A method for calculating single well controlled reserves based on pressure difference conversion coefficient
By calculating single well control reserves based on the pressure differential conversion coefficient, the problem of poor accuracy and long calculation period of single well control reserves in the existing technology is solved, and the rapid and accurate reserve evaluation of gas field sites is achieved, which is suitable for gas field economy. Benefit development.
Patent Information
- Application Number
- CN202210264929.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-17
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2042-03-17
AI Technical Summary
The existing single well control reserve calculation methods have problems such as poor accuracy, high cost and long calculation cycle, especially in the on-site promotion and application of gas fields, which are difficult to achieve economic benefits development.
The single well control reserve calculation method based on the pressure difference conversion coefficient. By combining the difference between the skewed average formation pressure and the skewed bottom flow pressure, combined with the change law of the physical properties of natural gas high pressure, the pressure difference relationship between adjacent time is derived, and the material equilibrium equation is used. Calculate the single well control reserves and use the iterative method to improve the calculation accuracy.
It realizes fast and accurate single well control reserve calculation, which is suitable for batch use in gas fields on site, provides a clear and concise method, and improves the rapid evaluation ability of single well control reserves of gas wells.
Smart Images

Figure CN114611306B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of oil and gas field development, and in particular to a single well controlled reserve calculation method based on a pressure difference conversion coefficient. Background Art
[0002] The single well controlled reserves reflect the value of gas well production and directly determine the reliability of production dynamic analysis results and development measures adjustment. The methods for obtaining single well controlled reserves include static method and dynamic method. The static method estimates the reserves through the gas reservoir volume method, and the result is less accurate.
[0003] The dynamic method mainly includes material balance method, well test, dynamic material balance method, numerical simulation method and other methods. Among them: material balance method is the basic theory, but it is necessary to obtain the average formation pressure by shutting in the well to obtain the single well controlled reserves, and the test time is relatively long; well test requires gas well shut-in test, which is costly; dynamic material balance method is based on the production decline analysis theory, which is highly theoretical and it is difficult to accurately obtain the pseudo time; numerical simulation method strongly depends on the accuracy of the geological model, and the calculation cycle is relatively long. Therefore, it is of great significance to establish a single well controlled reserves calculation method that is conducive to the promotion and application of gas field sites to achieve economic benefits in gas field development. Summary of the invention
[0004] The present invention aims to solve the above problems and proposes a single well controlled reserves calculation method based on pressure difference conversion coefficient.
[0005] The technical solution of the present invention is:
[0006] According to the principles of gas reservoir engineering, for a fixed-volume closed gas reservoir with a fixed production rate, after the pressure wave reaches the boundary, the difference between the pseudo-average formation pressure and the pseudo-bottom-hole flowing pressure is a constant:
[0007]
[0008] Where: is the pseudo-average formation pressure, MPa 2 / mPa·s; is the average formation pressure, MPa;
[0009] ψ(p wf ) is the pseudo bottom hole pressure, MPa 2 / mPa·s; p wf is the bottom hole flowing pressure, MPa;
[0010] C is the reservoir temperature T, gas production q sc , permeability K, gas reservoir thickness h, control radius r e , wellbore radius r w Determined constant term.
[0011] By deducing formula (1), we can obtain the following relationship between the pseudo-pressure differences at adjacent moments:
[0012]
[0013] Where: is the pseudo-average formation pressure at time j, MPa 2 / mPa·s;
[0014] is the pseudo-average formation pressure at time j+1, MPa 2 / mPa·s;
[0015] ψ(p wfj ) is the pseudo bottom flow pressure at time j, MPa 2 / mPa·s;
[0016] ψ[p wf(j+1) ] is the pseudo bottom flow pressure at time j+1, MPa 2 / mPa·s;
[0017] j and j+1 are production times, and satisfy (j+1)-j=1, d.
[0018] The pseudo-pressure is defined as:
[0019]
[0020] Where: ψ(p) is the pseudo pressure, MPa 2 / mPa·s;
[0021] p 0 is the reference pressure, MPa;
[0022] p is pressure, MPa;
[0023] μ is the gas viscosity corresponding to p, mPa·s;
[0024] Z is the deviation coefficient corresponding to p, dimensionless.
[0025] Substituting equation (3) into equation (2), and considering the variation law of natural gas high-pressure physical property parameters at adjacent moments, it is deduced that there is the following relationship between the pressure differences at adjacent moments:
[0026]
[0027] Where: is the average formation pressure at time j, MPa; is the average formation pressure at time j+1, MPa;
[0028] p wfjis the bottom hole pressure at time j, MPa; p wf(j+1) is the bottom hole flowing pressure at time j+1, MPa;
[0029] μ rj For p rj Corresponding gas viscosity, mPa·s; Z rj For p rj The corresponding coefficient of deviation;
[0030] μ wfj For p wfj Corresponding gas viscosity, mPa·s; Z wfj For p wfj The corresponding coefficient of deviation.
[0031] Based on the natural gas high-pressure physical property experiment, the relationship between gas viscosity μ, deviation coefficient Z, and pressure p is:
[0032] μZ / p=αp β (5)
[0033] p / Z=ap+b (6)
[0034] Where: α and β are constants, dimensionless, obtained by fitting the μZ / p~p curve with a power function;
[0035] a and b are constants, dimensionless, and are obtained by fitting the p / Z~p curve by linear function.
[0036] Substituting equation (5) into equation (4), it is deduced that the pressure difference at adjacent moments is expressed by the pressure difference conversion coefficient:
[0037]
[0038] Where: is the pressure difference conversion coefficient, dimensionless;
[0039] According to the principles of gas reservoir engineering, for a constant volume closed elastic drive gas reservoir, the material balance equation is:
[0040]
[0041] Where: Z r for The corresponding coefficient of deviation is dimensionless;
[0042] p i is the original formation pressure, MPa; Z i For p i The corresponding coefficient of deviation is dimensionless;
[0043] G p is the cumulative natural gas production under standard ground conditions, 104 m 3 ;
[0044] G is the controlled reserves of a single well, 10 4 m 3 .
[0045] Substituting formula (6) into formula (8), we can get the formula for calculating the average formation pressure:
[0046]
[0047] Substituting equation (7) into equation (9), the single well controlled reserves expressed by the pressure difference conversion coefficient are derived:
[0048]
[0049] Where: q sc is the gas production of the gas well under standard ground conditions, 10 4 m 3 / d.
[0050] A method for calculating the controlled reserves of a single well based on the pressure difference conversion coefficient is as follows:
[0051] Assume that the initial value of the single well controlled reserves is in the range of [5000,10000];
[0052] The initial value of single well controlled reserves is used as the initial value of single well controlled reserves iteration;
[0053] The average formation pressure, pressure difference conversion coefficient and single well controlled reserves iterative final value are obtained in turn;
[0054] If the absolute value of the relative error between the iteration final value of the single-well controlled reserves and the iteration initial value of the single-well controlled reserves is ≤0.01%, the iteration final value of the single-well controlled reserves shall be taken as the single-well controlled reserves.
[0055] Also includes:
[0056] If the absolute value of the relative error between the final iteration value of the single-well controlled reserves and the initial iteration value of the single-well controlled reserves is greater than 0.01%, the iteration is performed with the new initial iteration value of the single-well controlled reserves. The specific process is as follows:
[0057] The final value of the single well controlled reserves iteration in the previous round of iteration is used as the initial value of the single well controlled reserves iteration in the new round of iteration;
[0058] The average formation pressure, pressure difference conversion coefficient and the final value of the single well controlled reserves of a new round of iteration are obtained in sequence;
[0059] The absolute value of the relative error between the final iteration value of the single-well controlled reserves of a new round of iteration and the initial iteration value of the single-well controlled reserves of a new round of iteration is determined again, until the absolute value of the relative error satisfies the condition of ≤0.01% through cyclic iteration, and the final iteration value of the single-well controlled reserves of the last iteration is used as the single-well controlled reserves.
[0060] More preferably, the process of obtaining the average formation pressure is:
[0061]
[0062] Where: is the average formation pressure at time j, MPa;
[0063] p i is the original formation pressure, MPa;
[0064] G pj is the cumulative natural gas production under the standard ground conditions at time j, 10 4 m 3 ;
[0065] G is the single well controlled reserves under the standard ground conditions, 10 4 m 3 ;
[0066] a and b are both constants, obtained by fitting the p / Z~p curve by a linear function.
[0067] More preferably, the process of obtaining the pressure difference conversion coefficient is:
[0068]
[0069] Where: is the pressure difference conversion coefficient, dimensionless;
[0070] p wfj is the bottom hole flowing pressure at time j, MPa;
[0071] β is a constant and dimensionless; it is obtained by fitting the μZ / p~p curve by power function.
[0072] More preferably, the process of obtaining the iterative final value of the single well controlled reserves is:
[0073]
[0074] Where: q sc is the gas production of the gas well under standard ground conditions, 10 4 m 3 / d;
[0075] p wf(j+1) is the bottom hole flowing pressure at time j+1, MPa.
[0076] A method for calculating the controlled reserves of a single well based on the pressure difference conversion coefficient is as follows:
[0077] Step 1: Initial Value Assumptions
[0078] Assume that the initial value of the controlled reserves of a single well is G 0 , G 0 The value range is [5000,10000];
[0079] Step 2: Determine the initial value of the single well controlled reserves iteration G i begin(k)
[0080] If the number of iterations k = 1, G i begin(k) =G 0 ;
[0081] If the number of iterations k>1, G i begin(k) = the final iteration value G of the single well controlled reserves at the k-1th iteration i end(k-1) ;
[0082] Step 3: Calculate the average formation pressure
[0083] Step 4: Calculate the pressure difference conversion factor
[0084] Step 5: Calculate the final value of the iterative controlled reserves G of a single well i end(k) ;
[0085] Step 6: Calculate the final value of the iterative control reserves of a single well G i end(k) The initial value of the single well controlled reserves iteration G i begin(k) The absolute value of the relative error between |G i end(k) -G i begin(k) | / G i end(k) ;
[0086] If |G i end(k) -G i begin(k) | / G i end(k) <0.01%, single well controlled reserves iteration final value G i end(k) Valid, proceed to step 8;
[0087] If |G iend(k) -G i begin(k) | / G i end(k) ≥0.01%, single well controlled reserves iteration final value G i end(k) Invalid, repeat steps 2 to 6 to iterate again;
[0088] Step 7: Iterate the final value G of the single well controlled reserves determined in step 6 i end(k) As a single well controlled reserves G.
[0089] After k iterations, the single well controlled reserves G = G i end(k) ;
[0090] After k+1 iterations, the single well controlled reserves G = G i end(k+1) .
[0091] The technical effects of the present invention are:
[0092] The present invention establishes a single well controlled reserves calculation method based on pressure difference conversion coefficient through comprehensive research on pseudo-pressure difference at adjacent moments, definition of pseudo-pressure, law of change of natural gas high-pressure physical properties and material balance equation. The present invention has clear principle and concise calculation, and provides an effective method for rapid evaluation of single well controlled reserves of gas wells, which is suitable for batch use on site in gas fields. BRIEF DESCRIPTION OF THE DRAWINGS
[0093] Figure 1 This is the calculated value of the single well controlled reserves and the relative error distribution diagram of the S3 well in the specific experimental example of the present invention. DETAILED DESCRIPTION
[0094] Example 1
[0095] A method for calculating the controlled reserves of a single well based on the pressure difference conversion coefficient is as follows:
[0096] Assume that the initial value of the single well controlled reserves is in the range of [5000,10000];
[0097] The initial value of single well controlled reserves is used as the initial value of single well controlled reserves iteration;
[0098] The average formation pressure, pressure difference conversion coefficient and single well controlled reserves iterative final value are obtained in turn;
[0099] If the absolute value of the relative error between the iteration final value of the single-well controlled reserves and the iteration initial value of the single-well controlled reserves is ≤0.01%, the iteration final value of the single-well controlled reserves shall be taken as the single-well controlled reserves.
[0100] Example 2
[0101] On the basis of Example 1, it also includes:
[0102] If the absolute value of the relative error between the final iteration value of the single-well controlled reserves and the initial iteration value of the single-well controlled reserves is greater than 0.01%, the iteration is performed with the new initial iteration value of the single-well controlled reserves. The specific process is as follows:
[0103] The final value of the single well controlled reserves iteration in the previous round of iteration is used as the initial value of the single well controlled reserves iteration in the new round of iteration;
[0104] The average formation pressure, pressure difference conversion coefficient and the final value of the single well controlled reserves of a new round of iteration are obtained in sequence;
[0105] The absolute value of the relative error between the final iteration value of the single-well controlled reserves of a new round of iteration and the initial iteration value of the single-well controlled reserves of a new round of iteration is determined again, until the absolute value of the relative error satisfies the condition of ≤0.01% through cyclic iteration, and the final iteration value of the single-well controlled reserves of the last iteration is used as the single-well controlled reserves.
[0106] Example 3
[0107] A method for calculating the controlled reserves of a single well based on the pressure difference conversion coefficient is as follows:
[0108] Step 1: Obtain parameters
[0109] Get calculation parameters: original formation pressure p i , bottom hole pressure p wf , Cumulative natural gas production G p , gas production q sc , constant a, constant b and constant β;
[0110] Among them, the bottom hole pressure p wf , Cumulative natural gas production under standard ground conditions G p , gas well production under standard surface conditions q sc Select the data from the production time ≥ 300 days to the time before the gas production decreases;
[0111] Constants a and b are obtained by fitting the p / Z~p curve with a linear function;
[0112] The constant β is obtained by fitting the μZ / p~p curve through a power function;
[0113] Step 2: Initial Value Assumptions
[0114] Assume that the initial value of the controlled reserves of a single well is G 0 , G 0 The value range is [5000,10000];
[0115] Step 3: Determine the initial value of the single well controlled reserves iteration G i begin(k)
[0116] If the number of iterations k = 1, G i begin(k) =G 0 ;
[0117] If the number of iterations k>1, G i begin(k) = the final iteration value G of the single well controlled reserves at the k-1th iteration i end(k-1) ;
[0118] Step 4: Set the initial value of iteration G i begin(k) , original formation pressure p i , Cumulative natural gas production G pj Substitute constants a and b into equation (9) to calculate the average formation pressure
[0119] Step 5: Average formation pressure calculated from step 4 Bottom hole pressure p wfj , constant β, calculate the pressure difference conversion coefficient
[0120] Step 6: Convert the pressure difference calculated in step 5 to the conversion factor Original formation pressure p i , constant a, constant b, gas production q sc , bottom hole pressure p wfj and p wf(j+1) Substitute into formula (10) to calculate the final value of the iterative control reserves of a single well G i end (k) ;
[0121] Step 7: Calculate the final value of the iterative control reserves of a single well G i end(k) The initial value of the single well controlled reserves iteration G i begin(k) The absolute value of the relative error between |G i end(k) -G i begin(k) | / G i end(k) ;
[0122] If |G i end(k) -G i begin(k) | / G iend(k) <0.01%, single well controlled reserves iteration final value G i end(k) Valid, proceed to step 8;
[0123] If |G i end(k) -G i begin(k) | / G i end(k) ≥0.01%, single well controlled reserves iteration final value G i end(k) If invalid, repeat steps 3 to 7 to iterate again;
[0124] Step 8: Iterate the final value G of the single well controlled reserves determined in step 7 i end(k) As a single well controlled reserves G;
[0125] After k iterations, the single well controlled reserves G = G i end(k) ;
[0126] After k+1 iterations, the single well controlled reserves G = G i end(k+1) .
[0127] Specific experimental examples
[0128] Well S3 was selected for example analysis and method verification. Well S3 is a numerical simulation well. It was produced at a fixed rate on May 21, 2019. Its accurate single-well controlled reserves G is 7521.66×10 4 m 3 .
[0129] A method for calculating the controlled reserves of a single well based on the pressure difference conversion coefficient is as follows:
[0130] Step 1: Obtain parameters
[0131] <![CDATA[Original formation pressure p i (MPa)]]> 21 Constant a 1.075 Constant b -0.3026 Constant β -0.823 <![CDATA[Bottom-hole flowing pressure p wfj (MPa)]]> 16.12939 <![CDATA[Bottom-hole flowing pressure p wf(j+1) (MPa)]]> 16.12502 <![CDATA[Gas production rate q scj (10 4 m 3 )]]> 1.5 <![CDATA[Gas production rate q sc(j+1) (10 4 m 3 )]]> 1.5 <![CDATA[Cumulative gas production G pj (10 4 m 3 )]]> 1204.5 <![CDATA[Cumulative gas production G p(j+1) (10 4 m 3 )]]> 1206 ;
[0132] Step 2: Initial Value Assumptions
[0133] Assume that the initial value of the controlled reserves of a single well is G 0 =5000×10 4 m 3 ;
[0134] Step 3: Determine the initial value of the single well controlled reserves iteration G i begin(k) =G 0 =5000×10 4 m3 ;
[0135] Step 4: Set the initial value of iteration G i begin(k) , original formation pressure p i , Cumulative natural gas production G pj , constants a and b are substituted into equation (9) to calculate the average formation pressure
[0136] Step 5: Average formation pressure calculated from step 4 Bottom hole pressure p wfj , constant β, calculate the pressure difference conversion coefficient
[0137] Step 6: Convert the pressure difference calculated in step 5 to the conversion factor Original formation pressure p i , constant a, constant b, gas production q sc , bottom hole pressure p wfj and p wf(j+1) Substitute into formula (10) to calculate the final value of the iterative control reserves of a single well G i end(k) =7067.87×10 4 m 3 ;
[0138] Step 7: When k = 1, |G i end(1) -G i begin(1) | / G i end(1) =29.26%≥0.01%, single well controlled reserves iteration final value G i end(1) Invalid, start the iterative process;
[0139] When k = 2: Let G i begin(2) =G i end(1) , calculate G i end(2) =7067.87×10 4 m 3 , absolute value of relative error |G i end(2) -G i begin(2) | / G i end(2) =6.93%≥0.01%, single well controlled reserves iteration final value G i end(2) Invalid, continue to iterate;
[0140] When k = 3: Let G i begin(3) =G i end(2) , calculate G i end(3) =7681.78×10 4 m 3 , absolute value of relative error |G i end(3) -G i begin(3) | / G i end(3) =1.14%≥0.01%, single well controlled reserves iteration final value G i end(3) Invalid, continue to iterate;
[0141] When k = 4: Let G i begin(4) =G i end(3) , calculate G i end(4) =7695.13×10 4 m 3 , absolute value of relative error |G i end(4) -G i begin(4) | / G i end(4) =0.17%≥0.01%, single well controlled reserves iteration final value G i end(4) Invalid, continue to iterate;
[0142] When k = 5: Let G i begin(5) =G i end(4) , calculate G i end(5) =7697.15×10 4 m 3 , absolute value of relative error |G i end(5) -G i begin(5) | / G i end(5) =0.03%≥0.01%, single well controlled reserves iteration final value G i end(5) Invalid, continue to iterate;
[0143] When k = 6: Let G i begin(6) =G i end(5) , calculate Gi end(6) =7697.45×10 4 m 3 , absolute value of relative error |G i end(6) -G i begin(6) | / G i end(6) =0.004%<0.01%, single well controlled reserves iteration final value G i end(6) Valid, stop iteration; proceed to step 8;
[0144] Step 8: Iterate the final value G of the single well controlled reserves determined in step 7 i end(6) As a single well controlled reserves G;
[0145] We get G = 7697.45 × 10 4 m 3 .
[0146] Random point selection calculation will produce certain accidental results. In order to verify the reliability of the present invention, the above steps are used to continuously calculate all production data between 2021 / 8 / 1 and 2021 / 8 / 31 to obtain the calculated value of the single well controlled reserves G of well S3 and the distribution of the relative error with production time, as shown in Figure 2. Figure 1 The results show that the calculated value distribution range of single well controlled reserves G is 7597.69×10 4 m 3 to 7706.30×10 4 m 3 The average calculated value is 7653.20×10 4 m 3 The distribution range of the absolute value of the relative error is from 1.01% to 2.45%, and the average relative error is 1.75%. The calculation results show that the present invention has higher accuracy and better stability.
Claims
1. A method for calculating single well controlled reserves based on pressure difference conversion coefficient, characterized in that: Here’s how: Step 1: Obtain parameters Get calculation parameters: original formation pressure p i , bottom hole pressure p wf , Cumulative natural gas production G p , gas production q sc , constant a, constant b and constant β; Among them, the bottom hole pressure p wf , Cumulative natural gas production under standard ground conditions G p , gas well production under standard surface conditions q sc Select the data from the production time ≥ 300 days to the time before the gas production decreases; Constants a and b are obtained by fitting the p / Z~p curve with a linear function; The constant β is obtained by fitting the uZ / p~p curve through a power function; Step 2: Initial Value Assumptions Assume that the initial value of the controlled reserves of a single well is G0, and the value range of G0 is [5000, 10000]; Step 3: Determine the initial value of the single well controlled reserves iteration G i begin(k) If the number of iterations k = 1, G i begin(k) =G0; If the number of iterations k>1, G i begin(k) = the final iteration value G of the single well controlled reserves at the k-1th iteration i end(k-1) ; Step 4: Calculate the average formation pressure Step 5: Calculate the pressure difference conversion factor Where: is the pressure difference conversion coefficient, dimensionless; p wfj is the bottom hole flowing pressure at time j, MPa; β is a constant, dimensionless, obtained by fitting the uZ / p~p curve by power function; Step 6: Calculate the final value of the iterative control reserves of a single well G i end(k) ; Where: q sc is the gas production of the gas well under standard ground conditions, 10 4 m 3 / d; p wf(j+1) is the bottom hole flowing pressure at time j+1, MPa; Step 7: Calculate the final value of the iterative control reserves of a single well G i end(k) The initial value of the single well controlled reserves iteration G i begin(k) The absolute value of the relative error between |G i end(k) -G i begin(k) | / G i end(k) ; If |G i end(k) -G i begin(k) | / G i end(k) <0.01%, single well controlled reserves iteration final value G i end(k) Valid, proceed to step 8; If |G i end(k) -G i begin(k) | / G i end(k) ≥0.01%, single well controlled reserves iteration final value G i end(k) If invalid, repeat steps 3 to 7 to iterate again; Step 8: Iterate the final value G of the single well controlled reserves determined in step 7 i end(k) As a single well controlled reserves G.
2. The method for calculating single well controlled reserves based on pressure difference conversion coefficient according to claim 1, characterized in that: Also includes: If the absolute value of the relative error between the final iteration value of the single-well controlled reserves and the initial iteration value of the single-well controlled reserves is greater than 0.01%, the iteration is performed with the new initial iteration value of the single-well controlled reserves. The specific process is as follows: The final value of the single well controlled reserves iteration in the previous iteration is used as the initial value of the single well controlled reserves iteration in the new iteration; The average formation pressure, pressure difference conversion coefficient and the final value of the single well controlled reserves of a new round of iteration are obtained in sequence; The absolute value of the relative error between the final iteration value of the single-well controlled reserves of a new round of iteration and the initial iteration value of the single-well controlled reserves of a new round of iteration is determined again, until the absolute value of the relative error satisfies the condition of ≤0.01% through cyclic iteration, and the final iteration value of the single-well controlled reserves of the last iteration is used as the single-well controlled reserves.
3. The single well controlled reserves calculation method based on the pressure difference conversion coefficient according to claim 2 is characterized in that: The process of obtaining the average formation pressure is as follows: Where: is the average formation pressure at time j, MPa; p i is the original formation pressure, MPa; G pj is the cumulative natural gas production under the standard ground conditions at time j, 10 4 m 3 ; G is the single well controlled reserves under the standard ground conditions, 10 4 m 3 ; a and b are both constants, obtained by fitting the p / Z~p curve by a linear function.