] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a pre-embedded chute fixing structure for the secondary lining of a mining tunnel, which is composed of a pre-embedded chute, an anchoring section and a screw rod, wherein the anchoring section and the pre-embedded chute are fixedly connected, a through hole is opened inside the anchoring section, an internal thread is provided on the through hole, and one end of the screw rod is threadedly sleeved inside the anchoring section.
[0010] Preferably, the length of the screw is 60 mm.
[0011] Preferably, the length of the anchoring section is 20 mm.
[0012] Preferably, a cross wire is provided at the end of the screw away from the embedded slide groove.
[0013] An application method of a secondary lining pre-buried chute fixing structure of a mining tunnel, the steps of which include:
[0014] (1) Determine the position of the embedded chute on the tunnel secondary lining formwork by on-site measurement and layout, and open a positioning hole at the position of the embedded chute determined by measurement;
[0015] (2) Carry out steel bar binding and installation;
[0016] (3) Before the secondary lining trolley moves forward to the section where the steel bars have been installed, the embedded slide groove is fixed to the template through the positioning hole with screws from the outside of the template. The screws penetrate deep into the anchoring section and do not leak out. After the entire ring of the template is unfolded, the secondary lining trolley retreats to the construction joint of the secondary lining of the upper plate, and the screws are unscrewed again so that the screws are completely inserted into the anchoring section to complete the fixed installation of the embedded slide groove.
[0017] The beneficial effects of the present invention are as follows: when in use, the present invention no longer requires operators to enter the steel frame for installation and positioning, and internal and external positioning can be achieved by utilizing the positioning holes, anchor rods and anchoring sections on the template. The installation process takes a short time, saves time and effort, and is easy to install. At the same time, positioning control is performed by utilizing the positioning holes on the template, which makes positioning more accurate and ensures construction quality. The overall structure of the present invention is simple, which is convenient for on-site construction storage and on-site construction installation, making construction convenient and rapid, saving construction period and improving economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1This is a schematic diagram of the exploded structure of a fixed structure of a pre-buried chute in a secondary lining of a mining method tunnel according to the present invention;
[0019] Figure 2 It is a schematic diagram of the combined structure of a pre-buried chute fixing structure of a secondary lining of a mining method tunnel according to the present invention;
[0020] In the figure: 1. embedded slide groove, 2. anchoring section, 3. through hole, 4. screw. DETAILED DESCRIPTION
[0021] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0022] See also Figure 1-2 The present invention provides a technical solution: a fixed structure of a pre-buried chute for the secondary lining of a mining tunnel, which is composed of a pre-buried chute 1, an anchoring section 2 and a screw 4. The anchoring section 2 is fixedly connected to the pre-buried chute 1. A through hole 3 is provided inside the anchoring section 2. An internal thread is provided on the through hole 3. One end of the screw 4 is threadedly sleeved inside the anchoring section 2. The screw 4 is a high-strength solid screw with a length of 60 mm. A cross wire is provided at the end away from the pre-buried chute 1 for easy screwing. The anchoring section 2 is 20 mm long and has a wall thickness of 10 mm.
[0023] An application method of a secondary lining pre-buried chute fixing structure of a mining tunnel, the steps of which include:
[0024] (1) The position of the embedded chute 1 is determined on the tunnel secondary lining formwork by on-site measurement and laying out, and a positioning hole is opened at the position of the embedded chute 1 determined by measurement;
[0025] (2) Use a steel bar tying trolley to install steel bars;
[0026] (3) Before the secondary lining trolley moves forward to the section where the steel bars have been installed, the embedded chute 1 is fixed to the formwork through the positioning hole with the screw 4 from the outside of the formwork. The screw 4 penetrates deeply into the anchor section 2 and does not leak out. After the entire ring of the formwork is unfolded, the secondary lining trolley retreats to the construction joint of the secondary lining of the upper plate, and the screw 4 is unscrewed again, so that the screw 4 completely enters the inner anchor section 2 to complete the fixed installation of the embedded chute 1.
[0027] When the thickness of the secondary lining steel bar protective layer of the mining method tunnel is designed to be 45mm, the slide groove thickness b=20mm, the anchor section length is 60mm, and the total height is 80mm. After the embedded slide groove 1 is installed, the total thickness of the total trough body is greater than the thickness of the steel bar protective layer, resulting in obstruction of forward movement and inability to install. The total thickness of the trough body after installation of the present invention is 20+b=40mm, which is less than the thickness of the steel bar protective layer. Therefore, after the entire ring of the template is unfolded, the secondary lining trolley can retreat to the construction joint of the secondary lining of the upper plate, and the secondary lining trolley and the steel bar trolley can be switched back and forth at will to facilitate the installation and fixation of the embedded slide groove 1.
[0028] When in use, the present invention no longer requires operators to enter the steel frame for installation and positioning. The positioning holes, anchor rods 4 and anchor sections 2 on the template can be used to achieve internal and external positioning. The installation process takes a short time, saves time and effort, and is easy to install. At the same time, the positioning holes on the template are used for positioning control, which makes the positioning more accurate and ensures the construction quality. The overall structure of the present invention is simple, which is convenient for on-site construction storage and on-site construction installation, making the construction convenient and rapid, saving construction period and improving economic benefits.
[0029] The preferred embodiments of the present invention are described above. It should be pointed out that the present invention is not limited to the above-mentioned specific embodiments, and the devices and structures not described in detail should be understood to be implemented in a common manner in the art; any simple modifications, equivalent changes and modifications made to the above embodiments by any technician familiar with the art based on the technical essence of the present invention without departing from the scope of the technical solution of the present invention, shall still fall within the scope of protection of the technical solution of the present invention.
Claims
1. An application method of a fixed structure of a pre-buried chute in a secondary lining of a mining tunnel, characterized in that: The fixing structure is composed of a pre-buried slide groove, an anchoring section and a screw rod. The anchoring section is fixedly connected to the pre-buried slide groove. A through hole is provided inside the anchoring section. The through hole is provided with an internal thread. One end of the screw rod is threadedly sleeved inside the anchoring section. The length of the anchoring section is 20 mm; The end of the screw rod away from the embedded chute is provided with a cross wire. The steps of the application method include: The position of the embedded chute is determined on the tunnel secondary lining template by on-site measurement and laying out, and a positioning hole is opened at the position of the embedded chute determined by measurement; Carry out steel bar binding and installation; Before the secondary lining trolley moves forward to the section where the steel bars have been installed, the embedded slide groove is fixed to the formwork through the positioning hole with screws from the outside of the formwork. The screws penetrate into the anchor section without leaking out. After the entire ring of the formwork is unfolded, the secondary lining trolley retreats to the construction joint of the secondary lining of the upper plate, and the screws are unscrewed again so that the screws completely enter the anchor section to complete the fixed installation of the embedded slide groove.
Citation Information
Patent Citations
Tunnel embedded chute mounting fixator and application
CN107387128A
Fixed implementation method and assembly of tunnel rear-arranged type channel
CN107893667A
Duct piece pre-embedded screw sleeve assembly and application thereof
CN108825624A
Duct piece die with pre-buried channel
CN203919350U
Fixing device of expansion bolts and channel combination
CN204895173U