A construction method for shield machine splitting down the shaft and assembling through the station

Through the method of split-body downhole transfer assembly and transformation of the reaction frame, the problem of shield machine passing through the existing operating station environment is solved, and the safe and efficient construction of shield machine is achieved, especially in the construction of cross-transfer stations. In the environment, construction time and cost are saved.

CN114622919BActive Publication Date: 2024-11-08GUANGDONG CONSTR CO LTD OF CHINA RAILWAY NO 3 ENG GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210092790.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-01-26
Publication Date
2024-11-08
Estimated Expiration
2042-01-26

AI Technical Summary

Technical Problem

When the existing operating station is encountered during the construction line, the problem of how the shield machine can pass through the station, especially due to the permanent column of the station structure, the total length of the shield machine host of the existing technology cannot meet the overall requirements for passing through the station.

Method used

By shifting and assembling the shield machine into the shaft, first fix the shield tail and the rear bracket down the shaft, use the crawler crane to move horizontally and longitudinally, and then fix the cutter plate, front shield, middle shield and front bracket down the shaft to ensure that the shield is The main mechanism is assembled and the reaction frame is transformed and installed by transforming the reaction frame and using hydraulic push support, and finally installing the screw conveyor and assembly machine.

Benefits of technology

The shield machine is realized through station construction in a narrow environment, especially in the construction environment of cross-transfer stations, reducing construction time and cost and ensuring the safety and efficiency of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114622919B_ABST
    Figure CN114622919B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of underground shield construction, and specifically to a construction method for a shield machine split downhole translation assembly through a station, including: construction preparation; translation of the shield tail and the rear bracket downhole; translation of the cutter head, the front shield, the middle shield and the front bracket downhole; assembly of the shield machine mainframe; installation of the reaction frame downhole; installation of the assembler; installation of the screw conveyor: after the screw conveyor is transported to the shield tail by the segment vehicle, the screw conveyor is pulled up to the installation position by the fall chain to complete the installation; the rear supporting trolley is laid through the track in the station, and the battery vehicle is used to drag the whole through the station to the starting end and connect with the shield body. The present invention effectively overcomes the problem of difficulty in borrowing land on the main traffic arteries in the prosperous urban area, and can complete the problem of two equipment passing through the station through one traffic diversion, with little impact on the social environment and reducing the number of ground enclosure and diversion times.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of underground shield construction, and in particular to a shield machine split-body downhole horizontal assembly and station construction method. Background Art

[0002] With the acceleration of urban subway construction, shield construction has become a key equipment for urban subway construction. In the early stage of urban subway construction, line planning and line construction cannot be carried out simultaneously. The station under construction has planned the later tunnel construction interface. Due to the inability to design and construct simultaneously, the problem of planning for the later shield line construction cannot be fully considered. This brings construction inconvenience to the later line shield construction when passing through the existing operating subway station, such as the influence of station design structure, the influence of the ground surrounding environment, the change of passing the station or the starting process, etc., which brings many inconveniences to the later shield construction. When the design and construction are carried out simultaneously, the shield starting hoisting assembly is completed according to the conventional process flow to complete the starting preparation work, namely, the tunnel gate re-measurement, bracket positioning and reinforcement, trolley downhole, shield downhole assembly, assembly machine downhole assembly, shield tail downhole assembly, reaction frame lower half downhole positioning, screw conveyor installation, cutter head downhole assembly, reaction frame upper half installation connection pipeline assembly and commissioning, to meet the shield starting conditions.

[0003] Since only the planned line interface is reserved at the transfer station, when the planned line is constructed, it passes through the existing transfer station and is affected by the existing station structure and the surrounding ground environment due to construction planning reasons. It is difficult to borrow land and divert traffic, which brings inconvenience to the construction.

[0004] Patent CN104329096A discloses a shield machine starting translation construction process for passing through a station, including the steps of setting a ship-type structural steel plate on the base steel plate, symmetrically setting 8 polytetrafluoroethylene plates at the bottom of the ship-type structural steel plate, applying butter between the base steel plate and the ship-type structural steel plate, welding and fixing the starting bracket to the ship-type structural steel plate, and then using a hydraulic cylinder to push the starting bracket to drive the shield machine main body to translate as a whole. It ensures that the shield machine translation construction is completed quickly, safely and effectively under limited construction sites. It has the characteristics of simple construction technology and single process, and the shield machine translation assembly and the subsequent supporting system passing through the station can be operated at the same time, saving construction period and reducing investment, which not only meets the construction period requirements but also avoids affecting ground traffic. Patent application CN110195591B discloses a disassembled shield machine disassembly and station-passing equipment and a disassembly and station-passing method thereof, which are characterized in that they include an assembled shield machine station-passing platform and a shield machine steering device. The assembled shield machine station-passing platform includes a sub-platform No. 1, a sub-platform No. 2, a sub-platform No. 3 and a sub-platform No. 4 that are horizontally welded and connected as one body; the sub-platform No. 1 is used to place the shield machine cutter head, the sub-platform No. 2 is used to place the front shield of the shield machine, the sub-platform No. 3 is used to place the middle shield of the shield machine, and the sub-platform No. 4 is used to place the tail shield of the shield machine. The shield machine steering device includes a ball-jointed upper cover plate and a ball-jointed lower cover plate that are covered and rotatably matched and are located in the sub-platform No. 2. Four types of jacking devices press down the ball-jointed upper cover plate and the ball-jointed lower cover plate in turn through the ball-jointed upper pressure plate and the high-strength compression device, so that the ball-jointed upper cover plate and the ball-jointed lower cover plate slide downward along the U-shaped reinforced ring beam. The advantage is that the disassembled shield machine can be transported through the station in a narrow space after disassembly and steering, and the station-passing construction is safe and efficient.

[0005] Although the above-mentioned prior arts have solved the technical problem of the shield machine's translation through the station, the construction methods of the above-mentioned prior arts are not applicable and efficient for the construction environment of the under-construction line encountering the existing operating station. This application aims at the construction environment when the under-construction line encounters the existing operating station, and solves the technical problem of how the shield machine can be translated through the station. Since the existing operating transfer station is usually a three-story structure, considering the durability of the overall structure of the station, a number of columns are set in the middle of the left and right lines at the starting end. The columns are permanent columns of the station structure. Therefore, the translation of the shield machine between the left and right lines is affected by the columns. The permanent column structure is 6.9 meters away from the front wall, and the total length of the main machine of the shield machine in this application is 9.5 meters, which cannot meet the overall downhole and station requirements.

[0006] In summary, there is an urgent need to provide a construction method for the sub-shaft translation and assembly of a shield machine. Summary of the invention

[0007] In order to solve the above problems, the present invention provides a shield machine split shaft translation assembly through the station construction method.

[0008] To achieve the above object, the technical solution of the present invention is as follows:

[0009] A shield machine split shaft horizontal assembly and station construction method comprises the following steps:

[0010] S1. Construction preparation: preparation of the end well and modification of the existing starting bracket, which includes the front bracket and the rear bracket;

[0011] S2. Horizontal movement of the shield tail downhole: Fix the shield tail and the rear bracket together, use a crawler crane to lower the shield tail and the rear bracket downhole together, and horizontally move them into place;

[0012] S3, the cutterhead, front shield and middle shield are moved horizontally down the well: the cutterhead, front shield, middle shield and front bracket are fixed together, and the cutterhead, front shield, middle shield and front bracket are lowered into the well together with a crawler crane, and moved horizontally into place;

[0013] S4. Shield machine mainframe assembly: Assemble the shield tail and middle shield, measure the distance between the front bracket and the tunnel portal, and ensure that the front end of the front bracket is 1000mm away from the end wall of the tunnel portal;

[0014] S5. Installation of reaction frame: Control the height of the reaction frame below the height of the negative 2-story platform, lower the reaction frame into the well, and move it horizontally into place;

[0015] S6, assembly machine installation: The assembly machine is dragged from the station receiving end to the starting end by a winch through a segment vehicle, and the remaining 3 meters are manually pulled to the assembly position with a fall chain. The assembly machine is pushed to the flange contact surface for bolt installation;

[0016] S7, screw conveyor installation: After the screw conveyor is transported to the shield tail by the segment vehicle, the screw conveyor is pulled up to the installation position by the fall chain to complete the installation;

[0017] S8, the rear supporting trolley is laid through the track in the station, and is dragged through the station to the starting end by an electric vehicle and connected to the shield body.

[0018] Further, step S1 includes:

[0019] S11. Review and measure the station clearance dimensions and reserve the required working space; understand the station structure, remeasure the floor elevation and level it with sand;

[0020] S12. Prepare H-shaped steel, make horse stools, and install them in the end water collection well with the same elevation as the bottom plate;

[0021] S13. Prepare the bottom steel plate according to the size of the end well, fully lay the bottom steel plate on the top of the bottom plate, and splice it. The welds between the bottom steel plates are segmented and the welds cannot be higher than the upper surface of the bottom steel plate;

[0022] S14, preparation of the departure bracket: the departure bracket is designed into the front bracket and the rear bracket according to the station structure size;

[0023] S15. Clean the upper surface of the bottom steel plate and apply grease on the travel path of the starting bracket.

[0024] Furthermore, the front bracket and the rear bracket are connected by locating pins. A plurality of locating pins are arranged at the rear end of the front bracket, and a plurality of corresponding locating holes are arranged at the front end of the rear bracket. There is a clearance fit between the locating pins and the locating holes. The locating pins are designed with rounded corners for easy insertion, thereby ensuring the stability of the starting bracket after the combination.

[0025] Further, step S2 includes:

[0026] S21. Put the crawler crane in place, fix the shield tail and rear bracket together, and lower the shield tail and rear bracket into the well;

[0027] S22. Prepare two 100t hydraulic jacks and a pump station, connect the pump station to the hydraulic jacks, arrange the two hydraulic jacks on one side of the rear bracket and perpendicular to the axis of the shield tail, weld the push support on the bottom steel plate at the rear of the hydraulic jacks, ensure that each time the horizontal push is 1800mm, and push repeatedly until the shield tail reaches the starting tunnel range of the right line from the left line;

[0028] S23. When the shield tail reaches the right tunnel gate, stop lateral movement and switch to longitudinal movement. Manually rotate the two hydraulic jacks 90°, place the hydraulic jacks at the front end of the rear bracket and push them longitudinally backward until the shield tail is in place.

[0029] Furthermore, the push support includes a push plate and a reinforcement plate, the reinforcement plate is vertically mounted on the push plate, and the reinforcement plate is a right-angled triangle plate.

[0030] Further, step S3 includes:

[0031] S31, assemble the cutter head, front shield and middle shield together and fix them to the front bracket to prepare for top pushing;

[0032] S32. Prepare two 100t hydraulic jacks and a pump station, connect the pump station to the hydraulic jack, arrange the two hydraulic jacks on one side of the rear bracket, weld the push support on the bottom steel plate at the rear of the hydraulic jack, ensure that each lateral push is 900mm, and push repeatedly until the cutter head, front shield and middle shield reach the starting tunnel gate range of the right line from the left line;

[0033] S33. After pushing to the right tunnel gate, stop lateral movement, place two hydraulic jacks at the rear end of the rear bracket, and use the hydraulic jacks to push the rear bracket to move the shield tail forward until it merges with the middle shield.

[0034] Further, step S5 includes:

[0035] S51. Since the net height of the existing reaction frame is higher than the negative 2-story platform slab of the station, the five vertical legs on the top of the reaction frame are first removed so that the overall height of the modified reaction frame is lower than the negative 2-story platform space;

[0036] S52, prepare two steel plates, splice the two steel plates and place them on the bottom steel plate at the position of going down the well, apply grease on the bottom steel plate within the walking path of the reaction frame, hoist the reaction frame down the well, and place the reaction frame at the center of the two prepared steel plates;

[0037] S53. The steel plate and the reaction frame legs are welded and reinforced with triangular plates, and the weld height is not less than 5mm;

[0038] S54. After the reinforcement is completed, each leg is reinforced obliquely with channel steel on both sides to prevent it from falling down;

[0039] S55. After reinforcement is completed, a dragging point is made at the side wall of the right line, a 10t electric hoist is hung, and the wire rope is used to drag the right line;

[0040] S56. After the reaction frame is dragged to the right line, confirm the positioning point in advance. After it is in place, cut off the reinforcement support on one side, use the jack to lift the reaction frame 30mm and remove a steel plate at the bottom. After completing one side, remove the steel plate on the other side.

[0041] Furthermore, in step S53, the number of the triangles is 8, and the structure of the triangles is an equilateral triangle with a side length of 300 mm*300 mm.

[0042] Furthermore, in step S54, the number of channel steels is 2, which are respectively arranged on both sides of the reaction frame, and the length of the channel steel is 3000 mm.

[0043] Further, step S7 includes:

[0044] S71. After the assembly machine is installed, use the installed reaction frame to make the first lifting point, and make the second lifting point at the middle shield position. Hang two 10t electric hoists at the first lifting point, and hang two 10t hand hoists at the second lifting point to prepare for the assembly of the bolt conveyor;

[0045] S72, the screw conveyor is transported to the rear of the shield tail by the segment vehicle, and the rear end of the bolt conveyor is hung on the electric hoist of the first hanging point, and the front end is hung on the hand hoist of the second hanging point by using the electric hoist and hand hoist set in step S71, so as to lift the bolt conveyor;

[0046] S73. Slowly insert the screw conveyor into the installation position to complete the installation.

[0047] Compared with the prior art, the present invention has the following beneficial effects:

[0048] The present invention reasonably splits the shield machine, first lowers the shield tail into the well, translates it into position by first moving it horizontally and then vertically, then lowers the cutter head, front shield and middle shield into the well, translates them into position, and then moves the shield tail in the opposite direction to combine the shield machine main body, thereby realizing the shield machine's station-crossing construction in a narrow environment, especially realizing the shield machine's station-crossing construction in the construction environment of an intersection transfer station between a line under construction and an existing operating station, and the translation operation direction of the present application minimizes the translation path, saving construction time and cost.

[0049] The invention reasonably transforms the reaction frame according to the clearance size of the construction environment, and realizes the translation of the reaction frame through the station without using a hanging point.

[0050] The invention reasonably transforms the starting bracket into a front bracket and a rear bracket, and arranges positioning pins and positioning holes at the connection between the front bracket and the rear bracket, thereby avoiding deviation after the front bracket and the rear bracket are combined, which is helpful for the combination of the shield machine.

[0051] When installing the screw conveyor, the present invention uses the installed reaction frame as the hanging point, and there is no need to weld the bracket to make the hanging point, which saves construction cost and construction time and improves installation efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0052] Figure 1 This is the front view of the shield machine after installation in the present invention.

[0053] Figure 2 It is a top view of the shield tail when it is lowered into the well.

[0054] Figure 3 It is a top view when the shield tail is laterally translated to the right line hole.

[0055] Figure 4 It is a top view of the shield tail when it is translated into position.

[0056] Figure 5 This is a top view of the cutterhead, front shield and middle shield as they are lowered into the well.

[0057] Figure 6 This is a top view of the cutterhead, front shield and middle shield when they are horizontally translated to the right-line hole.

[0058] Figure 7 This is a top view of the blade disc, front shield, middle shield and shield tail when combined.

[0059] Figure 8 This is the front view of the reaction frame before reinforcement.

[0060] Fig. 9 It is the left view after the reaction frame is reinforced.

[0061] Fig.10It is a top view of the front bracket.

[0062] Fig.11 It is a left side view of the rear bracket.

[0063] Fig.12 It is the front view of the push support.

[0064] Fig.13 It is a left view of the push support.

[0065] Description of reference numerals:

[0066] 1-starting bracket, 101-front bracket, 102-rear bracket, 103-positioning pin, 104-positioning hole;

[0067] 2-blade disc, 3-front shield, 4-middle shield, 5-shield tail;

[0068] 6-reaction frame, 601-triangular plate, 602-steel plate, 603-channel steel, 604-lifting ear;

[0069] 7-stool, 8-structural column, 9-hydraulic top, 10-bottom steel plate;

[0070] 11- push support, 1101- push plate, 1102- reinforcement plate;

[0071] 12-left line, 13-right line. DETAILED DESCRIPTION

[0072] The technical solution of the present invention will be clearly described below in conjunction with the accompanying drawings. Obviously, the described embodiments are not all embodiments of the present invention. All other embodiments obtained by ordinary technicians in this field without creative work belong to the protection scope of the present invention. It should be noted that the orientation or position relationship indicated by the terms "center", "up", "down", "left", "right", "vertical", "horizontal", etc. is based on the orientation or position relationship shown in the accompanying drawings. It is only for the convenience of describing the present invention and simplifying the description. It does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0073] like Figure 1 As shown, the present invention provides a shield machine split shaft horizontal assembly and station construction method, specifically a station between two subway lines, such as Figure 2 As shown in the figure, the two subway lines are the left line 12 and the right line 13. The size of the hoisting wellhead in the present invention is 7.5*10.5m. Figure 2The dotted line around the middle shield tail 5 shows the wellhead, which is 29 meters deep and has a temporary enclosure area of ​​about 700 square meters. The construction environment is the main road in the city center, with large traffic and pedestrian flow. After scheme comparison and traffic diversion, the line shape is smooth, which does not affect the speed of the traffic and the inconvenience caused by multiple diversions. The selected diversion completes the shield host station passing requirement at one time. The shield machine used in the present invention is an earth pressure balance shield machine. The screw conveyor and the segment assembly machine pass the station directly through the rail flatbed car in the station, and the main machine (cutter disc, front shield, middle shield, shield tail) is hoisted and transported to go down the well to pass the station. The total length of the shield machine main machine is 9.5 meters, the shield tail is 3.9 meters long, and the permanent structural column of the station is 6.9 meters away from the front end wall, which does not meet the overall downhole translation and station passing requirements. The shield tail and the cutter disc, front shield, and middle shield are separated to pass the station to meet the space requirements.

[0074] The specific steps include:

[0075] S1. Construction preparation:

[0076] S11. Review and measure the station clearance dimensions and reserve the required working space; understand the station structure, remeasure the floor elevation and level it with sand;

[0077] S12, prepare H-shaped steel, make horse stool 7, and install it in the end water collection well, with the same elevation as the bottom plate;

[0078] S13. Prepare the bottom steel plate 10 according to the size of the end well. The size of the steel plate is 6000mm*2000mm*200mm. Fully lay the bottom steel plate 10 on the bottom plate for splicing. The welds between the bottom steel plates 10 are segmented welded. The welds cannot be higher than the upper surface of the bottom steel plate 10.

[0079] S14, Preparation of originating bracket 1, please refer to Fig.10 and Fig.11 According to the station structure size, the departure bracket 1 is designed to be divided into a front bracket 101 and a rear bracket 102. The front bracket 101 and the rear bracket 102 are connected by a positioning pin 103. A plurality of positioning pins 103 are arranged at the rear end of the front bracket 101, and a plurality of corresponding positioning holes 104 are arranged at the front end of the rear bracket 102. There is a clearance fit between the positioning pins 103 and the positioning holes 104. The positioning pins 103 are designed with rounded corners for easy insertion, so as to ensure the stability of the departure bracket 1 after the combination.

[0080] S15, cleaning the upper surface of the bottom steel plate 10 and applying grease on the travel path of the starting bracket 1.

[0081] S2, shield tail 5 downhole translation: Figure 2-4 As shown, the shield tail 5 and the rear bracket 102 are fixed together, and the shield tail 5 and the rear bracket 102 are lowered into the well together using a crawler crane and translated into position;

[0082] S21, the crawler crane is in place, the shield tail 5 and the rear bracket 102 are fixed together, and the shield tail 5 and the rear bracket 102 are lowered into the well;

[0083] S22, prepare two 100t hydraulic jacks 9 and a pump station, connect the pump station to the hydraulic jack 9, arrange the two hydraulic jacks 9 on one side of the rear bracket 102, and be perpendicular to the axis of the shield tail 5, weld the jacking support 11 on the bottom steel plate 10 at the rear of the hydraulic jack 9, ensure that each lateral jacking is 1800mm, remove the jacking support 11 after each push, and weld the jacking support 11 on the bottom steel plate 10 at the rear of the hydraulic jack 9 again, and push repeatedly until the shield tail 5 reaches the starting tunnel gate range of the right line 13 from the left line 12;

[0084] Please refer to Fig.12 and Fig.13 The push support 11 includes a push plate 1101 and a reinforcing plate 1102. The reinforcing plate 1102 is vertically installed on the push plate 1101, and the reinforcing plate 1102 is a right-angled triangle plate.

[0085] S23, when the shield tail 5 reaches the right line 13 tunnel gate, the lateral movement is stopped and the longitudinal movement is changed. The two hydraulic jacks 9 are manually rotated 90° and the hydraulic jacks 9 are placed at the front end of the rear bracket 102 to push longitudinally backward until the shield tail 5 is in place.

[0086] S3, cutterhead 2, front shield 3, middle shield 4 downhole translation: please refer to Figure 5-7 , fix the cutterhead 2, the front shield 3, the middle shield 4 and the front bracket 101 together, use a crawler crane to lower the cutterhead 2, the front shield 3, the middle shield 4 and the front bracket 101 together into the well, and translate them into place;

[0087] S31, assembling the cutter head 2, the front shield 3, and the middle shield 4 together, and fixing them to the front bracket 101, so as to prepare for jacking;

[0088] S32, prepare two 100t hydraulic jacks 9 and a pump station, connect the pump station to the hydraulic jack 9, arrange the two hydraulic jacks 9 on one side of the rear bracket 102, weld the jacking support 11 on the bottom steel plate 10 at the rear of the hydraulic jack 9, ensure each lateral jacking of 900mm, the same as the jacking shield tail 5, remove the jacking support 11 after each jacking, weld the jacking support 11 on the bottom steel plate 10 at the rear of the hydraulic jack 9 again, and repeat this process until the cutter head 2, the front shield 3, and the middle shield 4 reach the starting tunnel gate range of the right line 13 from the left line 12;

[0089] S33, after pushing to the right tunnel door, stop lateral movement, place two hydraulic jacks 9 at the rear end of the rear bracket 102, use the hydraulic jacks 9 to push the rear bracket 102, so that the shield tail 5 moves forward to merge with the middle shield 4.

[0090] S4. Assembly of the shield machine mainframe: Assemble the shield tail 5 and the middle shield 4, measure the distance between the front bracket 101 and the tunnel portal, and ensure that the front end of the front bracket 101 is 1000 mm away from the end wall of the tunnel portal.

[0091] S5, installation of reaction frame 6: control the height of reaction frame 6 to be below the height space of negative 2-layer platform, lower reaction frame 6 into the well, and translate it into place;

[0092] S51. Since the net height of the existing reaction frame 6 is higher than the negative 2-story platform slab of the station, the five legs on the top of the reaction frame 6 are first removed to make the overall height of the modified reaction frame 6 lower than the negative 2-story platform space. Please refer to the modified reaction frame 6 Figure 8 ;

[0093] S52, prepare two steel plates 602, splice the two steel plates 602 and place them on the bottom steel plate 10 at the position of going down the well, apply grease on the bottom steel plate 10 within the walking path of the reaction frame 6, hoist the lifting lug 604 of the reaction frame 6 down the well, and place the reaction frame 6 at the center of the two prepared steel plates 602;

[0094] S53, the steel plate 602 and the base of the reaction frame 6 are welded and reinforced with a triangular plate 601. The number of triangular plates 601 is 8. The structure of the triangular plate 601 is an equilateral triangle with a side length of 300mm*300mm. The height of the weld between the triangular plate 601 and the leg of the reaction frame 6 is not less than 5mm.

[0095] S54. After the reinforcement is completed, each leg is obliquely reinforced with channel steel 603 on both sides to prevent front and rear falling. There are two channel steels 603, which are respectively set on both sides of the reaction frame 6. The length of the channel steel 603 is 3000mm. Please refer to the reinforced reaction frame 6. Fig. 9 ;

[0096] S55. After the reinforcement is completed, a dragging point is made at the lower position of the right line side wall, and a 10t electric hoist is hung at the dragging point. The steel plate 602 at the bottom of the reaction frame 6 is connected to the electric hoist, and the reaction frame 6 is dragged to the right line by a steel wire rope. When the height of the negative 2-story platform is limited to the reaction frame 6, the reaction frame 6 is not suitable for hoisting and installation. The electric fall chain is used to drag the reaction frame 6 for overall translation positioning, which reduces the risk of hoisting in the tunnel;

[0097] S56. After the reaction frame 6 is dragged to the right line, the positioning point is confirmed in advance. After it is in place, the reinforcement support on one side is cut off, and the reaction frame 6 is lifted up 30mm by a jack to remove a steel plate at the bottom. After completing one side, the steel plate on the other side is removed.

[0098] S6, assembly machine installation: After the reaction frame 6 is installed, the track is laid to extend into the shield tail. The track laying height is determined by the surveying engineer through reverse calculation based on the height of the assembly machine flange surface; then the assembly machine is dragged from the station receiving end to the starting end by the segment car through the winch, and the remaining 3 meters are manually pulled to the assembly position with a fall chain. The assembly machine is pushed to the flange contact surface for bolt installation;

[0099] S7, screw conveyor installation:

[0100] S71. After the assembly machine is installed, use the installed reaction frame 6 to make the first lifting point, and make the second lifting point at the middle shield 5. Hang two 10t electric hoists at the first lifting point and hang two 10t hand hoists at the second lifting point to prepare for the assembly of the bolt conveyor.

[0101] S72, the screw conveyor is transported to the rear of the shield tail 5 by the segment car, and the rear end of the bolt conveyor is hung on the electric hoist of the first hanging point and the front end is hung on the hand hoist of the second hanging point by the hand hoist set in step S71, so as to lift the bolt conveyor;

[0102] S73. Slowly insert the screw conveyor into the installation position to complete the installation.

[0103] The installation of the screw conveyor does not require a supporting steel hanger, saving installation time and material costs.

[0104] S8, the rear supporting trolley is laid through the track in the station, and is dragged through the station to the starting end by an electric vehicle and connected to the shield body.

[0105] The above specific implementation methods are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to examples, a person skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.

Claims

1. A shield machine split downhole translation assembly station construction method, characterized in that: The steps include: S1. Construction preparation: preparation of the end well and modification of the existing starting bracket, which includes the front bracket and the rear bracket; S2. Horizontal movement of the shield tail downhole: The bracket for placing the shield tail is lowered into the well and fixed on the bottom steel plate. The shield tail is hoisted into the well using a crawler crane and fixed together with the bracket, and then horizontally moved into place. S3, the cutterhead, front shield and middle shield are moved horizontally down the well: the bracket for placing the cutterhead, front shield and middle shield is lowered into the well and positioned on the bottom steel plate. The middle shield, front shield and cutterhead are hoisted down the well in the order of the crawler crane, assembled and fixed together with the bracket, and then moved horizontally into place; S4. Shield machine mainframe assembly: Assemble the shield tail and middle shield, measure the distance between the front bracket and the tunnel portal, and ensure that the front end of the front bracket is 1000mm away from the end wall of the tunnel portal; S5. Installation of reaction frame: Control the height of the reaction frame below the height of the negative 2-story platform, lower the reaction frame into the well, and move it horizontally into place; S6, assembly machine installation: The assembly machine is dragged from the station receiving end to the starting end by a winch through a segment vehicle, and the remaining 3 meters are manually pulled to the assembly position with a fall chain. The assembly machine is pushed to the flange contact surface for bolt installation; S7, screw conveyor installation: After the screw conveyor is transported to the shield tail by the segment vehicle, the screw conveyor is pulled up to the installation position by the fall chain to complete the installation; S8, the rear supporting trolley is laid on the track in the station, and is dragged through the station to the starting end by a battery car, and connected to the shield body; Step S2 includes: S21. Put the crawler crane in place, fix the shield tail and rear bracket together, and lower the shield tail and rear bracket into the well; S22. Prepare two 100t hydraulic jacks and a pump station, connect the pump station to the hydraulic jacks, arrange the two hydraulic jacks on one side of the rear bracket and perpendicular to the axis of the shield tail, weld the push support on the bottom steel plate at the rear of the hydraulic jacks, ensure that each time the horizontal push is 1800mm, and push repeatedly until the shield tail reaches the starting tunnel range of the right line from the left line; S23, when the shield tail reaches the right tunnel gate, stop the lateral movement and change to longitudinal movement. Manually rotate the two hydraulic jacks 90 degrees, place the hydraulic jacks at the front end of the rear bracket and push them longitudinally backward until the shield tail is in place; Step S3 includes: S31, assemble the cutter head, front shield and middle shield together and fix them to the front bracket to prepare for top pushing; S32. Prepare two 100t hydraulic jacks and a pump station, connect the pump station to the hydraulic jack, arrange the two hydraulic jacks on one side of the rear bracket, weld the push support on the bottom steel plate at the rear of the hydraulic jack, ensure that each lateral push is 900mm, and push repeatedly until the cutter head, front shield and middle shield reach the starting tunnel gate range of the right line from the left line; S33. After pushing to the right tunnel gate, stop lateral movement, place two hydraulic jacks at the rear end of the rear bracket, and use the hydraulic jacks to push the rear bracket to move the shield tail forward until it merges with the middle shield.

2. The shield machine split shaft translation assembly and station construction method according to claim 1 is characterized in that: Step S1 includes: S11. Review and measure the station clearance dimensions and reserve the required working space; understand the station structure, remeasure the floor elevation and level it with sand; S12. Prepare H-shaped steel, make horse stools, and install them in the end water collection well with the same elevation as the bottom plate; S13. Prepare the bottom steel plate according to the size of the end well, fully lay the bottom steel plate on the top of the bottom plate, and splice it. The welds between the bottom steel plates are segmented and the welds cannot be higher than the upper surface of the bottom steel plate; S14, preparation of the departure bracket: the departure bracket is designed into the front bracket and the rear bracket according to the station structure size; S15. Clean the upper surface of the bottom steel plate and apply grease on the travel path of the starting bracket.

3. The shield machine split shaft translation assembly and station construction method according to claim 2 is characterized in that: The front bracket and the rear bracket are connected by locating pins. A plurality of locating pins are arranged at the rear end of the front bracket, and a plurality of corresponding locating holes are arranged at the front end of the rear bracket. There is a clearance fit between the locating pins and the locating holes. The locating pins are designed with rounded corners for easy insertion, thereby ensuring the stability of the starting bracket after the combination.

4. The shield machine split shaft translation assembly and station construction method according to claim 1 is characterized in that: The push support includes a push plate and a reinforcing plate, wherein the reinforcing plate is vertically mounted on the push plate and is a right-angled triangular plate.

5. The shield machine split shaft translation assembly and station construction method according to claim 1 is characterized in that: Step S5 includes: S51. Since the net height of the existing reaction frame is higher than the negative 2-story platform slab of the station, the five vertical legs on the top of the reaction frame are first removed so that the overall height of the modified reaction frame is lower than the negative 2-story platform space; S52, prepare two steel plates, splice the two steel plates and place them on the bottom steel plate at the position of going down the well, apply grease on the bottom steel plate within the walking path of the reaction frame, hoist the reaction frame down the well, and place the reaction frame at the center of the two prepared steel plates; S53. The steel plate and the base of the reaction frame legs are welded and reinforced with triangular plates, and the weld height is not less than 5mm; S54. After the reinforcement is completed, each leg is reinforced obliquely with channel steel on both sides to prevent it from falling down; S55. After reinforcement is completed, a dragging point is made at the side wall of the right line, a 10t electric hoist is installed, and the wire rope is used to drag the right line; S56. After the reaction frame is dragged to the right line, confirm the positioning point in advance. After it is in place, cut off the reinforcement support on one side, use the jack to lift the reaction frame 30mm and remove a steel plate at the bottom. After completing one side, remove the steel plate on the other side.

6. The shield machine split shaft translation assembly and station construction method according to claim 5 is characterized in that: In step S53, the number of the triangles is 8, and the structure of the triangles is that the side length is 300 mm. 300mm equilateral triangle.

7. The shield machine split shaft translation assembly and station construction method according to claim 5 is characterized in that: In step S54, the number of channel steels is 2, which are respectively arranged on both sides of the reaction frame, and the length of the channel steel is 3000 mm.

8. The shield machine split shaft translation assembly and station construction method according to claim 1 is characterized in that: Step S7 includes: S71. After the assembly machine is installed, use the installed reaction frame to make the first lifting point, and make the second lifting point at the middle shield position. Hang two 10t electric hoists at the first lifting point, and hang two 10t hand hoists at the second lifting point to prepare for the assembly of the bolt conveyor; S72, the screw conveyor is transported to the rear of the shield tail by the segment vehicle, and the rear end of the bolt conveyor is hung on the electric hoist of the first hanging point, and the front end is hung on the hand hoist of the second hanging point by using the electric hoist and hand hoist set in step S71, so as to lift the bolt conveyor; S73. Slowly insert the screw conveyor into the installation position to complete the installation.