A method for preparing a steel truss steel mesh formwork-free floor deck
By using flat steel and steel mesh in the steel truss steel mesh floor decking combined with the spot welding technology of the steel trusses, the problems of aesthetics and low efficiency in the construction of steel structures and concrete structures are solved, and lightweight, easy construction and High-strength floor decking simplifies the construction process and reduces costs.
Patent Information
- Application Number
- CN202210044499.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-01-14
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2042-01-14
AI Technical Summary
The steel plates used at the bottom of the reinforced truss floor decks of existing steel structures are unsightly and difficult to dismantle and reuse. The construction of prefabricated composite panels for concrete structures is complex and inefficient, and is prone to unsafe structural stress issues.
The preparation method of steel truss steel mesh formwork-free floor decking is adopted. By arranging flat steel at intervals, installing steel wire mesh arranged horizontally and vertically, and setting steel trusses on it for spot welding, a steel truss steel mesh building is formed. The bearing plate is suitable for both steel structures and concrete structures, simplifying the construction process.
It achieves lightweight floor decking, facilitates transportation and construction, improves production efficiency and structural strength, reduces construction costs, avoids the need for on-site formwork, and simplifies construction steps.
Smart Images

Figure CN114508191B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of floor deck components, and in particular to a method for preparing a steel truss steel mesh formwork-free floor deck. Background Art
[0002] Prefabricated buildings have been widely used and developed at home and abroad due to their advantages such as high assembly rate, short construction period, energy saving and environmental protection.
[0003] The floor slab is an important load-bearing component in the prefabricated building system, which has the function of bearing and transmitting loads. Among them, the steel truss floor slab and the prefabricated composite slab are generally divided into steel structures and concrete structures in the field of prefabricated buildings due to their different connection methods and application scenarios.
[0004] At present, the steel truss floor decking used in general steel structures is made of steel plates at the bottom, which is not beautiful. If it is made into a removable and reusable steel formwork, the construction is relatively complicated and the cost is high. If it is not removed, it will peel if it is painted directly. Considering the defects of the bottom steel plate in terms of corrosion resistance, it needs to be repainted frequently, and the later use and maintenance are also very troublesome.
[0005] In addition, the cast-in-place joints between the prefabricated composite slabs used in concrete structures usually require on-site formwork, which makes construction cumbersome and inefficient. The reinforcement of the composite slabs must be avoided during the prefabrication and construction processes. Even if avoidance is considered in advance, collisions and installation failures are still prone to occur on-site due to various reasons such as the construction sequence. Workers on the construction site will directly bend or even cut the steel bars, causing unsafe structural stress. Summary of the invention
[0006] The present application provides a method for preparing a steel truss steel mesh formwork-free floor decking, and the prepared floor decking can be used for both steel structures and concrete structures, and can meet the use requirements of both.
[0007] The present application provides a method for preparing a steel truss steel mesh formwork-free floor deck, which adopts the following technical solution:
[0008] A method for preparing a steel truss steel mesh formwork-free floor decking plate comprises the following specific steps:
[0009] Step 1: Arrange and position several flat steel bars at intervals;
[0010] Step 2: Install a wire mesh on the flat steel, wherein the wire mesh is formed by a plurality of first steel wires and a plurality of second steel wires being arranged crosswise in a horizontal and vertical manner;
[0011] Step 3: Set up a steel truss on the wire mesh, and spot weld the steel truss and the flat steel, so that the steel truss and the flat steel clamp the wire mesh;
[0012] Step 4: Pour concrete until the concrete covers the lower end of the steel truss to form a truss composite plate.
[0013] By adopting the above technical solution, the floor decking is light in weight, which meets the practical requirements of steel structure. The floor decking is convenient in transportation, hoisting and construction. The wire mesh can be prefabricated in advance and used directly in the preparation process, without the need for manual threading of the wire, which improves the production efficiency. At the same time, after the floor decking is made, the steel truss and flat steel clamp the wire mesh, and the wire mesh serves as the force-bearing reinforcement of the floor decking. The steel truss is the support of the floor decking in between. The structural strength and stiffness requirements of the completed overall floor decking can be achieved through the stiffness formed by the steel truss and the use of concrete with a higher strength grade in the floor decking, thereby meeting the use requirements of the later pouring of concrete floor slabs. In addition, the steel bars in the steel truss can also be used as force-bearing reinforcement of the floor slab, further improving the stability of the overall structure.
[0014] Optionally, the first steel wire and the second steel wire are perpendicular to each other, and the first steel wire is stacked and connected with the second steel wire, and the first steel wire is located below the second steel wire;
[0015] When the steel mesh is arranged in step 2, the flat steel is arranged between two adjacent first steel wires, and the upper end surface of the flat steel is against the lower end surface of the second steel wire.
[0016] By adopting the above technical scheme, the structure of the wire mesh floor decking can reduce the thickness of the concrete slab, and there is no need to set up a thicker concrete slab to ensure the concrete pouring requirements, thereby reducing the weight of the floor decking itself and facilitating the transportation, lifting and construction of the floor decking; and the arrangement of the first steel wire and the second steel wire can ensure the structural strength of the wire mesh while also enabling the wire mesh to be stably clamped by the flat steel and the steel truss, thereby ensuring the span of the wire mesh and the positioning of the wire mesh in the thickness direction of the concrete slab, reducing the probability of the wire mesh position shifting during the pouring of the concrete slab, improving the pouring quality of the concrete slab, and ensuring the structural strength and rigidity of the floor decking.
[0017] Optionally, the thickness of the flat steel is similar to the diameter of the first steel wire;
[0018] In step 2, after the wire mesh is arranged on the flat steel, the bottom end of the first steel wire is at the same horizontal position as the bottom end of the flat steel.
[0019] By adopting the above technical solution, the first steel wire or flat steel can be directly arranged to facilitate the subsequent casting and forming of the concrete slab.
[0020] Optionally, the bottom of the steel truss has a truss web for connecting to the wire mesh and the flat steel, and the flat steel is provided with N pieces, wherein N is an even number, and a number of the flat steels are arranged in parallel in the horizontal direction. The steel truss is provided with N / 2 pieces, and the steel truss is also arranged in parallel in the horizontal direction, and two adjacent flat steels are respectively connected to the two sides of the truss web.
[0021] By adopting the above technical solution, the steel truss is connected to the flat steel through the truss web reinforcement, clamping the wire mesh. The wire mesh serves as the force-bearing reinforcement of the floor decking plate. It has good integrity and no faults in the middle, and can form a support for the floor decking plate between the trusses.
[0022] Optionally, truss web reinforcement horizontal sections are extended outwardly along the horizontal direction on both sides of the truss web reinforcement, and the truss web reinforcement horizontal sections are connected to the flat steel.
[0023] By adopting the above technical solution, the truss web reinforcement is connected to the flat steel through the horizontal section of the truss web reinforcement, which can increase the connection contact area between the truss web reinforcement and the flat steel. The horizontal setting of the horizontal section of the truss web reinforcement reduces the connection difficulty between the truss web reinforcement and the flat steel, thereby improving the connection strength between the horizontal section of the truss web reinforcement and the flat steel.
[0024] Optionally, in step three, the horizontal section of the truss web reinforcement is spot welded to the flat steel at intervals, and the spacing between two adjacent spot welds is regular.
[0025] By adopting the above technical scheme, the spot welding connection can meet the connection strength requirements between the horizontal section of the truss web reinforcement and the flat steel, and the construction is convenient, which can greatly improve the processing efficiency and reduce the production cost. It is convenient for factory production and processing. At the same time, it is reliably connected to the cast-in-place concrete layer and can withstand the load during the construction of the cast-in-place concrete slab. There is no need to use a formwork, and the construction process is simple, which greatly improves the construction efficiency and reduces the construction cost.
[0026] Optionally, in step 4, the strength grade of the concrete used for pouring is at least C30 concrete.
[0027] By adopting the above technical solution, at least C30 concrete can ensure the structural strength and rigidity requirements of the floor deck.
[0028] Optionally, in step 4, the thickness of the poured concrete is between 18 and 22 mm.
[0029] By adopting the above technical solution, the thickness setting can ensure that the overall weight of the prepared floor decking plate will not be too heavy, and can meet the use requirements of steel structures and concrete structures.
[0030] Optionally, in step 4, after pouring is completed, the wire mesh does not pass through the peripheral side of the concrete slab.
[0031] By adopting the above technical solution, after the on-site hoisting is completed, it is only necessary to seal the bottom of the adjacent concrete slabs with sealing tape, and then directly cast to form the floor slab; the on-site formwork and post-pouring are eliminated, which saves construction steps and reduces construction costs.
[0032] In summary, the present application includes at least one of the following beneficial effects:
[0033] 1. By using the steel wire mesh, the steel wire mesh can be prefabricated in advance and can be used directly during the preparation process, without the need for manual threading of the steel wire, thus improving the overall production efficiency of the floor deck;
[0034] 2. The steel truss is spot welded to the flat steel and the wire mesh is clamped between the two before pouring the concrete slab, which can greatly reduce the difficulty of construction, improve construction efficiency, reduce production costs, and facilitate the processing of floor decking;
[0035] 3. The floor decking is 20mm thick and is cast with concrete of strength grade not less than C30, which ensures the structural strength and rigidity of the floor decking. The cost is low and it is easy to promote and use.
[0036] 4. After the floor deck is hoisted, the bottom can be sealed directly between the adjacent concrete slabs with the joint sealing tape. The subsequent floor slab can be directly cast and formed without the need for on-site formwork. It can be directly used as a protective layer for the floor slab, which simplifies the construction steps and reduces the cost.
[0037] 5. The key point is that this application meets the requirements of weight and strength at the same time, and can be used for both steel structures and reinforced concrete structures. Since no formwork is required at the construction site, it can replace the steel truss floor decking or truss reinforced concrete composite slabs in prefabricated buildings, and has good market promotion benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] Figure 1 This is a schematic diagram of the structure after step 1 of this embodiment is completed;
[0039] Figure 2 This is a schematic diagram of the structure after step 2 of this embodiment is completed;
[0040] Figure 3 This is a schematic diagram of the structure after step three of this embodiment is completed;
[0041] Figure 4 It is a schematic diagram of the structure after the steel truss and flat steel are spot welded;
[0042] Figure 5 A schematic diagram of the structure of the steel truss in this embodiment;
[0043] Figure 6 This is a schematic diagram of the structure after step 4 of this embodiment is completed;
[0044] Figure 7 This is a structural diagram after the floor deck is hoisted;
[0045] Figure 8 is a schematic diagram of the structure of the floor slab after casting in this embodiment;
[0046] Fig. 9 yes Figure 8 Enlarged view of point A in the middle.
[0047] Explanation of the reference numerals in the accompanying drawings: 1. Steel truss; 11. Upper chord steel bar; 12. Truss web reinforcement; 121. Truss web reinforcement vertical section; 122. Truss web reinforcement horizontal section; 13. Lower chord steel bar; 14. Support; 141. Support horizontal reinforcement; 142. Support vertical reinforcement; 2. Steel wire mesh; 21. First steel wire; 22. Second steel wire; 3. Flat steel; 4. Concrete slab; 41. Inclined surface; 5. Floor deck; 6. Floor slab; 7. Sealing tape. DETAILED DESCRIPTION
[0048] The following is combined with Figure 1-9 This application is described in further detail.
[0049] The embodiment of the present application discloses a method for preparing a steel truss steel mesh formwork-free floor decking. The prepared floor decking can be used for both steel structures and concrete structures, which not only improves the unsightly exposed steel plate of the steel truss floor decking, but also solves the defects of close-seam splicing of truss reinforced concrete composite slabs, which leads to discontinuity due to disconnection of the stress reinforcement, and the problem of wide-seam connection, which requires additional formwork at the seam width, which takes a long time and is difficult to construct.
[0050] The preparation method of the floor decking comprises the following specific steps:
[0051] Reference Figure 1 Step 1: Arrange and position a plurality of flat steel bars 3 at intervals. The flat steel bars 3 are long plate-shaped structures. The number of flat steel bars 3 is set to N, where N is an even number. The flat steel bars 3 are arranged in groups of two with equal intervals, and the two flat steel bars 3 in each group are arranged at the same intervals.
[0052] Reference Figure 2, Step 2: Install the steel mesh 2 on the flat steel 3. The steel mesh 2 has a wire diameter of 1.5 mm and a mesh aperture of 50 mm. The steel mesh 2 is formed by a plurality of first steel wires 21 and second steel wires 22 arranged vertically and crosswise. The first steel wires 21 and the second steel wires 22 are stacked and connected, and the first steel wires 21 are located below the second steel wires 22. During the arrangement process, the flat steel 3 is arranged between two adjacent first steel wires 21. The diameter of the first steel wire 21 is similar to the thickness of the flat steel 3, and preferably the sizes of the two are consistent. When the arrangement is completed, the upper end face of the flat steel 3 is against the lower end face of the second steel wire 22, and the lower end face of the flat steel 3 is at the same horizontal position as the lower end face of the first steel wire 21.
[0053] Reference Figure 3 and Figure 4 Step 3: Arrange the steel truss 1 on the steel mesh 2, and spot weld the steel truss 1 and the flat steel 3, so that the steel truss 1 and the flat steel 3 clamp the steel mesh 2. The number of the steel truss 1 is N / 2. Specifically, Figure 5 The steel truss 1 includes an upper chord steel bar 11, a truss web 12, a lower chord steel bar 13 and a support 14. The upper chord steel bar 11 is parallel to the flat steel bar 3, and the projection of the upper chord steel bar 11 in the vertical direction is located in the middle position of the projection of the corresponding two flat steel bars 3 in the vertical direction. The truss web 12 is arranged on the upper chord steel bar 11, and two truss webs 12 are arranged. The two truss webs 12 extend in the direction close to the two flat steel bars 3 respectively. The two truss webs 12 are symmetrically arranged along the upper chord steel bar 11, and the truss webs 12 have several bends in the process of extending. The bending of the truss web 12 divides the truss web 12 into a truss web vertical section 121 and a truss web horizontal section 122. The two truss web horizontal sections 122 are respectively located above the two flat steel bars 3 on the corresponding sides, and are used for spot welding connection with the flat steel bars. The position of the flat steel 3 not blocked by the second steel wire 22 can be connected to the horizontal section 122 of the truss web reinforcement by spot welding, and the spacing between two adjacent spot welds is regular.
[0054] Reference Figure 6 , step four, pouring concrete until the concrete covers the lower end of the steel truss 1 to form a truss composite plate. The strength grade of the concrete is at least C30, and the particle size of the fine stone concrete is ≤5-8mm. The thickness of the poured concrete is between 18-22mm, preferably 20mm, so as to meet the weight and strength requirements and can be used as a protective layer for the floor slab. Since ordinary concrete is used, the cost is low. After pouring, the outer peripheral side of the concrete slab 4 is basically consistent with the peripheral side of the wire mesh 2. The wire mesh 2 does not pass through the concrete slab 4. The adjacent floor slabs are closely spliced, so there is no need to cast in situ on the construction site.
[0055] The use principle of the floor decking prepared in this application is:
[0056] Reference Figure 7, hoist and position several manufactured floor decking panels 5. Figure 8 and Fig. 9 , and then paste the sealing tape 7 at the gap position between the adjacent concrete slabs 4, and finally pour concrete on the floor decking 5 to wrap the steel truss 1 to form the floor slab 6. The steel bars in the steel truss can be used as the stress-bearing bars of the floor slab. The floor decking 5 is equivalent to a protective layer during the use stage of the floor slab 6, and does not affect the arrangement of the stress-bearing steel bars of the floor slab 6. There are no reinforcements, the parts are closely assembled, and there is no need to support or dismantle the formwork. The cost is low and the construction is convenient.
[0057] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A method for preparing a steel truss steel mesh formwork-free floor deck, characterized in that: The specific steps include: Step 1: Arrange and position a plurality of flat steels (3) at intervals; Step 2: installing a steel wire mesh (2) on the flat steel (3), wherein the steel wire mesh (2) is formed by a plurality of first steel wires (21) and a plurality of second steel wires (22) arranged in a cross-arranged manner in a horizontal and vertical direction; Step 3: Arrange a steel truss (1) on the steel mesh (2), and spot weld the steel truss (1) and the flat steel (3), so that the steel truss (1) and the flat steel (3) clamp the steel mesh (2); Step 4: pouring concrete until the concrete covers the lower end of the steel truss (1) to form a truss composite slab; The first steel wire (21) and the second steel wire (22) are perpendicular to each other, and the first steel wire (21) and the second steel wire (22) are stacked and connected, and the first steel wire (21) is located below the second steel wire (22); When the steel mesh (2) is arranged in step 2, the flat steel (3) is arranged between two adjacent first steel wires (21), and the upper end surface of the flat steel (3) abuts against the lower end surface of the second steel wire (22); The thickness of the flat steel (3) is close to the diameter of the first steel wire (21); In step 2, after the steel mesh (2) is arranged on the flat steel (3), the bottom end of the first steel wire (21) is at the same horizontal position as the bottom end of the flat steel (3); In step 4, the strength grade of the concrete used for pouring is at least C30 concrete; In step 4, the thickness of the poured concrete is between 18-22 mm.
2. The method for preparing a steel truss steel mesh formwork-free floor deck according to claim 1, characterized in that: The bottom of the steel truss (1) has a truss web (12) for connecting to the steel mesh (2) and the flat steel (3). The flat steel (3) is provided in N numbers, wherein N is an even number. A plurality of the flat steels (3) are arranged in parallel in the horizontal direction. The steel truss (1) is provided in N / 2 numbers. The steel truss (1) is also arranged in parallel in the horizontal direction, and two adjacent flat steels (3) are respectively connected to the two sides of the truss web (12).
3. The method for preparing a steel truss steel mesh formwork-free floor deck according to claim 2, characterized in that: Truss web reinforcement horizontal sections (122) extend outwardly in the horizontal direction on both sides of the truss web reinforcement (12), and the truss web reinforcement horizontal sections (122) are connected to the flat steel (3).
4. The method for preparing a steel truss steel mesh formwork-free floor deck according to claim 3, characterized in that: In step three, the truss web reinforcement horizontal section (122) is spot welded to the flat steel (3) at intervals, and the spacing between two adjacent spot welds is the same.
5. The method for preparing a steel truss steel mesh formwork-free floor deck according to claim 1, characterized in that: In step 4, after pouring is completed, the steel wire mesh (2) does not pass through the peripheral side of the concrete slab (4).