A method for installing and connecting deepwater steel catenary riser

Through the collaborative operation of the pipe-laying ship and the floating central platform, combined with the design of underwater robots and polymer polyester cables, the independent tie-back of deep-water steel catenary risers has been achieved, solving the problem of relying on large floating cranes in the existing technology. The limitations of the boat reduce construction costs.

CN114809947BActive Publication Date: 2024-10-01CHINA NAT OFFSHORE OIL CORP +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210107964.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-01-28
Publication Date
2024-10-01
Estimated Expiration
2042-01-28

AI Technical Summary

Technical Problem

In the development of deepwater oil and gas fields, the existing steel catenary riser installation technology relies on large floating cranes, which limits the independent operation of underwater robots, resulting in high construction costs and the inability to achieve underwater buckle connection rigging, which affects the control of construction costs.

Method used

The steel catenary riser is laid by the pipe-laying ship and the pulling head is installed. The underwater robot connects the tie-back tension conversion rigging and the winch pulling cable of the floating center platform, and utilizes the lifting equipment of the pipe-laying ship and the floating center platform. For the tie-back of steel catenary risers, polymer polyester cables and guide pulleys are used to assist traction, enabling independent underwater operations.

Benefits of technology

Without relying on large floating cranes, the underwater robot can operate independently, saving engineering costs. Through the design of guide pulleys and polymer polyester cables, the difficulty of pulling the main tow cable of the platform lifting winch has been solved, and the steel suspension system has been realized. Effective tiebacks to chain line risers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114809947B_ABST
    Figure CN114809947B_ABST
Patent Text Reader

Abstract

The invention discloses a deepwater steel catenary riser installation and tie-back method, comprising the following steps: a pipe-laying vessel lays a steel catenary riser; after the steel catenary riser is laid, the towing head is installed and then the tie-back tension conversion rigging is connected; an underwater robot successively connects the tie-back tension conversion rigging and the winch towing cable; the winch towing cable is lifted to the top of the towing head, and the winch towing cable is connected to the tie-back tension conversion rigging; the floating center platform continues to lift the winch towing cable, and the control winch side-pull steel cable set on the floating center platform is connected to the towing head; the winch towing cable is slowly lowered, and at the same time, the control winch side-pull steel cable laterally pulls the towing head, and the steel catenary riser is shifted into the floating center platform suspension structure, and the steel catenary riser tie-back operation is completed. The invention realizes the underwater robot's independent underwater operation without relying on a large floating crane, saves engineering costs, and realizes the installation and tie-back of the steel catenary riser based on the floating center platform in place.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of marine riser facility installation, and in particular to a deepwater steel catenary riser installation and tie-back method. Background Art

[0002] In the development of deepwater oil and gas fields, steel catenary risers have the characteristics of low cost, great adaptability to floating body movement, and suitability for high temperature and high pressure working environment. They account for a large proportion of various types of risers on deep-sea platforms and have broad application prospects. As a carrier of the conveying medium, the steel catenary riser connects the submarine wellhead and the central platform, and can transport crude oil, natural gas, chemicals, etc. The steel catenary riser uses steel pipes, one end of which is located on the seabed and connected to the submarine wellhead through the pipeline terminal structure, and the other end is suspended on the floating platform through special load-bearing components such as flexible joints or stress joints. The pipeline exists in the form of a steel catenary below the sea surface, so it is called a steel catenary riser. The steel catenary riser was gradually developed abroad in the 1990s and has been widely used in the development of deep-sea oil and gas fields. Due to the limitations of the technical capabilities of deepwater oil and gas field development in my country, there is little research on the installation technology of steel catenary risers, and the installation and tie-back method of steel catenary risers has not yet been mastered. However, the early foreign steel catenary riser installation technology had certain limitations. First, large-diameter anchor chains and steel cables were used to tie back the rigging, which relied on large floating cranes for operation and was limited by the resources of construction vessels. Second, the towing cable connection with the floating platform was mostly carried out above the water surface on the side of the large floating crane, and it was not possible for underwater robots to independently hook and connect the rigging underwater. These limitations were not conducive to controlling construction costs. Summary of the invention

[0003] The purpose of the present invention is to provide a deepwater steel catenary riser installation and tie-back method, which can realize the independent underwater operation of an underwater robot without relying on a large floating crane, save engineering costs, and realize the installation and tie-back of the steel catenary riser based on the floating central platform in place.

[0004] In order to achieve the purpose of the present invention, the present invention provides a deepwater steel catenary riser installation and tie-back method, comprising the following steps:

[0005] S1. The pipe-laying vessel lays the steel catenary riser from the riser terminal structure toward the floating central platform, and the floating central platform lowers the winch towing cable to a preset water depth;

[0006] S2, after the steel catenary riser is laid, a dragging end cap is installed at the end of the steel catenary riser, and the tension conversion rigging is connected back, and the steel catenary riser is lowered to a preset water depth by the lifting winch cable on the pipe-laying vessel;

[0007] S3, the underwater robot is launched from the pipe-laying vessel, and the underwater robot tows an auxiliary towing cable which is successively connected to the tie-back tension conversion rigging and the winch towing cable of the floating central platform;

[0008] S4, the floating central platform lifts the winch towing cable to the top of the towing head, and the underwater robot connects the winch towing cable to the tie-back tension conversion rigging;

[0009] S5, the floating central platform continues to lift the winch towing cable to lift the steel catenary riser to the designed water depth, and connects the side-pull steel cable of the control winch provided on the floating central platform to the towing head;

[0010] S6. The winch towing cable of the floating central platform is slowly lowered, and at the same time, the control winch side-pull steel cable laterally pulls the towing head to shift the steel catenary riser into the floating central platform suspension structure, and the steel catenary riser reconnection operation is completed.

[0011] As a preferred technical solution of the present invention, the tie-back tension conversion rigging includes an eyelet plate, which is fixedly connected to the top of the towing head; a connecting cable, two connecting cables are connected to the eyelet plate, one connecting cable is connected to the lifting winch steel cable on the pipe-laying vessel, and the other connecting cable is connected to the winch towing cable; a mooring point, one end of which is connected to the lifting winch steel cable on the pipe-laying vessel; and a connecting hanging point, one end of which is connected to the winch towing cable, and the other end of which is connected to the other end of the mooring point.

[0012] As a preferred technical solution of the present invention, the connecting cable is a high molecular polyester cable.

[0013] As a preferred technical solution of the present invention, it also includes: a guide pulley, which is arranged at the connection point between the fastening point and the connection hanging point, and the auxiliary traction cable is connected to the guide pulley.

[0014] Compared with the prior art, the present invention provides a deepwater steel catenary riser installation and tie-back method, which has the following beneficial effects.

[0015] The present invention pre-tows the towing cables of the main winch and the steering winch to a designated position through a small towing winch for temporary mooring and fixing. The underwater operation can be completed by air divers, and the crane of the floating central platform can assist the operation when necessary. This step can be carried out before all operations begin; the floating platform has been installed in place, and the pipe-laying vessel needs to lay the pipe from the far end to the platform, and perform the riser tie-back operation at the end of the laying; after the steel catenary riser is laid, the towing head is installed and the tie-back tension conversion rigging is completed on the deck of the main operation ship; the tie-back tension conversion rigging reserves guide pulleys, fastening points and connection hanging points. This design can solve the difficulty of pulling the main towline of the platform lifting winch. This guide pulley can be installed underwater by an underwater robot; the connecting cable is independently connected underwater by the underwater robot, eliminating the restriction on large ship resources; the tension of the steel catenary riser is transferred from the pipe-laying vessel's lowering winch to the platform lifting winch operation, which can be achieved in three ways: one is that the pipe-laying vessel winch steel cable is lowered while the platform lifting winch main towline is not retracted or released; the second is that the pipe-laying vessel winch remains unretracted and the platform lifting winch recovers the main towline; the third is that the pipe-laying vessel winch and the platform lifting winch operate simultaneously, that is, the pipe-laying vessel winch releases the steel cable and recovers the platform lifting winch main towline at the same time. The present invention relies on the pipe-laying vessel to lower the winch and the floating central platform lifting equipment, and without relying on a large floating crane, realizes the installation and connection of the steel catenary riser after the floating central platform is in place, thereby facilitating installation and implementation; the underwater transmission tension conversion rigging adopts a new design concept of polymer polyester cable, and is professionally designed to assist the underwater robot in underwater connection operations, thereby realizing independent underwater operation of the underwater robot and saving engineering costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the installation of the steel catenary riser of the present invention;

[0017] Figure 2 It is a schematic diagram of the structure of the tie-back tension conversion rigging of the present invention;

[0018] Figure 3 It is a schematic diagram of the winch towing cable traction of the present invention;

[0019] Figure 4 The present invention A Figure 3 A magnified structural diagram of the .

[0020] 1 is the riser terminal structure, 2 is the floating central platform, 3 is the steel catenary riser, 4 is the towing head, 5 is the tie-back tension conversion rigging, 6 is the auxiliary towing cable, 7 is the eyelet plate, 8 is the connecting cable, 9 is the fastening point, 10 is the connecting hanging point, and 11 is the guide pulley. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0022] See also Figure 1-Figure 4 The embodiment of the present invention provides a deepwater steel catenary riser installation and tie-back method, comprising the following steps:

[0023] S1, the pipe-laying vessel lays the steel catenary riser 3 from the riser terminal structure 1 toward the floating central platform 2, and the floating central platform 2 lowers the winch towing cable to a preset water depth;

[0024] S2, the steel catenary riser 3 is laid, and after the dragging head 4 is installed at the end of the steel catenary riser 3, the tension conversion rigging 5 is connected back, and the steel catenary riser 3 is lowered to the preset water depth by the lifting winch steel cable on the pipe-laying vessel;

[0025] S3, the underwater robot is launched from the pipe-laying vessel, and the underwater robot tows the auxiliary towing cable 6 which is successively connected to the tie-back tension conversion rigging 5 and the winch towing cable of the floating central platform 2;

[0026] S4, the floating central platform 2 lifts the winch towing cable, lifts the winch towing cable to above the towing head 4, and the underwater robot connects the winch towing cable to the tie-back tension conversion rigging 5;

[0027] S5, the floating central platform 2 continues to lift the winch towing cable to lift the steel catenary riser 3 to the designed water depth, and connects the side-pull steel cable of the control winch provided on the floating central platform 2 to the towing head 4;

[0028] S6, the winch towing cable of the floating central platform 2 is slowly lowered, and at the same time, the control winch side-pull steel cable laterally pulls the towing head 4 to shift the steel catenary riser 3 into the suspension structure of the floating central platform 2, and the reconnection operation of the steel catenary riser 3 is completed.

[0029] In one embodiment of the present invention, the tie-back tension conversion rigging 5 includes an eyelet plate 7, which is fixedly connected to the top of the towing head 4; a connecting cable 8, two connecting cables 8 are connected to the eyelet plate 7, one connecting cable 8 is connected to the lifting winch steel cable on the pipe-laying vessel, and the other connecting cable 8 is connected to the winch towing cable; a mooring point 9, one end of which is connected to the lifting winch steel cable on the pipe-laying vessel; a connecting hanging point 10, one end of which is connected to the winch towing cable, and the other end of which is connected to the other end of the mooring point 9.

[0030] In one embodiment of the present invention, the connecting cable 8 is a high molecular polyester cable.

[0031] In one embodiment of the present invention, it further comprises: a guide pulley 11 , wherein the guide pulley 11 is arranged at the connection point between the fastening point 9 and the connection hanging point 10 , and the auxiliary traction cable 6 is connected to the guide pulley 11 .

[0032] The above are only preferred specific implementation modes of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solutions and inventive concepts of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A deepwater steel catenary riser installation and tie-back method, characterized in that: The following steps are involved: S1. A pipe-laying vessel lays a steel catenary riser (3) from a riser terminal structure (1) toward a floating central platform (2), and the floating central platform (2) lowers a winch towing cable to a preset water depth; S2, the steel catenary riser (3) is laid, a dragging head (4) is installed at the end of the steel catenary riser (3), and then a tension conversion rigging (5) is connected back, and the steel catenary riser (3) is lowered to a preset water depth by a lifting winch steel cable on the pipe-laying vessel; S3, the underwater robot is launched from the pipe-laying vessel, and the underwater robot tows the auxiliary towing cable (6) which is successively connected to the tie-back tension conversion rigging (5) and the winch towing cable of the floating central platform (2); S4, the floating central platform (2) lifts the winch towing cable to the top of the towing head (4), and the underwater robot connects the winch towing cable to the tie-back tension conversion rigging (5); S5, the floating central platform (2) continues to lift the winch towing cable to lift the steel catenary riser (3) to the designed water depth, and connects the side-pull steel cable of the steering winch provided on the floating central platform (2) to the towing head (4); S6, the winch towing cable of the floating central platform (2) is slowly lowered, and at the same time, the side-pull steel cable of the control winch pulls the towing head (4) laterally to shift the steel catenary riser (3) into the suspension structure of the floating central platform (2), and the tie-back operation of the steel catenary riser (3) is completed; The tie-back tension conversion rigging (5) comprises an eyelet plate (7), wherein the eyelet plate (7) is fixedly connected to the top end of the towing head (4); a connecting cable (8), wherein two connecting cables (8) are connected to the eyelet plate (7), wherein one connecting cable (8) is connected to a lifting winch steel cable on the pipe-laying vessel, and the other connecting cable (8) is connected to the winch towing cable; a fastening point (9), wherein one end of the fastening point (9) is connected to the lifting winch steel cable on the pipe-laying vessel; and a connecting hanging point (10), wherein one end of the connecting hanging point (10) is connected to the winch towing cable, and the other end of the connecting hanging point (10) is connected to the other end of the fastening point (9).

2. A deepwater steel catenary riser installation and tie-back method according to claim 1, characterized in that: The connecting cable (8) is a high molecular polyester cable.

3. A deepwater steel catenary riser installation and tie-back method according to claim 1, characterized in that: Also includes: A guide pulley (11), wherein the guide pulley (11) is arranged at a connection point between the fastening point (9) and the connection hanging point (10), and the auxiliary traction cable (6) is connected to the guide pulley (11).