A railway line component laying and replacing door crane device and its operation method
By designing an adjustable railway line component paving and replacement crane device, the problem of occupying adjacent line space and safety risks in railway line component replacement is solved, flexible operation and efficient component replacement are achieved, and the requirements of complex working conditions are met. Improves the reliability and efficiency of the device.
Patent Information
- Application Number
- CN202210333361.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-31
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2042-03-31
AI Technical Summary
The existing railway line component replacement methods have problems such as occupying adjacent line space, operating safety risks and inflexible operation, making it difficult to adapt to the operation needs under complex working conditions.
A railway line component door replacing device is designed, including an adjustable transverse movement mechanism and legs. The legs have lateral movement, lifting and leveling functions. The combination of multiple door crane devices can realize the circuit components of different lengths. handling, placement and replacement.
It realizes operations that do not occupy adjacent line space, reduces operational safety risks, adapts to complex working conditions, simplifies the device structure, improves the convenience and efficiency of maintenance and maintenance, and reduces equipment costs.
Smart Images

Figure CN114808567B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of railway engineering machinery, and in particular to a gantry crane hoisting device and an operating method thereof for carrying out replacement and hoisting of railway line components. Background Art
[0002] At present, the mileage of my country's high-speed railways has reached 35,000 kilometers, and the volume of passenger traffic has reached 70% of the total passenger traffic. Its normal operation has an increasing impact on national travel and business activities. Therefore, on-site lifting, replacement and maintenance of high-speed railway line components has become a top priority in the field of track engineering machinery line maintenance technology. At present, railway line components are mainly lifted and replaced by rail cranes, cantilever crane equipment, etc. For the replacement of longer and heavier line components, such as rails, point rails, switch cores and other components, when multiple rail cranes are used for operation, manual control is often difficult to achieve synchronization of operations, and heavy objects swing and deform greatly, which seriously affects construction efficiency; when using cantilever cranes for operation, the cantilever is very easy to touch the contact network on the upper part of the railway line, and there are serious safety hazards in the operation; other single-point or two-point lifting methods are not suitable for replacement parts with large length and volume. After lifting, the weight of large line components is transferred to the line through the bogie, which causes great damage to the line. The gantry cranes currently widely used in the lifting industry have the following technical defects: 1) Due to their large structure and inflexible operation, they are not easy to transport to the railway line for on-site operations; 2) The height and width spacing of the gantry crane legs cannot be adjusted, and the horizontal span spacing and height from the ground are fixed, which makes it difficult to adapt to the complex working conditions of different ground heights and different line widths on site; 3) A single gantry crane cannot adapt to the needs of replacing components of different lengths, occupies a large space, has a large mass, and is inconvenient to transport and place; 4) There are safety risks, low operating efficiency, and a low degree of integration of transportation, layout and operating processes. At the same time, the operation process may occupy adjacent lines for construction and exceed the limit.
[0003] In the prior art, the following technical solutions are mainly related to the present invention:
[0004] Prior art 1 is a Chinese invention application filed by Baoji CRRC Times Engineering Machinery Co., Ltd. on February 1, 2018 and published on March 1, 2019, with publication number CN109403161A. The invention discloses a construction process for replacing turnouts with a large-tonnage crane railcar, and the specific steps are as follows: 1. Before the new turnout is installed on the ballast bed, it is first assembled in sections by using the pre-laying and shifting method; 2. Before installing the new turnout, a crane railcar is used as the main turnout disassembly equipment to dismantle the old turnout and clean the ballast bed; 3. After the new turnout is assembled, a crane railcar is used as the main turnout transfer equipment to transfer the new turnout to the vicinity of the installation location; 4. After the new turnout is transferred to the vicinity of the installation location, a crane railcar is used as the main turnout installation equipment to accurately install it to the corresponding position of the ballast bed. The invention uses large-tonnage crane railcars, wireless tracking rangefinders, and special crane slings for turnouts to replace turnouts, which can not only greatly improve the efficiency and quality of turnout replacement, reduce the labor intensity of replacement work, but also reduce construction costs and improve the quality of turnout replacement. However, the construction process of large-tonnage crane railcars for replacing turnouts in the prior art 1 only replaces the entire set of turnouts, which not only occupies a large space and has a large mass, but is also inconvenient to transport and place. In addition, the use of large-tonnage crane railcars to replace turnouts poses a safety risk of the crane arm touching the contact network.
[0005] Prior art 2 is a Chinese invention application filed by Nan Sicheng on June 16, 2020, and published on September 20, 2020, with publication number CN111717804A. The invention discloses a simple gantry crane, which relates to the technical field of construction equipment. The simple gantry crane comprises a support frame, a connecting block is arranged at the lower end of the support frame, a base frame is arranged at the lower end of the connecting block, and a lifting device is arranged at the upper end of the support frame. The support frame comprises a frame body, a rectangular groove 1 and a rectangular groove 2, wherein the rectangular groove 1 is arranged at the middle part of the front surface of the frame body, the rectangular groove 2 is arranged at the lower end of the front surface of the frame body, two circular grooves 1 are arranged at the lower ends of the left and right sides of the frame body, and a rectangular groove 3 is arranged at the upper end of the rear surface of the rectangular groove 1. The left and right positions of the support frame are changed by sliding a pulley in the rectangular groove 5, and the front and rear positions of the hook are changed by a motor, thereby increasing the lifting range compared with a traditional gantry crane. After the lifting device rises to the upper end of the support frame, the clamping block is squeezed into the rectangular groove 3. When the vertical rod rises to the top, the clamping block returns to its original position under the action of a spring, so that the lifting device is fixed at this height. The pulling ring can be pulled away by a climbing frame to lower the lifting device, thereby facilitating the installation and removal of the lifting device. However, the simple gantry crane of the prior art 2 does not have basic functions such as leg height and width spacing adjustment, and the horizontal span spacing and height from the ground are fixed, which cannot meet the operational requirements under complex working conditions of different ground heights and different line widths on site, and a single gantry crane cannot adapt to the need to replace components of different lengths.
[0006] Prior art 3 is a Chinese utility model patent applied for by China Railway Construction High-tech Equipment Co., Ltd. on July 22, 2019 and announced on September 22, 2020, with the announcement number CN211547115U. The utility model discloses a device for replacing railway turnouts, which includes a crawler traveling platform and a gantry-type rail lifting and arranging device. The crawler traveling platform includes a lifting platform, and the lifting platform is connected to a lifting device and a vertical support device below. The two are connected to the lifting platform and the platform frame through a joint bearing. The lifting platform includes a load-bearing platform above, and two pairs of clamps are arranged in the transverse direction of the load-bearing platform. The lifting platform is connected to the crawler traveling device through a lifting device and a supporting device. However, the equipment for replacing railway turnouts in prior art 3 is operated by large-scale railway turnout replacement equipment. The equipment uses a crawler traveling platform and a gantry-type rail lifting and arranging device to realize the transportation, placement, position adjustment and replacement of the turnout, which requires the occupation of adjacent line operations, and has a complex structure, high equipment cost, high maintenance difficulty, and high maintenance and replacement costs.
[0007] Prior art 4 is a Chinese invention application filed by China Railway Construction High-Tech Equipment Co., Ltd. on August 15, 2016 and published on March 6, 2018, with publication number CN107761486A. The invention discloses a method for rapid replacement of large components of railway turnouts and corresponding replacement equipment, the replacement equipment includes at least one group of bearing platforms, a bearing frame is installed above the bearing platform, the bearing frame is connected to a telescopic machine beam, the telescopic machine beam is connected to a sliding hoisting mechanism, the telescopic machine beam is also equipped with a driving mechanism, one end of the telescopic machine beam is connected to a frame hinge beam, and the bearing frame is equipped with a Z-direction flip auxiliary adjustment mechanism. The replacement method and equipment are hierarchically refined in the turnout laying market, meet the needs of replacement and maintenance of existing railway turnouts, and focus on the needs of replacement and maintenance of high-speed railway turnouts; highlight the key points and focus on solving the most urgent key contents of turnout maintenance and replacement; and take into account the functional positioning of turnout laying and replacement equipment, to the greatest extent meet the compatibility of different models of turnouts and the replacement of different components of the same turnout, and ensure that the replacement method has a wide range of applications and strong application expansion. However, the existing technology 4 of the rapid replacement method of large components of railway turnouts and its corresponding replacement equipment uses a large-scale turnout laying and changing car to perform lifting and replacement operations. The laying and changing car is designed with multiple complex mechanisms such as a lifting mechanism, a rotating and lateral movement mechanism, and a flipping and adjustment mechanism to achieve the transportation, placement, position adjustment and replacement of the turnout. The laying and changing car has a complex structure, high equipment cost, great difficulty in maintenance, and even higher maintenance and replacement costs.
[0008] Prior art 5 is a Chinese utility model patent applied for by Beijing Jianding National Railway Engineering Design Co., Ltd. on April 2, 2014, and announced on October 8, 2014, with the announcement number CN203866656U. The utility model discloses a turnout laying machine for track construction, which belongs to the field of railway track construction. The turnout laying machine includes a metal structure for providing support, a walking mechanism for realizing the movement of the unit, a lifting mechanism for realizing the lifting of the turnout, fixed legs for providing support, a diesel engine group for providing power, a hydraulic system for providing power conversion, a radio remote control system and a complete safety monitoring system. The utility model is an engineering equipment that can realize vertical telescopic expansion, horizontal widening, longitudinal running, and three-dimensional adjustment of the sling grabbing object. By controlling the lifting, lateral movement, and longitudinal movement of the turnout assembly, the replacement and laying of the turnout are completed, and it has high stability. However, the turnout laying machine used for track construction of the prior art 5 performs lifting and replacement operations through a turnout laying and changing machine. The turnout laying and changing machine is designed with a turnout lifting mechanism and a running mechanism to realize the transportation, placement, position adjustment and replacement of the turnouts. The laying and changing machine has a complex structure, high equipment cost, great difficulty in maintenance, and even higher maintenance and replacement costs. Summary of the invention
[0009] In view of this, the purpose of the present invention is to provide a railway line component replacement door crane device and an operating method thereof, so as to solve the technical problems that the existing railway line component replacement method occupies adjacent line space, poses operational safety risks, is inflexible in operation, and is difficult to adapt to operational requirements under complex working conditions of the railway line.
[0010] In order to achieve the above-mentioned invention object, the present invention specifically provides a technical implementation scheme of a railway line component paving and replacing door hanging device, and the railway line component paving and replacing door hanging device comprises:
[0011] truss;
[0012] A transverse running mechanism is arranged on the truss and can move transversely along the truss to adjust the hoisting position; the transverse running mechanism includes a lifting mechanism, and the lifting mechanism can drive the ring chain to move up and down in the vertical direction to realize the transportation of railway line components;
[0013] A left leg and a right leg are movably arranged at the lower parts of the left and right ends of the truss respectively, and the left leg and the right leg can move laterally along the truss to adjust the lateral span of the door hanging device.
[0014] The left leg and the right leg can be lifted and lowered vertically to adjust the height of the truss from the working surface.
[0015] Furthermore, the lower parts of the left leg and the right leg are provided with leveling legs, and the fine leveling function of the left leg, the right leg and the door hanging device can be achieved through the leveling legs.
[0016] Further, the left leg includes an upper left leg connected to the truss, and a lower left leg movably connected to the upper left leg, and the upper left leg can be lifted and moved vertically relative to the lower left leg. The right leg includes an upper right leg connected to the truss, and a lower right leg movably connected to the upper right leg, and the upper right leg can be lifted and moved vertically relative to the lower right leg.
[0017] Furthermore, the lifting mechanism includes a lifting drive motor, a reducer, a first transmission gear and a second transmission gear. The lifting drive motor drives the first transmission gear to rotate through the reducer, and the first transmission gear drives the second transmission gear to rotate, and the second transmission gear is connected to the endless chain. The lifting and lowering function of the endless chain can be realized by the forward and reverse rotation of the lifting drive motor.
[0018] Furthermore, the transverse movement running mechanism also includes an annular chain, an installation box, a transverse driving motor, a first reducer, a running wheel, a driving sprocket, a driven sprocket and a running rail. The lifting mechanism is arranged in the installation box, and the running wheel is arranged at the bottom of the installation box. The running rail is arranged laterally on the inner side of the bottom of the truss, and the running wheel cooperates with the running rail. The transverse driving motor drives the driving sprocket to rotate through the first reducer, and the rotation of the driving sprocket drives the annular chain to rotate, and the driven sprocket provides auxiliary positioning for the rotation of the annular chain. The two ends of the annular chain are connected to the installation box, and the lifting mechanism is driven by the forward and reverse rotation of the transverse driving motor to realize the horizontal transverse movement function.
[0019] Furthermore, a long slot hole is provided in the horizontal direction at the bottom of the truss, and sliders are provided on both sides of the upper part of the left upper leg and the upper right leg in the longitudinal direction. A guide rail is provided in the horizontal direction at the bottom of the truss, and a mounting plate is provided in the upper part of the left upper leg and the upper right leg, and the mounting plate passes through the long slot hole upward. A traverse driving motor, a second reducer, a driving gear and a driven gear are provided on the mounting plate, and a first rack and a second rack are provided in parallel with each other in the horizontal direction at the bottom of the truss. The traverse driving motor drives the driving gear to rotate through the second reducer, the driving gear is meshed with the first rack, and the driven gear is meshed with the second rack to provide auxiliary positioning for the traverse of the legs. The guide rail cooperates with the slider to provide guidance for the traverse movement of the left upper leg and the upper right leg. The traverse movement of the left upper leg and the upper right leg is achieved by the forward and reverse rotation of the traverse driving motor.
[0020] Furthermore, the left upper leg and the right upper leg each include a screw, a screw nut, a screw bearing and a telescopic square tube. The screw is arranged in the telescopic square tube, the screw nut is fixed to the inner bottom side of the telescopic square tube, and the screw and the screw nut cooperate. The upper part of the screw is fixed to the inside of the telescopic square tube through the screw bearing.
[0021] Furthermore, the lower left leg and the lower right leg each include a fixed square tube, a supporting square tube, a crossbeam and a bearing beam. The fixed square tube is sleeved on the outside of the telescopic square tube, and the supporting square tube is arranged on the left and right sides of the fixed square tube. The upper part of the fixed square tube is fixed to one end of the supporting square tube, and the lower part of the fixed square tube is fixed to the supporting square tube through a crossbeam. The other end of the supporting square tube is fixed to the bearing beam, and a lifting drive motor and a third reducer are arranged on the bearing beam. The lower part of the screw rod is connected to the third reducer after extending out of the bottom of the telescopic square tube and the fixed square tube. The third reducer is driven by the forward and reverse rotation of the lifting drive motor, and then the screw rod is driven to rotate, and then the screw rod nut and the telescopic square tube are driven to move up and down by the rotation of the screw rod, thereby realizing the extension and retraction of the left leg and the right leg.
[0022] The present invention also specifically provides a technical implementation scheme of the above-mentioned railway line component laying and replacing door hanging device operation method, comprising the following steps:
[0023] S101) The gantry crane retracts the left and right legs, fixes them on the first flat car and transports them to the work site;
[0024] S102) After arriving at the construction site, a gantry crane is deployed through a lifting platform, the left and right legs of the gantry crane are extended and supported to the working surface, the horizontality of the truss is adjusted, and the first flat car is withdrawn;
[0025] S103) the door crane device lifts the new line component placed on the second flat car and transported to the bottom thereof, and the second flat car withdraws;
[0026] S104) the door hanging device moves the new line component to one side of the line for placement, and lifts the old line component and moves it to the other side of the line;
[0027] S105) the door crane device lifts the new line component and moves it horizontally to the line, and lifts the old line component, and the second flat car drives in;
[0028] S106) After the door hanging device places the old line components on the second flat car, the second flat car drives away;
[0029] S107) The first flat car drives in, and the door hanging device is recovered to the first flat car through the lifting platform. The first flat car drives away, and the replacement of railway line components is completed.
[0030] Furthermore, the number of gantry cranes is determined according to the length of the line components, and multiple gantry cranes are deployed and recovered through the first flat car and the lifting platform, and the laying and replacement of long and large railway line components are achieved through multi-point synchronous operation of multiple gantry cranes.
[0031] Furthermore, the spacing and height of the left leg and the right leg of the gantry crane device can be adjusted to meet the requirements of different working surface conditions.
[0032] Furthermore, when carrying out the lifting operation of railway line components, the overall load of the gantry crane acts on the working surface of the railway line through the leveling legs.
[0033] By implementing the technical solution of the railway line component replacement door hanging device and its operation method provided by the present invention, the following beneficial effects are achieved:
[0034] (1) The railway line component replacement door crane device and the operation method of the present invention can replace line components without occupying adjacent line space, and the operation is flexible and there is no operational safety risk, and it can well adapt to the operation requirements under complex line conditions;
[0035] (2) The railway track component replacement gantry crane device and the operation method thereof of the present invention are suitable for replacing a whole set of turnouts as well as replacing a single point rail, switch core, etc., and can realize the transportation, placement, position adjustment and replacement of track components of various lengths by combining multiple gantry crane devices;
[0036] (3) The present invention provides a gantry crane device for replacing railway line components and an operation method thereof. The gantry crane device has the functions of lateral movement, lifting and leveling of the legs. The lateral span spacing and the height from the ground of the legs are adjustable, which can meet the requirements of different line ground working conditions. The height of the gantry crane device is adjustable, and there is no risk of touching the contact network during the lifting process.
[0037] (4) The present invention relates to a gantry crane device for replacing railway line components and an operation method thereof. The legs of the gantry crane device are arranged on both sides of the railway line, so there is no need to occupy adjacent lines for operation, and there is no risk of over-limit operation. At the same time, the device has a simple structure, high reliability, easy maintenance and overhaul, low manufacturing cost, and high operation efficiency.
[0038] (5) The railway line component replacement gantry crane device and its operation method of the present invention have a small space occupation and light weight. The placement and recovery of the gantry crane device can be achieved through a lifting platform. The transportation, placement, operation and recovery of the gantry crane device can all be wirelessly controlled. The degree of integration and intelligence is high, and the operation efficiency is further improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the prior art descriptions. Obviously, the drawings described below are only some embodiments of the present invention, and for ordinary technicians in this field, other embodiments can be obtained based on these drawings without creative work.
[0040] Figure 1 It is a three-dimensional structural schematic diagram of a specific embodiment of the railway line component laying and replacing door hanging device (after removing the front shielding of the truss);
[0041] Figure 2 The present invention Figure 1 A schematic diagram of a local enlarged structure;
[0042] Figure 3 The present invention Figure 1 A schematic diagram of a partially enlarged structure of another part;
[0043] Figure 4 It is a structural schematic diagram of a lifting mechanism in a specific embodiment of a door hanging device for replacing railway line components of the present invention;
[0044] Figure 5 It is a structural schematic diagram of a transverse travel mechanism in a specific embodiment of a door hanging device for replacing railway line components of the present invention;
[0045] Figure 6 It is a structural schematic diagram of a leg transverse movement mechanism in a specific embodiment of a door hanging device for replacing railway line components of the present invention;
[0046] Figure 7 It is a structural schematic diagram of the lower leg in a specific embodiment of the railway line component laying and replacing door hanging device of the present invention;
[0047] Figure 8 It is a schematic diagram of a single hoisting structure of a specific embodiment of the railway line component laying and replacing door hanging device of the present invention;
[0048] Fig. 9 It is a schematic diagram of multiple hoisting structures of a specific embodiment of the railway line component laying and replacing door hanging device of the present invention;
[0049] Fig.10 It is a schematic diagram of the transport structure of a specific embodiment of the railway line component laying and door hanging device of the present invention;
[0050] Fig.11 It is a flowchart of a specific embodiment of the operation method of replacing the door hanging device of the railway line component of the present invention;
[0051] Fig.12 It is a schematic diagram of a door crane device transportation step (first flat car transportation) in a specific embodiment of the operation method for replacing a door crane device for railway line components of the present invention;
[0052] Fig.13 It is a schematic diagram of the door crane device deployment (first flat car withdrawal) step in a specific embodiment of the railway line component replacement door crane device operation method of the present invention;
[0053] Fig.14It is a schematic diagram of a new line component unloading (second flat car withdrawal) step in a specific embodiment of the railway line component replacement door hanging device operation method of the present invention;
[0054] Fig.15 It is a schematic diagram of the hoisting steps of the door crane device in a specific embodiment of the operation method of replacing the door crane device of the railway line component of the present invention;
[0055] Fig.16 It is a schematic diagram of a second flat car driving-in step in a specific embodiment of the operation method of the railway line component laying and replacing door hanging device of the present invention;
[0056] Fig.17 It is a schematic diagram of the old line component recovery (first flat car driving in) step in a specific embodiment of the railway line component replacement door hanging device operation method of the present invention;
[0057] Fig.18 It is a schematic diagram of a door hanging device recovery step in a specific embodiment of the operation method for replacing a door hanging device for railway line components of the present invention;
[0058] In the figure: 1-leveling leg, 2-lower left leg, 3-upper left leg, 4-truss, 5-annular chain, 6-hook, 7-lifting mechanism, 8-transverse walking mechanism, 9-upper right leg, 10-lower right leg, 11-bearing beam, 12-lifting drive motor, 13-reducer, 14-first transmission gear, 15-second transmission gear, 16-annular chain, 17-installation box, 18-transverse drive motor, 19-first reducer, 20-traveling wheel, 21-driving sprocket, 22-driven sprocket, 23-traveling rail, 24-long slot hole, 25-slider, 26-guide rail, 27-installation plate, 28-transverse Driving motor, 29-second reducer, 30-driving gear, 31-driven gear, 32-first rack, 33-second rack, 34-screw, 35-screw nut, 36-screw bearing, 37-telescopic square tube, 38-fixed square tube, 39-supporting square tube, 40-crossbeam, 41-lifting drive motor, 42-third reducer, 100-gantry crane, 200-lifting platform, 300-first flat car, 400-second flat car, 500-new line components, 600-old line components, 700-hoisting device, 800-basic rail, 900-working surface (roadbed), 1000-rail car. DETAILED DESCRIPTION
[0059] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0060] As attached Figure 1 To Attachment Fig.18 As shown, a specific embodiment of the railway line component laying and replacing door hanging device and its operation method of the present invention is given, and the present invention is further explained in conjunction with the drawings and specific embodiments.
[0061] Railway line components mainly refer to vulnerable rail components, turnout core components, and point rail components. The main characteristics of such components are slender size, heavy weight, and difficulty in manual handling. The use of existing construction equipment for replacement has the technical defects of large equipment size, easy damage to replacement components, and potential safety hazards. For the current replacement of large components of railway lines, the use of rail cranes has the technical defects of large equipment size and large space occupation, the need to call multiple rail flat cars for collaborative operation, the risk of touching the contact network, the need to occupy adjacent line space, and large loads causing great damage to the line. The use of traditional gantry cranes has the technical defects of inflexible structure, inability to move and adjust in all directions, and difficulty in adapting to different ground conditions on site. The following specific embodiments take the railway turnout replacement operation as an example to introduce the railway line component replacement gantry crane device and its operation method of the present invention in detail.
[0062] Example 1
[0063] As attached Figure 1 As shown, an embodiment of a railway line component replacement door hanging device 100 of the present invention specifically includes:
[0064] Truss 4;
[0065] It is arranged on the truss 4 and can be moved horizontally along the truss 4 (such as attached Figure 1 The lateral movement running mechanism 8 is movable in the direction indicated by W in the figure to adjust the hoisting position; the lateral movement running mechanism 8 includes a lifting mechanism 7, which can drive the ring chain 16 to move up and down in the vertical direction, and a hook 6 is provided at the end of the ring chain 16, and the hook 6 is further connected to the lifting device 700, and the lifting device 700 is clamped to realize the transportation of the railway line components;
[0066] The left leg and the right leg are movably arranged at the lower part of the left and right ends of the truss 4, respectively, and the left leg and the right leg can move laterally along the truss 4 to adjust the lateral span of the door hanging device 100. The left leg and the right leg are arranged on both sides of the railway line, and there is no need to occupy the adjacent line for operation, and there is no risk of over-limit operation.
[0067] The left leg and the right leg can be moved vertically (such as attached Figure 1 The truss 4 is lifted and lowered in the direction indicated by H in the figure to adjust the height of the truss 4 from the working surface 900 (i.e., the roadbed).
[0068] The lower part of the left leg and the right leg is provided with a leveling leg 1, and the leveling leg 1 can realize the fine leveling function of the left leg, the right leg and the door hanging device 100. The leveling leg 1 can realize the fine adjustment of the height according to the flatness of the working surface 900.
[0069] The railway line component replacement gantry crane device 100 of the present invention described in Example 1 has multifunctional and adaptive characteristics. The legs on both sides of the device are supported on the working surface 900 on both sides of the line. The legs on both sides can be moved horizontally, raised and lowered, and leveled to meet the operating requirements of different line ground conditions. The two horizontal legs of the gantry crane device 100 are supported on the left and right sides of the line. The replacement of old and new line components is carried out in the inner empty part of the gantry crane device 100. There is no need to occupy the adjacent line space during the operation of the line, there is no risk of touching the contact network, and no ballast damage will be caused to the line. The legs of the gantry crane device 100 have a lateral movement function, which can adapt to the working conditions of different ground widths on both sides of the line. The legs of the gantry crane device 100 have a vertical telescopic adjustment function, which can be suitable for working conditions at different ground heights, and the line components that need to be replaced can be lifted to different working heights.
[0070] As attached Figure 2 As shown, the left leg includes an upper left leg 3 connected to the truss 4, and a lower left leg 2 movably connected to the upper left leg 3, and the upper left leg 3 can be lifted and moved vertically relative to the lower left leg 2. Figure 3 As shown, the right leg includes a right upper leg 9 connected to the truss 4, and a right lower leg 10 movably connected to the right upper leg 9, and the right upper leg 9 can be lifted and lowered vertically relative to the right lower leg 10.
[0071] As attached Figure 4As shown, the lifting mechanism 7 includes a lifting drive motor 12, a reducer 13, a first transmission gear 14 and a second transmission gear 15. The lifting drive motor 12 drives the first transmission gear 14 to rotate through the reducer 13, and the first transmission gear 14 drives the second transmission gear 15 to rotate, and the second transmission gear 15 is connected to the ring chain 16. The ring chain 16 can be lifted and lowered in the vertical direction by the forward and reverse rotation of the lifting drive motor 12. The lifting and lifting structure of the lifting mechanism 7 adopts the mode of matching the ring chain 16 with the gear, which can effectively prevent slipping during the lifting process.
[0072] As attached Figure 5 As shown, the transverse travel mechanism 8 also includes an annular chain 5, an installation box 17, a transverse drive motor 18, a first reducer 19, a running wheel 20, a driving sprocket 21, a driven sprocket 22 and a running rail 23. The lifting mechanism 7 is arranged in the installation box 17, and the running wheel 20 is arranged at the bottom of the installation box 17. The running rail 23 is arranged on the inner side of the bottom of the truss 4 in the transverse direction, and the running wheel 20 cooperates with the running rail 23. The transverse drive motor 18 drives the driving sprocket 21 to rotate through the first reducer 19, and the driving sprocket 21 rotates to drive the annular chain 5 to rotate, and the driven sprocket 22 provides auxiliary positioning for the rotation of the annular chain 5. The two ends of the annular chain 5 are connected to the installation box 17, and the lifting mechanism 7 is driven by the forward and reverse rotation of the transverse drive motor 18 to realize the horizontal transverse movement function.
[0073] As attached Figure 6 As shown, the bottom of the truss 4 is provided with a long slot 24 in the horizontal direction, and the upper left leg 3 and the upper right leg 9 are provided with a long slot 24 in the vertical direction (as shown in the attached figure). Figure 6 Slide blocks 25 are provided on both sides of the truss 4 (in the direction shown by L in the figure). A guide rail 26 is provided at the bottom of the truss 4 in the horizontal direction, and a mounting plate 27 is provided on the upper part of the left upper leg 3 and the right upper leg 9, and the mounting plate 27 passes through the long slot 24 upward. A traverse driving motor 28, a second reducer 29, a driving gear 30 and a driven gear 31 are provided on the mounting plate 27, and a first rack 32 and a second rack 33 are provided in parallel with each other in the horizontal direction at the bottom of the truss 4. The traverse driving motor 28 drives the driving gear 30 to rotate through the second reducer 29, and the driving gear 30 is meshed with the first rack 32, and the driven gear 31 is meshed with the second rack 33 to provide auxiliary positioning for the traverse of the legs. The guide rail 26 cooperates with the slide block 25 to provide guidance for the traverse movement of the left upper leg 3 and the right upper leg 9. The traverse movement of the left upper leg 3 and the right upper leg 9 is achieved by the forward and reverse rotation of the traverse driving motor 28.
[0074] As attached Figure 7As shown, the upper left leg 3 and the upper right leg 9 both include a screw 34, a screw nut 35, a screw bearing 36 and a telescopic square tube 37. The screw 34 is arranged in the telescopic square tube 37, the screw nut 35 is fixed to the inner bottom side of the telescopic square tube 37, and the screw 34 and the screw nut 35 cooperate. The upper part of the screw 34 is fixed to the inside of the telescopic square tube 37 through the screw bearing 36. The lower left leg 2 and the lower right leg 10 both include a fixed square tube 38, a supporting square tube 39, a crossbeam 40 and a bearing beam 11. The fixed square tube 38 is sleeved on the outside of the telescopic square tube 37, the supporting square tube 39 is arranged on the left and right sides of the fixed square tube 38, the upper part of the fixed square tube 38 is fixed to one end of the supporting square tube 39, and the lower part of the fixed square tube 38 is fixed to the supporting square tube 39 through the crossbeam 40. The other end of the supporting square tube 39 is fixed to the load-bearing beam 11, and a lifting drive motor 41 and a third reducer 42 are arranged on the load-bearing beam 11. The lower part of the screw rod 34 extends out of the bottom of the telescopic square tube 37 and the fixed square tube 38 and is connected to the third reducer 42. The third reducer 42 is driven by the forward and reverse rotation of the lifting drive motor 41, and then the screw rod 34 is driven to rotate, and the screw rod nut 35 and the telescopic square tube 37 are driven to move up and down by the rotation of the screw rod 34, so as to realize the extension and retraction of the left and right legs.
[0075] As attached Figure 8 As shown in FIG. 1 , a schematic diagram of the placement and operation of a single gantry crane 100 is shown. The legs of the gantry crane 100 are supported on the roadbed 900 on both sides of the line. The distance between the legs of the gantry crane 100 is adjustable in the W direction and the height from the ground in the H direction. Embodiment 1 further arranges multiple gantry cranes 100 with multifunctional adaptive characteristics along the operating direction of the railway line (such as the attached Fig. 9 The group of cranes (in the direction indicated by L in the figure) forms a group crane group, which works together to complete the intelligent laying and replacement of long and large components of the railway line. Fig. 9 As shown, it is a schematic diagram of the placement and operation of multiple gantry cranes 100 along the line operation direction L. By performing lifting operations at multiple points of multiple gantry cranes 100, replacement operations of long and large railway line components of various sizes can be realized. The gantry crane 100 can realize the lifting and translation of railway line components through a set of driving mechanisms, and realize the lifting and handling functions of railway line components. The gantry crane effectively reduces the total height of the lifting space, simplifies the structure, reduces the volume, and the height of the legs is adjustable, which can automatically adapt to the different heights of the working surfaces 900 on both sides of the line.
[0076] c
[0077] As attached Fig.10As shown, it is a schematic diagram of the transport structure of the gantry crane 100 of the present invention on the rail flat car described in Example 1. The gantry crane 100 and the lifting platform 200 are both arranged on the first flat car 300. The gantry crane 100 is further fixed on the lifting platform 200, and the lifting platform 200 has the functions of lifting and rotating. The new line component 500 for replacement is placed on the second flat car 400. The rail car 1000 provides power to transport the gantry crane 100 placed on the first flat car 300 and the new line component 500 placed on the second flat car 400 to the construction area. After arriving at the designated construction area, the gantry crane 100 places the legs on both sides of the gantry crane 100 in the designated area of the roadbed 900 on both sides of the basic rail 800 of the line through the lifting and rotating action of the lifting platform 200 on the first flat car 300.
[0078] Example 3
[0079] As attached Fig.11 As shown, an embodiment of the operation method of the railway line component replacement door hanging device of the present invention as described in Example 1 specifically includes the following steps:
[0080] S101) The door hanging device 100 retracts the left leg and the right leg, and fixes them on the first flat car 300 for transportation to the work site, as shown in the attached Fig.12 As shown;
[0081] S102) After arriving at the construction site, the gantry crane 100 is deployed through the lifting platform 200, the left and right legs of the gantry crane 100 are extended and supported to the working surface 900, the horizontality of the truss 4 is adjusted, and the first flat car 300 is withdrawn. Fig.13 As shown;
[0082] S103) The door hanging device 100 lifts the new line component 500 placed on the second flat car 400 and transported to the bottom thereof, and the second flat car 400 is withdrawn. Fig.14 As shown;
[0083] S104) The door hanging device 100 moves the new line component 500 to one side of the line and places it, and lifts the old line component 600 and moves it to the other side of the line, as shown in the attached figure. Fig.15 As shown;
[0084] S105) The door crane 100 lifts the new line component 500 and moves it horizontally to the line, and lifts the old line component 600. The second flat car 400 enters. Fig.16 As shown;
[0085] S106) After the door hanging device 100 places the old line component 600 on the second flat car 400, the second flat car 400 drives away. Fig.17 As shown;
[0086] S107) The first flat car 300 enters, and the door hanging device 100 is recovered to the first flat car 300 through the lifting platform 200. The first flat car 300 leaves, and the replacement of the railway line components is completed. Fig.18 shown.
[0087] The number of gantry cranes 100 is determined according to the length of the line components, and multiple gantry cranes 100 are deployed and recovered through the first flat car 300 and the lifting platform 200, and the replacement of long and large railway line components is achieved through the multi-point synchronous operation of multiple gantry cranes 100. At the same time, the spacing and height of the left and right legs of the gantry crane 100 can be adjusted to meet the needs of different working surface conditions. When performing the lifting operation of railway line components, the overall load of the gantry crane 100 acts on the roadbed 900 of the railway line through the leveling leg 1. The pressure of the load acting on the roadbed 900 can be effectively dispersed by leveling, so as to reduce the damage to the railway line caused by the operation of the gantry crane 100.
[0088] In the operation method of replacing the gantry crane device for railway line components described in Example 3 of the present invention, the lateral spacing and the height from the ground of the two legs of a single gantry crane device 100 are adjustable to meet the requirements of different working surface conditions. When the gantry crane device 100 is constructed on the line, it does not occupy the space of the adjacent line, and the lifting load is applied to the roadbed 900 on both sides of the railway line, without loading damage to the line. At the same time, multiple gantry crane devices 100 form a gantry crane device group. When the gantry crane device group is constructed, multiple gantry crane devices 100 are synchronized, coordinated, and lifted at multiple points through wireless remote control. The number of gantry crane devices 100 is increased or decreased according to the length of the line components to adapt to the replacement of railway line components of all lengths and types, which is particularly suitable for the replacement of long and large line components. Multiple gantry crane devices 100 are carried by the first flat car 300, and the deployment and recovery of the gantry crane devices on the construction line are completed by the lifting platform 200 on the first flat car 300. When performing the lifting operation, the overall load acts on the roadbed 900 of the railway line through the leveling legs 1, which will not cause damage to the railway line.
[0089] In the description of this application, it should be noted that when an element is referred to as being "fixed on" or "set on" another element, it can be directly on the other element or indirectly set on the other element; when an element is referred to as being "connected to" another element, it can be directly connected to the other element or indirectly connected to the other element.
[0090] It should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0091] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, "multiple" and "several" mean two or more, unless otherwise clearly and specifically defined.
[0092] It should be noted that the structures, proportions, sizes, etc. illustrated in the drawings of this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the conditions under which this application can be implemented. Therefore, they have no substantive technical significance. Any structural modification, change in proportional relationship or adjustment of size should still fall within the scope of the technical content disclosed in this application without affecting the effects and purposes that can be achieved by this application.
[0093] By implementing the technical solution of the railway line component replacement door hanging device and its operation method described in the specific embodiment of the present invention, the following technical effects can be produced:
[0094] (1) The railway line component replacement door crane device and its operation method described in the specific embodiment of the present invention do not occupy the adjacent line space when replacing line components, are flexible to operate, do not pose any operational safety risks, and can well adapt to the operational requirements under complex line conditions;
[0095] (2) The railway track component replacement gantry crane device and its operation method described in the specific embodiment of the present invention are suitable for replacing a whole set of turnouts as well as replacing a single point rail, switch core, etc., and can realize the transportation, placement, position adjustment and replacement of track components of various lengths by combining multiple gantry crane devices;
[0096] (3) The railway line component replacement gantry crane device and its operation method described in the specific embodiment of the present invention have the functions of lateral movement, lifting and leveling of the legs, and the lateral span spacing and height from the ground of the legs are adjustable, which can meet the functions required by different line ground conditions. The height of the gantry crane device is adjustable, and there is no risk of touching the contact network during the lifting process;
[0097] (4) The railway line component replacement gantry crane device and its operation method described in the specific embodiment of the present invention have legs straddling the two sides of the railway line, without occupying the adjacent line for operation, and without the risk of over-limit operation. At the same time, the device has a simple structure, high reliability, easy maintenance and repair, low manufacturing cost and high operation efficiency.
[0098] (5) The railway line component replacement gantry crane device and its operation method described in the specific embodiment of the present invention have a small space occupation and light weight. The placement and recovery of the gantry crane device can be achieved through a lifting platform. The transportation, placement, operation and recovery of the gantry crane device can all be wirelessly controlled. The degree of integration and intelligence is high, and the operation efficiency is further improved.
[0099] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
[0100] The above is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention has been disclosed as above in the preferred embodiment, it is not used to limit the present invention. Any technician familiar with the art can make many possible changes and modifications to the technical solution of the present invention by using the methods and technical contents disclosed above without departing from the spirit and technical solution of the present invention, or modify it into an equivalent embodiment of equivalent changes. Therefore, any simple modification, equivalent replacement, equivalent change and modification made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the scope of protection of the technical solution of the present invention.
Claims
1. A method for operating a door hanging device for laying and replacing railway line components, characterized in that: The door hanging device (100) comprises: Trusses (4); A transverse travel mechanism (8) is arranged on the truss (4) and can move transversely along the truss (4) to adjust the hoisting position; the transverse travel mechanism (8) includes a lifting mechanism (7), and the lifting mechanism (7) can drive the endless chain (16) to move up and down in the vertical direction to realize the transportation of railway line components; A left support leg and a right support leg are movably arranged at the lower parts of the left and right ends of the truss (4), respectively, and the left support leg and the right support leg can move laterally along the truss (4) to adjust the lateral span of the door hanging device (100); The left leg and the right leg can be lifted and lowered vertically to adjust the height of the truss (4) from the working surface (900); The method comprises the following steps: S101) The door hanging device (100) retracts the left leg and the right leg, fixes them on the first flat car (300) and transports them to the work site; S102) After arriving at the construction site, a gantry crane (100) is deployed via a lifting platform (200), the left leg and the right leg of the gantry crane (100) are extended and supported to the working surface (900), the horizontality of the truss (4) is adjusted, and the first flat car (300) is withdrawn; S103) the door hanging device (100) lifts the new line component (500) placed on the second flat car (400) and transported to the bottom thereof, and the second flat car (400) is withdrawn; S104) the door hanging device (100) moves the new line component (500) to one side of the line for placement, and lifts the old line component (600) and moves it to the other side of the line; S105) the door hanging device (100) lifts the new line component (500) and moves it horizontally to the line, and lifts the old line component (600), and the second flat car (400) drives in; S106) After the door hanging device (100) places the old line component (600) on the second flat car (400), the second flat car (400) drives away; S107) the first flat car (300) drives in, and the door hanging device (100) is recovered to the first flat car (300) through the lifting platform (200), and the first flat car (300) drives away, completing the laying and replacement of railway line components; The number of gantry devices (100) is determined according to the length of the line component, a plurality of gantry devices (100) are deployed and recovered through a first flat car (300) and a lifting platform (200), and the laying and replacement of long railway line components is achieved through multi-point synchronous operation of the plurality of gantry devices (100); The left leg comprises an upper left leg (3) connected to the truss (4), and a lower left leg (2) movably connected to the upper left leg (3), and the upper left leg (3) can be lifted and moved vertically relative to the lower left leg (2); the right leg comprises an upper right leg (9) connected to the truss (4), and a lower right leg (10) movably connected to the upper right leg (9), and the upper right leg (9) can be lifted and moved vertically relative to the lower right leg (10); The bottom of the truss (4) is provided with a long slot hole (24) in the transverse direction, and sliders (25) are provided on both sides of the upper parts of the left upper leg (3) and the right upper leg (9) in the longitudinal direction; the bottom of the truss (4) is provided with a guide rail (26) in the transverse direction, and the upper parts of the left upper leg (3) and the right upper leg (9) are provided with a mounting plate (27), and the mounting plate (27) passes through the long slot hole (24) upward; the mounting plate (27) is provided with a transverse driving motor (28), a second reducer (29), a driving gear (30) and a driven gear (31), and the bottom of the truss (4) is parallel to each other in the transverse direction. A first rack (32) and a second rack (33) are arranged on the side of the support leg; the lateral movement driving motor (28) drives the driving gear (30) to rotate through the second reducer (29); the driving gear (30) is meshed with the first rack (32); the driven gear (31) is meshed with the second rack (33) to provide auxiliary positioning for the lateral movement of the support leg; the guide rail (26) cooperates with the slider (25) to provide guidance for the lateral movement of the upper left support leg (3) and the upper right support leg (9); the lateral movement of the upper left support leg (3) and the upper right support leg (9) is achieved by the forward and reverse rotation of the lateral movement driving motor (28).
2. The railway line component replacement door hanging device operation method according to claim 1 is characterized by: The spacing and height of the left and right legs of the door hanging device (100) can be adjusted to meet the requirements of different working surface conditions.
3. The railway line component replacement door hanging device operation method according to claim 1 or 2, characterized in that: The lower parts of the left supporting leg and the right supporting leg are both provided with leveling supporting legs (1), and the leveling supporting legs (1) can realize a fine leveling function of the left supporting leg, the right supporting leg and the door hanging device (100).
4. The railway line component replacement door hanging device operation method according to claim 3 is characterized in that: When carrying out a railway line component lifting operation, the overall load of the portal lifting device (100) acts on the working surface (900) of the railway line through the leveling legs (1).
5. The railway line component replacement door hanging device operation method according to claim 1, 2 or 4, characterized in that: The lifting mechanism (7) comprises a lifting drive motor (12), a reducer (13), a first transmission gear (14) and a second transmission gear (15); the lifting drive motor (12) drives the first transmission gear (14) to rotate via the reducer (13); the first transmission gear (14) drives the second transmission gear (15) to rotate; the second transmission gear (15) is connected to the endless chain (16); the endless chain (16) can be lifted and lowered in the vertical direction by the forward and reverse rotation of the lifting drive motor (12).
6. The railway line component replacement door hanging device operation method according to claim 5 is characterized in that: The transverse travel mechanism (8) further comprises an endless chain (5), a mounting box (17), a transverse drive motor (18), a first reducer (19), a travel wheel (20), a driving sprocket (21), a driven sprocket (22) and a travel rail (23); the lifting mechanism (7) is arranged in the mounting box (17), the travel wheel (20) is arranged at the bottom of the mounting box (17); the travel rail (23) is arranged in the transverse direction on the inner side of the bottom of the truss (4), and the travel wheel (20) is arranged at the bottom of the truss (4). 0) cooperates with the running rail (23); the lateral drive motor (18) drives the driving sprocket (21) to rotate through the first reducer (19), the driving sprocket (21) rotates to drive the ring chain (5), and the driven sprocket (22) provides auxiliary positioning for the rotation of the ring chain (5); the two ends of the ring chain (5) are connected to the installation box (17), and the lifting mechanism (7) is driven by the forward and reverse rotation of the lateral drive motor (18) to realize the horizontal lateral movement function.
7. The railway line component replacement door hanging device operation method according to claim 1, 2, 4 or 6, characterized in that: The left upper leg (3) and the right upper leg (9) both comprise a screw rod (34), a screw rod nut (35), a screw rod bearing (36) and a telescopic square tube (37); the screw rod (34) is arranged in the telescopic square tube (37); the screw rod nut (35) is fixed to the inner bottom side of the telescopic square tube (37); the screw rod (34) and the screw rod nut (35) cooperate; the upper part of the screw rod (34) is fixed to the inside of the telescopic square tube (37) via the screw rod bearing (36).
8. The railway line component replacement door hanging device operation method according to claim 7 is characterized in that: The left lower leg (2) and the right lower leg (10) both comprise a fixed square tube (38), a supporting square tube (39), a crossbeam (40) and a bearing beam (11); the fixed square tube (38) is sleeved on the outside of the telescopic square tube (37); the supporting square tube (39) is arranged on the left and right sides of the fixed square tube (38); the upper part of the fixed square tube (38) is fixed to one end of the supporting square tube (39); the lower part of the fixed square tube (38) is fixed to the supporting square tube (39) via the crossbeam (40); the other end of the supporting square tube (39) is fixed to the supporting square tube (39); The load beam (11) is fixed, and a lifting drive motor (41) and a third reducer (42) are arranged on the load beam (11); the lower part of the screw rod (34) extends out of the bottom of the telescopic square tube (37) and the fixed square tube (38) and is connected to the third reducer (42); the third reducer (42) is driven by the forward and reverse rotation of the lifting drive motor (41), thereby driving the screw rod (34) to rotate, and the screw rod nut (35) and the telescopic square tube (37) are driven to move up and down by the rotation of the screw rod (34), thereby realizing the extension and retraction of the left leg and the right leg.
Citation Information
Patent Citations
Railway turnout large-size component rapid replacing method and corresponding equipment thereof
CN107761486A
Construction process for changing turnout by using large-tonnage hoisting track car