A tower base slope vegetation restoration structure and restoration method
By forming a waste tire structure of diamond grid units on the tower base slope, the problem of uneven moisture penetration is solved, effective soil solidification and ecological restoration of the tower base slope is achieved, and vegetation growth conditions and protection capabilities are improved. , meets the acceptance requirements of soil and water conservation facilities.
Patent Information
- Application Number
- CN202210622104.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-02
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2042-06-02
AI Technical Summary
Inadequate restoration of the vegetation on the base slope leads to intensified soil erosion. The existing technology ignores the problem of uneven moisture penetration when using old tires of abandoned cars to stabilize soil and protect slopes, resulting in differences in the growth of slope vegetation, which makes it difficult to meet the acceptance requirements of soil and water conservation facilities. .
Design a vegetation restoration structure on the base slope, and use several arc-section waste tires to form a diamond grid unit, which is fixed to the slope through anchor connecting parts and separating grate plates to ensure uniform moisture penetration and connect through tire walls. The parts enhance adhesion and form multiple interconnected vegetation grids.
It has achieved effective soil solidification and slope protection and ecological restoration of waste tires on the tower base slope, improved vegetation growth conditions and protection capabilities, ensured uniform water content of water and soil, prevented sand and soil erosion, and improved tire grid and slope adhesion between the two sides reduces the risk of landslides.
Smart Images

Figure CN114775660B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of slope vegetation restoration, in particular to a tower base slope vegetation restoration structure and a restoration method. Background Art
[0002] The State Grid transmission line projects are numerous, wide and long, involving many types of soil erosion areas, including a large number of transmission line projects located in arid areas. According to the acceptance practice of soil and water conservation facilities and the problems found in the supervision and inspection of the water administration department, the inadequate vegetation restoration of the tower base slope during the construction process is one of the key soil and water conservation problems that have existed for a long time in the power transmission and transformation projects. In addition, the inadequate vegetation restoration of the tower base slope and the slag slide of the tower base slope are relatively common, and the later rectification is very difficult and costly. At present, most of the vegetation restoration measures adopt simple artificial grass planting and sowing grass seeds. When the selection of suitable grass species is insufficient, the cultivation is missing, and the water and soil aerogenetic conditions are not met, there are often problems such as low survival rate, slow recovery and low coverage, which leads to the full development of slope gullies, aggravated soil and water erosion, damage to the surrounding landscape and ecosystem, and even secondary geological disasters, which seriously affect the smooth acceptance of soil and water conservation facilities and make it difficult to meet the goal of soil and water erosion prevention and control.
[0003] One of the more commonly used repair methods at present is to use old discarded car tires, fix them on the slope with a slope of usually less than 35°, and then cover them with soil, and choose plants to plant according to the local ecological environment. Patents with patent numbers CN01141695.5 and CN201922345069.9 both disclose this technology. However, during the implementation of such patents, although they can effectively consolidate the soil and protect the slope, they all ignore the problem that after the slope is divided into individual grass grids by tires, the moisture in the upper soil is affected by the isolation of the tires, resulting in uneven moisture penetration, which causes differences in the growth of slope vegetation.
[0004] Based on this, the present invention designs a tower base slope vegetation restoration structure and restoration method to solve the above problems. Summary of the invention
[0005] The purpose of the invention is to provide a tower base slope vegetation restoration structure and restoration method to solve the above technical problems.
[0006] To achieve the above-mentioned purpose, the invention provides the following technical solutions: a tower base slope vegetation restoration structure, comprising a number of circular arc segments of waste tires, the circular arc segments of waste tires are arranged in an alternating positive and negative pattern and connected end to end along the horizontal slope surface to form a wave unit, every two groups of the wave units are symmetrically abutted against each other up and down to form a rhombus unit, the rhombus units are arranged in an array along the longitudinal slope surface to form a grid unit, a plurality of vegetation planting grids are formed in the grid unit, and two adjacent vegetation planting grids are interconnected.
[0007] Preferably, the circular arc segment of waste tire is formed by cutting and processing a complete waste tire, and the center angle of the circular arc segment of waste tire is 120°.
[0008] Preferably, both ends of the circular arc segment waste tire are provided with end mounting holes, and an anchor rod connector is provided between the ends of two adjacent circular arc segment waste tires in the wave unit. The anchor rod connector passes through the end mounting holes of the two adjacent circular arc segment waste tires at the same time and is anchored into the slope soil layer of the tower base slope.
[0009] Preferably, the anchor rod connector is two cross-fixed U-shaped anchor rods, and two end mounting holes having a hole spacing corresponding to the U-shaped anchor rods are respectively provided at both ends of the circular arc segment waste tire.
[0010] Preferably, a partition grate plate is provided between the end faces of two adjacent arc segments of waste tires in the wave unit.
[0011] Preferably, the partition grate plate comprises a partition shielding between the end faces of the two arc segments of the waste tire, the partition is densely covered with penetration holes, and mounting hole plates are fixedly provided at the upper and lower ends of the partition, and the anchor rod connector passes through the two mounting hole plates at the bottom of the mountain.
[0012] Preferably, a sidewall mounting hole is provided in the middle of the arc outer wall of the arc segment waste tire, and the arc outer walls of two adjacent arc segment waste tires in the rhombus unit and the grid unit are connected and fixed by a sidewall connector.
[0013] Preferably, the tire wall connecting piece includes an intermediate pad arranged between the upper and lower arc outer walls of the arc segments of the waste tire, and two inner pads respectively attached to the upper and lower arc inner walls of the arc segments of the waste tire, the intermediate pad and the two inner pads correspondingly open upper and lower groups of mounting holes and are respectively inserted and connected with upper and lower groups of U-shaped stud screws, and the two threaded ends of the U-shaped stud screws are padded with double-hole pads and respectively locked with anti-loosening double nuts.
[0014] Preferably, the contact surfaces on both sides of the middle pad are grooved arc surfaces consistent with the curvature of the outer wall of the arc segment of the waste tire, and the contact surfaces of the two inner pads are convex arc surfaces consistent with the curvature of the inner wall of the arc segment of the waste tire.
[0015] A method for repairing a tower base slope vegetation restoration structure, comprising the following steps:
[0016] The first step is to clean the slope surface; remove debris and loose stones from the slope surface, flatten the protruding parts, and fill the sunken parts with foreign soil;
[0017] The second step is to fix the tires; several arc-section waste tires are arranged in an alternating positive and negative manner along the slope surface in a transverse direction, end to end, to form a wave unit, a partition grate plate is inserted between the end faces of two adjacent arc-section waste tires, and an anchor rod connector is used to simultaneously pass through the end mounting holes of the two adjacent arc-section waste tires and then anchored into the slope soil layer of the tower base slope; each two groups of the wave units are symmetrically abutted against each other up and down to form a rhombus unit, and the rhombus units are arranged and connected in an array along the longitudinal direction of the slope surface to form a grid unit, and the arc outer walls of the two adjacent arc-section waste tires that are abutted against each other up and down are connected and fixed by setting a tire wall connector; a plurality of vegetation planting grids are formed in the grid unit, and two adjacent vegetation planting grids are interconnected;
[0018] The third step is to cover the foreign soil. Fill the prepared foreign soil into each vegetation planting grid, 3 to 5 cm higher than the arc section of the waste tire, and then compact it.
[0019] The fourth step is sowing: select seeds that are adapted to the local climate and environment and sow them evenly in the soil in the vegetation planting grid, and cover them with shade nets;
[0020] The fifth step is maintenance and management. After sowing, water appropriately according to the situation. Water can penetrate each other along the vegetation planting grids through the dividing grate plates to ensure that the moisture content of each area of the planting soil is sufficient and uniform. Remove the shade net after the seeds germinate.
[0021] Compared with the prior art, the invention has the following beneficial effects:
[0022] (1) The present invention utilizes waste tires to consolidate soil and protect slopes, and is applicable to both soil slopes and rock slopes. It has a wide applicable area and creates basic conditions for the growth of plants on the slopes.
[0023] (2) The present invention arranges and fixes waste tires regularly on the tower base slope to be treated, forming a diamond grid structure, which can not only effectively utilize waste tires, but also enhance the ecological restoration and slope protection capabilities of the slope; waste tire soil consolidation and slope protection not only has relatively low requirements for slope flatness, but also has certain advantages in soil consolidation and water retention, and can achieve good greening effects in a relatively short time.
[0024] (3) Each vegetation planting grid of the grid unit of the present invention is composed of a plurality of circular arc segments of waste tires in an alternating positive and negative shape. The ends of the circular arc segments of waste tires are connected to each other. Water can penetrate along each vegetation planting grid through the partitioning grate plate, thereby ensuring that the water content of each area of the planting soil is sufficient and uniform.
[0025] (4) In the present invention, a partitioning grate plate is provided at the connection between the arc segment waste tire and the end of the arc segment waste tire, and a permeable hole is provided on the partition of the partitioning grate plate. While allowing water to flow, the loss of sand and soil can be prevented, and the effects of water penetration and soil consolidation and slope protection are taken into consideration.
[0026] (5) The grid unit of the present invention is designed as a non-straight structure with a wavy or zigzag shape. After the design structure is attached to the slope surface, the anti-skid properties of the wavy or zigzag structure are utilized to effectively improve the adhesion between the tire grid and the slope, prevent the tire grid from causing landslides, and thus improve the soil consolidation and slope protection effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] In order to more clearly illustrate the technical solutions of the embodiments of the invention, the drawings required for describing the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0028] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0029] Figure 2 It is a schematic diagram of the rhombus unit structure of the present invention;
[0030] Figure 3 This is a schematic diagram of the arc segment waste tire structure of the present invention;
[0031] Figure 4 This is a schematic diagram of the connection and fixing structure between circular arc segments of waste tires of the present invention;
[0032] Figure 5 It is a schematic diagram of the structure of the anchor rod connector and the partition grate plate of the present invention;
[0033] Figure 6 It is a schematic diagram of the structure of the tire wall connecting piece of the present invention;
[0034] Figure 7 This is a schematic diagram of the water penetration path of the present invention;
[0035] Figure 8 It is a schematic diagram of the structure of the tire wall connecting piece in another embodiment of the present invention.
[0036] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0037] 100-arc segment of waste tires, 200-wave unit, 300-diamond unit, 400-grid unit, 500-vegetation planting grid, 600-anchor connector, 610-U-shaped anchor, 700-tower base slope, 800-dividing grate plate, 810-partition, 820-permeability hole, 830-mounting hole plate, 900-timber wall connector, 910-middle pad, 920-inner pad, 930-U-shaped double-head screw, 940-double-hole pad, 950-anti-loosening double nut. DETAILED DESCRIPTION
[0038] The following will be combined with the drawings in the embodiments of the invention to clearly and completely describe the technical solutions in the embodiments of the invention. Obviously, the described embodiments are only part of the embodiments of the invention, not all of the embodiments. Based on the embodiments in the invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the invention.
[0039] See also Figure 1-7 The invention provides a technical solution: a tower base slope vegetation restoration structure, comprising a plurality of arc-shaped waste tires 100, which are arranged in a positive and negative alternating manner and connected end to end along the slope to form a wave unit 200, and each two groups of wave units 200 are symmetrically abutted and connected to form a rhombus unit 300, and the rhombus units 300 are arranged in an array along the slope to form a grid unit 400, and a plurality of vegetation planting grids 500 are formed in the grid unit 400, and two adjacent vegetation planting grids 500 are interconnected to form a grid unit 400. Figure 7 The permeation path shown.
[0040] Specifically, Figure 3 As shown, the arc segment waste tire 100 is formed by cutting and processing a complete waste tire to form an arc segment structure with a C-shaped cross section, so that when the arc segment waste tire 100 is connected front and back, the inner cavities of the two arc segment waste tires 100 are interconnected and form a grid unit 400, and the inner cavities of the two arc segment waste tires 100 correspond to two vegetation planting grids 500 respectively, so that the purpose of interconnection between the vegetation planting grids 500 is achieved, so that water can penetrate each other along the vegetation planting grids 500 through the partition grate plate 800, ensuring that the water content of each area of the planting soil is sufficient and uniform;
[0041] In this embodiment, the central angle of the circular arc segment waste tire 100 is 120°. In actual operation, it is believed that the vegetation planting grid 500 formed by the circular arc segment waste tire 100 with a central angle of 120° is closer to a full diamond structure, and the overall aesthetics is better. In addition, a complete tire can be equally divided into three circular arc segment waste tires 100. In actual operation, it can also be set to other angles that can equally divide the complete tire.
[0042] Specifically, Figure 3-5As shown, both ends of the circular arc segment waste tire 100 are provided with end mounting holes 110, which are pre-punched before laying the circular arc segment waste tire 100. An anchor rod connector 600 is arranged between the ends of two adjacent circular arc segment waste tires 100 in the wave unit 200. The anchor rod connector 600 passes through the end mounting holes 110 of the two adjacent circular arc segment waste tires 100 at the same time and is anchored into the slope soil layer of the tower base slope 700. As a fixing structure between the circular arc segment waste tire 100 and the tower base slope 700, the anchor rod connector 600 is two cross-fixed U-shaped anchor rods 610. Two end mounting holes 110 with a hole spacing corresponding to the U-shaped anchor rod 610 are respectively provided at both ends of the circular arc segment waste tire 100, and an X-shaped connection structure is formed at the connection of the ends of the circular arc segment waste tire 100 to ensure that the end faces of the two circular arc segment waste tires 100 are fully fitted, thereby making the finally formed vegetation planting grid 500 more regular and stable.
[0043] Specifically, Figure 3-5 As shown, in view of the interconnected structure between the aforementioned arc-section waste tires 100, water can penetrate each other, and soil and sediment can also flow with it under the action of rainwater scouring. In order to ensure that water and soil in each vegetation planting grid 500 are not easily lost, a partition grate plate 800 is arranged between the end faces of two adjacent arc-section waste tires 100 in the wave unit 200. The partition grate plate 800 includes a partition 810 shielded between the end faces of the two arc-section waste tires 100. After the partition 810 is installed, it blocks between the end faces of the two arc-section waste tires 100. The partition 810 is densely covered with penetration holes 820 for water penetration and preventing the loss of sediment. Considering that sediment may block the penetration holes 820 and part of the mud can still pass through the penetration holes 820, this embodiment can further use permeable moving bricks made of porous concrete material of crushed stone instead of using;
[0044] Mounting hole plates 830 are fixedly provided at the upper and lower ends of the partition 810. After installation, the mounting hole plates 830 are fitted to the upper and lower sidewall outer walls of the arc-section waste tire 100, and can also serve as a highly flush limiting structure at the connection of the two arc-section waste tires 100, so that the arc-section waste tires 100 are more regular after connection. The anchor rod connector 600 passes through the two mounting hole plates 830 at the bottom of the mountain, and fixes the arc-section waste tire 100 and the partition grate plate 800 in the slope soil layer of the tower base slope 700 at the same time.
[0045] Specifically, Figure 3 , 4As shown in 6, a sidewall mounting hole 120 is provided in the middle of the arc outer wall of the arc segment waste tire 100, and the arc outer walls of the two adjacent arc segment waste tires 100 in the rhombus unit 300 and the grid unit 400 are connected and fixed by a sidewall connector 900. The sidewall connector 900 includes an intermediate pad 910 provided between the arc outer walls of the upper and lower arc segment waste tires 100, and two inner pads 920 respectively attached to the arc inner walls of the upper and lower arc segment waste tires 100. The intermediate pad 910 and the two inner pads 920 are provided with upper and lower groups of mounting holes correspondingly and are respectively inserted and connected with upper and lower groups of U-shaped double The head screw 930, the two threaded ends of the U-shaped double-headed screw 930 are padded with double-hole pads 940 and then locked with anti-loosening double nuts 950 respectively. When in use, the middle pad 910 is padded in the middle of the outer walls of the two arc segments of the waste tire 100 to be connected, and the two inner pads 920 are padded on the inner walls of the two arc segments of the waste tire 100 to be connected respectively. The middle pad 910 and the inner pad 920 are aligned with the hole positions of the tire wall mounting holes 120, and the U-shaped double-headed screw 930 is penetrated from the inner cavity of one arc segment of the waste tire 100 to the inner cavity of the other arc segment of the waste tire 100. After the two threaded ends of the U-shaped double-headed screw 930 are padded with double-hole pads 940, they are locked with anti-loosening double nuts 950 respectively to complete the installation;
[0046] Furthermore, in order to make the connection more fitting, the contact surfaces on both sides of the middle pad 910 are grooved arc surfaces with the same curvature as the outer wall of the arc segment of the waste tire 100, and the contact surfaces of the two inner pads 920 are convex arc surfaces with the same curvature as the inner wall of the arc segment of the waste tire 100, thereby increasing the contact surface between the fixing part and the tire wall, thereby improving the structural stability.
[0047] As another example, Figure 8 As shown, on the basis of the above-mentioned embodiment, the contact surface between the middle pad 910 and the inner pad 920 is designed to have a certain slope, the inclination angle α, so that after the tire wall connector 900 connects the two arc-segment waste tires 100, the included angle between the central axes of the two arc-segment waste tires 100 is 2α. After the integration device is connected with the tire wall connector 900 of this structure, the grid unit 400 is observed from the side of the slope (side view), that is, a wavy or zigzag non-straight structure. After the design structure is attached and combined with the slope surface, the anti-skid characteristics of the wavy or zigzag structure are utilized to effectively improve the adhesion between the tire grid and the slope, prevent the tire grid from sliding, and thus improve the soil consolidation and slope protection effect.
[0048] Based on the above-mentioned tower base slope vegetation restoration structure, the actual application of the restoration method is as follows:
[0049] The first step is to clean the slope surface; remove debris and loose stones from the slope surface, flatten the protruding parts, and fill the sunken parts with foreign soil;
[0050] The second step is to fix the tires; a plurality of arc-section waste tires 100 are arranged in an alternating manner along the slope surface in a transverse direction, end to end, to form a wave unit 200; a partition grate plate 800 is inserted between the end faces of two adjacent arc-section waste tires 100, and an anchor rod connector 600 is simultaneously passed through the end mounting holes 110 of the two adjacent arc-section waste tires 100 and then anchored into the slope soil layer of the tower base slope 700; each two groups of wave units 200 are symmetrically abutted against each other up and down to form a rhombus unit 300, and the rhombus units 300 are arranged and connected in an array along the longitudinal direction of the slope surface to form a grid unit 400, and the arc outer walls of the two adjacent arc-section waste tires 100 abutting against each other up and down are connected and fixed by setting a tire wall connector 900; a plurality of vegetation planting grids 500 are formed in the grid unit 400, and the two adjacent vegetation planting grids 500 are interconnected;
[0051] The third step is to cover the foreign soil; fill the configured foreign soil into each vegetation planting grid 500, 1003 to 5 cm higher than the arc section of the waste tire, and then compact it;
[0052] The fourth step is sowing: select seeds that are adapted to the local climate and environment and sow them evenly in the soil within 500 square meters of the vegetation planting grid, and cover them with shade nets;
[0053] The fifth step is maintenance and management. After sowing, water is applied appropriately according to the situation. Water can penetrate each other along the vegetation planting grids 500 through the partitioning grate plates 800 to ensure that the moisture content of each area of the planting soil is sufficient and uniform. After the seeds germinate, remove the shade net.
[0054] In the description of the invention, it should be understood that the terms "coaxial", "bottom", "one end", "top", "middle", "the other end", "upper", "one side", "top", "inside", "front", "center", "both ends" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the invention.
[0055] In the invention, unless otherwise clearly stipulated and limited, the terms such as "installation", "setting", "connection", "fixation" and "screw-on" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integrated connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements. Unless otherwise clearly defined, ordinary technicians in this field can understand the specific meanings of the above terms in the invention according to the specific circumstances.
[0056] Although embodiments of the invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the invention, and the scope of the invention is defined by the appended claims and their equivalents.
Claims
1. A tower base slope vegetation restoration structure, characterized in that: The invention comprises a plurality of circular arc segment waste tires (100), wherein the circular arc segment waste tires (100) are arranged in a positive and negative alternating manner and connected end to end along the transverse direction of a slope surface to form a wave unit (200), and each two groups of the wave units (200) are symmetrically abutted and connected up and down to form a rhombus unit (300), and the rhombus units (300) are arranged in an array abutting and connected along the longitudinal direction of the slope surface to form a grid unit (400), and a plurality of vegetation planting grids (500) are formed in the grid unit (400), and two adjacent vegetation planting grids (500) are interconnected; Both ends of the circular arc segment waste tire (100) are provided with end mounting holes (110); an anchor rod connector (600) is provided between the ends of two adjacent circular arc segment waste tires (100) in the wave unit (200); the anchor rod connector (600) simultaneously passes through the end mounting holes (110) of the two adjacent circular arc segment waste tires (100) and is anchored into the slope soil layer of the tower base slope (700); The anchor rod connector (600) is two cross-fixed U-shaped anchor rods (610), and two end mounting holes (110) with a hole spacing corresponding to the U-shaped anchor rods (610) are respectively provided at both ends of the circular arc segment waste tire (100).
2. The tower base slope vegetation restoration structure according to claim 1 is characterized in that: The circular arc segment waste tire (100) is formed by cutting a complete waste tire, and the center angle of the circular arc segment waste tire (100) is 120°.
3. The tower base slope vegetation restoration structure according to claim 1 is characterized in that: A partitioning grate plate (800) is provided between the end surfaces of two adjacent arc-section waste tires (100) in the wave unit (200).
4. The tower base slope vegetation restoration structure according to claim 3 is characterized by: The partition grate plate member (800) comprises a partition plate (810) shielded between the end faces of two arc-shaped waste tires (100), the partition plate (810) being densely covered with penetration holes (820), the partition plate (810) being fixedly provided with mounting hole plates (830) at the upper and lower ends, and the anchor rod connector (600) passing through the two mounting hole plates (830) at the bottom.
5. The tower base slope vegetation restoration structure according to claim 1 is characterized in that: A sidewall mounting hole (120) is provided in the middle of the circular arc outer wall of the circular arc segment waste tire (100), and the circular arc outer walls of two adjacent circular arc segment waste tires (100) in the rhombus unit (300) and the grid unit (400) are connected and fixed by providing a sidewall connector (900).
6. The tower base slope vegetation restoration structure according to claim 5 is characterized by: The tire wall connector (900) comprises an intermediate pad (910) arranged between the upper and lower arc outer walls of the circular arc segments of the waste tire (100), and two inner pads (920) respectively attached to the upper and lower arc inner walls of the circular arc segments of the waste tire (100), wherein the intermediate pad (910) and the two inner pads (920) are provided with upper and lower groups of mounting holes correspondingly and are respectively inserted and connected with upper and lower groups of U-shaped double-headed screws (930), and the two threaded ends of the U-shaped double-headed screws (930) are respectively locked with anti-loosening double nuts (950) after being padded with double-hole pads (940).
7. The tower base slope vegetation restoration structure according to claim 6 is characterized by: The contact surfaces on both sides of the middle pad (910) are both grooved arc surfaces with the same curvature as the arc outer wall of the arc segment of the waste tire (100), and the contact surfaces of the two inner pads (920) are both convex arc surfaces with the same curvature as the arc inner wall of the arc segment of the waste tire (100).
8. The method for repairing a tower foundation slope vegetation restoration structure according to claim 3, characterized in that: The following steps are involved: The first step is to clean the slope surface; remove debris and loose stones from the slope surface, flatten the protruding parts, and fill the sunken parts with foreign soil; The second step is to fix the tires; a plurality of arc-section waste tires (100) are arranged in a positive and negative alternating manner along the slope surface in a transverse direction, end to end, to form a wave unit (200); a partition grate plate (800) is inserted between the end surfaces of two adjacent arc-section waste tires (100); an anchor rod connector (600) is simultaneously passed through the end mounting holes (110) of the two adjacent arc-section waste tires (100) and then anchored into the slope soil layer of the tower base slope (700); each two groups of the wave units are connected to the tower base slope (700); The elements (200) are symmetrically abutted and connected up and down to form a rhombus unit (300), and the rhombus units (300) are arranged in an array along the longitudinal direction of the slope to form a grid unit (400), and the arc outer walls of two adjacent arc segments of waste tires (100) are connected and fixed by arranging a tire wall connector (900); a plurality of vegetation planting grids (500) are formed in the grid unit (400), and two adjacent vegetation planting grids (500) are interconnected; The third step is to cover the foreign soil; fill the configured foreign soil into each vegetation planting grid (500), 3 to 5 cm higher than the arc section of the waste tire (100), and then compact it; The fourth step is sowing; selecting seeds adapted to the local climate and environment and sowing them evenly in the foreign soil in the vegetation planting grid (500), and covering them with a shade net; The fifth step is maintenance and management; after sowing, water is applied appropriately according to the situation. Water can penetrate each other along the vegetation planting grids (500) through the partitioning grate plate (800) to ensure that the moisture content of each area of the planting soil is sufficient and uniform. After the seeds germinate, the shade net is removed.
Citation Information
Patent Citations
Ecological protection structure of rock slope and construction method of structure
CN107916673A
Side slope protection connecting plate, ecological protection slope and construction method of ecological protection slope
CN113700008A
Method for consolidating soil, protecting slope and planting vegetation on rock slope
CN1358908A
Scale-shaped disease and pest prevention and control slope protection structure utilizing waste tires for slope protection
CN211646427U
Slope frame work and construction method therefor
JP2000160568A