A construction technology of reverse shaft pulling pipe method for subway bypass
Through the construction process of the reverse well pulling method of subway side channel, the horizontal reverse well drilling rig and rotatable casing combination are used for seamless temporary support, which solves the mechanized construction problems of bypass engineering and the ground settlement control problems, achieving high efficiency , low-cost construction results have broadened the application scope of reverse drilling rigs.
Patent Information
- Application Number
- CN202210444412.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-25
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2042-04-25
AI Technical Summary
The prior art has low mechanized engineering degree in bypass engineering, especially in narrow spaces, and is difficult to effectively control ground settlement, which limits the application range of reverse well drilling rigs.
The construction process of the subway side channel reverse well pulling method includes locking construction at the left and right side channel ports, mounting lifting beams and barrel guard platforms, using a horizontal reverse well drilling rig for guide hole construction, and passing rotatable barrels and hole expansion The drill bit assembly provides seamless temporary support, simplifying construction processes and controlling ground settlement.
It realizes low-cost and fast mechanized construction of bypass, simplifies construction complexity, is suitable for narrow sites, improves construction efficiency and short construction period, and broadens the application range of reverse well drilling rigs.
Smart Images

Figure CN114856611B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of horizontal hole drilling and support, and more specifically to a construction process of a subway bypass reverse well pipe pulling method. Background Art
[0002] In recent years, with the advancement of the country's urbanization process, urban subways have sprung up one after another, and there are more and more bypass projects, but the degree of mechanized construction is not high. Shanghai Metro Line 2 and Line 8 use grid-type pipe jacking construction. In January 2018, the Yinnan section connecting channel of Ningbo Rail Transit Line 3 was constructed using the shield method, which was the first time in the world. However, due to the small construction site and other reasons, the degree of mechanized construction of domestic bypass projects is not high, and the pipe jacking method and shield method construction have not been widely promoted. Summary of the invention
[0003] To this end, the technical problem to be solved by the present invention is to provide a new process that is more suitable for the mechanized construction of the bypass channel, which adapts to the narrow space of the bypass channel construction, is simple to operate, easy to promote and effectively solves the problem of controlling ground subsidence. At the same time, it is also conducive to further broadening the application scope of the raise drilling rig.
[0004] In order to solve the above technical problems, the present invention provides the following technical solutions:
[0005] A construction process of a subway bypass reverse shaft pipe pulling method, comprising the following steps:
[0006] (A) Locking construction is performed on the left and right bypass channel ports respectively, the left bypass channel port is located on the inner wall of the left tunnel, and the right bypass channel port is located on the inner wall of the right tunnel, and a lifting beam is installed on the top of the left tunnel and a casing installation platform is constructed at the bottom of the left tunnel;
[0007] (B) constructing a drilling rig foundation in the right tunnel and installing a horizontal raise boring machine on the drilling rig foundation; using the horizontal raise boring machine to construct a horizontal guide hole from the bypass channel port on the right side to the bypass channel port on the left side;
[0008] (C) The horizontal guide hole is constructed until it is connected to the left tunnel, and the construction of the horizontal guide hole is completed; then, the hole expansion drilling construction is carried out, and at the same time, the pipe is pulled to temporarily support the expanded hole;
[0009] (D) Concrete lining pouring and bypass channel formation.
[0010] The above-mentioned subway bypass reverse shaft pulling pipe construction process specifically includes the following steps in step (C):
[0011] (C-1) connecting the reaming drill bit and the rotatable casing via a lifting beam to form a relatively fixed whole, thereby forming a rotatable casing and drill bit assembly;
[0012] (C-2) Connect the rotatable casing and drill bit assembly to the drill pipe, start the horizontal raise drilling rig to carry out hole expansion construction, and the rotatable casing and drill bit assembly rotates to expand the hole and moves in the direction of the right tunnel. The debris generated during the hole expansion process is removed manually or mechanically;
[0013] (C-3) Before the rotatable casing and drill bit assembly is about to enter the soil or rock mass, a swivel joint is used to connect the non-rotatable casing and the rotatable casing on the rotatable casing and drill bit assembly to form the casing and drill bit assembly, and the non-rotatable casing is pulled forward by the rotatable casing and drill bit assembly, and the non-rotatable casing only moves linearly with the rotatable casing and drill bit assembly;
[0014] (C-4) As the hole expansion construction proceeds, it is necessary to intermittently connect a non-rotatable casing to the casing and drill bit assembly until the hole expansion is completed and the bypass channel is initially formed.
[0015] In the above-mentioned subway bypass reverse well pulling pipe construction process, in step (C-1): the reaming drill bit and the rotatable casing are connected as a whole and rotated together through the horizontal slot of the rotatable casing; the horizontal slot is fixedly installed on the inner wall of the rotatable casing and is parallel to the axis of the rotatable casing, and a convex strip is fixedly installed on the circumferential edge of the bottom surface of the reaming drill bit; the convex strip is located in the groove of the horizontal slot and is gap-matched with the inner wall of the groove.
[0016] In the above-mentioned subway bypass reverse well pulling pipe construction process, in step (C-3): the interfaces between the non-rotatable casings overlap by 3 cm, along the forward direction of the reaming drill: the port connected to the non-rotatable casing is on the inside, and when the non-rotatable casing slides forward in a straight line, the resistance is reduced.
[0017] In the above-mentioned subway bypass reverse well pulling pipe construction process, the non-rotatable casings are connected by welding.
[0018] In the above-mentioned subway bypass reverse well pulling pipe construction process, a grouting hole is opened on each section of the non-rotatable casing, and a valve is installed in the grouting hole.
[0019] In the above-mentioned subway bypass reverse well pulling pipe construction process, in step (C-3): the end of each section of the non-rotatable casing adjacent to the reaming drill bit is a male joint, and the end away from the reaming drill bit is a female joint; the male joint and the female joint are matched in a concave-convex manner, and two adjacent non-rotatable casings are relatively fixed by the non-rotatable casing joints.
[0020] In the above-mentioned subway bypass reverse well pulling pipe construction process, in step (C-3): the interface between the non-rotatable casing and the rotatable casing overlaps by 3 cm.
[0021] In the above-mentioned subway bypass reverse-shaft pipe-pulling construction process, the non-rotatable casing is connected to the rotatable casing by a male joint at one end, and the rotatable casing is connected to the non-rotatable casing by a female joint at one end; the male joint and the female joint are matched in a concave-convex manner; the swivel joint is installed in the tube at the connection between the non-rotatable casing and the rotatable casing.
[0022] The technical solution of the present invention achieves the following beneficial technical effects:
[0023] (1) For rock or waterless or low-water strata, compared with shield and pipe jacking construction, the present invention effectively solves the problem of low-cost mechanized rapid construction of bypass channels, and carries out the excavation and temporary support processes of the bypass channels simultaneously, which greatly simplifies the complexity of mechanized construction and facilitates its popularization and application.
[0024] (2) The present invention solves the problem of controlling ground subsidence by studying the seamless connection between horizontal hole expansion and temporary support of the raise boring machine. Compared with the shield method and the jacking method, the present invention is more suitable for the narrow site of the bypass construction, and has high efficiency, short construction period, simple process and low cost. It opens up a more practical new way for the mechanized construction of the bypass, and also further broadens the application scope of the raise boring machine. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of the construction process of the reverse shaft pipe pulling method of the subway bypass of the present invention;
[0026] Figure 2 It is a schematic diagram of the installation of the reverse well drilling machine and the construction of the horizontal guide hole in the reverse well pulling pipe construction process of the subway bypass of the present invention;
[0027] Figure 3a It is a structural schematic diagram of the non-rotatable casing in the construction process of the reverse shaft pulling pipe method of the subway bypass of the present invention. Figure 3b This is a schematic diagram of the structure of the rotatable casing in the construction process of the subway bypass reverse shaft pulling pipe method of the present invention. Figure 3c This is a schematic diagram of the structure of the expansion drill bit in the construction process of the subway bypass reverse well pulling pipe method of the present invention. Figure 3d It is a structural schematic diagram of a rotatable casing and a drill bit assembly in the construction process of the subway bypass reverse shaft pulling pipe method of the present invention;
[0028] Figure 4 It is a combination of a non-rotatable casing, a rotatable casing and a hole-reaming drill bit in the construction process of the subway bypass reverse shaft pulling method of the present invention;
[0029] Figure 5It is a schematic diagram of the connection structure between the non-rotatable casing and the rotatable casing in the construction process of the reverse shaft pulling pipe method of the subway bypass of the present invention;
[0030] Figure 6 It is a schematic diagram of the connection structure between the rotatable casing and the reaming drill bit in the reverse well pulling pipe construction process of the subway bypass of the present invention.
[0031] In the figure: 1-left tunnel; 2-right tunnel; 3-bypass; 4-bypass port; 5-drilling rig foundation; 6-casing installation platform; 7-lifting beam; 8-horizontal raise drilling rig; 9-horizontal guide hole; 10-non-rotatable casing; 11-rotatable casing and drill bit combination; 12-swivel joint; 13-non-rotatable casing joint; 14-rotatable casing; 15-reaming drill bit; 16-casing and drill bit combination; 17-convex strip; 18-horizontal slot. DETAILED DESCRIPTION
[0032] like Figures 1 to 4 As shown, the specific implementation method of the subway bypass reverse shaft pulling pipe method in this embodiment includes the following steps:
[0033] A. Before the raise boring machine and casing enter the site, the left and right bypass channel ports 4 are locked respectively, and the reinforcement strength is calculated and determined according to the soil layer or surrounding rock conditions. The left bypass channel port 4 is located on the inner wall of the left tunnel 1, and the right bypass channel port 4 is located on the inner wall of the right tunnel 2, and a lifting beam 7 is installed on the top of the left tunnel 1 and a casing installation platform 6 is constructed at the bottom of the left tunnel 1.
[0034] B. Construct a drilling rig foundation 5 in the right tunnel 2, wherein the design of the drilling rig foundation 5 focuses on the tensile strength during hole expansion; and install a horizontal raise boring machine 8 on the drilling rig foundation 5; utilize the horizontal raise boring machine 8 to construct a horizontal guide hole 9 from the bypass channel port 4 on the right side to the bypass channel port 4 on the left side.
[0035] C. Construction is completed until the horizontal guide hole 9 is connected to the left tunnel 1, and then the hole expansion drilling construction is carried out, and the pipe is pulled to temporarily support the expanded hole. Specifically, the following steps are included:
[0036] C-1, connecting the reaming drill bit 15 and the rotatable casing 14 into a relatively fixed whole through the lifting beam 7, forming a rotatable casing and drill bit assembly 11;
[0037] like Figure 6As shown, the reaming drill bit 15 is connected to the rotatable casing 14 as a whole and rotates together through the horizontal slot 18 of the rotatable casing 14; the horizontal slot 18 is fixedly installed on the inner wall of the rotatable casing 14 and is parallel to the axis of the rotatable casing 14, and a convex strip 17 is fixedly installed on the circumferential edge of the bottom surface of the reaming drill bit 15; the convex strip 17 is located in the groove of the horizontal slot 18 and has a clearance fit with the inner wall of the groove. The reaming drill bit 15 can slide freely horizontally along the horizontal slot 18, and can drive the rotatable casing 14 to rotate synchronously when rotating.
[0038] C-2, the rotatable casing and drill bit assembly 11 is connected to the drill pipe, and the horizontal raise drilling rig 8 is turned on to carry out hole expansion construction. The rotatable casing and drill bit assembly 11 rotates to expand the hole and moves in the direction of the right tunnel 2. The slag generated during the hole expansion process is removed manually or mechanically;
[0039] C-3. Before the rotatable casing and drill bit assembly 11 is about to enter the soil or rock mass, the non-rotatable casing 10 is connected to the rotatable casing 14 on the rotatable casing and drill bit assembly 11 by a rotary joint 12 to form a casing and drill bit assembly 16. The non-rotatable casing 10 is pulled forward by the rotatable casing and drill bit assembly 11. The non-rotatable casing 10 only moves linearly with the rotatable casing and drill bit assembly 11. When the reaming drill bit 15 rotates forward together with the rotatable casing 14, the non-rotatable casing 10 is dragged forward, so that reaming and support are carried out simultaneously until the reaming is completed;
[0040] like Figure 5As shown, the interfaces between the non-rotating casings 10 overlap by 3 cm, and along the forward direction of the reaming drill bit 15: the port connected to the non-rotating casing 10 is on the inner side, and when the non-rotating casing 10 slides forward in a straight line, the resistance is reduced. A grouting hole is opened on each section of the non-rotating casing 10, and a valve is installed in the grouting hole. The end of each section of the non-rotating casing 10 adjacent to the reaming drill bit 15 is a male joint, and the end away from the reaming drill bit 15 is a female joint; the male joint and the female joint are matched in a concave-convex manner, and the two adjacent non-rotating casings 10 are relatively fixed by the non-rotating casing joint 13. The interface between the non-rotatable casing 10 and the rotatable casing 14 overlaps by 3 cm; the end of the non-rotatable casing 10 connected to the rotatable casing 14 is a male joint, and the end of the rotatable casing 14 connected to the non-rotatable casing 10 is a female joint; the male joint and the female joint are matched with each other in a concave and convex manner; the swivel joint 12 is installed in the tube at the connection between the non-rotatable casing 10 and the rotatable casing 14, and the swivel joint 12 adopts the design in the prior art, and the purpose is to convert rotational linear motion into only linear motion. For example: when a trenchless horizontal directional drilling rig in the prior art lays urban pipelines, the drill rod is connected to a rotating drill bit, and the rotating drill bit is connected to the pipeline. The drill rod and the rotating drill bit rotate together and make a linear motion to the right (left), and the pipeline does not rotate but makes a linear motion to the right (left) with the drill bit.
[0041] C-4. As the hole enlarging construction proceeds, it is necessary to intermittently connect the non-rotatable casing 10 to the casing and drill bit assembly 16, and the non-rotatable casings 10 are connected by welding; until the hole enlarging is completed, the bypass channel 3 is initially formed.
[0042] D. Concrete lining pouring and bypass channel forming: After the hole expansion is completed, the hole expansion drill and drilling machine are removed, and concrete pouring is started according to the design requirements to form the bypass channel. Before pouring, the grouting holes on the casing are connected and reserved. After the concrete reaches the design strength, the bypass channel wall is filled with grouting.
[0043] In the technical solution of the present invention:
[0044] (1) The locking construction of the left and right side channel ports is intended to strengthen the hole support. The lifting beam is mainly used to install the hole expansion drill bit and splice the ribbed steel plate casing.
[0045] (2) When installing the reverse well drilling rig, pay attention to the transmission of tension during hole expansion, and the tensile strength calculation of the drilling rig foundation should be performed. The horizontal pilot hole construction is similar to the reverse well vertical pilot hole construction.
[0046] (3) When the reaming drill bit rotates, the rotatable casing rotates with the drill bit; when the drill bit needs to be repaired or the roller cutter is replaced, the reaming drill bit can slide along the horizontal groove on the rotatable casing and move forward and backward, and personnel and maintenance equipment enter the front of the roller cutter through the slag outlet of the drill bit body for operation.
[0047] (4) In addition to temporary support, the rotatable casing also prevents the reaming drill bit from sagging. This is because the reaming drill bit itself is not axisymmetric. If there is no rotatable casing in the soil layer, the reaming route and the guide hole trajectory will be significantly different.
[0048] (5) The slag expanded from the bypass channel can be directly transported to the slag truck by belt conveyor. However, if the amount of slag is not large, it can also be directly removed manually.
[0049] (6) After the rotatable casing connected to the reaming drill bit enters the rock mass or soil mass, the rotatable casing is subsequently connected to the non-rotatable casing, and the two are connected by a rotating joint.
[0050] (7) Non-rotatable casings can be directly connected by multiple nodes or by full-circumference welding. Each section of non-rotatable casing has four grouting holes (with valves inside) for injecting lubricants to reduce the resistance of the casing forward.
[0051] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the claims of this patent application.
Claims
1. A construction process of a subway bypass reverse shaft pulling pipe method, characterized in that: The steps include: (A) Locking construction is performed on the left and right side channel ports (4) respectively, the left side channel port (4) is located on the inner wall of the left tunnel (1), and the right side channel port (4) is located on the inner wall of the right tunnel (2), and a lifting beam (7) is installed on the top of the left tunnel (1) and a casing installation platform (6) is constructed at the bottom of the left tunnel (1); (B) constructing a drilling rig foundation (5) in the right tunnel (2), and installing a horizontal raise boring machine (8) on the drilling rig foundation (5); using the horizontal raise boring machine (8) to construct a horizontal guide hole (9) from the right side bypass channel port (4) to the left side bypass channel port (4); (C) Construction is completed until the horizontal guide hole (9) is connected to the left tunnel (1); then, expansion drilling is performed in the direction of the right tunnel (2), and at the same time, a pipe is pulled to temporarily support the expanded borehole; (D) After the hole is expanded, the concrete lining is poured into the bypass channel.
2. The construction process of the subway bypass reverse shaft pulling pipe method according to claim 1 is characterized in that: In step (C), the following steps are specifically included: (C-1) connecting the reaming drill bit (15) and the rotatable casing (14) into a relatively fixed whole through a lifting beam (7), thereby forming a rotatable casing and drill bit assembly (11); (C-2) Connecting the rotatable casing and drill bit assembly (11) to the drill pipe, starting the horizontal raise drilling machine (8) to carry out hole expansion construction, the rotatable casing and drill bit assembly (11) rotates to expand the hole and moves in the direction of the right tunnel (2), and the debris generated during the hole expansion process is removed manually or mechanically; (C-3) Before the rotatable casing and drill bit assembly (11) is about to completely enter the soil or rock mass, the non-rotatable casing (10) is connected to the rotatable casing (14) on the rotatable casing and drill bit assembly (11) by a rotary joint (12) to form a casing and drill bit assembly (16), and the non-rotatable casing (10) is pulled forward by the rotatable casing and drill bit assembly (11), and the non-rotatable casing (10) only moves linearly with the rotatable casing and drill bit assembly (11); (C-4) As the hole enlarging construction proceeds, it is necessary to intermittently connect the non-rotatable casing (10) to the casing and drill bit assembly (16) until the hole enlarging is completed and the bypass channel (3) is initially formed.
3. The subway bypass reverse shaft pulling pipe construction process according to claim 2 is characterized in that: In step (C-1): the reaming drill bit (15) and the rotatable casing (14) are connected as a whole through the horizontal groove (18) of the rotatable casing (14) so as to rotate together; the horizontal groove (18) is fixedly mounted on the inner wall of the rotatable casing (14) and is parallel to the axis of the rotatable casing (14); a convex strip (17) is fixedly mounted on the circumferential edge of the bottom surface of the reaming drill bit (15); the convex strip (17) is located in the groove of the horizontal groove (18) and is clearance-matched with the inner wall of the groove.
4. The construction process of the subway bypass reverse shaft pulling pipe method according to claim 2 is characterized in that: In step (C-3): the interfaces between the non-rotatable casings (10) overlap by 3 cm, and along the forward direction of the reaming drill bit (15): the port connected to the rear non-rotatable casing (10) is on the inner side, and when the non-rotatable casing (10) slides forward in a straight line, the resistance is reduced.
5. The subway bypass reverse well pulling pipe construction process according to claim 3 or 4, characterized in that: The non-rotatable casings (10) are connected by welding.
6. The subway bypass reverse shaft pipe pulling method construction process according to claim 3 or 4 is characterized in that: Each section of the non-rotatable casing (10) is provided with a grouting hole, and a valve is installed in the grouting hole.
7. The construction process of the subway bypass reverse shaft pulling pipe method according to claim 4 is characterized in that: In step (C-3): the end of each section of the non-rotatable casing (10) adjacent to the reaming drill bit (15) is a male joint, and the end away from the reaming drill bit (15) is a female joint; the male joint and the female joint are matched in a concave-convex manner, and two adjacent non-rotatable casings (10) are relatively fixed via a non-rotatable casing joint (13).
8. The construction process of the subway bypass reverse shaft pulling pipe method according to claim 2 is characterized in that: In step (C-3): the interface between the non-rotatable casing (10) and the rotatable casing (14) overlaps by 3 cm.
9. The subway bypass reverse shaft pulling pipe construction process according to claim 8 is characterized in that: One end of the non-rotatable casing (10) connected to the rotatable casing (14) is a male joint, and one end of the rotatable casing (14) connected to the non-rotatable casing (10) is a female joint; the male joint and the female joint are matched in a concave-convex manner; the swivel joint (12) is installed in the tube at the connection between the non-rotatable casing (10) and the rotatable casing (14).
Citation Information
Patent Citations
Temporary supporting technology for broaching construction of broken stratum through raise-boring machine
CN108756889A
Horizontal directional drilling pipe pulling method
CN110145230A
Raise boring method construction method for 200-600m ventilation shaft of highway extra-long tunnel
CN112412467A
Construction method of prefabricated pipe-jacking working well
CN112943256A
METROPOLITAN STATION AND THE METHOD OF ITS CONSTRUCTION (DESIGN AND METHOD OF P.B. YURKEVICH)
RU2012112354A