A transmission tower foundation structure and construction method

By adopting structural designs such as rafts, stress-bearing piles, ground connection walls and permeable nets in the deep water-saturated soft clay layer area, the problem of low bearing capacity and difficulty in ensuring safety of the transmission tower foundation in this area was solved, and the construction was realized High safety, low cost and short construction period.

CN114809065BActive Publication Date: 2024-10-29CEEC JIANGSU ELECTRIC POWER DESIGN INST CO LTD +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202210383125.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-04-13
Publication Date
2024-10-29
Estimated Expiration
2042-04-13

AI Technical Summary

Technical Problem

In areas with deep, water-saturated soft clay layers, it is difficult for existing technologies to effectively guarantee the bearing capacity and safety of transmission tower foundations. In particular, there are risks such as necking and pile breakage during the construction process, making it difficult to maintain the stability and safety of the structure. Assure.

Method used

Adopt a basic structure design including rafts, stress-bearing piles, ground walls, permeable nets and vertical drainage bodies. By setting settlement monitoring points on the top of the ground walls, the load can be adjusted in real time, combined with sand cushions and permeable nets, to improve drainage. Consolidation efficiency ensures the stability and integrity of the foundation.

Benefits of technology

It achieves the safety and stability of the foundation of extra-large transmission towers in deep soft soil areas, reduces the construction cost and construction period, effectively avoids the risk of overall collapse caused by foundation settlement and slippage, and improves the drainage and consolidation efficiency of the soil. Foundation bearing capacity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114809065B_ABST
    Figure CN114809065B_ABST
Patent Text Reader

Abstract

The present invention discloses a transmission tower foundation structure, including: a raft, wherein a load-bearing pile is arranged under the beam intersection of the raft, a sand cushion layer is laid at the bottom, and ground-connected walls are arranged on four sides; the plate is provided with a reserved hole, and a permeable net is arranged in the reserved hole; a vertical drainage body, wherein the vertical drainage body is arranged under the raft and inserted into the sand cushion layer, and is used to improve the drainage and consolidation efficiency; a settlement monitoring point, wherein the settlement monitoring point is arranged at the top of the ground-connected wall. The ground-connected wall and raft foundation of the present invention patent greatly improve the integrity of the foundation, and constrain the horizontal displacement of the soil under the foundation, so that the drainage and consolidation of the soil can be effectively realized; the sand piles used in the present invention patent can greatly improve the drainage and consolidation efficiency of the foundation soil, shorten the construction period and improve the effective foundation bearing capacity.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a transmission tower foundation structure and a construction method, belonging to the technical field of foundation technology. Background Art

[0002] my country has a vast territory and numerous rivers. In the process of constructing power transmission channels, it is inevitable to cross natural barriers such as the Yangtze River. As power transmission channels become increasingly tight, the construction height of pole towers has gradually increased. At present, the height of the world's largest power transmission line pole tower has reached 385m. For the middle and lower reaches of the Yangtze River, Qiantang River and other basins, the soil conditions in some areas along the line are poor, and the bearing layer is mainly composed of a deep, water-rich, saturated soft clay layer. At present, the design of extra-large transmission towers mainly adopts an ultra-long cast-in-place pile foundation type. Cast-in-place piles are expensive and have a long construction period. In addition, there are construction risks such as shrinkage and broken piles when constructing foundation piles in soft soil areas, and the safety of the structure is difficult to guarantee. Therefore, the inventor proposes a foundation type for an extra-large power transmission tower suitable for areas with deep, water-rich, saturated soft clay layers. Summary of the invention

[0003] The purpose of the present invention is to provide a transmission tower foundation structure and a construction method to solve the defects of the existing building foundation in the prior art that the bearing capacity is low in deep soft clay areas and the safety and stability are difficult to ensure.

[0004] A transmission tower foundation structure, characterized by comprising:

[0005] A raft slab, wherein load-bearing piles are arranged under the beam intersection points of the raft slab, a sand cushion layer is laid on the bottom, and ground-connected walls are arranged on the four sides;

[0006] The plate is provided with a reserved hole, and a water-permeable net is provided in the reserved hole;

[0007] A vertical drainage body, which is arranged below the raft and inserted into the sand cushion layer to improve drainage consolidation efficiency;

[0008] The settlement monitoring point is arranged at the top of the ground-connected wall.

[0009] Furthermore, at least eight settlement monitoring points are provided, and at least two settlement monitoring points are provided on each side of the ground-connected wall.

[0010] Furthermore, the permeable net comprises a sleeve, a steel wire mesh is arranged inside the sleeve, and a permeable geotextile interlayer is arranged in the middle of the steel wire mesh.

[0011] Furthermore, the load-bearing pile is one of a screw pile, a cast-in-place pile or a precast pile.

[0012] Furthermore, the vertical drainage body is one of a sand pile, a sand well or a plastic drainage belt.

[0013] Furthermore, the diaphragm wall is arranged in the form of a "field" character or a "well" character grid under the raft foundation.

[0014] A construction method for a transmission tower foundation structure, the method comprising the steps of:

[0015] S1: Arrange the bearing piles, vertical drainage bodies, sand cushions, diaphragm walls, raft foundations and permeable nets in sequence;

[0016] Carry out surveying and setting out, drive vertical drainage bodies and bearing piles at designated positions, arrange diaphragm walls, lay a sand cushion after completion, and reserve steel bar heads or steel bar joints for the diaphragm walls and bearing piles, chisel the top to be rough and pour it into an integral body with the raft foundation, and install a permeable net at the reserved hole;

[0017] S2: Directly carry out the construction of the superstructure on the raft foundation and simultaneously carry out static loading, arrange settlement monitoring points on the raft foundation, and adjust the position of the upper load in real time according to the monitoring data until the final foundation settlement reaches stability.

[0018] Compared with the prior art, the beneficial effects achieved by the present invention are as follows: The structure of the present invention is simple, reasonably designed, with low construction cost, short construction period, environmentally friendly, and can effectively reduce the risk of overall collapse caused by foundation settlement and sliding;

[0019] The diaphragm wall and raft foundation of the present invention greatly improve the integrity of the foundation and restrict the horizontal displacement of the soil under the foundation, enabling effective soil drainage consolidation;

[0020] The vertical drainage body adopted in the present invention can greatly improve the drainage consolidation efficiency of the foundation soil, shorten the construction period and effectively improve the bearing capacity of the foundation;

[0021] Through the monitoring results of the settlement monitoring points of the present invention, controlling the distribution and magnitude of the load applied on the foundation can effectively control the stability of the foundation settlement and the settlement difference of the overall foundation. Description of the Drawings

[0022] Figure 1 is the overall sectional view of the structure of the present invention;

[0023] Figure 2 is the sectional view of the permeable net of the present invention;

[0024] Figure 3 is the flow chart of the construction method of the present invention;

[0025] In the figure: bearing pile - 1, vertical drainage body - 2, diaphragm wall - 3, raft foundation - 4, permeable net - 5, settlement monitoring point - 6, sand cushion - 7, permeable geotextile interlayer - 8, sleeve - 9, wire mesh - 10. Detailed Embodiments

[0026] In order to make the technical means, creative features, achieved purposes and effects of the present invention easy to understand, the present invention will be further described below in conjunction with specific embodiments.

[0027] As shown in Figures 1 to 3 , a transmission tower foundation structure is characterized by comprising:

[0028] A raft 4, with load-bearing piles 1 provided under the beam intersection points of the raft 4, a sand cushion layer 7 laid at the bottom, and diaphragm walls 3 provided on four sides;

[0029] The raft 4 is provided with reserved holes, and a permeable net 5 is arranged in the reserved holes;

[0030] Vertical drainage bodies 2, which are arranged below the raft 4 and inserted into the sand cushion layer 7 for improving the drainage consolidation efficiency;

[0031] Settlement monitoring points 6, which are arranged at the top of the diaphragm walls 3.

[0032] Preferably, the load-bearing piles 1 are arranged under the beam intersection points of the raft 4 according to the structural stress requirements. It is recommended to select screw piles. If the soil layer conditions are good, bored piles or precast piles can also be selected;

[0033] Preferably, for the vertical drainage bodies 2: one of sand piles, sand wells or plastic drainage belts can be selected, and they can be evenly distributed under the raft 4 foundation according to the drainage area. Their main function is to accelerate drainage and improve the bearing capacity of the foundation;

[0034] Preferably, for the diaphragm walls 3: it is recommended to use the TRD construction method. And if the foundation required for the building is large, diaphragm walls can also be added under the raft 4 in the form of a "field" character or a "well" character grid. Their main function is to restrain the soil body under the raft 4 and prevent the soil body under the raft 4 from undergoing large lateral displacements under the action of loads, ensuring the effective progress of the subsequent static pressure drainage consolidation;

[0035] Preferably, for the raft 4: a beam-slab raft foundation is selected, holes are reserved according to the drainage area, and it is connected with the diaphragm walls to form an integral whole, jointly restraining the soil body under the raft to only undergo vertical deformation, ensuring the effective progress of the subsequent static pressure drainage consolidation;

[0036] Preferably, for the permeable net 5: it is composed of two layers of steel wire nets on the upper and lower sides and one layer of permeable geotextile in the middle, and is arranged at the reserved holes of the raft to ensure the smooth progress of drainage and effectively prevent the occurrence of piping;

[0037] Preferably, the settlement monitoring points 6 are arranged at the top of the diaphragm walls, and there are no less than eight, with at least two on each side;

[0038] In addition, a construction method for a transmission tower foundation in a deep, water-rich, saturated soft clay area is provided, and the steps are as follows:

[0039] S1: Arrange the load-bearing piles, vertical drainage body, sand cushion, ground-connected wall, raft, and permeable net in the order of priority. First, carry out surveying and laying out, drive sand piles and load-bearing piles at designated locations, and arrange the ground-connected wall. After completion, lay the sand cushion, and reserve steel bar heads or steel bar joints on the ground-connected wall and the load-bearing piles. Roughen the top and cast it into a whole with the raft foundation. Install the permeable net at the reserved holes, and arrange settlement monitoring points on the raft foundation, which should be arranged at least eight on the top of the ground-connected wall.

[0040] S2: After the foundation strength meets the standard, the superstructure can be constructed directly on the raft and static loading can be carried out at the same time. The initial load is borne by the excess pore water pressure, but as the structure is constructed, the load increases, the pore water pressure gradually dissipates, the soil consolidates, the effective stress increases, and the final load value is 1.1-1.3 times the design load of the superstructure. While loading, the position of the upper load is adjusted in real time according to the monitoring data until the final foundation settlement is stable.

[0041] The patented structure of the present invention is simple, the design is reasonable, the environment is friendly, the construction cost is low, and it saves time and effort. It can effectively resist the vertical and lateral deformation of the building foundation structure and is suitable for building in deep soft soil areas.

[0042] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A transmission tower foundation structure, characterized in that: Including: A raft slab (4), with load-bearing piles (1) provided under the beam intersection points of the raft slab (4), diaphragm walls (3) provided at the four sides of the bottom, and a sand cushion layer (7) laid at the bottom; The raft slab (4) is provided with reserved holes, and a permeable net (5) is arranged in the reserved holes; Vertical drainage bodies (2), which are arranged under the raft slab (4) and inserted into the sand cushion layer (7) for improving the drainage consolidation efficiency; Settlement monitoring points (6), which are arranged at the top of the diaphragm wall (3); The permeable net (5) includes a sleeve (9), a wire mesh (10) is arranged in the sleeve (9), and a permeable geotextile interlayer (8) is arranged in the middle of the wire mesh (10); The diaphragm wall (3) is arranged in a "field" or "well" grid form under the raft slab (4).

2. The transmission tower foundation structure according to claim 1, characterized in that: At least eight settlement monitoring points (6) are arranged, and at least two settlement monitoring points (6) are arranged on each side of the diaphragm wall (3).

3. The transmission tower foundation structure according to claim 1, characterized in that: The load-bearing pile (1) is one of a screw pile, a cast-in-place pile or a precast pile.

4. The transmission tower foundation structure according to claim 1, characterized in that: The vertical drainage body (2) is one of a sand pile, a sand well or a plastic drainage band.

5. A construction method for a transmission tower foundation structure according to any one of claims 1 to 4, characterized in that: The method includes the steps: S1: Arrange the load-bearing piles, vertical drainage bodies, sand cushion layer, diaphragm walls, raft slab and permeable net in sequence; Carry out measurement and setting out, drive vertical drainage bodies and load-bearing piles at the designated positions, arrange diaphragm walls, lay the sand cushion layer after completion, and reserve steel bar heads or steel bar joints for the diaphragm walls and load-bearing piles, chisel the top to be rough and pour it into an integral whole with the raft foundation, install the permeable net at the reserved holes, and arrange settlement monitoring points on the raft foundation; S2: Directly carry out the construction of the upper structure on the raft slab and simultaneously carry out static loading, arrange settlement monitoring points on the raft foundation, and adjust the position of the upper load in real time according to the monitoring data until the final foundation settlement reaches stability.

Citation Information

Patent Citations

  • Method for treating spiral oil-extruding filling pile composite foundation in stratum containing soft clay

    CN101634143A

  • Soft soil foundation consolidation method combining drainage pile loading prepressing and deep mixing piles

    CN102071675A

  • Method for treating peat soil foundation through combination of loading and heating

    CN113106960A

  • Piled raft foundation structure of narrow-base power transmission tower

    CN202595756U

  • Quick treatment device of foundation pit piping

    CN205387712U