A local arch replacement device and arch replacement method for a highway soft rock tunnel

By designing support and replacement devices, using grouting conduits and hydraulic cylinders, the problems of high labor intensity, low efficiency and poor safety in road tunnel arch replacement operations are solved, and a more efficient and safe tunnel arch replacement process is achieved.

CN114542125BActive Publication Date: 2024-11-15CHANGAN UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210312932.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-28
Publication Date
2024-11-15
Estimated Expiration
2042-03-28

AI Technical Summary

Technical Problem

The labor intensity, low efficiency and poor safety in existing highway tunnel arch replacement operations, especially in soft rock tunnels, steel arch frames are difficult to remove, which can easily lead to collapse and safety hazards.

Method used

A local arch replacement device for soft rock tunnels on highways is designed, including support device and replacement device, which is reinforced by drilling grouting conduits, and local support and lifting of steel arch frames is used to reduce disturbances and pass hydraulic pressure. The cylinder and telescopic hinges enable efficient arch replacement operation.

Benefits of technology

It improves the strength and safety performance of the tunnel, reduces the labor intensity and time of the arch change operation, and enhances construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114542125B_ABST
    Figure CN114542125B_ABST
Patent Text Reader

Abstract

The present invention discloses a local arch replacement device for a highway soft rock tunnel, and belongs to the technical field of tunnel arch replacement. The supporting device of the local arch replacement device for a highway soft rock tunnel is arranged on both sides of the replacement device, and the two sides of the upper bracket one of the supporting device are slidably connected with the two sides of the lower bracket one. The upper crossbeam one of the upper bracket one is provided with a vertical support, and the two sides of the vertical support are provided with oblique supports. The upper bracket two of the replacement device is provided with a lifting arm, and the lifting arm is provided with a slot for clamping a steel arch frame, and the upper crossbeam two on the upper bracket two is provided with a lifting platform, and the upper crossbeam two is provided with a power element for driving the lifting platform to slide along the upper crossbeam two. The present invention also discloses an arch replacement method for the local arch replacement device for a highway soft rock tunnel. The present invention adopts the above-mentioned local arch replacement device and arch replacement method for a highway soft rock tunnel, which can solve the problems of high labor intensity, low efficiency and poor safety of the existing arch replacement operation in soft rock tunnels.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel arch replacement, and in particular to a local arch replacement device and an arch replacement method for a highway soft rock tunnel. Background Art

[0002] At present, the New Austrian Tunneling Method is used in the design of highway tunnels, that is, the bearing capacity of the surrounding rock itself is fully utilized during the excavation process. Initial support is first applied during the excavation to limit the deformation of the surrounding rock, and the steel arch frame is subjected to force and deformed together with the surrounding rock. The steel arch frame is the main way to limit the deformation of the surrounding rock in the initial support. Due to the poor geological conditions of the weak surrounding rock, the inclination of the tunnel is limited, and what is more serious is that the arch and the side wall are simultaneously intruded. When the tunnel deformation is too large and exceeds the minimum allowable value of the secondary lining thickness, in order to ensure the safety of the structure, the arch replacement operation must be carried out. The traditional way to deal with this problem is to blast off the initial support and carry out the initial support construction again.

[0003] At present, the general highway tunnel arch replacement operation process is to dismantle and replace the support and deformed steel arch frame. However, there are some difficulties in this process:

[0004] 1. In the era when there was no NATM design, the support method for underground lanes and tunnels was rigid wooden support, that is, first make new support and then remove the old support. The mining method is an important and commonly used construction concept and construction process. The formwork lining is first carried out (arch first and then wall method). The wooden support cannot be left in the concrete. When the concrete is poured to the support position, the support is removed to transfer the load to the formwork and arch frame. This method is used in the actual operation of replacing the arch in soft rock tunnels on highways, but there are many disadvantages such as weak nodes between the new and old steel frames, difficulty in removal, and difficulty in achieving longitudinal connection of the steel frames.

[0005] 2. The method of dismantling severely deformed steel arch frames is generally through blasting or manual demolition, but blasting will disturb the surrounding rock again, which is very likely to cause collapse. During manual demolition, on-site construction workers use mechanical methods to dismantle the steel arch frames. The so-called mechanical demolition currently mainly refers to impact hammers, and the vibration of impact hammers is not necessarily smaller than blasting; more importantly, the driver is sitting in the cab and it is difficult to reach the embedded groove, which may cause misoperation and chisel the steel frame, posing a safety hazard. In addition, when manual demolition operations are performed above the human body, the fallen objects will directly hit the human body, and safety is also difficult to guarantee. Summary of the invention

[0006] The purpose of the present invention is to provide a local arch replacement device for a highway soft rock tunnel, so as to solve the problems of high labor intensity, low efficiency and poor safety in the existing arch replacement operation of soft rock tunnels. Another purpose of the present invention is to provide an arch replacement method for the local arch replacement device for a highway soft rock tunnel.

[0007] To achieve the above-mentioned purpose, the present invention provides a local arch replacement device for a highway soft rock tunnel, comprising a supporting device and a replacement device, wherein the supporting device is arranged on both sides of the replacement device, and the supporting device is used for local temporary support of the front and rear sides of a steel arch frame that needs to be replaced; the supporting device comprises an upper bracket 1 and a lower bracket 1, and the two sides of the upper bracket 1 are slidably connected with the two sides of the lower bracket 1, an upper cross beam 1 is arranged on the upper bracket 1, a vertical support is arranged on the upper cross beam 1, and oblique supports are arranged on both sides of the vertical support; the replacement device comprises an upper bracket 2 and a lower bracket 2, a lifting arm for driving the upper steel arch frame to rise and fall is arranged on the upper bracket 2, a clamping groove for clamping the steel arch frame is arranged on the lifting arm, an upper cross beam 2 is arranged on the upper bracket 2, a lifting platform is arranged on the upper cross beam 2, and a power element for driving the lifting platform to slide along the upper cross beam 2 is arranged on the upper cross beam 2.

[0008] Preferably, a lower cross beam 1 is arranged on the lower bracket 1, and the lower cross beam 1 is arranged parallel to the upper cross beam 1.

[0009] Preferably, a grouting conduit is provided outside the supporting device, and the grouting conduit is uniformly and radially inserted into the rock mass on the tunnel to reinforce the rock mass.

[0010] Preferably, sleeves are provided at the bottom of both sides of the upper bracket, the sleeves are sleeved on the top of the lower bracket, the sleeves are slidably connected to the lower bracket, and a plurality of adjustment holes are provided on the lower bracket, and screws pass through the adjustment holes to connect the sleeves to the lower bracket.

[0011] Preferably, the bottom of the lower bracket 1 is provided with rollers for easy movement, and an anchoring platform for supporting the lower bracket 1 is provided in the tunnel.

[0012] Preferably, a lower crossbeam 2 is provided on the lower bracket 2, and the lower crossbeam 2 is arranged parallel to the upper crossbeam 2; rollers for easy movement are provided at the bottom of the lower bracket 2, and an anchoring platform for supporting the lower bracket 2 is provided in the tunnel.

[0013] Preferably, the slot is a long strip structure, and the steel arch frame is provided with a limit block to prevent the steel arch frame from sliding down, and the steel arch frame slides upward, leftward, and rightward in the slot.

[0014] Preferably, the lifting platform includes a telescopic hinge, sliders are provided at both ends of the bottom of the telescopic hinge, a guide rail for guiding the sliding of the slider is provided on the second upper crossbeam, and a supporting platform for supporting the steel arch frame is provided at the top of the telescopic hinge.

[0015] Preferably, the power element is a hydraulic cylinder, which is arranged on the second crossbeam, and the telescopic rod of the hydraulic cylinder is connected to the telescopic hinge.

[0016] The arch replacement method of the local arch replacement device for a highway soft rock tunnel comprises the following steps:

[0017] S1. Drill holes on both sides of the steel arch frame section that needs to be replaced, then insert the grouting pipe into the drilled hole, and perform radial grouting reinforcement on the tunnel rock mass through the grouting pipe;

[0018] S2. Push the support device to both sides of the arch replacement section, adjust the upper bracket 1 and the lower bracket 1 of the support device until the vertical support and the oblique support effectively support the tunnel, and tighten the screws;

[0019] S3. Install the steel arch frame in the slot of the lifting arm, place the steel arch frame on the supporting platform in a retracted state, push the replacement device to the arch replacement section, control the lifting arm to rise through the control platform set on the replacement device, and raise the steel arch frame to the preset position. Then, control the lifting and lowering of the telescopic hinge and the sliding of the lifting platform along the upper crossbeam 2 through the control platform to push the steel arch frame to the set position and perform the arch replacement operation.

[0020] The advantages and positive effects of the local arch replacement device and arch replacement method for a highway soft rock tunnel described in the present invention are:

[0021] 1. When the replacement device is used to replace the steel arch frame, the tunnels at both ends of the arch replacement section are reinforced and supported by supporting devices on both sides of the replacement device, which is beneficial to improve the strength of the tunnel, reduce the disturbance to the tunnel during the arch replacement operation, and improve the safety performance.

[0022] 2. Rollers are set at the bottom of the replacement device and the supporting device for easy movement. The position of the steel arch frame can be adjusted through telescopic hinges and hydraulic cylinders, which saves time and effort and is conducive to improving the efficiency of arch replacement.

[0023] 3. Use grouting conduits to first reinforce the tunnels at both ends of the exchange section, which is beneficial to improving the strength of the tunnel and improving the safety of construction.

[0024] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a structural schematic diagram of an embodiment of a local arch replacement device and an arch replacement method for a highway soft rock tunnel of the present invention;

[0026] Figure 2 It is a schematic structural diagram of a supporting device of an embodiment of a local arch replacement device and an arch replacement method for a highway soft rock tunnel of the present invention;

[0027] Figure 3 It is a schematic diagram of the structure of a replacement device of an embodiment of a local arch replacement device and an arch replacement method for a highway soft rock tunnel of the present invention;

[0028] Figure 4The present invention is a schematic diagram of the lifting platform structure of an embodiment of a local arch replacement device and an arch replacement method for a highway soft rock tunnel according to the present invention.

[0029] Reference numerals

[0030] 1. Support; 2. Roller; 3. Upper bracket 1; 4. Lower bracket 1; 5. Vertical support; 6. Upper bracket 2; 7. Lower bracket 2; 8. Lifting platform; 9. Oblique support; 10. Upper crossbeam 1; 11. Lower crossbeam 1; 12. Grouting guide tube; 13. Anchor platform; 14. Upper crossbeam 2; 15. Lower crossbeam 2; 16. Steel arch frame; 17. Lifting arm; 18. Slot; 19. Guide rail; 20. Slider; 21. Telescopic hinge; 22. Support platform. DETAILED DESCRIPTION

[0031] The technical solution of the present invention is further described below through the accompanying drawings and embodiments.

[0032] Unless otherwise defined, the technical terms or scientific terms used in the present invention should be understood by people with ordinary skills in the field to which the present invention belongs. The words "first", "second" and similar words used in the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0033] Example

[0034] Figure 1 The present invention is a schematic diagram of the structure of a local arch replacement device and an arch replacement method for a highway soft rock tunnel. As shown in the figure, a local arch replacement device for a highway soft rock tunnel includes a support device and a replacement device, and the support device is arranged on both sides of the replacement device. The support device is used to temporarily support the front and rear sides of the steel arch frame 16 that needs to be replaced, thereby improving the strength of the soft rock tunnel on both sides of the arch replacement section and reducing deformation and disturbance.

[0035] Figure 2The present invention is a schematic diagram of the support device structure of an embodiment of a local arch replacement device and an arch replacement method for a highway soft rock tunnel. As shown in the figure, the support device includes an upper bracket 3 and a lower bracket 4, and the upper bracket 3 and the lower bracket 4 are made of rigid materials and can be assembled from steel plates or steel pipes. Casings are provided at the bottom of both sides of the upper bracket 3, and the casings are sleeved on the top of the lower bracket 4, and the casings are slidably connected to the lower bracket 4. The lower bracket 4 is provided with a plurality of adjustment holes, and the casing is provided with connecting holes. The screws pass through the adjustment holes and the connecting holes to connect the casing to the lower bracket 4. The height of the upper bracket 3 can be adjusted by selecting different adjustment holes.

[0036] An upper crossbeam 10 is arranged on the upper support 3, and a lower crossbeam 11 is arranged on the lower support 4, and the lower crossbeam 11 is arranged parallel to the upper crossbeam 10. The crossbeam 1 and the crossbeam 2 are conducive to improving the strength of the support device. A vertical support 5 is arranged on the middle part of the upper crossbeam 10, and oblique supports are arranged on both sides of the vertical support 5, and the oblique supports are symmetrically distributed on both sides of the vertical support 5. The vertical support 5 and the oblique supports are used to support the soft rock tunnel.

[0037] A support 1 is provided at the bottom of the lower bracket 4, and a roller 2 for easy movement is provided on the support 1 to facilitate the delivery of the support device into the tunnel. An anchoring platform 13 is provided in the tunnel to support the support 1. The support 1 is placed on the anchoring platform 13, and the force of the support device can be transmitted to the ground of the tunnel through the anchoring platform 13.

[0038] A grouting conduit 12 is arranged outside the support device, and the grouting conduit 12 is inserted evenly and radially into the rock mass on the tunnel to reinforce the rock mass. The grouting conduit 12 is used to reinforce the soft rock tunnel, improve the strength of the tunnel, reduce the disturbance to the tunnel during the construction process, and improve the safety of the construction.

[0039] Figure 3 The present invention is a schematic diagram of the structure of a replacement device for a local arch replacement device and an embodiment of an arch replacement method for a highway soft rock tunnel. As shown in the figure, the replacement device includes an upper bracket 2 6 and a lower bracket 2 7. The upper bracket 2 6 is provided with a lifting arm 17 for driving the upper steel arch frame 16 to rise and fall. The lifting arm 17 uses an existing structure, and the lifting arm 17 can use an existing hydraulic cylinder. The lifting arm 17 is provided with a slot 18 for clamping the steel arch frame 16. The slot 18 is a long strip structure. The steel arch frame 16 is provided with a limit block to prevent the steel arch frame 16 from sliding down. The steel arch frame 16 slides upward, left, and right in the slot 18, which is convenient for adjusting the position of the steel arch frame 16.

[0040] Figure 4The present invention is a schematic diagram of a lifting platform structure of an embodiment of a local arch replacement device and an arch replacement method for a highway soft rock tunnel. As shown in the figure, an upper crossbeam 2 14 is provided on the upper bracket 2 6, and a lifting platform 8 is provided on the upper crossbeam 2 14. The lifting platform 8 includes a telescopic hinge 21, and the telescopic hinge 21 is an existing structure. The telescopic hinge 21 is extended or retracted by the lifting of the hydraulic cylinder. Slide blocks 20 are provided at both ends of the bottom of the telescopic hinge 21, and a guide rail 19 that guides the sliding of the slide block 20 is provided on the upper crossbeam 2 14. The slide block 20 is located in the guide rail 19 and is slidably connected to the guide rail 19. A support platform 22 that supports the steel arch frame 16 is provided at the top of the telescopic hinge 21.

[0041] The upper cross beam 14 is provided with a power element for driving the lifting platform 8 to slide along the upper cross beam 14. The power element is a hydraulic cylinder, which is hinged on the cross beam 14, and the telescopic rod of the hydraulic cylinder is rotatably connected to one end of the telescopic hinge 21. The lifting platform 8 is driven to move on the cross beam 14 by the hydraulic cylinder, so as to fine-tune the steel arch frame 16.

[0042] A control platform for adjusting the lifting arm 17 and the hydraulic cylinder is provided on the lower support 2 7 or the upper support 2 6, so as to facilitate the operation of adjusting the position of the steel arch frame 16. The lifting arm 17 and the hydraulic cylinder are electrically connected to the control platform using existing technology.

[0043] A lower cross beam 15 is arranged on the lower bracket 7, and the lower cross beam 15 is arranged parallel to the upper cross beam 14. A roller 2 for easy movement is arranged at the bottom of the support 1, and the lower bracket 7 is arranged on the support 1. An anchoring platform 13 supporting the support 1 is arranged in the tunnel.

[0044] The arch replacement method of the local arch replacement device for a highway soft rock tunnel comprises the following steps:

[0045] S1. Drill holes on both sides of the steel arch frame 16 section that needs to be replaced, then insert the grouting pipe 12 into the drilled hole, and perform radial grouting reinforcement on the tunnel rock mass through the grouting pipe 12.

[0046] S2. Push the support device to both sides of the arch replacement section, adjust the upper bracket 3 and the lower bracket 4 of the support device until the vertical support 5 and the inclined support effectively support the tunnel, and tighten the screws.

[0047] S3. Install the steel arch frame 16 in the slot 18 of the lifting arm 17, place the steel arch frame 16 on the supporting platform 22 in a retracted state, push the replacement device to the arch replacement section, control the lifting arm 17 to rise through the control platform provided on the replacement device, and raise the steel arch frame 16 to a preset position. Then, control the lifting and lowering of the telescopic hinge 21 and the sliding of the lifting platform 8 along the upper cross beam 14 through the control platform to push the steel arch frame 16 to the set position to perform the arch replacement operation.

[0048] Therefore, the present invention adopts the above-mentioned local arch replacement device and arch replacement method for highway soft rock tunnels, which can solve the problems of high labor intensity, low efficiency and poor safety of existing arch replacement operations in soft rock tunnels.

[0049] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that they can still modify or replace the technical solution of the present invention with equivalents, and these modifications or equivalent replacements cannot cause the modified technical solution to deviate from the spirit and scope of the technical solution of the present invention.

Claims

1. A local arch replacement device for a highway soft rock tunnel, characterized in that: It comprises a supporting device and a replacing device, wherein the supporting device is arranged on both sides of the replacing device, and the supporting device is used for temporarily supporting the front and rear sides of the steel arch frame that needs to be replaced; the supporting device comprises an upper bracket 1 and a lower bracket 1, and the two sides of the upper bracket 1 are slidably connected with the two sides of the lower bracket 1, and an upper crossbeam 1 is arranged on the upper bracket 1, and a vertical support is arranged on the upper crossbeam 1, and oblique supports are arranged on both sides of the vertical support; the replacing device comprises an upper bracket 2 and a lower bracket 2, and the upper bracket 2 is provided with a lifting arm for driving the upper steel arch frame to lift and lower, and a clamping groove for clamping the steel arch frame is arranged on the lifting arm, and an upper crossbeam 2 is arranged on the upper bracket 2, and a lifting platform is arranged on the upper crossbeam 2, and a power element for driving the lifting platform to slide along the upper crossbeam 2 is arranged on the upper crossbeam 2; The bottom of both sides of the upper bracket 1 is provided with a sleeve, the sleeve is sleeved on the top of the lower bracket 1, the sleeve is slidably connected with the lower bracket 1, and a plurality of adjustment holes are provided on the lower bracket 1, and screws pass through the adjustment holes to connect the sleeve with the lower bracket 1; The slot is a long strip structure, and a limit block is provided on the steel arch frame to prevent the steel arch frame from sliding down. The steel arch frame slides upward, leftward, and rightward in the slot; The lifting platform comprises a telescopic hinge, two ends of the bottom of the telescopic hinge are provided with sliding blocks, a guide rail for guiding the sliding of the sliding block is provided on the second upper crossbeam, and a supporting platform for supporting a steel arch frame is provided on the top of the telescopic hinge.

2. A local arch replacement device for a highway soft rock tunnel according to claim 1, characterized in that: A lower crossbeam 1 is arranged on the lower bracket 1, and the lower crossbeam 1 is arranged parallel to the upper crossbeam 1.

3. The local arch replacement device for a highway soft rock tunnel according to claim 1, characterized in that: A grouting conduit is arranged outside the supporting device, and the grouting conduit is inserted into the rock mass on the tunnel in a uniform radial shape to reinforce the rock mass.

4. The local arch replacement device for a highway soft rock tunnel according to claim 1, characterized in that: The bottom of the lower bracket 1 is provided with rollers for easy movement, and an anchoring platform for supporting the lower bracket 1 is provided in the tunnel.

5. The local arch replacement device for a highway soft rock tunnel according to claim 1, characterized in that: The lower bracket 2 is provided with a lower crossbeam 2, which is arranged parallel to the upper crossbeam 2; the bottom of the lower bracket 2 is provided with rollers for easy movement, and an anchoring platform for supporting the lower bracket 2 is arranged in the tunnel.

6. The local arch replacement device for a highway soft rock tunnel according to claim 1, characterized in that: The power element is a hydraulic cylinder, which is arranged on the second crossbeam, and the telescopic rod of the hydraulic cylinder is connected with the telescopic hinge.

7. A method for replacing an arch in a local arch replacement device for a highway soft rock tunnel according to any one of claims 1 to 6, characterized in that: The following steps are involved: S1. Drill holes on both sides of the steel arch frame section that needs to be replaced, then insert the grouting pipe into the drilled hole, and perform radial grouting reinforcement on the tunnel rock mass through the grouting pipe; S2. Push the support device to both sides of the arch replacement section, adjust the upper bracket 1 and the lower bracket 1 of the support device until the vertical support and the oblique support effectively support the tunnel, and tighten the screws; S3. Install the steel arch frame in the slot of the lifting arm, place the steel arch frame on the supporting platform in a retracted state, push the replacement device to the arch replacement section, control the lifting arm to rise through the control platform set on the replacement device, and raise the steel arch frame to the preset position. Then, control the lifting and lowering of the telescopic hinge and the sliding of the lifting platform along the upper crossbeam 2 through the control platform to push the steel arch frame to the set position and perform the arch replacement operation.