Backfill lining structure and construction method of rock tunnel

By filling the cavity with stones and grouting backfilling, the problems of long construction period and high cost of joint support of steel arch frames in the rock tunnel are solved, dense connection is achieved, and the stability and support effect of the tunnel are improved.

CN114458335BActive Publication Date: 2024-11-05CHINA HYDROPOWER ELEVENTH ENG BUREAU (ZHENGZHOU) CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210273640.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-19
Publication Date
2024-11-05
Estimated Expiration
2042-03-19

AI Technical Summary

Technical Problem

In water conservancy and hydropower projects, the joint support form of steel arch frames in rock tunnels is affected by excavation methods and rock conditions, resulting in irregular excavation of tunnel sections, large design dimensions, and traditional construction methods are long and costly, so they cannot be formed in time. Stable structure.

Method used

Use blocks and stones to fill the cavity, replace the steel arch frame sub-arch, and backfill the gaps between the blocks and stones and steel arch frames and steel mesh through cement grouting to form a dense connection, shorten the support cycle, reduce the thickness of the spray anchor, and enhance the Support effect.

Benefits of technology

It has achieved shortening the support cycle, reducing construction costs, enhancing the overall stability and support effect of rock tunnels, and meeting construction needs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114458335B_ABST
    Figure CN114458335B_ABST
Patent Text Reader

Abstract

The invention discloses a backfill lining structure and a construction method for a rock tunnel, comprising a tunnel body, wherein a steel arch frame is arranged in the tunnel body, a concrete layer is arranged on the outermost side of the steel arch frame, a system anchor rod is arranged in the concrete layer, a block stone is arranged on the top circular arc of the tunnel body, the top of the block stone is in contact with the rock surface of the tunnel, and the gap between the block stone and the rock surface of the tunnel is filled with cement slurry, a drainage hole is also arranged on the top circular arc of the tunnel body, and a grouting hole is arranged on the bottom circular arc, and the cement slurry is injected into the gap between the block stone and the rock surface of the tunnel through the grouting hole; the backfill lining structure and the construction method for a rock tunnel of the invention replace the steel arch frame sub-arch by filling the cavity with block stone, and reduce the thickness of the sprayed anchor support, and cement slurry is grouted to backfill the gap between the block stone, the steel arch frame and the steel mesh to form a densely connected whole with the surrounding rock, shorten the support period and enhance the support effect, and meet the construction requirements.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel construction, and in particular to a backfill lining structure of a rock tunnel and a construction method. Background Art

[0002] In current water conservancy and hydropower projects, rock tunnel support is divided into plain concrete or steel mesh concrete sprayed anchor support, anchor support, combined support of steel arch frame and one or more of the above support forms, and concrete lining support, according to the surrounding rock type. For the combined support form of steel arch frame, due to the influence of excavation methods or rock conditions, it will lead to irregular excavation of tunnel sections and large discrepancies in the designed tunnel section dimensions. Traditional construction treatment measures include customizing steel arch frames, or welding supporting secondary arches on steel arch frames, pouring concrete in the cavity, etc., but this method has a long construction cycle, cannot form a stable support structure in time, and has high costs and is inconvenient to use. Summary of the invention

[0003] The purpose of the present invention is to solve the above-mentioned problems and to provide a backfill lining structure and construction method for a rock tunnel that meets construction requirements by filling the cavity with blocks of stone to replace the secondary arch of the steel arch frame, reducing the thickness of the sprayed anchor support, and backfilling the gaps between the blocks of stone, the steel arch frame and the steel mesh with cement grout to form a densely connected whole with the surrounding rock, shortening the support period and enhancing the support effect.

[0004] To achieve the above-mentioned purpose, the technical solution of the present invention is: a backfill lining structure of a rock tunnel, comprising a tunnel body, a steel arch frame is arranged in the tunnel body, a concrete layer is arranged on the outermost side of the steel arch frame, a system anchor rod is arranged in the concrete layer, a block stone is arranged on the top circular arc of the tunnel body, the top of the block stone is in contact with the rock surface of the tunnel, the gap between the block stone and the rock surface of the tunnel is filled with cement slurry, a drainage hole is also arranged on the top circular arc of the tunnel body, and a grouting hole is arranged on the bottom circular arc, and the cement slurry is injected into the gap between the block stone and the rock surface of the tunnel through the grouting hole.

[0005] Preferably, steel meshes and longitudinal connecting steel bars are respectively provided on both sides and in the top arc of the tunnel body, and the steel meshes are laid on the longitudinal connecting steel bars.

[0006] Preferably, the system anchor rods include top arch anchor rods and side wall anchor rods, the top arch anchor rods are evenly arranged on the top arc of the tunnel body, the side wall anchor rods are evenly arranged on both sides of the tunnel body, and the ends of the top arch anchor rods and the side wall anchor rods are hooked with the steel mesh.

[0007] A construction method for a backfill lining structure of a rock tunnel comprises the following steps:

[0008] (1) Install the top arch anchor rods and side wall anchor rods along the surrounding rock diameter. The top arch anchor rods and side wall anchor rods are arranged in a plum blossom shape and are connected with the steel mesh in the backfill lining structure;

[0009] (2) Drainage holes are arranged within a 90° radius along the top arch in a plum blossom pattern. PVC drainage pipes are installed in the drainage holes, with the ends of the drainage pipes exposed from the backfill lining structure;

[0010] (3) Install the steel arch frame and weld the anchor rods to the steel arch frame;

[0011] (4) Install longitudinal connecting steel bars on adjacent steel arches, and lay steel mesh on the longitudinal connecting steel bars, covering the entire section;

[0012] (5) The cavity where the distance between the tunnel rock surface and the steel mesh is greater than 150 mm is filled with stone blocks, and the cavity where the distance is less than 150 mm is directly sprayed with concrete in layers;

[0013] (6) In the rock filling area, a galvanized grouting pipe is installed in the grouting hole. The grouting pipe extends 100 mm from the rock surface, with an exposed length of 150 mm. An on-off valve is installed, and the exhaust hole is located at the top of the grouting area.

[0014] (7) Use wet spraying method to spray C20 concrete with anchors;

[0015] (8) Watering maintenance begins 2 hours after the anchor spraying is completed, and the maintenance period is 14 days;

[0016] (9) Pour cement slurry into the block stone filling area, with a water-cement ratio of 0.6:1 and a grouting pressure of 0.2Mpa to 0.3Mpa;

[0017] (10) Seven days after the backfill grouting is completed, holes are drilled in the grouting area for quality inspection.

[0018] The present invention discloses a backfill lining structure and construction method for a rock tunnel, comprising a tunnel body, wherein a steel arch frame is arranged in the tunnel body, a concrete layer is arranged on the outermost side of the steel arch frame, a system anchor rod is arranged in the concrete layer, a block stone is arranged on the top circular arc of the tunnel body, the top of the block stone is in contact with the rock surface of the tunnel, and the gap between the block stone and the rock surface of the tunnel is filled with cement slurry, a drainage hole is also arranged on the top circular arc of the tunnel body, and a grouting hole is arranged on the bottom circular arc, and the cement slurry is injected into the gap between the block stone and the rock surface of the tunnel through the grouting hole; the backfill lining structure and construction method for a rock tunnel of the present invention replaces the steel arch frame sub-arch by filling the cavity with block stone, reduces the thickness of the sprayed anchor support, and backfills the gaps between the block stone, the steel arch frame and the steel mesh with cement slurry to form a densely connected whole with the surrounding rock, shortens the support period and enhances the support effect, and meets the construction requirements. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 The present invention is a schematic structural diagram of a backfill lining structure for a rock tunnel.

[0020] Among them: 1. Steel arch frame; 2. Concrete layer; 3. Top arch anchor rod; 4. Block stone; 5. Cement slurry; 6. Tunnel rock surface; 7. Drainage hole; 8. Grouting hole; 9. Steel mesh; 10. Longitudinal connecting steel bar; 11. Side wall anchor rod. DETAILED DESCRIPTION

[0021] The present invention will now be described in further detail with reference to the accompanying drawings. The accompanying drawings are simplified schematic diagrams, which only illustrate the basic structure of the present invention in a schematic manner, and thus only show the components related to the present invention.

[0022] Please refer to Figure 1 The technical solution of the present invention is: a backfill lining structure of a rock tunnel, comprising a tunnel body, a steel arch frame 1 is arranged in the tunnel body, a concrete layer 2 is arranged on the outermost side of the steel arch frame 1, a system anchor is arranged in the concrete layer 2, a block stone 4 is arranged on the top circular arc of the tunnel body, the top of the block stone 4 is in contact with the tunnel rock surface 6, and the gap between the block stone 4 and the tunnel rock surface 6 is filled with cement slurry 5, a drainage hole 7 is also arranged on the top circular arc of the tunnel body, and a grouting hole 8 is arranged on the bottom circular arc, and the cement slurry 5 is injected into the gap between the block stone 4 and the tunnel rock surface 6 through the grouting hole 8, wherein the block stone 4 is a rough stone, and the material selected is non-weathered rock. By filling the cavity with the block stone 4, the steel arch sub-arch is replaced, and the thickness of the sprayed anchor support is reduced, and the gap between the block stone, the steel arch frame and the steel mesh is backfilled with cement slurry to form a densely connected whole with the surrounding rock.

[0023] In the scheme of the present invention, steel mesh 9 and longitudinal connecting steel bars 10 are respectively provided on both sides and in the top arc of the tunnel body, and the steel mesh 9 is laid on the longitudinal connecting steel bars 10. The system anchor rods include top arch anchor rods 3 and side wall anchor rods 11. The top arch anchor rods 3 are evenly arranged on the top arc of the tunnel body, and the side wall anchor rods 11 are evenly arranged on both sides of the tunnel body. The ends of the top arch anchor rods 3 and the side wall anchor rods 11 are both hooked with the steel mesh 9.

[0024] A construction method for a backfill lining structure of a rock tunnel comprises the following steps:

[0025] (1) The top arch anchor rod 3 and the side wall anchor rod 11 are installed along the surrounding rock diameter. The top arch anchor rod 3 and the side wall anchor rod 11 are arranged in a plum blossom shape with an arrangement spacing of 2m×2m. The anchor rod diameter is φ25mm. The side wall anchor rod 11 is 2m to 3m long, the top arch anchor rod 3 is 4.5m long, and the exposed length of the anchor rod is 200mm to 300mm. They are connected to the steel mesh in the backfill lining structure.

[0026] (2) Drain holes 7 are arranged within 90° along the radial direction of the top arch with a spacing of 3m×3m. The drilling equipment is a YT28 air-leg rock drill. The depth of the drainage holes is 3m and the diameter is 50mm. The drainage holes 7 are arranged in a plum blossom shape. PVC drainage pipes are installed in the drainage holes 7, and the ends of the drainage pipes are exposed from the backfill lining structure. φ10mm drainage holes are drilled in the PVC drainage pipes. The drainage holes are arranged in a group every 500mm along the length. Adjacent groups of drainage holes are staggered, with four holes in a group and symmetrical drilling.

[0027] (3) Install the steel arch frame 1, with an installation spacing of 0.8m to 1.5m. The specific installation spacing is adjusted according to the surrounding rock type and the degree of crack development. The single steel arch frame is assembled in sections in the order of first erecting the columns and then the top arch. The columns are connected with high-strength bolts, and the columns are installed on a solid rock foundation. Positioning anchor rods are injected at any time. The anchor rod diameter is φ25mm and the rock penetration depth is 1.5m. The anchor rods are welded to the steel arch frame 1 to fix the steel arch frame 1.

[0028] (4) Adjacent steel arch frames are installed with 10 longitudinal connecting steel bars with a diameter of φ25mm and an installation spacing of 1.5m. Steel mesh is laid on the longitudinal connecting steel bars. The mesh specifications are 200mm×200mm, φ6mm diameter, and fully covered on the entire section; adjacent steel meshes are overlapped in accordance with the requirements of the steel bar specifications.

[0029] (5) The cavity where the distance between the tunnel rock surface 6 and the steel mesh is greater than 150 mm is filled with stone blocks 4. The stone blocks 4 are filled with rubble stones. The material selected is non-weathered rock, clean and free of mud. The diameter of the rubble stone blocks 4 is 150 mm to 300 mm. The rubble stone filling volume is uniform and dense. In the area where the distance is less than 150 mm, the concrete layer 2 is directly sprayed in layers.

[0030] (6) In the rock filling area, a galvanized grouting pipe is installed in the grouting hole. The grouting pipe is extended to a position 100 mm from the rock surface, with an exposed length of 150 mm. An on-off valve is installed. The grouting area of ​​a single grouting pipe shall not exceed 10 m. 2 The exhaust holes are set at the top of the grouting area. For the penetrating rubble filling area, grouting pipes can be set at a spacing of 3m×3m, and the exhaust holes are replaced by holes in adjacent grouting locations.

[0031] (7) Use wet spraying method to spray anchor C20 concrete. The equipment is TK800 rotor wet spraying machine. The slump of concrete is greater than 10mm and the thickness of the spray anchor is not less than 150mm. The working wind pressure of spraying is 0.4Mpa~0.7Mpa, and the spraying is carried out in layers from bottom to top. The thickness of a single layer of spraying on the side wall shall not exceed 80mm. The thickness of a single layer of spraying on the top arch shall not exceed 50mm. When spraying 2 layers of concrete in layers, the next layer of spraying should be carried out after the previous layer of concrete has finally set.

[0032] (8) Watering maintenance begins 2 hours after the anchor spraying is completed. The maintenance period is 14 days. When the outside temperature is high, the number of watering can be increased. The number of watering should be based on ensuring that the sprayed concrete surface is moist. When the temperature is below 5℃, stop watering maintenance.

[0033] (9) Pour cement slurry 5 into the filled block area, the water-cement ratio of cement slurry is 0.6:1, the grouting pressure is 0.2Mpa~0.3Mpa, the grouting equipment uses 3SNS grouting pump, pure pressure grouting. Backfill grouting is carried out in sections, the length of each section is not more than 50m, and the end of the section is tightly sealed with concrete. The grouting of a single section is carried out in two sequences, first grouting the sequence I hole, then grouting the sequence II hole, and grouting in sequence according to the principle of from bottom to top and from low to high. When the cement slurry is discharged from the top exhaust hole, close the exhaust pipe valve, and close the grouting pipe valve after grouting for 10 minutes at the design pressure to stop grouting. Complete all the backfill lining process operations.

[0034] (10) Seven days after the backfill grouting is completed, the grouting area is drilled for quality inspection and cement liquid with a water-cement ratio of 2:1 is injected into the hole. Under the design pressure, the initial grouting volume does not exceed 10L, which is qualified. The unqualified parts are still reinforced with grouting according to step 9 to further complete all the backfill lining construction processes.

[0035] The invention's construction method for the backfill lining structure of a rock tunnel successfully solves the problem of long combined support period and unsatisfactory support effect caused by irregular tunnel excavation. The cavity is filled with stone blocks to replace the steel arch frame's secondary arch, and the thickness of the sprayed anchor support is reduced. Cement slurry is grouted to backfill the gaps between the stone blocks, steel arch frame and steel mesh to form a densely connected whole with the surrounding rock, thereby improving the overall stability.

[0036] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.

Claims

1. A construction method for a backfill lining structure of a rock tunnel, comprising a backfill lining structure in a tunnel body, characterized in that: The tunnel body is provided with a steel arch frame, the outermost side of the steel arch frame is provided with a concrete layer, the concrete layer is provided with a system anchor rod, a block stone is provided on the top circular arc of the tunnel body, the top of the block stone is in contact with the tunnel rock surface, the gap between the block stone and the tunnel rock surface is filled with cement slurry, a drainage hole is also provided on the top circular arc of the tunnel body, and a grouting hole is provided on the bottom circular arc, and the cement slurry is injected into the gap between the block stone and the tunnel rock surface through the grouting hole; The construction method of the backfill lining structure comprises the following steps: (1) Install the top arch anchor rods and side wall anchor rods along the surrounding rock diameter. The top arch anchor rods and side wall anchor rods are arranged in a plum blossom shape and are connected with the steel mesh in the backfill lining structure; (2) Drainage holes are arranged within a 90° radius along the top arch in a plum blossom pattern. PVC drainage pipes are installed in the drainage holes, with the ends of the drainage pipes exposed from the backfill lining structure; (3) Install the steel arch frame and weld the anchor rods to the steel arch frame; (4) Install longitudinal connecting steel bars on adjacent steel arches, and lay steel mesh on the longitudinal connecting steel bars, covering the entire section; (5) The cavity where the distance between the tunnel rock surface and the steel mesh is greater than 150 mm is filled with stone blocks, and the cavity where the distance is less than 150 mm is directly sprayed with concrete in layers; (6) In the rock filling area, a galvanized grouting pipe is installed in the grouting hole. The grouting pipe extends 100 mm from the rock surface, with an exposed length of 150 mm. An on-off valve is installed, and the exhaust hole is located at the top of the grouting area. (7) Use wet spraying method to spray C20 concrete with anchors; (8) Watering maintenance begins 2 hours after the anchor spraying is completed, and the maintenance period is 14 days; (9) Pour cement slurry into the block stone filling area, with a water-cement ratio of 0.6:1 and a grouting pressure of 0.2Mpa to 0.3Mpa; (10) Seven days after the backfill grouting is completed, holes are drilled in the grouting area for quality inspection.

2. The construction method of the backfill lining structure of a rock tunnel according to claim 1, characterized in that: Steel meshes and longitudinal connecting steel bars are respectively arranged on both sides and in the top arc of the tunnel body, and the steel meshes are laid on the longitudinal connecting steel bars.

3. The construction method of the backfill lining structure of a rock tunnel according to claim 2, characterized in that: The system anchor rods include top arch anchor rods and side wall anchor rods. The top arch anchor rods are evenly arranged on the top arc of the tunnel body, and the side wall anchor rods are evenly arranged on both sides of the tunnel body. The ends of the top arch anchor rods and the side wall anchor rods are hooked with the steel mesh.