A method for improving the permeability of deep well recharged aquifers by hydraulic fracturing

By obtaining geological data and comprehensive evaluation of rock fracturing permeability, the deep well fracturing back-injection layer was determined and the segmented fracturing sand addition process was adopted, which solved the problem of low reinjection efficiency of deep wells in the western region, and achieved efficient mine water recovery and Ecological protection.

CN114658484BActive Publication Date: 2024-11-12XIAN RES INST OF CHINA COAL TECH & ENG GRP CORP
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202210292458.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-23
Publication Date
2024-11-12
Estimated Expiration
2042-03-23

AI Technical Summary

Technical Problem

During coal mining, the deep aquifers in the western region are dense and have weak permeability, resulting in low reinfusion efficiency of deep wells and lack of natural and suitable deep aquifers, which limits the recycling and utilization of mine water and the protection of the ecological environment.

Method used

By obtaining geological data, the target re-irrigation water storage layer is determined, vertical well drilling and sampling inspection is carried out, combined with the comprehensive evaluation index of rock fracturing permeability, the deep well fracturing back-irrigation layer is determined, and the permeability is improved by using the segmented fracturing sand adding process to improve permeability and expand the range of reinjection.

Benefits of technology

It effectively improves the efficiency of deep well refilling, expands the application scope of deep well refilling technology, reduces the cost of mine inrush water treatment, and provides technical support for zero emissions of mine water.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114658484B_ABST
    Figure CN114658484B_ABST
Patent Text Reader

Abstract

The invention discloses a deep well fracturing and recharging design method applicable to coal mining areas, which mainly includes determining the mineralization of mine water to be recharged in the mining area and multiple target recharge water reservoirs within a depth of 500 to 5000 meters below the ground in the mining area that can be used for deep well recharge of mine water; obtaining sampling and detection data of the target recharge water reservoir; determining the applicable target recharge layer; determining the deep well fracturing and recharge layer for arranging long drill horizontal wells; determining the layout position and layout parameters of the long drill horizontal well in the deep well fracturing and recharge layer; then using the segmented fracturing and sand inclusion process to complete the segmented fracturing construction of the long drill horizontal well in the deep well fracturing and recharge layer; using a screw drill to drill through the packers of each segment to communicate with the segmented sealed long drill horizontal well to complete the deep well recharge operation. The method of the invention effectively improves the efficiency of deep well recharge, and the method of the invention can obtain an applicable deep well recharge layer, expand the promotion and application scope of deep well recharge technology, and reduce the treatment cost of mine water inrush.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of mine water protection in coal mining, and in particular relates to a method for improving the permeability of a deep well recharge water storage layer by hydraulic fracturing. Background Art

[0002] As coal resource development shifts to deeper areas, mine water with high mineralization and containing special components (especially fluorine) will continue to increase. Mining activities and water-rock interactions cause mine water to contain suspended matter, salt, special components, petroleum, etc., which leads to increasingly serious water quality problems in mine water, limiting the recycling of mine water. The disorderly discharge of mine water will also cause pollution to the surrounding ecological environment. With the increasingly stringent requirements for zero discharge of mine water, the treatment of high-salt and high-fluorine mine water has become a difficult problem faced by coal mining companies. Among them, deep well recharge has been widely used as a widely applicable, safe, economical and efficient means.

[0003] The existing deep well recharge technology directly selects deep aquifers with developed pores and fractures, strong permeability, and good waterproofing performance of upper and lower impermeable layers for recharge. However, the deep aquifers in western my country are dense, have weak permeability, small injection diffusion range, and small recharge volume. Therefore, there is a lack of deep aquifers that are naturally suitable for recharge. Summary of the invention

[0004] In view of the defects and shortcomings in the prior art, the present invention provides a deep well fracturing and recharge design method suitable for coal mining areas, which solves the technical problem of low deep well backfilling efficiency in the central and western mining areas in the prior art by improving the permeability coefficient, diffusion range and water storage capacity of the deep recharge water reservoir.

[0005] To achieve the above object, the present invention adopts the following technical scheme:

[0006] A deep well fracturing and recharging design method applicable to coal mining areas comprises the following steps:

[0007] Step 1, obtaining geological data or test data of the mining area, and determining the mineralization of the mine water to be recharged in the mining area and multiple target recharge aquifers within a depth of 500 to 5000 meters below the ground in the mining area that can be used for deep well recharge of mine water according to the obtained geological data or test data;

[0008] Step 2, drilling a vertical well. During the vertical well drilling process, sampling and testing are performed on each of the multiple target recharge aquifers determined in step 1, and sampling and testing data of the target recharge aquifer is obtained. The sampling and testing data of the target recharge aquifer includes the mineralization of the target recharge aquifer.

[0009] Step 3: According to the obtained sampling test data, the target recharge aquifer with a thickness greater than 100 m and both the top and bottom rock layers being impermeable layers is taken as the target recharge layer;

[0010] Step 4: determining the comprehensive evaluation index of rock fracturing permeability of the target recharge water reservoir according to the sampling test data obtained in step 2; determining the deep well fracturing recharge layer for arranging the long drill horizontal well according to the obtained comprehensive evaluation index of rock fracturing permeability, the mineralization of the mine water to be recharged obtained in step 1, and the mineralization of the target recharge water reservoir obtained in step 2;

[0011] Specifically, the target recharge water reservoir with the smallest comprehensive evaluation index of rock fracturing permeability and a target recharge water reservoir with a mineralization greater than that of the mine water to be recharged is used as the deep well fracturing recharge water reservoir;

[0012] Step 5: Determine the layout position and layout parameters of the long drill horizontal well in the deep well fracturing reinjection layer according to the fracturing fracture simulation results;

[0013] Step 6: determine the perforation position and fracturing section position of the long drill horizontal well, and then use the staged fracturing and sanding process to complete the staged fracturing construction of the long drill horizontal well in the deep well fracturing recharge layer;

[0014] Step 7: After completing the segmented fracturing construction of the long drill horizontal well in the deep well fracturing reinjection layer, a screw drill is used to drill through the packers of each segment, connect the segmented sealed long drill horizontal well, and complete the deep well reinjection operation.

[0015] The present invention also has the following technical features:

[0016] Specifically, the sampling and testing described in step 2 includes mineral testing, triaxial confining pressure loading test, full water quality analysis and permeability testing.

[0017] Furthermore, the rock fracturing permeability comprehensive evaluation index of the target recharge aquifer obtained from the sampling test data obtained in step 2 specifically includes: obtaining the stress-strain curve of each target recharge aquifer rock during the loading failure process through a triaxial confining pressure loading test; determining the rock fracturing permeability comprehensive evaluation index of the target recharge aquifer according to the stress-strain curve; the rock fracturing permeability comprehensive evaluation index is determined by the following formula:

[0018]

[0019] Where:

[0020] B E It is the comprehensive evaluation index of rock fracturing permeability;

[0021] S2 is the elastic energy accumulated before the peak in the rock stress-strain curve, in MPa;

[0022] S 3 is the energy input by the external force to the rock after the peak in the rock stress-strain curve, in MPa;

[0023] S 4 is the residual elastic energy after the rock peak, in MPa;

[0024] ε p is the peak strain in the rock stress-strain curve;

[0025] ε r is the residual strain after the peak in the rock stress-strain curve;

[0026] σ r is the residual stress after the peak in the rock stress-strain curve, in MPa;

[0027] K 0 is the initial permeability of the target recharge aquifer, in cm 2 ;

[0028] K max is the maximum process permeability of the target recharged aquifer during loading failure, in cm 2 .

[0029] Furthermore, the confining pressure in the triaxial confining pressure loading test is the hydrostatic pressure at the buried depth of the target recharge aquifer.

[0030] Furthermore, the deep well fracturing recharge layer for arranging long drill horizontal wells is determined based on the comprehensive evaluation index of rock fracturing permeability, the mineralization of the mine water to be recharged obtained in step 1, and the mineralization of the target recharge water reservoir, specifically including: taking the target recharge water reservoir with the smallest comprehensive evaluation index of rock fracturing permeability and a mineralization of the target recharge water reservoir greater than the mineralization of the mine water to be recharged as the deep well fracturing recharge layer.

[0031] Furthermore, the layout parameters in step 5 include the segment length, displacement and sand inclusion strength of the long horizontal well.

[0032] Furthermore, the layout parameters should ensure that the cracks generated by fracturing do not penetrate the deep well fracturing reinjection layer.

[0033] Furthermore, the segment spacing of the staged fracturing construction in step 6 is 80 to 150 m, and a drillable bridge plug is used for segmentation during the staged fracturing construction process.

[0034] Furthermore, the length of the long horizontal well is 200 to 2000 meters.

[0035] Compared with the prior art, the present invention has the following beneficial technical effects:

[0036] The method of the present invention establishes a comprehensive evaluation index of rock fracturing permeability of the target recharge layer. Combined with the mineralization of the mine water to be recharged and the mineralization of the target recharge layer, the deep well recharge layer for laying long drill horizontal wells can be determined, and then the permeability of the deep well fracturing recharge layer is improved through the staged fracturing and sand inclusion process, thereby effectively improving the efficiency of deep well recharge. In particular, for the western mining areas that lack natural high-permeability target strata for injection, the method of the present invention can be used to obtain a suitable deep well recharge layer, thereby expanding the scope of promotion and application of deep well recharge technology, reducing the treatment cost of mine water gushing, and providing strong technical support for zero discharge of mine water. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 is a flow chart of the method of the present invention;

[0038] Figure 2 Schematic diagram of the maximum process permeability of the target recharged aquifer during loading failure.

[0039] The present invention is described in detail below with reference to the accompanying drawings and specific implementation methods. DETAILED DESCRIPTION

[0040] In accordance with the above technical scheme, specific embodiments of the present invention are given below. It should be noted that the present invention is not limited to the following specific embodiments, and all equivalent changes made on the basis of the technical scheme of this application fall within the protection scope of the present invention.

[0041] It should be noted that for pressurized water injection wells in mining areas, since the injection flow rate is proportional to the permeability coefficient, the purpose of increasing the injection flow rate can be achieved by increasing the permeability coefficient of the pressurized aquifer through hydraulic fracturing.

[0042] The technical terms involved in the present invention are explained as follows:

[0043] Mineralization: The total amount of various ions, molecules and compounds contained in groundwater is called total mineralization, expressed in grams per liter (g / L).

[0044] Staged fracturing and sanding process: Staged fracturing is to install packers and fracturing sleeves on the completion casing string to divide the oil and gas reservoir into several sections, and then use the same pump truck to perform single-stage fracturing in sequence, while using proppants to keep the cracks open.

[0045] Deep well reinjection refers to the artificial recharge of groundwater sources by injecting treated urban domestic sewage and industrial wastewater through drilling.

[0046] The present invention is further described in detail below with reference to the embodiments.

[0047] Example 1

[0048] This embodiment discloses a deep well fracturing and recharging design method applicable to coal mining areas, comprising the following steps:

[0049] Step 1, obtaining geological data or test data of the mining area, and determining the mineralization of the mine water to be recharged in the mining area and multiple target recharge aquifers within a depth of 500 to 5000 meters below the ground in the mining area that can be used for deep well recharge of mine water according to the obtained geological data or test data;

[0050] Step 2, firstly select a suitable drilling site on the ground, drill vertically, drill down, construct a vertical well, and then perform vertical well drilling. During the vertical well drilling process, sample and test each target recharge aquifer in the multiple target recharge aquifers determined in step 1, and obtain sampling and testing data of the target recharge aquifer, wherein the sampling and testing data of the target recharge aquifer includes the mineralization of the target recharge aquifer;

[0051] Among them, the sampling and testing includes mineral testing, triaxial confining pressure loading test, full water quality analysis and permeability testing.

[0052] Step 3: According to the obtained sampling test data, the target recharge aquifer with a thickness greater than 100 m and both the top and bottom rock layers being impermeable layers is taken as the target recharge layer;

[0053] Step 4: determine the comprehensive evaluation index of rock fracturing permeability of the target recharge layer according to the sampling test data obtained in step 2, and then determine the deep well fracturing recharge layer for arranging the long drill horizontal well according to the comprehensive evaluation index of rock fracturing permeability, the mineralization of the mine water to be recharged obtained in step 1, and the mineralization of the target recharge water reservoir obtained in step 2;

[0054] As a preferred method, firstly, a stress-strain curve of each target recharge aquifer rock during the loading failure process is obtained through a triaxial confining pressure loading test; a comprehensive evaluation index of rock fracturing permeability of the target recharge aquifer is determined according to the stress-strain curve;

[0055] The rock fracturing permeability comprehensive evaluation index is determined by the following formula:

[0056]

[0057] Where:

[0058] B E It is the comprehensive evaluation index of rock fracturing permeability;

[0059] S 2 is the elastic energy accumulated before the peak in the rock stress-strain curve, in MPa;

[0060] S 3 is the energy input by the external force to the rock after the peak in the rock stress-strain curve, in MPa;

[0061] S 4 is the residual elastic energy after the rock peak, in MPa;

[0062] ε p is the peak strain in the rock stress-strain curve;

[0063] ε r is the residual strain after the peak in the rock stress-strain curve;

[0064] σ r is the residual stress after the peak in the rock stress-strain curve, in MPa;

[0065] K 0 is the initial permeability of the target recharge aquifer rock, in cm 2 ;

[0066] K max is the maximum permeability of the target recharge aquifer rock during the loading failure process, in cm 2 .

[0067] Then, the target recharge water reservoir with the smallest comprehensive evaluation index of rock fracturing permeability and a target recharge water reservoir with a mineralization greater than that of the mine water to be recharged is used as the deep well fracturing recharge layer.

[0068] Specifically, in the triaxial confining pressure loading test, the variation curve of the permeability coefficient of the rock sample during the transformation from pores to fractures is first obtained, and then the stress-strain curve of the target recharged aquifer rock during the loading failure process is obtained.

[0069] Step 5: Determine the layout position and layout parameters of the long drill horizontal well in the deep well fracturing reinjection layer according to the fracturing fracture simulation results;

[0070] Among them, the length of the long drilling horizontal well is 200~2000 meters. The layout parameters include the segment length, displacement and sand inclusion strength of the long drilling horizontal well. By controlling the angle of the fracture height, combined with the lithology and ground stress of the formation, the displacement and the segment length of the long drilling horizontal well are determined. Among them, the segment length of the long drilling horizontal well is 80~150m; the sand addition strength should be determined by the length of the long drilling horizontal well, the thickness of the deep well fracturing reinjection layer and the length of the fracture, through fracturing software simulation or theoretical calculation, and adjusted in real time according to the on-site construction conditions.

[0071] Step 6: determine the perforation position and fracturing section position of the long drill horizontal well, and then use the staged fracturing and sanding process to complete the staged fracturing construction of the long drill horizontal well in the deep well fracturing reinjection layer; the stage spacing of the staged fracturing construction is 80 to 150m, and a drillable bridge plug is used for segmentation during the staged fracturing construction.

[0072] Among them, drillable bridge plugs are used for segmentation, and fracturing can expand the cracks in the deep well fracturing recharge layer. Active water fracturing fluid, suitable clay stabilizers, fungicides, etc. are used as additives. The composition of active water fracturing fluid is: clean water + KCL + 0.05% fungicide. Quartz sand is selected as the supporting medium, mainly 20 / 40 mesh medium sand (850-425μm) and 16 / 20 mesh coarse sand (1180-850μm). During the fracturing process, the fracturing parameters are controlled according to the ground stress, burial depth and lithology to ensure that the cracks caused by fracturing do not penetrate the deep well fracturing recharge layer.

[0073] Step 7: After completing the segmented fracturing construction of the long drill horizontal well in the deep well fracturing reinjection layer, a screw drill is used to drill through the packers of each segment to connect the segmented sealed long drill horizontal well to complete the deep well reinjection operation.

[0074] As a preference, a large flow mud pump is selected in deep well reinjection operations.

[0075] Application Example 1

[0076] This application example provides a specific application example of the deep well fracturing and reinjection design method suitable for coal mining areas based on Example 1.

[0077] This application example follows the following steps:

[0078] 1. First, screen out the areas that can be used for deep well recharge of mine water, and determine the Upper Permian Shiqianfeng Formation (P3sh); Lower Triassic Liujiagou Formation (T1l) and Heshanggou Formation (T1h) that can be used for deep well recharge of mine water. According to the geological data or test data, determine the mineralization of the mine water to be recharged in the mining area. Among them, the chemical type of the groundwater in the Shiqianfeng Formation is Cl-Ca·Na, and the TDS content is 31212.34mg / L; the chemical type of the groundwater in the Liujiagou Formation is Cl-Ca·Na, and the TDS content is 65111.14mg / L; the chemical type of the groundwater in the Heshanggou Formation is Cl-Ca·Na, and the TDS content is 22488.06mg / L. The mineralization of the coal mine water to be recharged is 1000~2000mg / L;

[0079] 2. Samples were taken from the Upper Permian Shiqianfeng Formation (P3sh); the Lower Triassic Liujiagou Formation (T1l) and Heshanggou Formation (T1h) for full analysis of minerals, mechanical properties, water quality, and permeability tests. Based on the test data obtained, it was determined that the thickness of the three groups was greater than 100m and that both the top and bottom rock layers were impermeable layers;

[0080] 3. Draw the following according to the obtained test data: Figure 2 The stress-strain curve shown;

[0081] Among them, the average burial depth of the sandstone of the Heshanggou Formation is 1600m, and the corresponding confining pressure is 40MPa; the average burial depth of the sandstone of the Liujiagou Formation is 1800m, and the corresponding confining pressure is 45MPa; the average burial depth of the sandstone of the Shiqianfeng Formation is 2050m, and the corresponding confining pressure is 51MPa; a triaxial confining pressure loading test is carried out to obtain the stress-strain curve of each target recharged aquifer rock during the loading failure process, and the relevant parameters are obtained as follows, and then the obtained parameters are used to determine the comprehensive evaluation index of rock fracturing permeability, and then according to the comprehensive evaluation index of rock fracturing permeability, the long drilling horizontal well is arranged in the middle of the 200m thick sandstone layer in Liujiagou;

[0082] <![CDATA[S2]]> <![CDATA[S3]]> <![CDATA[S4]]> <![CDATA[ε p ]]> <![CDATA[ε r ]]> <![CDATA[K0]]> <![CDATA[K max ]]> <![CDATA[B E ]]> Heshanggou Formation sandstone 0.345 0.156 0.058 0.011 0.015 1.02E-13 2.02E-13 0.788 Liujiagou Formation sandstone 0.556 0.054 0.056 0.012 0.014 1.12E-13 4.23E-13 0.432 Shiqianfeng Formation sandstone 0.478 0.123 0.0078 0.013 0.018 8.12E-14 1.24E-13 0.965

[0083] An L-shaped horizontal well is used, and the length of the horizontal section of the L-shaped horizontal well is 500~1000m. A three-opening wellbore structure is adopted. A Φ381mm drill bit is used for the first opening. After drilling, a Φ273.1mm, steel grade J55 surface casing is lowered. G-grade oil well cement is used for cementing. After waiting for 48 hours, the pressure test is 6Mpa; a Φ241.3mm drill bit is used for the second opening. The upper formation of the target layer is deflected, and the drilling is completed in the middle of the uppermost recharge target layer. A Φ193.7mm (N80) casing is lowered, and G-grade oil well cement is used for cementing. After waiting for 72 hours, the pressure test is 30MPa; finally, a Φ171.5mm drill bit is used for drilling the three-opening horizontal section, and a Φ139.7mm, steel grade P110 three-opening screen is lowered. The well is washed and the wellhead device is installed before completion.

[0084] The horizontal section borehole is divided into 3~6 sections, and the staged fracturing and sanding process is adopted to expand the cracks in the sandstone aquifer by fracturing. The active water fracturing fluid of clean water + KCL + 0.05% fungicide is used. 20 / 40 mesh medium sand (850~425μm) and 16 / 20 mesh coarse sand (1180~850μm) quartz sand are selected as the supporting medium; during the expansion of the fracturing crack, the control seam height shall not penetrate the aquifer and destroy the upper and lower water barriers, and the control seam height shall not exceed 90m.

[0085] The horizontal well is divided into 3 to 6 sections, and then each section is perforated and fractured separately. The interval between sections is 80 to 150 m. The fracturing construction is carried out by high-volume injection with bare casing, and the drillable bridge plug is used for segmentation. The pumping bridge plug perforation segmented fracturing joint technology is adopted. After the fracturing of all well sections is completed, the bridge plug is drilled out uniformly with a screw drill to connect the horizontal wellbore. The whole well section is fractured by isolating one section, perforating one section, and fracturing one section. The bridge plug setting and perforation operations are completed at one time.

[0086] The preferred embodiments of the present invention are described in detail above in conjunction with the accompanying drawings. However, the present invention is not limited to the specific details in the above embodiments. Within the technical concept of the present invention, a variety of simple modifications can be made to the technical solution of the present invention, and these simple modifications all belong to the protection scope of the present invention.

[0087] In addition, various embodiments of the present invention may be arbitrarily combined, and as long as they do not violate the concept of the present invention, they should also be regarded as the contents disclosed by the present invention.

Claims

1. A method for improving the permeability of deep well recharge aquifers by hydraulic fracturing. It is characterized in that The following steps are involved: Step 1, obtaining geological data or test data of the mining area, and determining the mineralization of the mine water to be recharged in the mining area and multiple target recharge aquifers within a depth of 500 to 5000 meters below the ground in the mining area that can be used for deep well recharge of mine water according to the obtained geological data or test data; Step 2, drilling a vertical well. During the vertical well drilling process, sampling and testing are performed on each of the multiple target recharge aquifers determined in step 1, and sampling and testing data of the target recharge aquifer is obtained. The sampling and testing data of the target recharge aquifer includes the mineralization of the target recharge aquifer. Step 3: According to the obtained sampling test data, the target recharge aquifer with a thickness greater than 100 m and both the top and bottom rock layers being impermeable layers is taken as the target recharge layer; Step 4: determining the comprehensive evaluation index of rock fracturing permeability of the target recharge water reservoir according to the sampling test data obtained in step 2; determining the deep well fracturing recharge layer for arranging the long drill horizontal well according to the obtained comprehensive evaluation index of rock fracturing permeability, the mineralization of the mine water to be recharged obtained in step 1, and the mineralization of the target recharge water reservoir obtained in step 2; Specifically, the target recharge water reservoir with the smallest comprehensive evaluation index of rock fracturing permeability and a target recharge water reservoir with a mineralization greater than that of the mine water to be recharged is used as the deep well fracturing recharge water reservoir; Step 5: Determine the layout position and layout parameters of the long drill horizontal well in the deep well fracturing reinjection layer according to the fracturing fracture simulation results; Step 6: determine the perforation position and fracturing section position of the long drill horizontal well, and then use the staged fracturing sand inclusion process to complete the staged fracturing construction of the long drill horizontal well in the deep well fracturing reinjection layer; Step 7: After completing the staged fracturing construction of the long drill horizontal well in the deep well fracturing reinjection layer, a screw drill is used to drill through the packers of each segment to connect the segmented sealed long drill horizontal well, and complete the deep well reinjection operation; Determining the rock fracturing permeability comprehensive evaluation index of the target recharge aquifer according to the sampling test data obtained in step 2 specifically includes: obtaining the stress-strain curve of each target recharge aquifer rock during the loading failure process through a triaxial confining pressure loading test; Determine the comprehensive evaluation index of rock fracturing permeability of the target recharge water reservoir based on the stress-strain curve; The rock fracturing permeability comprehensive evaluation index is determined by the following formula: Where: B E It is the comprehensive evaluation index of rock fracturing permeability; S 2 It is the elastic energy accumulated before the peak in the rock stress-strain curve, in MPa; S 3 It is the energy input by the external force to the rock after the peak in the rock stress-strain curve, in MPa; S 4 is the residual elastic energy after the rock peak, in MPa; ε p is the peak strain in the rock stress-strain curve; ε r is the residual strain after the peak in the rock stress-strain curve; σ r is the residual stress after the peak in the rock stress-strain curve, in MPa; K 0 is the initial permeability of the target recharge aquifer, in cm 2 ; K max is the maximum permeability of the target recharged aquifer during the loading failure process, in cm 2 .

2. The method for improving the permeability of deep well recharged aquifers by hydraulic fracturing as claimed in claim 1, It is characterized in that The sampling and testing described in step 2 includes mineral testing, triaxial confining pressure loading test, full water quality analysis and permeability testing.

3. The method for improving the permeability of deep well recharged aquifer by hydraulic fracturing as claimed in claim 2, It is characterized in that The confining pressure in the triaxial confining pressure loading test is the hydrostatic pressure at the buried depth of the target recharge aquifer.

4. The method for improving the permeability of deep well recharged water reservoir by hydraulic fracturing as claimed in claim 1, It is characterized in that Determining the recharge layer for arranging the long drill horizontal well according to the comprehensive evaluation index of rock fracturing permeability in step 4 specifically includes: the comprehensive evaluation index value of rock fracturing permeability is the smallest, and the mineralization of the target recharge water reservoir is greater than the mineralization of the mine water to be recharged.

5. The method for improving the permeability of deep well recharged aquifer by hydraulic fracturing as claimed in claim 1, It is characterized in that The layout parameters described in step 5 include the segment length, displacement and sand inclusion strength of the long horizontal well.

6. The method for improving the permeability of deep well recharged aquifers by hydraulic fracturing as claimed in claim 1, It is characterized in that The layout parameters should ensure that the fractures produced by the fracturing do not penetrate the deep well fracturing reinjection layer.

7. The method for improving the permeability of deep well recharged aquifers by hydraulic fracturing as claimed in claim 1, It is characterized in that The segment spacing of the staged fracturing construction in step 6 is 80 to 150 m, and a drillable bridge plug is used for segmentation during the staged fracturing construction process.

8. The method for improving the permeability of deep well recharged aquifers by hydraulic fracturing as claimed in claim 1, It is characterized in that The length of the long horizontal well is 200 to 2000 meters.

Citation Information

Patent Citations

  • Water source heat pump recharging technical method

    CN104633996A

  • Method for mine water transfer storage

    CN110107351A

  • Fractured soft low-permeability coal seam roof or floor staged fracturing horizontal well coal bed gas extraction method

    CN112983385A

  • Method of improving development efficiency of low-permeability oil deposits

    RU2709260C1