Single shield dual-mode shield tunneling construction method in TBM mode through broken zone

By performing advanced grouting and reinforcement in single shield dual-mode shield TBM mode, the problems of low efficiency and high safety risks in crushing belt excavation are solved, and safe and efficient crossing of crushing belts are achieved, reducing the cost and risk of mode conversion. Improve tunnel stability and construction safety.

CN114673506BActive Publication Date: 2024-11-22CHINA RAILWAY 19TH BUREAU GROUP RAIL TRANSPORTATION ENGINEERING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210313819.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-28
Publication Date
2024-11-22
Estimated Expiration
2042-03-28

AI Technical Summary

Technical Problem

In the construction of crossing the crushing belt excavation under single shield dual-mode shield TBM mode, the existing technology has problems such as low efficiency, high safety risks and long-term mode conversion, especially in the intersecting of hard rock formations and composite formations, which is difficult to ensure Tunnel stability and construction safety.

Method used

By setting up a forward grouting platform, drilling operations and injecting a mixture of phosphoric acid/water glass, grouting and reinforcement of the soil in the crushing zone, grouting and reinforcement using the advance grouting equipment and soil silo partitions in the hole to improve the enclosure Rock stability and reduce water permeability, reducing model conversion costs and risks.

Benefits of technology

It effectively reduces the number of mode conversions, reduces the use of steel products and oil products, improves construction safety and tunnel stability, saves energy and consumes, and significantly improves construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114673506B_ABST
    Figure CN114673506B_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of building construction, and specifically is a construction method for excavating a broken zone by a single-shield dual-mode shield machine under a TBM mode, wherein an advance grouting platform is set up, a drilling machine is then fixed, drilling is performed, water is injected to wash the pipe after the drilling, a phosphoric acid / water glass mixture is injected after the pipe washing, and then grouting is performed through a grouting pipe; the drilling depth reaches 12 meters of a cutter head, and the grouting operation is performed in six sections during the process; the pressure is controlled at 0.6MPa during the grouting operation, and the grouting reinforcement of the advance hole is terminated after the grouting is completed; the position of the broken zone is determined by detailed survey, supplementary survey and advance geological prediction (adopted by TBM), the soil of the broken zone is grouting reinforced, and then the face is grouting reinforced through a reserved ball valve on a soil bin partition, so as to improve the stability of the surrounding rock of the broken zone and reduce the water permeability of the surrounding rock, reduce the investment cost of multiple mode conversions, and ensure the construction safety, reduce the excavation risk and the safety of surface buildings (structures).
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building construction, and specifically relates to a construction method for excavating a broken zone by a single-shield dual-mode shield machine in a TBM mode. Background Art

[0002] Normally, single-mode shield machines have low excavation efficiency in extremely hard rock formations, and single-shield or dual-shield TBMs cannot excavate in composite formations. Previously, offline dual-mode tunnel boring machines, whose earth pressure balance (EPB) and TBM modes could not coexist at the same time, took more than one month to switch between earth pressure and TBM modes in the tunnel, affecting the overall construction period. The emergence of the single-shield EPB+TBM dual-mode shield machine construction method fills the gap in domestic EPB+TBM dual-mode shield machines.

[0003] During shield tunneling, there are many unforeseen problems and complex and changeable strata. If you are not careful during the construction process, it will lead to adverse consequences. Especially in the broken zone excavation construction of the transition section between different lithology rock formations, in the absence of surface reinforcement conditions, it is very easy to cause adverse consequences and bad social impacts. Often, the transition between the two rock formations is hard rock before and after, and the stratum transition zone is a broken zone. Often, long-distance full-section hard rock is excavated by TBM tunneling machines. When the double-shield TBM encounters a broken zone, it can drill a rock hole around the middle shield support body for advanced grouting reinforcement. However, when the single-shield dual-mode (EPB+TBM) shield TBM mode encounters a long-distance crossing of a relatively broken zone during full-section hard rock excavation, because all the segments are assembled after the middle shield and there is no rock hole for advanced grouting, and open excavation cannot maintain pressure, it is easy to have risks such as over-excavation, excessive settlement, and even collapse. If it takes 7 days to convert the TBM→EPB mode in the broken zone, it will take another 7 days to convert the EPB→TBM mode after crossing the broken zone and entering the full-section hard rock, which will waste at least 14 days of construction time or more and 2 or more mode conversion costs. In addition, the EPB mode cannot fully guarantee the stability of the formed tunnel, the rock strata in front of the cutter head and the surface when excavating the relatively broken fault boundary zone. For this reason, the present invention provides a single-shield dual-mode shield tunneling construction method for crossing the broken zone in TBM mode. Summary of the invention

[0004] In order to make up for the deficiencies of the prior art, at least one technical problem raised in the background technology is solved.

[0005] The technical solution adopted by the present invention to solve the technical problem is: the single-shield dual-mode shield tunneling construction method of the present invention crossing the broken zone in TBM mode comprises the following steps:

[0006] S1. Set up the advance grouting platform, then fix the drilling rig and carry out drilling operation. After the drilling operation, water is injected to wash the pipe. After washing the pipe, a mixture of phosphoric acid / water glass is injected, and then grouting operation is carried out through the grouting pipe;

[0007] S2, drilling to a depth of 12 meters from the cutterhead, during which the grouting operation is divided into six sections;

[0008] S3, during the grouting operation, the pressure is controlled at 0.6MPa. After the grouting is completed, the grouting reinforcement of the advance hole is completed, and the steps are repeated to complete the grouting reinforcement of the remaining three advance holes;

[0009] S4. Check the grouting effect. If it is qualified, complete the grouting reinforcement of this section. If it is unqualified or the front needs reinforcement, return to the grouting operation step. During operation, this method determines the location of the broken zone through detailed survey, supplementary survey and advanced geological prediction (TBM adoption), and uses the in-tunnel advanced grouting equipment to grout the broken zone soil above the soil bin and in front of the cutterhead through the shield advance grouting hole, and then grouting is used to reinforce the face through the reserved ball valve of the soil bin partition. Through reinforcement, the stability of the surrounding rock of the broken zone is improved and the permeability of the surrounding rock is reduced, the investment cost of multiple mode conversions is reduced, and the construction safety is guaranteed, the excavation risk and the safety of surface buildings (structures) are reduced, and the domestic existing There is a construction method of single-shield EPB+TBM dual-mode shield machine passing through the broken zone in TBM mode; through fixed-point advance grouting, it can reduce 2 or even multiple mode conversions, indirectly reduce the use of a large number of steel products (slag bucket / plate), welding consumables, and various grease consumables, and indirectly reduce the loss of electricity, shield tail grease, main bearing sealing grease, gear oil, industrial hydraulic oil and other oil products, with significant energy-saving and consumption-reduction and environmental protection benefits; at the same time, this construction method can enable the single-shield dual-mode shield machine to safely and smoothly excavate the broken zone strata using the TBM mode without exchanging the EPB and TBM modes, reducing a large amount of man-hour loss while avoiding the investment of 2 or more mode conversion costs.

[0010] Preferably, a grouting nozzle is installed at the end of the grouting pipe away from the grouting pump, a mounting frame is fixed inside the grouting nozzle, an elastic plate is fixed inside the mounting frame, a detection membrane is fixed inside the mounting frame, a transmission rod is fixed on the side of the detection membrane away from the center of the grouting nozzle, a sliding contact is fixed on the end of the transmission rod away from the detection membrane, a pressure-maintaining contact is slidably connected to the outside of the sliding contact, a boosting contact is fixed on the end of the pressure-maintaining contact close to the center of the grouting nozzle, a decompression contact is fixed on the end of the pressure-maintaining contact away from the boosting contact, a transmission plate is fixed on the end of the sliding contact away from the transmission rod, and the transmission A reset spring is fixed between the plate and the grouting nozzle; when working, the pressure inside the slurry will act on the detection membrane at the same time, causing the detection membrane to deform. After the deformation, the detection membrane will drive the transmission rod to move, and the movement of the transmission rod will drive the sliding contact to move. The movement of the sliding contact will in turn drive the transmission plate to stretch the reset spring to deform it. During the movement of the sliding contact, it will slide between the pressure maintaining contact, the pressure reducing contact, and the pressure increasing contact according to the slurry pressure inside the grouting nozzle. In this way, the slurry pressure inside the grouting nozzle can be detected in real time, thereby judging the grouting pressure and ensuring the stability of the grouting operation.

[0011] Preferably, a transition ring is fixed between the grouting pipe and the grouting nozzle, and the inner diameter of the transition ring near the grouting nozzle is smaller than the inner diameter of the transition ring near the grouting pipe. During operation, the design of the transition ring can effectively buffer the transportation of the slurry, preventing the slurry from directly colliding with the grouting nozzle and causing damage to the grouting nozzle. At the same time, the change in its internal pipe diameter can also help to increase the pressure of the slurry.

[0012] Preferably, guide rods are fixed on both sides of the transmission plate, an elastic airbag is fixed on one end of the guide rod away from the transmission plate, and a high-pitched whistle is connected to the other end of the elastic airbag away from the guide rod; during operation, once the slurry pressure is abnormal, the transmission plate will simultaneously drive the guide rod to move during the movement of the transmission plate, and the movement of the guide rod will pull the elastic airbag to expand or contract, and airflow will be generated during the deformation of the elastic airbag. The airflow will cause the high-pitched whistle to vibrate when flowing through it, and then emit a sharp whistle, thereby reminding external employees that the grouting pressure is abnormal and to check it in time.

[0013] Preferably, a plurality of connecting plates are fixed to one side of the elastic plate away from the center of the grouting nozzle, a telescopic rod is fixed to one side of the connecting plate away from the elastic plate, and a driving assembly is installed on one end of the telescopic rod away from the connecting plate; during operation, once the slurry pressure inside the grouting nozzle is too large or too small, the driving assembly will receive a signal and start to drive the telescopic rod to move, the movement of the telescopic rod drives the connecting plate to move, the movement of the connecting plate pulls the elastic plate to deform it, and the inner diameter of the grouting nozzle is changed by changing the shape of the elastic plate, thereby automatically controlling the pressure of the slurry sprayed out, so that even if the grouting pump is abnormal or the employee forgets to adjust it, the equipment can automatically adjust the injection pressure of the slurry to improve the grouting quality.

[0014] Preferably, a plurality of groups of elastic sheets are fixed to one side of the elastic plate close to the center of the grouting nozzle, and the position of the elastic sheet corresponds to the position of the connecting plate, a plurality of groups of stirring rods are fixed to the end of the elastic sheet away from the elastic plate, and a counterweight ball is fixed to the end of the stirring rod away from the elastic sheet; during operation, during the deformation of the elastic plate, it will simultaneously drive the elastic sheet to move, and the movement of the elastic sheet will drive the stirring rod and the counterweight ball to move, and the stirring rod and the counterweight ball will stir the slurry inside the grouting nozzle during the movement, thereby making the slurry more homogenous and improving the injection effect of the slurry, and during the injection of the slurry from the grouting nozzle, it will also collide with the stirring rod and the counterweight ball, which can also achieve the effect of homogenizing the slurry.

[0015] Preferably, a magnetic shell is fixed to the outside of the driving component, and a follower magnet is fixed to the inside of the elastic plate; during operation, the setting of the follower magnet and the magnetic shell can make the elastic plate stabilize faster after movement, reducing the influence of its inertial force on the elastic plate, thereby improving the accuracy of the elastic plate in pressure control.

[0016] Preferably, a toggle rod is provided on the outside of the connecting plate, and the toggle rod is fixedly connected to the elastic plate, and a knocking ball is fixed to the end of the toggle rod away from the elastic plate; when working, the elastic plate will simultaneously pull the toggle rod to move during the deformation process, and the movement of the toggle rod will drive the knocking ball to move. After the movement of the knocking ball, the outer shell of the grouting nozzle will be knocked according to the movement stroke of the elastic plate, thereby causing the grouting nozzle to vibrate. After the vibration, the grouting nozzle will vibrate the outside, thereby improving the grouting effect.

[0017] Preferably, the knocking ball is slidably connected to the outside with multiple groups of bouncing balls, a vibration rod is fixed to the end of the bouncing ball away from the knocking ball, and a vibrating rod is fixed to the end of the vibrating rod away from the bouncing ball; when working, the bouncing ball will be knocked on the bouncing ball at the same time during the movement of the toggle rod, and after being knocked, the bouncing ball will drive the vibrating rod to deform and then bounce back and forth, thereby driving the vibrating rod to vibrate, and this vibration force will be transmitted to the grouting nozzle, thereby increasing the vibration amplitude of the grouting nozzle, and further improving the vibration effect of the grouting nozzle on the outside.

[0018] Preferably, multiple groups of connecting ropes are fixed inside the counterweight ball, and a stirring ball is fixed at one end of the connecting rope away from the counterweight ball, and multiple groups of spray holes are opened inside the counterweight ball; when working, when the water flow hits the counterweight ball, the counterweight ball will move accordingly, and at this time, the stirring ball inside the counterweight ball will stir back and forth inside the counterweight ball under the action of inertia force, thereby hitting the cleaning powder inside the counterweight ball, so that the powder can be discharged through the spray holes, thereby improving the cleaning effect and facilitating the subsequent grouting.

[0019] The beneficial effects of the present invention are as follows:

[0020] 1. The single-shield dual-mode shield tunneling construction method for crossing a broken zone in TBM mode described in the present invention determines the location of the broken zone through detailed survey, supplementary survey and advanced geological prediction (adopted by TBM), grouting is performed on the soil in the broken zone for reinforcement, and then grouting is performed on the heading face through the reserved ball valve of the soil bin partition to improve the stability of the surrounding rock in the broken zone and reduce the permeability of the surrounding rock, thereby reducing the investment cost of multiple mode conversions while ensuring construction safety, reducing the excavation risk and the safety of surface buildings (structures).

[0021] 2. The single-shield dual-mode shield machine described in the present invention is used for the excavation construction method of crossing the broken zone in TBM mode. The sliding contacts will slide between the pressure-maintaining contacts, the pressure-reducing contacts, and the pressure-increasing contacts according to the slurry pressure inside the grouting nozzle. In this way, the slurry pressure inside the grouting nozzle can be detected in real time, thereby judging the grouting pressure and ensuring the stability of the grouting operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The present invention will be further described below in conjunction with the accompanying drawings.

[0023] Figure 1 is a flow chart of the method of the present invention;

[0024] Figure 2 It is a cross-sectional view of the grouting pipe structure in the present invention;

[0025] Figure 3 It is a cross-sectional view of the grouting nozzle structure in the present invention;

[0026] Figure 4 The present invention Figure 3A partial enlarged view of the middle part;

[0027] Figure 5 The present invention Figure 3 A partial enlarged view of point B in the middle;

[0028] Figure 6 It is a cross-sectional view of the weighted ball structure of the present invention.

[0029] In the figure: 1. grouting pipe; 2. grouting nozzle; 3. transition ring; 4. elastic plate; 5. mounting frame; 6. detection film; 7. transmission rod; 8. sliding contact; 9. pressure-maintaining contact; 10. pressure-reducing contact; 11. pressure-increasing contact; 12. transmission plate; 13. reset spring; 14. guide rod; 15. elastic air bag; 16. high-pitched whistle; 17. driving assembly; 18. telescopic rod; 19. connecting plate; 20. elastic sheet; 21. stirring rod; 22. weighted ball; 23. magnetic shell; 24. follow-up magnet; 25. toggle rod; 26. knocking ball; 27. bouncing ball; 28. vibration rod; 29. ​​vibrating rod; 30. connecting rope; 31. stirring ball; 32. spray hole. DETAILED DESCRIPTION

[0030] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.

[0031] Embodiment 1

[0032] like Figure 1 As shown, the single-shield dual-mode shield tunneling construction method for crossing a broken zone in TBM mode according to an embodiment of the present invention includes the following steps:

[0033] S1, set up the advance grouting platform, then fix the drilling rig, perform drilling operation, inject water to wash the pipe after the drilling operation, inject a mixture of phosphoric acid / water glass after washing the pipe, and then perform grouting operation through the grouting pipe 1;

[0034] S2, drilling to a depth of 12 meters from the cutterhead, during which the grouting operation is divided into six sections;

[0035] S3, during the grouting operation, the pressure is controlled at 0.6MPa. After the grouting is completed, the grouting reinforcement of the advance hole is completed, and the steps are repeated to complete the grouting reinforcement of the remaining three advance holes;

[0036] S4. Check the grouting effect. If it is qualified, complete the grouting reinforcement of this section. If it is unqualified or the front needs reinforcement, return to the grouting operation step. During operation, this method determines the location of the broken zone through detailed survey, supplementary survey and advanced geological prediction (TBM adoption), and uses the in-tunnel advanced grouting equipment to grout the broken zone soil above the soil bin and in front of the cutterhead through the shield advance grouting hole, and then grouting is used to reinforce the face through the reserved ball valve of the soil bin partition. Through reinforcement, the stability of the surrounding rock of the broken zone is improved and the permeability of the surrounding rock is reduced, the investment cost of multiple mode conversions is reduced, and the construction safety is guaranteed, the excavation risk and the safety of surface buildings (structures) are reduced, and the domestic existing There is a construction method of single-shield EPB+TBM dual-mode shield machine passing through the broken zone in TBM mode; through fixed-point advance grouting, it can reduce 2 or even multiple mode conversions, indirectly reduce the use of a large number of steel products (slag bucket / plate), welding consumables, and various grease consumables, and indirectly reduce the loss of electricity, shield tail grease, main bearing sealing grease, gear oil, industrial hydraulic oil and other oil products, with significant energy-saving and consumption-reduction and environmental protection benefits; at the same time, this construction method can enable the single-shield dual-mode shield machine to safely and smoothly excavate the broken zone strata using the TBM mode without exchanging the EPB and TBM modes, reducing a large amount of man-hour loss while avoiding the investment of 2 or more mode conversion costs.

[0037] like Figures 2 to 4 As shown, a grouting nozzle 2 is installed at the end of the grouting pipe 1 away from the grouting pump, a mounting frame 5 is fixed inside the grouting nozzle 2, an elastic plate 4 is fixed inside the mounting frame 5, a detection membrane 6 is fixed inside the mounting frame 5, a transmission rod 7 is fixed on the side of the detection membrane 6 away from the center of the grouting nozzle 2, a sliding contact 8 is fixed on the end of the transmission rod 7 away from the detection membrane 6, a pressure-maintaining contact 9 is slidably connected to the outside of the sliding contact 8, a boost contact 11 is fixed on the end of the pressure-maintaining contact 9 close to the center of the grouting nozzle 2, a decompression contact 10 is fixed on the end of the pressure-maintaining contact 9 away from the boost contact 11, a transmission plate 12 is fixed on the end of the sliding contact 8 away from the transmission rod 7, and the A reset spring 13 is fixed between the transmission plate 12 and the grouting nozzle 2; during operation, the pressure inside the slurry will act on the detection membrane 6 at the same time, thereby causing the detection membrane 6 to deform. After the deformation, the detection membrane 6 will drive the transmission rod 7 to move, and the movement of the transmission rod 7 will drive the sliding contact 8 to move. The movement of the sliding contact 8 will in turn drive the transmission plate 12 to stretch the reset spring 13 to deform it. During the movement of the sliding contact 8, it will slide between the pressure maintaining contact 9, the pressure reducing contact 10, and the pressure increasing contact 11 according to the slurry pressure inside the grouting nozzle 2. In this way, the slurry pressure inside the grouting nozzle 2 can be detected in real time, thereby judging the grouting pressure and ensuring the stability of the grouting operation.

[0038] like Figure 2As shown, a transition ring 3 is fixed between the grouting pipe 1 and the grouting nozzle 2, and the inner diameter of the transition ring 3 close to the grouting nozzle 2 is smaller than the inner diameter of the transition ring 3 close to the grouting nozzle 2. During operation, the design of the transition ring 3 can effectively buffer the transportation of the slurry, preventing the slurry from directly colliding with the grouting nozzle 2 and causing damage to the grouting nozzle 2. At the same time, the change in its internal pipe diameter can also help to increase the pressure of the slurry.

[0039] like Figure 4 As shown, guide rods 14 are fixed on both sides of the transmission plate 12, and an elastic airbag 15 is fixed to one end of the guide rod 14 away from the transmission plate 12, and a high-pitched whistle 16 is connected to one end of the elastic airbag 15 away from the guide rod 14; during operation, once the slurry pressure is abnormal, the transmission plate 12 will simultaneously drive the guide rod 14 to move during the movement, and the movement of the guide rod 14 will pull the elastic airbag 15 to expand or contract, and airflow will be generated during the deformation of the elastic airbag 15. The airflow will cause the high-pitched whistle 16 to vibrate when flowing through it, and then emit a sharp whistle, thereby reminding external employees that the grouting pressure is abnormal and to check in time.

[0040] like Figure 5 As shown, a plurality of connecting plates 19 are fixed to one side of the elastic plate 4 away from the center of the grouting nozzle 2, a telescopic rod 18 is fixed to one side of the connecting plate 19 away from the elastic plate 4, and a driving assembly 17 is installed at one end of the telescopic rod 18 away from the connecting plate 19; during operation, once the slurry pressure inside the grouting nozzle 2 is too large or too small, the driving assembly 17 will receive a signal and start to drive the telescopic rod 18 to move, the movement of the telescopic rod 18 drives the connecting plate 19 to move, the movement of the connecting plate 19 pulls the elastic plate 4 to deform it, and changes the shape of the elastic plate 4 and thus changes the inner diameter of the grouting nozzle 2, thereby automatically controlling the pressure of the slurry spraying, so that even if the grouting pump is abnormal or the employee forgets to adjust it, the equipment can also automatically adjust the injection pressure of the slurry to improve the grouting quality.

[0041] like Figure 5As shown, a plurality of groups of elastic sheets 20 are fixed to one side of the elastic plate 4 close to the center of the grouting nozzle 2, and the position of the elastic sheet 20 corresponds to the position of the connecting plate 19, and a plurality of groups of stirring rods 21 are fixed to the end of the elastic sheet 20 away from the elastic plate 4, and a counterweight ball 22 is fixed to the end of the stirring rod 21 away from the elastic sheet 20; during operation, during the deformation of the elastic plate 4, it will simultaneously drive the elastic sheet 20 to move, and the movement of the elastic sheet 20 will drive the stirring rod 21 and the counterweight ball 22 to move, and the stirring rod 21 and the counterweight ball 22 will stir the slurry inside the grouting nozzle 2 during the movement, thereby making the slurry more homogenous and improving the injection effect of the slurry, and during the injection of the slurry from the grouting nozzle 2, it will also collide with the stirring rod 21 and the counterweight ball 22, which can also achieve the effect of homogenizing the slurry.

[0042] like Figure 5 As shown, a magnetic shell 23 is fixed to the outside of the driving component 17, and a follower magnet 24 is fixed to the inside of the elastic sheet 20; when working, the setting of the follower magnet 24 and the magnetic shell 23 can make the elastic sheet 20 stabilize faster after movement, reduce the influence of its inertia force on the elastic plate 4, thereby improving the accuracy of the elastic plate 4 for pressure control.

[0043] like Figure 5 As shown, a toggle rod 25 is provided on the outside of the connecting plate 19, and the toggle rod 25 is fixedly connected to the elastic plate 4, and a knocking ball 26 is fixed on the end of the toggle rod 25 away from the elastic plate 4; when working, the elastic plate 4 will simultaneously pull the toggle rod 25 to move during the deformation process, and the movement of the toggle rod 25 will drive the knocking ball 26 to move. After the movement of the knocking ball 26, the outer shell of the grouting nozzle 2 will be knocked according to the movement stroke of the elastic plate 4, thereby causing the grouting nozzle 2 to vibrate. After the vibration, the grouting nozzle 2 will vibrate the outside, thereby improving the grouting effect.

[0044] like Figure 5 As shown, the knocking ball 26 is externally slidably connected to a plurality of groups of bouncing balls 27, a vibration rod 28 is fixed to the end of the bouncing ball 27 away from the knocking ball 26, and a vibrating rod 29 is fixed to the end of the vibrating rod 28 away from the bouncing ball 27; during operation, the toggle rod 25 will knock on the bouncing ball 27 at the same time during its movement, and the bouncing ball 27 will drive the vibration rod 28 to deform and then bounce back and forth after being knocked, thereby driving the vibrating rod 29 to vibrate, and this vibration force will be transmitted to the grouting nozzle 2, thereby increasing the vibration amplitude of the grouting nozzle 2, and thereby improving the vibration effect of the grouting nozzle 2 on the outside.

[0045] Embodiment 2

[0046] like Figure 6As shown, compared with Example 1, another implementation of the present invention is: a plurality of groups of connecting ropes 30 are fixed inside the counterweight ball 22, a stirring ball 31 is fixed at one end of the connecting rope 30 away from the counterweight ball 22, and a plurality of groups of injection holes 32 are opened inside the counterweight ball 22; during operation, when the water flow hits the counterweight ball 22, the counterweight ball 22 will move accordingly, and at this time, the stirring ball 31 inside the counterweight ball 22 will reciprocate and stir inside the counterweight ball 22 under the action of inertia force, thereby hitting the cleaning powder inside the counterweight ball 22, so that the powder can be discharged through the injection hole 32, thereby improving the cleaning effect and facilitating the subsequent grouting.

[0047] Working principle: This method determines the location of the broken zone through detailed investigation, supplementary survey and advanced geological prediction (TBM adoption), and uses in-tunnel advanced grouting equipment to grout the broken zone soil above the soil bin and in front of the cutterhead through the shield advance grouting hole, and then grouting the face through the reserved ball valve of the soil bin partition; through reinforcement, the stability of the surrounding rock of the broken zone is improved and the permeability of the surrounding rock is reduced, while reducing the investment cost of multiple mode conversions and ensuring construction safety, reducing the risk of excavation and the safety of surface buildings (structures), enriching the existing domestic single shield EPB + TBM dual-mode shield machine in TBM mode Construction method for penetrating broken zones; through fixed-point advance grouting, it can reduce 2 or even multiple mode conversions, indirectly reduce the use of a large number of steel products (slag buckets / plates), welding consumables, and various grease consumables, and indirectly reduce the loss of electric energy, shield tail grease, main bearing sealing grease, gear oil, industrial hydraulic oil and other oil products, with significant energy-saving and consumption-reduction and environmental protection benefits; at the same time, this construction method can enable a single-shield dual-mode shield machine to safely and smoothly excavate the broken zone strata using the TBM mode without exchanging the EPB and TBM modes, reducing a large amount of man-hour loss while avoiding the investment of 2 or more mode conversion costs;

[0048] When the grouting operation is performed, the slurry will flow into the grouting nozzle 2 through the grouting pipe 1, and then be injected to the outside through the grouting nozzle 2. In the process of the slurry being ejected through the grouting nozzle 2, the pressure inside the slurry will simultaneously act on the detection film 6, thereby causing the detection film 6 to deform. After the deformation, the detection film 6 will drive the transmission rod 7 to move, and the movement of the transmission rod 7 will drive the sliding contact 8 to move. The movement of the sliding contact 8 will drive the transmission plate 12 to stretch the reset spring 13 to deform it. During the movement of the sliding contact 8, it will slide between the pressure-maintaining contact 9, the pressure-reducing contact 10, and the pressure-increasing contact 11 according to the slurry pressure inside the grouting nozzle 2. In this way, the slurry pressure inside the grouting nozzle 2 can be detected in real time, thereby judging the pressure of the grouting, and ensuring the stability of the grouting operation.

[0049] The design of the transition ring 3 can effectively buffer the transportation of the slurry, prevent the slurry from directly colliding with the grouting nozzle 2 and causing damage to the grouting nozzle 2, and at the same time, the change of its internal pipe diameter can also help the slurry to increase the pressure; and once the slurry pressure is abnormal, during the movement of the transmission plate 12, it will simultaneously drive the guide rod 14 to move, and the movement of the guide rod 14 will pull the elastic airbag 15 to expand or contract, and in the process of the deformation of the elastic airbag 15, airflow will be generated, and the airflow will cause the high-pitched whistle 16 to vibrate when it flows through it, and then emit a sharp whistle, so as to remind external employees that the grouting pressure is abnormal and check it in time;

[0050] Once the slurry pressure inside the grouting nozzle 2 is too high or too low, the driving assembly 17 will receive a signal and start to drive the telescopic rod 18 to move. The movement of the telescopic rod 18 drives the connecting plate 19 to move. The movement of the connecting plate 19 pulls the elastic plate 4 to deform it. By changing the shape of the elastic plate 4, the inner diameter of the grouting nozzle 2 is changed, thereby automatically controlling the pressure of the slurry spraying. In this way, even if the grouting pump is abnormal or the employee forgets to adjust it, the equipment can automatically adjust the injection pressure of the slurry to improve the grouting quality.

[0051] During the deformation of the elastic plate 4, it will simultaneously drive the elastic sheet 20 to move, and the movement of the elastic sheet 20 will drive the stirring rod 21 and the counterweight ball 22 to move. During the movement, the stirring rod 21 and the counterweight ball 22 will stir the slurry inside the grouting nozzle 2, thereby making the slurry more homogenous and improving the injection effect of the slurry. In addition, during the injection of the slurry from the grouting nozzle 2, it will also collide with the stirring rod 21 and the counterweight ball 22, which can also achieve the effect of homogenizing the slurry. The arrangement of the follower magnet 24 and the magnetic shell 23 can make the elastic sheet 20 stabilize quickly after the movement, reduce the influence of its inertial force on the elastic plate 4, and thus improve the accuracy of the elastic plate 4 for pressure control.

[0052] During the deformation process, the elastic plate 4 will simultaneously pull the toggle rod 25 to move, and the movement of the toggle rod 25 will drive the knocking ball 26 to move. After the knocking ball 26 moves, it will knock the outer shell of the grouting nozzle 2 according to the movement stroke of the elastic plate 4, thereby causing the grouting nozzle 2 to vibrate. After the vibration, the grouting nozzle 2 will vibrate the outside, thereby improving the grouting effect; during the movement of the toggle rod 25, it will simultaneously knock the bouncing ball 27, and after being knocked, the bouncing ball 27 will drive the vibration rod 28 to deform and then bounce back and forth, thereby driving the vibration rod 29 to vibrate, and this vibration force will be transmitted to the grouting nozzle 2, thereby increasing the vibration amplitude of the grouting nozzle 2, and thereby improving the vibration effect of the grouting nozzle 2 on the outside;

[0053] Before starting grouting, water needs to be injected to clean the grouting pipe 1. During this process, when the water flow hits the counterweight ball 22, the counterweight ball 22 will move accordingly. At this time, the stirring ball 31 inside the counterweight ball 22 stirs back and forth inside the counterweight ball 22 under the action of inertia, thereby hitting the cleaning powder inside the counterweight ball 22, allowing the powder to be discharged through the injection hole 32, thereby improving the cleaning effect and facilitating subsequent grouting.

[0054] The above-mentioned front, back, left, right, top and bottom are all based on the figures in the specification. Figure 1 As a benchmark, according to the person's observation perspective, the side of the device facing the observer is defined as the front, the left side of the observer is defined as the left, and so on.

[0055] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the scope of protection of the present invention.

[0056] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A single-shield dual-mode shield tunneling construction method in TBM mode to cross a broken zone, characterized by: The following steps are involved: S1, setting up an advance grouting platform, then fixing the drilling rig, and performing drilling operations. After the drilling operations, water is injected to wash the pipes. After the pipes are washed, a mixture of phosphoric acid / water glass is injected, and then grouting operations are performed through the grouting pipe (1); S2, drilling to a depth of 12 meters from the cutterhead, during which the grouting operation is divided into six sections; S3, during the grouting operation, the pressure is controlled at 0.6 MPa. After the grouting is completed, the grouting reinforcement of the advanced hole is completed, and steps S1-S3 are repeated to complete the grouting reinforcement of the remaining three advanced holes; S4, check the grouting effect. If it is qualified, complete the grouting reinforcement. If it is unqualified or the front needs to be reinforced, return to the grouting operation step; A grouting nozzle (2) is installed at one end of the grouting pipe (1) away from the grouting pump, a mounting frame (5) is fixed inside the grouting nozzle (2), an elastic plate (4) is fixed inside the mounting frame (5), a detection membrane (6) is fixed inside the mounting frame (5), a transmission rod (7) is fixed on the side of the detection membrane (6) away from the center of the grouting nozzle (2), a sliding contact (8) is fixed on the end of the transmission rod (7) away from the detection membrane (6), a pressure-maintaining contact (9) is slidably connected to the outside of the sliding contact (8), a pressure-maintaining contact (11) is fixed on the end of the pressure-maintaining contact (9) close to the center of the grouting nozzle (2), a pressure-reducing contact (10) is fixed on the end of the pressure-maintaining contact (9) away from the pressure-increasing contact (11), a transmission plate (12) is fixed on the end of the sliding contact (8) away from the transmission rod (7), and a return spring (13) is fixed between the transmission plate (12) and the grouting nozzle (2).

2. The single-shield dual-mode shield tunneling construction method for tunneling through a broken zone in TBM mode according to claim 1, characterized in that: A transition ring (3) is fixed between the grouting pipe (1) and the grouting nozzle (2), and the inner diameter of the end of the transition ring (3) close to the grouting nozzle (2) is smaller than the inner diameter of the end of the transition ring (3) close to the grouting nozzle (2).

3. The single-shield dual-mode shield tunneling construction method for tunneling through a broken zone in TBM mode according to claim 1, characterized in that: Guide rods (14) are fixed to both sides of the transmission plate (12); an elastic air bag (15) is fixed to one end of the guide rod (14) away from the transmission plate (12); and a high-pitched whistle (16) is connected to one end of the elastic air bag (15) away from the guide rod (14).

4. The single-shield dual-mode shield tunneling construction method for tunneling through a broken zone in TBM mode according to claim 1 is characterized in that: A plurality of groups of connecting plates (19) are fixed to one side of the elastic plate (4) away from the center of the grouting nozzle (2), a telescopic rod (18) is fixed to one side of the connecting plate (19) away from the elastic plate (4), and a driving assembly (17) is installed at one end of the telescopic rod (18) away from the connecting plate (19).

5. The single-shield dual-mode shield tunneling construction method for tunneling through a broken zone in TBM mode according to claim 1 is characterized in that: A plurality of groups of elastic sheets (20) are fixed to one side of the elastic plate (4) close to the center of the grouting nozzle (2), and the position of the elastic sheet (20) corresponds to the position of the connecting plate (19). A plurality of groups of stirring rods (21) are fixed to one end of the elastic sheet (20) away from the elastic plate (4), and a weight ball (22) is fixed to one end of the stirring rod (21) away from the elastic sheet (20).

6. The single-shield dual-mode shield tunneling construction method for tunneling through a broken zone in TBM mode according to claim 5 is characterized in that: A magnetic housing (23) is fixed on the outside of the driving component (17), and a follower magnet (24) is fixed on the inside of the elastic sheet (20).

7. The single-shield dual-mode shield tunneling construction method for tunneling through a broken zone in TBM mode according to claim 4 is characterized in that: A toggle rod (25) is disposed outside the connection plate (19), the toggle rod (25) is fixedly connected to the elastic plate (4), and a knocking ball (26) is fixed to one end of the toggle rod (25) away from the elastic plate (4).

8. The single-shield dual-mode shield tunneling construction method for tunneling through a broken zone in TBM mode according to claim 7, characterized in that: The knocking ball (26) is externally slidably connected to a plurality of groups of bouncing balls (27); a vibration rod (28) is fixed to one end of the bouncing ball (27) away from the knocking ball (26); and a vibrating rod (29) is fixed to one end of the vibrating rod (28) away from the bouncing ball (27).

9. The single-shield dual-mode shield tunneling construction method for tunneling through a broken zone in TBM mode according to claim 5, characterized in that: A plurality of connection ropes (30) are fixed inside the counterweight ball (22), an agitation ball (31) is fixed to one end of the connection rope (30) away from the counterweight ball (22), and a plurality of injection holes (32) are provided inside the counterweight ball (22).