Implementation process control method and system for batch change of DCS in nuclear power plants

By acquiring and analyzing DCS change packages, generating change task tables and displaying them graphically, the issues of safety, speed, and accuracy in batch changes of DCS in nuclear power plants are resolved, enabling more efficient change implementation and risk management.

CN114740811BActive Publication Date: 2024-11-22TAISHAN NUCLEAR POWER JOINT VENTURE CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202210408686.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-04-19
Publication Date
2024-11-22
Estimated Expiration
2042-04-19

AI Technical Summary

Technical Problem

During the batch modification of DCS in nuclear power plants, how to ensure the safety, speed and accuracy of the modification implementation, especially in EPR units where there are design defects and complex control logic changes, existing technologies have problems such as low implementation efficiency, high risk and high probability of human error.

Method used

By acquiring batch change packages, extracting DCS change items, obtaining their logical relationships, generating a change task table, and displaying it graphically, the task table is output to execute the changes. At the same time, task verification and correction are performed, and the operation method is optimized by calculation and evaluation to reduce human error and improve the degree of automation.

Benefits of technology

It significantly improves the automation and accuracy of DCS logical changes, reduces the labor intensity of personnel, reduces the risks and time losses during the change implementation process, and improves the security and efficiency of changes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114740811B_ABST
    Figure CN114740811B_ABST
Patent Text Reader

Abstract

The present application discloses a control method and system for the implementation process of batch changes of DCS in nuclear power plants. First, a batch change package is obtained, and each DCS change item is extracted from the batch change package; then the DCS logical relationship between each DCS change item is obtained to generate a DCS change task table according to the logical relationship between each DCS change item; then the DCS change task table is output to perform batch changes to the DCS of the nuclear power plant according to the DCS change task table. By calculating and evaluating the implementation process of DCS batch changes, the operation mode can be more reasonably optimized, potential risks can be discovered and eliminated in a timely manner, and work efficiency can be improved. Moreover, the automation and accuracy of DCS logic change inspection can be significantly improved, and the labor intensity of personnel can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of DCS of nuclear power plants, and in particular to a process control method and system for implementing batch changes of DCS of nuclear power plants. Background Art

[0002] Nuclear power DCS (Digital Control System, referred to as DCS in English) has the characteristics of multiple systems, high degree of automation, and complex control logic structure. Taking the EPR nuclear power plant as an example, a single unit has as many as 450 subsystems, tens of thousands of pages of DCS control logic diagrams, hundreds of thousands of logic control modules, and millions of parameters. Although the DCS system has been tested in the design stage, there will inevitably be design defects or non-conformities during on-site commissioning and operation. These design defects or non-conformities are fed back to the DCS system designer according to specific processes and channels. The designer records and analyzes the problems, provides solutions, and issues formal change documents after verification and confirmation. The nuclear power plant then solidifies the change content into the DCS system according to the formal change document to form a complete closed loop. Generally, there will be a large number of control logic changes that need to be implemented on-site during the unit commissioning and startup phase and the first few refueling cycles of the unit's commercial operation, especially the first unit has a larger amount of changes. Therefore, there is an urgent need for an implementation process control method for batch changes of DCS in nuclear power plants to ensure that batch changes of DCS in nuclear power plants are safer, faster, and more accurate. Summary of the invention

[0003] The technical problem to be solved by this application is how to ensure that the batch change implementation process is safer, faster and more accurate when the DCS of a nuclear power plant is changed in batches.

[0004] In a first aspect, an embodiment provides a process control method for implementing a batch change of a DCS in a nuclear power plant, comprising:

[0005] Acquire a batch change package; the batch change package includes at least one DCS change item, and the DCS change item is used to express the change of at least one DCS parameter or DCS control logic;

[0006] Extracting each of the DCS change items from the batch change package;

[0007] Obtaining a DCS logical relationship between each of the DCS change items;

[0008] A DCS change task table is generated according to the logical relationship between each of the DCS change items; the DCS change task table includes at least one DCS change task; each of the DCS change tasks is generated according to the logical relationship between the DCS change items; each of the DCS change tasks includes at least one DCS change item;

[0009] The DCS change task list is outputted to execute batch changes to the DCS of the nuclear power plant according to the DCS change task list.

[0010] In one embodiment, the implementation process control method further includes:

[0011] Obtaining a DCS change completion table; the DCS change completion table is used to express information about the completed DCS change tasks;

[0012] The DCS change completion table is compared with the DCS change task table to obtain task verification results, and a new DCS change task table is output; the task verification results are used to express the execution accuracy of each completed DCS change task; the new DCS change task table is used to represent the unfinished DCS change tasks.

[0013] In one embodiment, the process control method is implemented, further comprising:

[0014] A DCS change correction table is outputted according to the task verification result; the DCS change correction table is used to indicate the information of the DCS change task that has been completed and has errors, so as to track and re-execute the changes of the DCS change task that has errors.

[0015] In one embodiment, obtaining a batch change package includes:

[0016] A DCS batch change file is obtained, and the DCS batch change file is converted into the batch change package; the DCS batch change file is a description file of the DCS batch change; the DCS batch change file includes a control logic page file, a screen configuration file and / or a digital program file that can be compiled and downloaded by the DCS configuration software; the type of the DCS batch change file includes a text format, a PDF format and / or a Visio format.

[0017] In one embodiment, the obtaining of the DCS logical relationship between each of the DCS change items includes:

[0018] Obtain DCS operation mathematical model;

[0019] Input each of the DCS change items into the DCS operation mathematical model, and obtain the DCS logical relationship between each of the DCS change items output by the DCS operation mathematical model;

[0020] The DCS logical relationship includes a general-specific relationship, a primary-secondary relationship, a parallel relationship, a progressive relationship, a point-to-surface relationship, a cause-effect relationship, a virtual-real relationship, and / or a qualitative-quantitative relationship.

[0021] In one embodiment, the method for acquiring the DCS operation mathematical model includes:

[0022] A mathematical model is constructed based on the nuclear power plant DCS system and the DCS data outputted before the nuclear power plant DCS system is batch-changed.

[0023] In one embodiment, implementing the process control method further includes:

[0024] Obtaining DCS data output after batch changes of the DCS system of the nuclear power plant;

[0025] Obtaining DCS data output after batch changes to the DCS operation mathematical model;

[0026] Verifying the DCS data output after the batch change of the DCS running mathematical model and comparing the DCS data output after the batch change of the nuclear power plant DCS system to obtain DCS verification result data;

[0027] The DCS batch change is verified according to the DCS verification result data.

[0028] In one embodiment, the outputting the DCS change task table includes:

[0029] The DCS change task table is graphically displayed; the graphical display includes graphically displaying the task parameters and task relationships of each DCS change task; the task parameters include change batch, change system, change modification page, change modification type, change modification item brief description and / or detailed change modification description; the task relationship includes graphically displaying the logical relationship between each DCS change item;

[0030] The graphical display is used to implement the list list, mapping relationship, control logic change information, change execution order and / or sequence storage information of each DCS change task in the DCS change task table.

[0031] In a second aspect, an embodiment provides a computer-readable storage medium having a program stored thereon; the program can be executed by a processor to implement the process control method as described in the first aspect.

[0032] In a third aspect, an embodiment provides a process control system for implementing batch changes of DCS in a nuclear power plant, including:

[0033] A change item extraction device, used for obtaining a batch change package and extracting each DCS change item from the batch change package; the batch change package includes at least one DCS change item, and the DCS change item is used to express the change of at least one DCS parameter or DCS control logic;

[0034] A task table generating device is used for acquiring the DCS logical relationship between each of the DCS change items, and generating a DCS change task table according to the logical relationship between each of the DCS change items; the DCS logical relationship includes a general-specific relationship, a primary-secondary relationship, a parallel relationship, a progressive relationship, a point-to-surface relationship, a cause-and-effect relationship, a virtual-real relationship and / or a qualitative-quantitative relationship; the DCS change task table includes at least one DCS change task; each of the DCS change tasks includes at least one of the DCS change items, and is generated according to the logical relationship between the DCS change items;

[0035] The task output device is used to output the DCS change task table so as to execute batch changes to the DCS of the nuclear power plant according to the DCS change task table.

[0036] The implementation process control system in the above-mentioned embodiment includes a change item extraction device, a task table generation device and a task output device. First, the change item extraction device obtains the batch change package and extracts each DCS change item from the batch change package. Then, the task table generation device obtains the DCS logical relationship between each DCS change item and generates a DCS change task table based on the logical relationship between each DCS change item. Finally, the DCS change task table is output by the task output device to perform batch changes to the DCS of the nuclear power plant according to the DCS change task table. Since the implementation process of DCS batch changes is calculated and evaluated, the operation mode can be more reasonably optimized, potential risks can be discovered and eliminated in a timely manner, and work efficiency can be improved. It can also significantly improve the automation and accuracy of DCS logic change inspections and reduce the labor intensity of personnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 This is a schematic diagram of the number of pages modified in the same batch change of the nuclear power plant DCS;

[0038] Figure 2 A schematic diagram of changes involving a modified page;

[0039] Figure 3 A schematic diagram of a process flow diagram for implementing a process control method in an embodiment;

[0040] Figure 4 A schematic diagram of a graphical display of a DCS change task table in an embodiment;

[0041] Figure 5 A schematic diagram of structural connections for implementing a process control system in another embodiment;

[0042] Figure 6 A schematic diagram of a process control method for implementing another embodiment;

[0043] Figure 7 It is a schematic diagram of the structural connection of a process control system in another embodiment. DETAILED DESCRIPTION

[0044] The present invention is further described in detail below by specific embodiments in conjunction with the accompanying drawings. Wherein similar elements in different embodiments adopt associated similar element numbers. In the following embodiments, many detailed descriptions are for making the present application better understood. However, those skilled in the art can easily recognize that some features can be omitted in different situations, or can be replaced by other elements, materials, methods. In some cases, some operations related to the present application are not shown or described in the specification, this is to avoid the core part of the present application being overwhelmed by too much description, and for those skilled in the art, it is not necessary to describe these related operations in detail, and they can fully understand the related operations according to the description in the specification and the general technical knowledge in the art.

[0045] In addition, the features, operations or characteristics described in the specification can be combined in any appropriate manner to form various implementations. At the same time, the steps or actions in the method description can also be interchanged or adjusted in a manner that is obvious to those skilled in the art. Therefore, the various sequences in the specification and the drawings are only for the purpose of clearly describing a certain embodiment and are not meant to be a required sequence, unless otherwise specified that a certain sequence must be followed.

[0046] The serial numbers assigned to the components herein, such as "first", "second", etc., are only used to distinguish the objects described and do not have any order or technical meaning. The "connection" and "coupling" mentioned in this application, unless otherwise specified, include direct and indirect connections (couplings).

[0047] DCS design changes are mainly divided into three parts: control logic changes, screen configuration changes, and digital program (such as alarm cards and procedures) changes. Control logic changes include: a. Control logic changes only, b. Parameter changes of control logic modules only, and c. Changes of control logic and module parameters. The entire DCS change implementation process is very risky, especially DCS control logic changes. Because the control logic is directly coupled with the underlying controllers, actuators, sensors, etc., once the control logic or parameters are modified incorrectly, it may cause unexpected actions such as controllers, actuators, sensors and alarms, affecting the safe and stable operation of the unit, violating the technical specifications and restrictions of nuclear power plant operation, and even causing accidents. The EPR unit DCS change documents and their implementation process have the following characteristics:

[0048] (1) Implement highly centralized windows.

[0049] The high concentration of windows is reflected in the following aspects: a. The designer's changes are generally made by summarizing a number of issues and merging them into one batch for unified issuance, that is, one batch contains multiple changes; b. There is a strong coupling between the nuclear power DCS control logic modules. In order to prevent equipment from moving, it may be necessary to isolate or shut down related equipment when executing changes. However, due to the restrictions of the technical specifications for the operation of nuclear power plants, related equipment is not allowed to be shut down during normal unit power operation. Therefore, except for a small number of changes that have immediate impacts and need to be executed as soon as possible, in the existing technology, changes are generally concentrated in windows such as temporary shutdown or overhaul of units for centralized implementation.

[0050] (2) The change documents are complicated.

[0051] The main contents of a single DCS change file package include: a. Description files of all changes included in the batch; b. Control logic page files, screen configuration files, and digital program files that can be imported into the unit DCS configuration software and compiled and downloaded for operation; c. Control logic page files, screen configuration files, and digital program files in PDF or Visio format generated according to b; There are many files in the above DCS change file package and the paths are complex, and there are a large number of compressed files inside. The existence of so many files, folder paths, and compressed files leads to inefficiency in the query and use process of files in the DCS change file package, especially when multiple batches of DCS change file packages are used together.

[0052] (3) Batch import and direct execution are not possible.

[0053] Although the change file package provides a control logic page file that can be directly imported into the unit DCS configuration software without modification, the EPR unit cannot import the entire page of control logic page due to platform technology limitations. This is because if the control logic is changed by importing the entire page, it will affect the register resources in the controller where the control logic is located, and may cause unacceptable consequences such as the controller resource pool being exhausted and offline downloading. In addition, since there may be temporary control logic changes implemented by the nuclear power plant in the on-site DCS control logic page, and these temporary changes are not included in the formal change file issued by the designer, if the overall page import method is used, the temporary changes implemented on-site will be overwritten and invalid, which may cause unexpected equipment actions or safety hazards. Therefore, the change can only be implemented by manually modifying the difference part on the relevant page. This work itself will take up a lot of manpower and time. In addition, because the on-site modification needs to be strictly carried out in accordance with the DCS change file, and the difficulty in querying and using the DCS change file will consume additional time and energy of the personnel, and increase the probability of change errors caused by personnel operation errors.

[0054] (4) If the same batch change includes multiple DCS control logic pages, please refer to Figure 1 , which is a schematic diagram of the number of modified pages in the same batch of changes to the nuclear power plant DCS. Because the design changes are issued in batches, the same batch generally involves the modification of multiple DCS control logic pages.

[0055] (5) Multiple batches of changes involve the same page, that is, multiple batches of changes may modify the same or different parts of the same page. Please refer to Figure 2 , which is a schematic diagram of changes involving a modified page, where circles represent control logic modules, lines represent the relationship between control logic modules, and dotted boxes represent the scope of the changes. In the schematic diagram, change batches A, B, and C all involve modifications to the same page X.

[0056] (6) When multiple batches modify the same module on the same page, there may be a situation where multiple batches modify the same module on the same page, for example, batch A modifies the parameter of a module to a1, and batch B modifies the parameter of the same module to b1; or batch A adds a module, and batch B deletes the module.

[0057] (7) Some modification content coupling has execution order requirements, such as Figure 2 As shown in , if the modification content of batch A is to add modules 1-10 and the logical connections between them, the modification of batch A must be executed before batch B, because if batch A is not executed, the modification content of batch B does not exist.

[0058] (8) There may be situations where some of the changes have already been implemented on site. Some defects on site may have been implemented through temporary change processes, or the DCS changes may have been partially implemented in advance.

[0059] As can be seen from the above content, the implementation process of DCS batch changes is characterized by heavy tasks, high risks and complex implementation. First, before the DCS batch changes are implemented, each modification content needs to be analyzed and evaluated in detail. During the implementation process, on-site modifications need to be strictly performed in accordance with the change documents. After the changes are implemented, each modification content needs to be compared and reviewed again. During these stages, it is inevitable that related files in one or more DCS change file packages will be frequently queried and used, and multiple files and folders will be switched back and forth. The labor intensity is high, the efficiency is low, and it is very easy to cause human errors. Secondly, batch DCS changes involve many modification items, complex coupling between modules, and there may be dependencies on the order of execution (see the above 4-7 characteristics), which places very high demands on the skills of the executors. During the on-site implementation, in addition to keeping a close eye on the unit work, In addition to the engineer's screen, the executors are also required to manually switch between multiple batches of change files and folders to find the target file, check and confirm the modification points, which is inefficient and distracts their attention. It is very easy to get tired and introduce human risks, resulting in quality problems such as wrong or missed modifications, and even equipment malfunctions. Thirdly, because all modifications are concentrated in limited specific windows such as overhauls or temporary shutdowns of units, the time pressure is high. If they cannot be completed on time, the critical path will be affected and delays will be caused. For every day of delay in the construction period, the direct loss of power generation will reach tens of millions. Finally, once the changes take effect, if problems are found and need to be re-executed, all isolation and equipment shutdown measures will have to be started again, and the unit must also be rolled back to the time window that meets the conditions, which is costly. Therefore, how to provide an efficient batch DCS change file rapid retrieval, page difference marking and centralized comparison display technology to assist technical personnel in risk identification and calculation evaluation at each key stage of the whole cycle, such as before the implementation of batch changes, during the implementation process, after the change modification is completed, before the download takes effect, and after the download takes effect, so as to minimize the risks in the DCS batch change implementation process, has become the key technology for solving such problems.

[0060] The implementation process control method for batch changes of DCS in nuclear power plants disclosed in the embodiments of the present application first obtains a batch change package and extracts each DCS change item from the batch change package; then obtains the DCS logical relationship between each DCS change item to generate a DCS change task table based on the logical relationship between each DCS change item; then outputs the DCS change task table to perform batch changes to the DCS in the nuclear power plant according to the DCS change task table. By calculating and evaluating the implementation process of DCS batch changes, it is possible to more reasonably optimize the operation mode, timely discover and eliminate potential risks, improve work efficiency, and significantly improve the automation and accuracy of DCS logic change inspections, thereby reducing the labor intensity of personnel.

[0061] Embodiment 1

[0062] Please refer to Figure 3 , is a flow chart of a process control method implemented in an embodiment, including:

[0063] Step 101: Obtain a batch change package.

[0064] The batch change package includes at least one DCS change item, wherein the DCS change item is used to express the change of at least one DCS parameter or DCS control logic.

[0065] In one embodiment, the method for obtaining a batch change package includes:

[0066] Obtain a DCS batch change file, and convert the DCS batch change file into a batch change package. Among them, the DCS batch change file is a description file of the DCS batch change. The DCS batch change file includes a control logic page file, a screen configuration file and / or a digital program file that can be compiled and downloaded by the DCS configuration software. In one embodiment, the types of DCS batch change files include text format, PDF format and / or Visio format. In one embodiment, when the type of the DCS batch change file is in text format, the text information of the DCS batch change file is directly obtained. In one embodiment, when the type of the DCS batch change file is in PDF format, the text information of the DCS batch change file is obtained after the DCS batch change file is converted into a text format. In one embodiment, when the type of the DCS batch change file is in Visio format, the text information of the DCS batch change file is directly obtained from the DCS batch change file.

[0067] Step 102: extract DCS change items.

[0068] Each DCS change item is extracted from the batch change package, and each DCS change item corresponds to a change in a DCS parameter. In one embodiment, the extraction of the DCS change items can be obtained by extracting the text information of the DCS batch change file. In one embodiment, when the batch change package includes changes in multiple DCS parameters or DCS control logic, the content in the batch change package is identified, extracted, classified, summarized and reorganized to obtain the DCS change items corresponding to the DCS parameter changes or DCS control logic changes.

[0069] Step 103: Obtain DCS logical relationship.

[0070] Obtaining the DCS logical relationship between each of the DCS change items. In one embodiment, the method for obtaining the DCS logical relationship between each DCS change item includes:

[0071] First, a DCS operation mathematical model is obtained, wherein the DCS operation mathematical model is constructed based on the DCS system of the nuclear power plant and the DCS data output before the batch change of the DCS system of the nuclear power plant.

[0072] Then, each DCS change item is input into the DCS operation mathematical model, and the DCS logical relationship between each DCS change item output by the DCS operation mathematical model is obtained. The DCS logical relationship includes the total-specific relationship, the primary-secondary relationship, the parallel relationship, the progressive relationship, the point-surface relationship, the cause-effect relationship, the virtual-real relationship and / or the qualitative-quantitative relationship.

[0073] Step 104: Generate a DCS change task table.

[0074] A DCS change task table is generated according to the logical relationship between each DCS change item. The DCS change task table includes at least one DCS change task, and each DCS change task is generated according to the logical relationship between the DCS change items.

[0075] In one embodiment, the DCS operation mathematical model first divides each DCS change item into three categories: control logic change, screen configuration change, and digital program change according to the change attributes of each item, and then generates a DCS change task table based on the logical relationship between the DCS change items according to their respective types, and stores the DCS change task table. The DCS change task table includes task parameters for each DCS change item, and the task parameters include change batch, system, modification page, modification type, modification item brief description and / or detailed modification description, etc.

[0076] Step 105: Output the DCS change task list.

[0077] Output the stored DCS change task table for executing batch changes to the DCS of the nuclear power plant according to the DCS change task table. In one embodiment, the DCS change task table is output in the form of a graphical display. The graphical display includes a graphical display of the task parameters and task relationships of each DCS change task, wherein the task parameters include the change batch, system, modification page, modification type, modification item summary and / or detailed modification description, and the task relationship includes a graphical display of the logical relationship between each DCS change item. The graphical display is used to implement the list list, mapping relationship, control logic change information, change execution order and / or sequence storage information of each DCS change task in the DCS change task table. In one embodiment, a DCS change task includes one or more DCS change items.

[0078] Please refer to Figure 4, which is a schematic diagram of a graphical display of a DCS change task table in an embodiment, wherein a base page a corresponds to a DCS change task, each circle corresponds to a DCS change item, and the modified DCS change item is marked with a modification mark.

[0079] In one embodiment, the process control method disclosed in the embodiments of the present application further includes:

[0080] Step 106, obtaining a DCS change completion table.

[0081] The DCS change completion table is used to express the information of completed DCS change tasks.

[0082] Step 107: Output a new DCS change task table.

[0083] The DCS change completion table is compared with the DCS change task table to obtain the task verification result and output the DCS change task new table. The task verification result is used to express the execution accuracy of each completed DCS change task, and the DCS change task new table is used to represent the unfinished DCS change tasks.

[0084] Step 108: Output the DCS change correction table.

[0085] A DCS change correction table is output according to the task verification result. The DCS change correction table is used to indicate the information of the completed DCS change tasks with errors, so as to track and re-execute the changes of the DCS change tasks with errors.

[0086] In one embodiment, the process control method disclosed in the embodiment of the present application further includes a final verification step, specifically including:

[0087] Firstly, the DCS data output after the batch change of the DCS system of the nuclear power plant and the DCS data output after the batch change of the DCS operation mathematical model are obtained; then, the DCS data output after the batch change of the DCS operation mathematical model and the DCS data output after the batch change of the DCS system of the nuclear power plant are compared to obtain the DCS verification result data; finally, the DCS batch change is verified according to the DCS verification result data.

[0088] The implementation process control method for batch changes of DCS in nuclear power plants disclosed in the embodiments of the present application first obtains a batch change package and extracts each DCS change item from the batch change package; then obtains the DCS logical relationship between each DCS change item to generate a DCS change task table based on the logical relationship between each DCS change item; then outputs the DCS change task table to perform batch changes to the DCS in the nuclear power plant according to the DCS change task table. By calculating and evaluating the implementation process of DCS batch changes, it is possible to more reasonably optimize the operation mode, timely discover and eliminate potential risks, improve work efficiency, and significantly improve the automation and accuracy of DCS logic change inspections, thereby reducing the labor intensity of personnel.

[0089] In one embodiment of the present application, a process control system for implementing batch changes of DCS in a nuclear power plant is also disclosed, and the process control method described above is applied. Figure 5 , is a structural connection diagram of an implementation process control system in another embodiment, and the implementation process control system includes a change item extraction device 100, a task table generation device 200 and a task output device 300. Among them, the change item extraction device 100 is used to obtain a batch change package and extract each DCS change item from the batch change package. The batch change package includes at least one DCS change item, and the DCS change item is used to express the change of at least one DCS parameter or DCS control logic. The task table generation device 200 is used to obtain the DCS logical relationship between each DCS change item, and generate a DCS change task table according to the logical relationship between each DCS change item. The DCS logical relationship includes a total-specific relationship, a primary-secondary relationship, a parallel relationship, a progressive relationship, a point-to-surface relationship, a cause-and-effect relationship, a virtual-real relationship and / or a qualitative-quantitative relationship. The DCS change task table includes at least one DCS change task, and each DCS change task includes at least one DCS change item, and is generated according to the logical relationship between the DCS change items. The task output device 300 is used to output the DCS change task table, so as to perform batch changes to the DCS of the nuclear power plant according to the DCS change task table.

[0090] In one embodiment, the implementation process control system disclosed in the present application selects the reference page of different change implementation stages of the DCS for comparison with the pages involved in the modification list, thereby calculating and evaluating the implementation process of the DCS batch change, so as to more reasonably optimize the operation mode, timely discover and eliminate potential risks, and improve work efficiency, specifically including:

[0091] 1. Before the change is implemented.

[0092] Generate a list of all DCS change modifications and automatically mark them, review and confirm them through the DCS batch change visualization device, and group all unexecuted modifications into tasks based on four dimensions: page name, whether there is an execution window requirement, whether there are pre-dependent modification items, and the number of operating terminals that the unit can use to implement the changes.

[0093] First, calculate the list of all modification items, establish the mapping relationship between the modification items and the change files involved in the modification, generate the execution order sequence of the DCS change batch according to the release time of the DCS change batch, use the page file of the unit before the implementation of the unit DCS change as the reference file, and import the above information into the DCS batch change visualization device;

[0094] Then, all modification items are classified by page, and the modification items are compared with the current base page of the unit. The modification items are automatically calculated and marked, and the modification items are marked as executed, unnecessary to be executed, and unexecuted items. Among them, the unexecuted items can be further divided into modification items without pre-dependency and modification items with pre-dependency;

[0095] The above-mentioned total list of modified items and automatically generated marks are then displayed on the DCS batch change visualization device, and the relevant personnel review and confirm the results, and the unexecuted items are further subdivided into items with specific execution window requirements and items without window requirements;

[0096] Finally, all the unexecuted modification items that were automatically calculated and manually reviewed are automatically grouped into tasks based on four dimensions: page name, whether there is an execution window requirement, whether there are pre-dependent modification items, and the number of operating terminals that the unit can use to implement the changes.

[0097] Here are some examples:

[0098] Step 1: Classify and sort all unexecuted modification tasks after manual review and confirmation by execution time (without window requirements, corresponding execution windows appearing by time);

[0099] Step 2: For each classification by time window in step 1, further classification and sorting are performed according to page name and whether there is a pre-dependent modification item. The constraint condition is that modification items that have modification dependencies must be grouped in the same group and the modification items are sorted according to their pre- and post-dependencies. Modification items belonging to the same page must be grouped in the same group.

[0100] Step 3. For each of the categories in step 2 that have been classified by time window, page name, and whether there are pre-dependent modification items, group them according to the number of operating terminals that can be used to implement the changes. For example, if there are 3 workstations on site that can be used to perform changes, the tasks will be divided into 3 groups;

[0101] After grouping tasks according to the above four dimensions, when DCS batch changes are implemented, when the unit is overhauled or temporarily shut down, each time the main line plan reaches an execution window that meets the conditions, a list of feasible modification items that has been classified by page name, whether there are pre-dependent modification items, and the number of operating terminals that the unit can use to implement the changes can be obtained under the window, and used for on-site modification operations.

[0102] The advantages of using the implementation process control system disclosed in this application before implementing the change include: because the classification has been identified and sorted, it can avoid interference from windows that are not satisfied and interdependent modification items during on-site implementation; in addition, because it has been classified according to pages, it can avoid repeated opening and saving and compiling for the same page (if it is executed in the original change issuance order, when the modification items belong to different pages, the page is frequently switched), which improves the modification efficiency and reliability, and can also avoid the situation where different modification groups modify the same page at the same time. This is equivalent to simplifying the operation, improving efficiency, and reducing interference with on-site configuration software.

[0103] 2. During the implementation of the change:

[0104] The detailed information of the specific modification items of a specific execution group can be displayed in the visualization comparison display device of the nuclear power DCS configuration logic, which is convenient for the execution personnel to query and use. After the on-site modification is completed, the modification item can be marked as executed and waiting for review in the visualization comparison display device. The unit page file is exported regularly (such as after the modification work is completed every day) as an intermediate reference file, and the modification item list is automatically checked and updated according to the work content of the cycle. The modification items executed in the cycle are marked (such as correct modification, incorrect modification) and the list of pre-modification items is updated. The relevant personnel will review and make the final judgment in the DCS batch change content visualization device. If the modification is indeed incorrect, it will be corrected in the modification of the next cycle; the current page of the unit is used as the reference page, and the unexecuted modification items and the modification items with execution errors are grouped according to the four dimensions of page name, whether there is an execution window requirement, whether there is a pre-dependent modification item, and the number of operation terminals that the unit can use to implement the change modification.

[0105] The advantages of using the implementation process control system disclosed in this application during the change implementation process include: being able to discover erroneous changes and missed changes before the changes are officially downloaded and take effect, and eliminating hidden dangers in a timely manner.

[0106] 3. After the phase change is implemented but before the download takes effect.

[0107] After the stage change is implemented, export the unit page file as a reference file before the download takes effect, and review the modifications in this stage again to ensure that all modifications have been checked and confirmed to be normal before downloading.

[0108] 4. After all changes are downloaded and take effect.

[0109] After all changes are downloaded and take effect, the unit page is exported as the baseline page after the modification is completed. All modification item lists are automatically compared and marked, and relevant personnel review them in the DCS batch change content visualization device to ensure that all modification items are reviewed, all deviations are clarified, and there is a subsequent process closed-loop tracking process.

[0110] The implementation process control method disclosed in this application has been successfully implemented in a third-generation EPR (European Pressurized Reactor) nuclear power plant. It solves the problem of low efficiency and error-proneness in querying related files in multiple batches of DCS change file packages, eliminates the complicated file search, opening and switching process of the execution personnel during change analysis / or on-site implementation, greatly improves efficiency and reduces human factors. By comparing the benchmark page with the change file page at different DCS change implementation stages and calculating and evaluating the implementation process of DCS batch changes, it can more reasonably optimize the operation mode, timely discover and eliminate potential risks, and improve work efficiency; in addition, because the change items have been identified and classified and sorted, it can effectively avoid interference with the change execution process due to factors such as window dissatisfaction during on-site implementation or execution order dependence between change items; furthermore, because it has been classified according to DCS change items, it can avoid repeated opening and saving and compiling for the same DCS change task (if it is executed in the original change issuance order, when the modification items belong to different pages, the page is frequently switched), which improves the modification efficiency and reliability, and can also avoid the situation where different modification groups modify the same page at the same time. This simplifies the operation, improves efficiency, and reduces interference with the on-site configuration software. Finally, the correctness of the execution of the change items can be checked and reviewed at multiple stages, which is equivalent to multiple barriers, further improving the accuracy of the change execution process.

[0111] Embodiment 2

[0112] In one embodiment of the present application, a process management for temporary changes of DCS in nuclear power plants is also disclosed. At present, the temporary change management systems used in domestic nuclear power plants mainly include N1-EAM system, IFS system (CEAS, CMS, TEAM), and SAP system, which require manual tracking and confirmation before manually advancing the temporary change process status. Not only does it waste a lot of working time and human resources, but there are also situations where the information is inaccurate and the status is promoted incorrectly, and even the subsequent process is carried out when the conditions are not met, which poses certain safety risks.

[0113] Please refer to Figure 6 , is a flow chart of implementing a process control method in another embodiment, comprising:

[0114] Step 101, obtaining a temporary change package.

[0115] The temporary change package includes at least one temporary change item, which is used to express the change of at least one DCS parameter or DCS control logic. The method for obtaining the temporary change package includes:

[0116] Obtain temporary change files and convert them into temporary change packages. The temporary change files are description files of temporary changes, and include control logic page files, screen configuration files and / or digital program files that can be compiled and downloaded by DCS configuration software. The types of temporary change files include text format, PDF format and / or Visio format.

[0117] Step 102, extract temporary changes.

[0118] Extract each temporary change item from the temporary change package.

[0119] Step 103, obtaining temporary change parameters.

[0120] Get the temporary change parameters logically related to each temporary change, including:

[0121] First, a DCS operation mathematical model is obtained, wherein the DCS operation mathematical model is a mathematical model constructed based on the DCS system of the nuclear power plant and the DCS data output by the DCS system of the nuclear power plant. Then, each temporary change item is input into the DCS operation mathematical model, and temporary change parameters logically related to each temporary change item output by the DCS operation mathematical model are obtained. Among them, the temporary change parameters include the change module corresponding to the temporary change, the organizational structure relationship of the change module, the topological structure relationship of the change module and / or the change module parameter information.

[0122] Step 104: Generate a temporary change database.

[0123] A temporary change database is generated according to the temporary change parameters related to each temporary change item.

[0124] Step 105: Output the temporary change items list.

[0125] Output a temporary change item table according to the temporary change database and preset output conditions, so as to remind and inspect each temporary change item. The temporary change item table includes temporary change parameters logically related to each temporary change item, and the preset output conditions include outputting according to a preset unit time or outputting in response to an output control instruction.

[0126] In one embodiment, the temporary change items table is outputted in the form of a graphical display. The graphical display includes a graphical display of the temporary change parameters and change relationships of each temporary change item, wherein the task parameters include the change batch, the change system, the change modification page, the change modification type, the change modification item brief description and / or the detailed change modification description, and the change relationship includes a graphical display of the logical relationship between each temporary change item. The graphical display is used to implement the list list, mapping relationship, control logic change information, change execution order and / or sequence storage information of each temporary change task in the temporary change items table. In one embodiment, a temporary change task includes one or more temporary change items.

[0127] In one embodiment, implementing the process control method further includes:

[0128] Step 106, obtaining DCS data.

[0129] The DCS data after the temporary change of the DCS system of the nuclear power plant is obtained, and the DCS data is input into the DCS operation mathematical model to obtain the change-related parameters output by the DCS operation mathematical model and related to each temporary change item.

[0130] Step 107, updating the temporary change database.

[0131] The temporary change database is updated according to the change-related parameters related to each temporary change item. When the change-related parameters are the same as the temporary change parameters, the temporary change item corresponding to the change-related parameters is removed from the temporary change database.

[0132] Step 108: Output a new temporary change list.

[0133] In one embodiment, a method for obtaining a temporary change file includes:

[0134] First, the temporary modification value of each DCS parameter or DCS control logic is input into the DCS operation mathematical model, and the risk assessment parameter corresponding to the DCS parameter output by the DCS operation mathematical model is obtained. Among them, the risk assessment parameter is used to indicate whether the DCS parameter after temporary modification is within the preset theoretical threshold range. Then, the temporary change file is obtained based on the temporary change items of the risk assessment parameters of the DCS parameters within the preset threshold range, and a warning is issued for the temporary change items that are not within the preset threshold range.

[0135] In one embodiment of the present application, a method for implementing a process control of a temporary change of a DCS in a nuclear power plant is disclosed. First, a temporary change package is obtained, wherein the temporary change package includes at least one temporary change item, and each temporary change item is used to express a change in at least one DCS parameter or DCS control logic; then each temporary change item is extracted from the temporary change package; then temporary change parameters logically related to each temporary change item are obtained, and a temporary change database is generated based on the temporary change parameters related to each temporary change item; finally, a temporary change item table is output according to preset output conditions based on the temporary change database, so as to remind and inspect each temporary change item. By digitally managing temporary change items involving DCS parameters, the automation and accuracy of inspections of temporary control logic changes of DCS in nuclear power units can be significantly improved, and the labor intensity of personnel can be reduced.

[0136] In one embodiment of the present application, a process control system for temporary changes of DCS in a nuclear power plant is also disclosed, and the process control method described in the second embodiment is applied. Figure 7 , is a structural connection diagram of an implementation process control system in another embodiment, and the implementation process control system includes a temporary change extraction module 210, a change database generation module 220 and a temporary change table output module 230. The temporary change extraction module 210 is used to obtain a temporary change package and extract each temporary change item from the temporary change package, wherein the temporary change package includes at least one temporary change item, and the temporary change item is used to express the change of at least one DCS parameter or DCS control logic. The change database generation module 220 is used to obtain temporary change parameters logically related to each temporary change item, and generate a temporary change database based on the temporary change parameters related to each temporary change item. The temporary change table output module 230 is used to output a temporary change item table according to the preset output conditions based on the temporary change database, so as to remind and inspect each temporary change item. Among them, the temporary change item table includes temporary change parameters logically related to each temporary change item, and the temporary change parameters include the change module corresponding to the temporary change, the organizational structure relationship of the change module, the topological structure relationship of the change module and / or the change module parameter information. The implementation process control system for temporary changes of DCS in nuclear power plants disclosed in the present application can significantly improve the automation and accuracy of inspections of temporary control logic changes of DCS in nuclear power units and reduce the labor intensity of personnel by digitally managing temporary changes involving DCS parameters.

[0137] In one embodiment of the present application, based on the inadequacy of the prior art in monitoring temporary changes of DCS in nuclear power plants, first, DCS temporary control logic change information is collected, and for each DCS temporary control logic change, information including the page where the change is located, the modules included in the change, the topological structure relationship between the modules, the module parameters, etc. is extracted, and stored in the DCS temporary control logic change information database in the form of a directed graph; then, the unit control logic page is exported regularly (according to the prescribed TCA inspection frequency), and the unit control logic information corresponding to the DCS temporary control logic is extracted from the unit control logic page; then, the unit control logic information is compared and contrasted, and if they are consistent, the inspection is passed; if they are inconsistent, the difference is output.

[0138] Those skilled in the art will appreciate that all or part of the functions of the various methods in the above-mentioned embodiments can be implemented by hardware or by computer programs. When all or part of the functions in the above-mentioned embodiments are implemented by computer programs, the program can be stored in a computer-readable storage medium, and the storage medium can include: read-only memory, random access memory, disk, optical disk, hard disk, etc., and the program is executed by a computer to implement the above-mentioned functions. For example, the program is stored in the memory of the device, and when the program in the memory is executed by the processor, all or part of the above-mentioned functions can be implemented. In addition, when all or part of the functions in the above-mentioned embodiments are implemented by computer programs, the program can also be stored in a storage medium such as a server, another computer, disk, optical disk, flash disk or mobile hard disk, and can be downloaded or copied and saved in the memory of the local device, or the system of the local device is updated, and when the program in the memory is executed by the processor, all or part of the functions in the above-mentioned embodiments can be implemented.

[0139] The above specific examples are used to illustrate the present invention, which is only used to help understand the present invention and is not intended to limit the present invention. For those skilled in the art, according to the concept of the present invention, some simple deductions, modifications or substitutions can be made.

Claims

1. A process control method for implementing batch changes of DCS in nuclear power plants, characterized in that: include: Acquire a batch change package; the batch change package includes at least one DCS change item, and the DCS change item is used to express the change of at least one DCS parameter or DCS control logic; Extracting each of the DCS change items from the batch change package; Obtaining a DCS logical relationship between each of the DCS change items; Generate a DCS change task table according to the logical relationship between each of the DCS change items; The DCS change task table includes at least one DCS change task; each DCS change task is generated according to the logical relationship between the DCS change items; each DCS change task includes at least one DCS change item; The DCS change task list is outputted to execute batch changes to the DCS of the nuclear power plant according to the DCS change task list.

2. The implementation process control method according to claim 1, characterized in that: Also includes: Get the DCS change completion form; The DCS change completion table is used to express the information of the completed DCS change tasks; Compare the DCS change completion table with the DCS change task table to obtain task verification results, and output a new DCS change task table; The task verification result is used to express the execution accuracy of each completed DCS change task; the DCS change task new table is used to represent the unfinished DCS change tasks.

3. The implementation process control method according to claim 2, characterized in that: Also includes: Outputting a DCS change correction table according to the task verification result; The DCS change correction table is used to indicate information of the DCS change tasks that have been completed and have errors, so as to track and re-execute the changes of the DCS change tasks that have errors.

4. The implementation process control method according to claim 1, characterized in that: The obtaining of batch change packages includes: A DCS batch change file is obtained, and the DCS batch change file is converted into the batch change package; the DCS batch change file is a description file of the DCS batch change; the DCS batch change file includes a control logic page file, a screen configuration file and / or a digital program file that can be compiled and downloaded by the DCS configuration software; the type of the DCS batch change file includes a text format, a PDF format and / or a Visio format.

5. The implementation process control method according to claim 1, characterized in that: The obtaining of the DCS logical relationship between each of the DCS change items includes: Obtain DCS operation mathematical model; Input each of the DCS change items into the DCS operation mathematical model, and obtain the DCS logical relationship between each of the DCS change items output by the DCS operation mathematical model; The DCS logical relationship includes a general-specific relationship, a primary-secondary relationship, a parallel relationship, a progressive relationship, a point-to-surface relationship, a cause-effect relationship, a virtual-real relationship, and / or a qualitative-quantitative relationship.

6. The implementation process control method according to claim 5, characterized in that: The method for obtaining the DCS operation mathematical model includes: A mathematical model is constructed based on the nuclear power plant DCS and DCS data output before the nuclear power plant DCS is batch-changed.

7. The implementation process control method according to claim 5, characterized in that: Also includes: Obtaining DCS data output after the DCS of the nuclear power plant is batch-changed; Obtaining DCS data output after batch changes to the DCS operation mathematical model; Verifying the DCS data output after the batch change of the DCS running mathematical model and comparing the DCS data output after the batch change of the nuclear power plant DCS to obtain DCS verification result data; The DCS batch change is verified according to the DCS verification result data.

8. The implementation process control method according to claim 1, characterized in that: The outputting of the DCS change task table includes: The DCS change task table is graphically displayed; the graphical display includes graphically displaying the task parameters and task relationships of each DCS change task; the task parameters include change batch, system, modification page, modification type, modification item brief description and / or detailed modification description; the task relationship includes graphically displaying the logical relationship between each DCS change item; The graphical display is used to implement the list list, mapping relationship, control logic change information, change execution order and / or sequence storage information of each DCS change task in the DCS change task table.

9. A computer-readable storage medium, characterized in that: A program is stored on the medium; the program can be executed by a processor to implement the process control method as described in any one of claims 1-8.

10. A process control system for implementing batch changes of DCS in nuclear power plants, characterized in that: include: A change item extraction device, used for obtaining a batch change package and extracting each DCS change item from the batch change package; the batch change package includes at least one DCS change item, and the DCS change item is used to express the change of at least one DCS parameter or DCS control logic; A task table generating device, used for acquiring the DCS logical relationship between each of the DCS change items, and generating a DCS change task table according to the logical relationship between each of the DCS change items; The DCS logical relationship includes a general-specific relationship, a primary-secondary relationship, a parallel relationship, a progressive relationship, a point-to-surface relationship, a cause-effect relationship, a virtual-real relationship, and / or a qualitative-quantitative relationship; the DCS change task table includes at least one DCS change task; each DCS change task includes at least one DCS change item, and is generated according to the logical relationship between the DCS change items; The task output device is used to output the DCS change task table so as to execute batch changes to the DCS of the nuclear power plant according to the DCS change task table.

Citation Information

Cited By

  • DCS database conversion system and method and storage medium

    CN121979938A