A composite shaft wall structure for a mine shaft and a construction method thereof

By using lightweight porous outer well wall and disassembly-free formwork mesh structure in deep mine shafts, the stability problem of the well wall structure under high ground stress is solved, the simplicity and safety of construction is achieved, and the well wall is ensured. Even pressure relief and long-term stability.

CN114856573BActive Publication Date: 2024-11-26CINF ENG CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202210669049.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-14
Publication Date
2024-11-26
Estimated Expiration
2042-06-14

AI Technical Summary

Technical Problem

Deep mine shafts are prone to rock bursts and long-term large deformation of surrounding rocks under high ground stress environments, resulting in dynamic damage and gradual cumulative deformation damage of the well wall structure. The construction progress of the existing composite well wall structure is slow and has poor adhesion, and the overall coordinated stress effect is Not good.

Method used

Adopt lightweight porous structure of the outer well wall and non-flat and interrupted structure of the disassembly-free formwork net to reduce the stress of the inner well wall and enhance the bonding effect between the two layers. By simultaneously casting the outer and inner well walls, it simplifies Construction process.

Benefits of technology

It improves the overall coordinated stress effect and stability of the composite well wall structure, the construction process is simple and fast, with high safety, and can evenly relieve pressure in a deep well environment to avoid damage to the well wall.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114856573B_ABST
    Figure CN114856573B_ABST
Patent Text Reader

Abstract

The invention discloses a composite shaft wall structure for a mine shaft, wherein the composite shaft wall comprises an outer shaft wall, an inner shaft wall and a non-removable template layer, wherein the non-removable template layer comprises a skeleton and a template net; the cross section of the skeleton is a closed annular structure, one side of which is adjacent to the inner side surface of the outer shaft wall, and the template net is arranged on the other side; the template net is adjacent to the outer side surface of the inner shaft wall, and both the skeleton and the template net can be assembled by blocks; the concrete strength grade of the outer shaft wall is C1-C10, and the shaft wall thickness is 100-300mm. A construction method for a composite shaft wall structure for a mine shaft is also disclosed. The stress of the inner shaft wall is reduced by the light porous structure of the outer shaft wall, the low elastic modulus, and the deformation-yielding pressure-releasing characteristics, and the non-flat and discontinuous structure of the template net enhances the bonding effect between the outer shaft wall and the inner shaft wall, so that the composite shaft wall structure has good overall coordinated force effect and high stability; during construction, the inner shaft wall and the outer shaft wall can be cast at the same time, and the construction is simple, fast, and safe.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of mine shaft support, and in particular relates to a mine shaft composite shaft wall structure and a construction method thereof. Background Art

[0002] In recent years, mine shafts in my country have gradually entered the depth range of 1500-2500m. For example, the main shaft of China Gold Group's Shaling Gold Mine is more than 1600m deep, and the shaft under construction in the Xiling Mine of Sanshan Island Gold Mine is more than 2000m. Deep shafts face the danger of strong rock bursts caused by deep high-altitude stress environments and long-term large deformation of weak and broken surrounding rocks, which can easily cause dynamic damage or gradual cumulative deformation damage to the shaft wall structure during the construction and service periods.

[0003] China Utility Model Patent Authorization Announcement No. CN205743912U discloses a composite shaft, which has a shaft body. The shaft wall of the shaft body is composed of an inner reinforced concrete layer, an intermediate interlayer and an outer reinforced concrete layer. The intermediate interlayer is formed by overlapping a number of shaft rings. The shaft ring is an annular ring formed by a number of color steel sandwich panels. The color steel sandwich panels are composed of two color steel plates and polyethylene foam plastic core materials. One end of the color steel sandwich panel is a convex structure and the other end is a concave structure. Two adjacent color steel sandwich panels are mortise-jointed with each other. This composite shaft wall structure with interlayer materials requires the inner and outer shaft wall concrete to be laid in batches and the interlayer materials to be laid separately, resulting in slow construction progress. In addition, the interlayer materials used in the composite shaft wall structure often have poor adhesion to the inner and outer shaft wall concrete, and the separated inner and outer shaft walls are easy to delaminate, and the overall coordinated force effect of the composite shaft wall structure is poor. Summary of the invention

[0004] In view of the existing problems and deficiencies in the prior art, the present invention provides a mine shaft composite shaft wall structure and a construction method thereof, which is suitable for deep shafts with strong rock bursts or long-term large deformation of soft and broken surrounding rocks. The stress of the inner shaft wall is reduced by the low elastic modulus and deformation-yielding characteristics of the lightweight porous structure of the outer shaft wall, and the non-flat and discontinuous structure of the template mesh enhances the bonding effect between the outer shaft wall and the inner shaft wall, so that the overall coordinated force effect of the composite shaft wall structure is good and the stability is high; during construction, the inner shaft wall and the outer shaft wall can be cast at the same time, and the construction is simple, fast and safe.

[0005] In order to achieve the above object, the technical solution adopted by the present invention is:

[0006] A composite shaft wall structure for a mine shaft, which has the following structural features: the composite shaft wall comprises an outer shaft wall, an inner shaft wall and a non-disassembly template layer, the non-disassembly template layer comprises a skeleton and a template net; the cross section of the skeleton is a closed annular structure, one side of which is adjacent to the inner side surface of the outer shaft wall, and the other side is provided with the template net; the template net is adjacent to the outer side surface of the inner shaft wall, and the skeleton and the template net can be assembled by blocks; the concrete strength grade of the outer shaft wall is C1-C10, and the shaft wall thickness is 100-300 mm.

[0007] The skeleton can be made of one or a combination of steel bars, steel pipes, and thin-walled steel, connected by welding, bolting or quick splicing structures. Among them, the steel bar specifications can be 10-32mm in diameter, and the steel pipe specifications can be 14-108mm in diameter; the thin-walled steel can be C-shaped, U-shaped or rectangular, with a cross-sectional height of 38-152mm and a wall thickness of 0.5-1.2mm. The thickness of the outer well wall can be calculated and determined based on the surrounding rock pressure that needs to be released by the wellbore surrounding rock pressure. Concrete with strength grades of C1-C10 has a lightweight porous structure, which makes the outer well wall have a lower elastic modulus and deformation yield characteristics, thereby reducing the stress of the inner well wall and reducing the impact of unbalanced wellbore surrounding rock stress on the inner well wall. It can be inquired from Baidu Encyclopedia that the formwork net can be widely used in large-scale buildings and civil engineering, among which the permanent non-disassembly formwork net is made of hot-dip galvanized steel plate. The surface of the template net is provided with meshes, and its cross section is a U-shaped cross section, so that the template net has a non-flat and discontinuous structure, which can enhance the bonding effect between the outer well wall and the inner well wall, so that the overall coordinated force effect of the composite well wall structure is good and the stability is high. The composite well wall formed by the outer well wall, the non-removal template layer and the inner well wall can be used in the unbalanced high ground stress environment of deep wells and avoid the damage to the well wall caused by the long-term large deformation of the surrounding rock of the wellbore. During the construction of this composite well wall structure, the inner well wall and the outer well wall can be cast at the same time, and the construction is simple, fast and safe.

[0008] In order to enhance the annular pressure relief effect of the outer well wall and make the pressure relief more uniform and reasonable. Preferably, the skeleton includes vertical structural members and annular structural members, and a plurality of the vertical structural members are connected by annular structural members to form an annular structure; the vertical structural members are made of rectangular steel, the long side of the rectangle is 50 to 150 mm, the short side of the rectangle is 30 to 60 mm, and the wall thickness is 0.5 to 0.8 mm; the rectangular steel is placed vertically, and its long side is arranged along the thickness direction of the outer well wall.

[0009] Preferably, the non-removal template layer further comprises an anchor rod, one end of which is fixed to the frame, and the other end is arranged in the wellbore surrounding rock outside the outer well wall. In order to make the frame more stably fixed, the anchor rod is selected to fix the frame to the wellbore surrounding rock.

[0010] Specifically, the anchor rod is made of short steel bars, and the diameter of the short steel bars is 12 to 25 mm.

[0011] Preferably, the template mesh adopts a ribbed expanded mesh, the mesh size of the ribbed expanded mesh is (4-8)*(10-11) mm, the plate thickness is 0.2-0.6 mm, and the mesh width is 600-900 mm. The ribbed expanded mesh is a porous mesh produced by mechanical cutting, extension and expansion of metal plates or coils, and the height of the ribbed expanded mesh is the same as the height of the shaft wall section.

[0012] Preferably, the outer well wall is cast with foamed concrete or paste concrete. Foamed concrete is a lightweight microporous concrete made by adding a foaming agent into a slurry made of cement, aggregate, admixture, additive and water after the foam is made into foam by a foaming machine, and then mixing, pouring and curing. Paste concrete is a water-free, toothpaste-like structured fluid composed of multi-scale bulk materials and water. Solid waste (such as tailings) is prepared into a paste and filled between the non-removal formwork and the shaft excavation section, which can effectively alleviate the environmental pollution caused by mining.

[0013] Preferably, the inner well wall is made of any one or a combination of concrete well wall, reinforced concrete well wall, steel fiber concrete well wall or steel plate constrained concrete well wall; wherein the strength grade of steel fiber concrete is CF30~CF60, and the strength grade of other concretes is C30~C60.

[0014] Preferably, a grouting flower tube is further provided on the skeleton, and the outcrop of the grouting flower tube is arranged at the well wall joint of the inner well wall. The grouting flower tube is arranged to facilitate the grouting and water blocking reinforcement of the composite well wall in the later stage.

[0015] Based on the same inventive concept, the present invention also provides a construction method for a mine shaft composite shaft wall structure, comprising the following steps:

[0016] S1: A vertical section of the shaft is excavated by vertical segmented excavation on the surrounding rock of the shaft; a non-dismantling template layer is made to ensure that the inner diameter of the non-dismantling template layer is the same as the inner diameter of the outer shaft wall; the non-dismantling template layer is made in several pieces so as to be transported to the shaft;

[0017] S2: transport the split non-disassembly formwork layer to the bottom of the shaft excavation section, assemble it into a complete non-disassembly formwork layer, and fix the upper and lower ends of the frame respectively;

[0018] S3: lower the well wall formwork and cast the outer well wall and the inner well wall;

[0019] S4: Continue to excavate the next section of the shaft excavation section downwards, and repeat steps S1 to S3 until the depth requirement of the shaft excavation section is reached.

[0020] In step S1, the height of the vertical segment is usually 3 to 5 m.

[0021] Preferably, in step S3, the outer well wall and the inner well wall are cast simultaneously.

[0022] In summary, the composite shaft wall structure and construction method of a mine shaft provided by the present invention have the following beneficial effects compared with the prior art:

[0023] 1. The composite shaft wall structure of the mine shaft of the present invention reduces the stress of the inner shaft wall through the lightweight porous structure, low elastic modulus and deformation-releasing pressure characteristics of the outer shaft wall. The uneven and discontinuous structure of the template mesh enhances the bonding effect between the outer shaft wall and the inner shaft wall, so that the overall coordinated force effect of the composite shaft wall structure is good and the stability is high.

[0024] 2. The composite shaft wall structure of the mine shaft of the present invention can enhance the circumferential pressure relief effect of the outer shaft wall, and the pressure relief is more uniform and reasonable.

[0025] 3. During the construction of the composite well wall structure of the present invention, the inner well wall and the outer well wall can be cast simultaneously, and the construction is simple, fast and highly safe. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of the transverse cross-sectional structure of a composite shaft wall structure of a mine shaft according to the present invention;

[0027] Figure 2 for Figure 1 Schematic diagram of the longitudinal section structure at the joint of the middle well wall;

[0028] Figure 3 for Figure 1 Schematic diagram of the longitudinal section structure at the middle working surface;

[0029] Figure 4 for Figure 1 Schematic diagram of the transverse section of the middle free-disassembly template layer.

[0030] In the figure

[0031] 1-shaft surrounding rock, 2-shaft excavation section, 3-outer shaft wall, 4-non-removable formwork layer, 41-skeleton, 411-vertical structural member, 412-circumferential structural member, 42-formwork mesh, 43-anchor rod, 5-inner shaft wall, 6-shaft wall joint, 7-shaft wall masonry formwork, 8-working face virtual slag. DETAILED DESCRIPTION

[0032] The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments. It should be noted that the embodiments of the present invention and the features in the embodiments can be combined with each other without conflict. For the convenience of description, if the words "upper", "lower", "left" and "right" appear in the following, they only indicate that the upper, lower, left and right directions are consistent with the drawings themselves, and do not limit the structure.

[0033] like Figure 1 As shown, a composite shaft wall structure of a mine shaft includes an outer shaft wall 3, an inner shaft wall 5 and a non-removable template layer 4, wherein the non-removable template layer 4 includes a skeleton 41 and a template net 42. The cross section of the skeleton 41 is a closed annular structure, one side of which is adjacent to the inner side surface of the outer shaft wall 3, and the other side is provided with the template net 42. The template net 42 is adjacent to the outer side surface of the inner shaft wall 5, and the skeleton 41 and the template net 42 can be assembled by blocks. The template net 42 adopts a ribbed expansion net, the ribbed expansion net has a mesh height of 4m, a mesh width of 900mm, a hole shape of 5*10mm, a rib height of 12mm, a rib distance of 100mm, and a plate thickness of 0.4mm. The skeleton 41 includes a vertical structural member 411 and an annular structural member 412, and a plurality of the vertical structural members 411 are connected by an annular structural member 412 to form an annular structure. The frame 41 can be made of one or a combination of steel bars, steel pipes, and thin-walled steel sections, connected by welding, bolting, or quick-joining structures.

[0034] A mine shaft has a buried depth of more than 1800m, a net diameter of the shaft is φ6.0m, a shaft excavation section 2 has a diameter of φ7.0m, and there is partial over-excavation. A construction method for a mine shaft composite shaft wall structure specifically includes the following steps:

[0035] S1. A vertical shaft excavation section 2 is excavated vertically in sections on the shaft surrounding rock 1, and the section height is usually 3 to 5 m; a shaft excavation section 2 is excavated, and the shaft wall construction section height is 4 m; a non-dismantling formwork layer 4 is manufactured to ensure that the inner diameter of the non-dismantling formwork layer 4 is the same as the inner diameter of the outer shaft wall 3; the non-dismantling formwork layer 4 is manufactured in several blocks for transportation to the shaft.

[0036] S2: transport the split non-removal formwork layer 4 to the bottom of the shaft excavation section 2 and assemble it into a complete non-removal formwork layer 4. Figure 2 and Figure 3 As shown, the upper end of the skeleton 41 is fixed to the upper well wall, and the lower end is fixed in the virtual slag 8 of the working face.

[0037] The non-disassembly formwork layer 4 is prefabricated in advance, and the outer diameter of the non-disassembly formwork layer 4 is the same as the inner diameter of the outer well wall 3, which is φ5.7m. The width of the non-disassembly formwork layer 4 is determined to be 1.7m according to the size limit of the wellbore bucket hole, and a total of 10 pieces need to be made in pieces for transportation to the well. The split non-disassembly formwork layer 4 is lowered to the working surface and assembled into a closed annular structure. When the shaft is buried at a depth of 1300 to 1700m, the vertical structural members 411 and the annular structural members 412 of the skeleton 41 are made of C-shaped thin-walled steel (section height 75mm, wall thickness 0.6mm). When the shaft is buried at a depth of 1700 to 2000m, if Figure 4 As shown, the annular structural member 412 of the skeleton 41 is made of C-shaped thin-walled steel (section height 75mm, wall thickness 0.6mm), and the vertical structural member 411 of the skeleton 41 is made of rectangular thin-walled steel to provide additional pressure relief space along the annular direction of the well wall. The rectangular long side of the rectangular thin-walled steel is 140mm, the rectangular short side is 50mm, and the wall thickness is 0.6mm. The long side of the rectangular thin-walled steel is placed vertically along the thickness direction of the outer well wall 3. The middle part of the skeleton 41 is fixed to the wellbore surrounding rock 1 by an anchor rod 43, and the anchor rod 43 can be a short steel bar. The diameter of the short steel bar is 14mm, and the short steel bar is arranged at the middle height of 2m on the non-removal formwork layer 4, and 2 steel bars are arranged on each non-removal formwork. When the burial depth of the vertical shaft is between 1700 and 2000m, the short steel bar is cancelled.

[0038] A grouting tube with a diameter of φ32*2.5mm and a hole of φ6mm is arranged vertically on the skeleton 41 of the non-removal formwork layer 4. The hole spacing is 300mm. A grouting tube is fixed on each non-removal formwork layer 4, and the exposed end of the grouting tube is arranged at the ash outlet of the well wall joint 6 to facilitate grouting and water blocking and reinforcement of the well wall in the later stage. The grouting tube is wrapped with SNG-PP-300 polypropylene needle-punched non-woven permeable geotextile to avoid clogging of the grouting hole.

[0039] S3: Lower the well wall masonry template 7 and cast the outer well wall 3 and the inner well wall 5 at the same time.

[0040] The cast-in-place outer layer concrete of the outer shaft wall 3 is poured symmetrically from bottom to top, and the cast-in-place outer layer concrete adopts foam concrete. When the shaft burial depth is between 1300 and 1700 meters, the strength grade of the foam concrete is C2, and the density is 820 kg / m 3 The thickness of the outer shaft wall 3 is 150 mm according to the surrounding rock pressure to be released. When the shaft depth is between 1700 and 2000 m, the strength grade of the foamed concrete is C2 and the density is 820 kg / m 3 The thickness of the outer wellbore wall 3 is determined to be 180 mm according to the surrounding rock pressure that needs to be released.

[0041] The inner shaft wall 5 is CF40 cast-in-place steel fiber concrete. When the shaft depth is between 1300 and 1700 meters, the thickness is 350 mm. When the shaft depth is between 1700 and 2000 meters, the thickness is 400 mm. The steel fiber aspect ratio is 80, and the dosage is 40 kg / m 3 .

[0042] S4: Continue to excavate the next section of the vertical shaft excavation section 2 downwards, and repeat steps S1 to S3 until the depth of the vertical shaft excavation section 2 reaches 1800m.

[0043] The contents explained in the above embodiments should be understood as these embodiments are only used to more clearly illustrate the present invention, and are not used to limit the scope of the present invention. After reading the present invention, various equivalent forms of modifications to the embodiments made by those skilled in the art fall within the scope defined by the claims attached to the present invention.

Claims

1. A composite shaft wall structure for a mine shaft, characterized in that: The composite well wall comprises an outer well wall (3), an inner well wall (5) and a non-removable template layer (4); the non-removable template layer (4) comprises a skeleton (41), a template mesh (42) and anchor rods (43); the template mesh (42) is a ribbed expansion mesh; The cross section of the skeleton (41) is a closed annular structure, one side of which is adjacent to the inner side of the outer well wall (3), and the other side of which is provided with the template mesh (42); The template net (42) is adjacent to the outer side surface of the inner well wall (5), and the frame (41) and the template net (42) can be assembled by blocks; The concrete strength grade of the outer well wall (3) is C1-C10, and the well wall thickness is 100-300 mm; The frame (41) comprises a vertical structural member (411) and an annular structural member (412); a plurality of the vertical structural members (411) are connected via the annular structural member (412) to form an annular structure; and the vertical structural members (411) are made of rectangular steel. One end of the anchor rod (43) is fixed to the frame (41), and the other end is arranged in the wellbore surrounding rock (1) outside the outer wellbore wall (3).

2. The mine shaft composite shaft wall structure according to claim 1, characterized in that: The vertical structural member (411) has a rectangular long side of 50 to 150 mm, a rectangular short side of 30 to 60 mm, and a wall thickness of 0.5 to 0.8 mm; the rectangular steel is placed vertically, and its long side is arranged along the thickness direction of the outer well wall.

3. The mine shaft composite shaft wall structure according to claim 1, characterized in that: The anchor rod (43) is made of short steel bars, and the diameter of the short steel bars is 12 to 25 mm.

4. The mine shaft composite shaft wall structure according to claim 1, characterized in that: The ribbed expanded mesh used in the template net (42) has a size of (4-8)*(10-11) mm, a plate thickness of 0.2-0.6 mm, and a mesh width of 600-900 mm.

5. The mine shaft composite shaft wall structure according to claim 1, characterized in that: The outer well wall (3) is cast using foam concrete or paste concrete.

6. The mine shaft composite shaft wall structure according to claim 1, characterized in that: The inner well wall (5) is made of any one or a combination of concrete well wall, reinforced concrete well wall, steel fiber concrete well wall or steel plate constrained concrete well wall; wherein the strength grade of steel fiber concrete is CF30-CF60, and the strength grade of other concrete is C30-C60.

7. The composite shaft wall structure of a mine shaft according to any one of claims 1 to 6, characterized in that: The frame (41) is also provided with a grouting flower tube, the exposed end of the grouting flower tube is arranged at the well wall joint (6) of the inner well wall (5).

8. A method for constructing a composite shaft wall structure of a mine shaft as claimed in any one of claims 1 to 7, characterized in that: The following steps are involved: S1: excavating a section of the shaft excavation section (2) by vertical segmented excavation on the shaft surrounding rock (1); manufacturing a non-removal template layer (4), ensuring that the inner diameter of the non-removal template layer (4) is the same as the inner diameter of the outer shaft wall (3); the non-removal template layer (4) is manufactured in a plurality of blocks so as to be transported to the bottom of the shaft; S2: transporting the split non-disassembly formwork layer (4) to the bottom of the shaft excavation section (2), assembling it into a complete non-disassembly formwork layer (4), and fixing the upper and lower ends of the frame (41) respectively; S3: lowering the well wall formwork (7) and casting the outer well wall (3) and the inner well wall (5); S4: Continue to excavate the next section of the vertical shaft excavation section (2) downwards, and repeat steps S1 to S3 until the required depth of the vertical shaft excavation section (2) is reached.

9. The method for constructing a composite shaft wall structure of a mine shaft according to claim 8, characterized in that: In step S3, the outer well wall (3) and the inner well wall (5) are cast simultaneously.

Citation Information

Patent Citations

  • Compound pit shaft

    CN205743912U

  • Vertical shaft restoration and reinforcement structure and restoration and reinforcement construction method

    CN106677787A

  • Waterproof and impervious concrete single-layer lining construction method under water-containing bedrock environment

    CN108915691A

  • Shaft surrounding rock support structure and excavation support method thereof

    CN109026012A

  • Concrete composite steel screen template free of disassembly

    CN203129577U