A high-performance assembled frame tunnel joint and construction method thereof

By using ultra-high performance concrete UHPC and prestressed connecting columns in the prefabricated frame tunnel joints, combined with a dual anchoring mechanism, the problems of low joint strength and insufficient waterproof performance are solved, achieving higher integrity and safety.

CN114856623BActive Publication Date: 2024-10-29GUANGXI UNIV
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210593290.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-27
Publication Date
2024-10-29
Estimated Expiration
2042-05-27

AI Technical Summary

Technical Problem

The strength of the prefabricated frame tunnel joint is low and the integrity is poor, which affects the safety and waterproof performance of the tunnel.

Method used

Ultra-high performance concrete UHPC embedded steel sleeve/prestressed combined anchorage is used. The prestressed connecting column and dual anchoring mechanism are used to enhance the compression and bending resistance of the joint, and the waterproofing capability is enhanced through grouting overflow filling.

Benefits of technology

It improves the overall strength and earthquake resistance of the joint, enhances the waterproof performance, simplifies the construction process, reduces construction defects, and improves the integrity and safety of the joint.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114856623B_ABST
    Figure CN114856623B_ABST
Patent Text Reader

Abstract

The present invention discloses a high-performance assembled frame tunnel joint and a construction method thereof, wherein the joint comprises an upper prefabricated part and a lower prefabricated part, wherein the upper prefabricated part is provided with exposed steel bars and a prestressed channel of the upper prefabricated part, and the lower prefabricated part is provided with an embedded steel sleeve and a prestressed channel of the lower prefabricated part, wherein the exposed steel bars are inserted into the embedded steel sleeve, and the prestressed connection column is arranged in the prestressed channel of the upper prefabricated part and the prestressed channel of the lower prefabricated part. The construction method realizes double anchoring of the upper prefabricated part and the lower prefabricated part by inserting the exposed steel bars of the upper prefabricated part into the embedded steel sleeve pre-cast with ultra-high performance concrete UHPC and using prestressed threaded steel bars to tension and then cast the prestressed connection column. The joint structure adopts ultra-high performance concrete UHPC embedded steel sleeve / prestressed combined anchoring, which has high strength, good performance, good waterproofness and integrity, and the grouting construction process is visualized, the construction is convenient and fast, and the construction period can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel engineering joints, and in particular to a high-performance assembled frame tunnel joint and a construction method thereof. Background Art

[0002] With the acceleration of urbanization, urban tunnel engineering has developed rapidly. In response to global warming and the development of green and low-carbon, industrialized construction methods are an important direction and path for the development of tunnel engineering. At present, industrialized construction has been widely used in shield tunnels and underground integrated pipe galleries. As a new industrialized construction method, prefabricated frame tunnels are favored in urban tunnel construction because of their high construction efficiency, less construction waste, reliable quality and high space utilization. However, this type of prefabricated frame tunnel is connected by various joints, and its structure is a discontinuum. The joint is the weakest part of the frame tunnel construction and operation stage. Therefore, unreasonable joint design will affect the safety performance of the entire tunnel. At present, most prefabricated frame tunnel joints use steel boxes or straight seam joints. Straight seam joints will reduce the strength of the joints, and steel box joints are prone to rust and are not easy to replace, which affects the integrity and safety of the tunnel. In addition, tunnels are in groundwater and rainfall environments all year round, so the waterproof design and waterproof performance of the tunnel will also affect the performance of the tunnel.

[0003] In view of this, research and improvements were conducted based on the existing problems. By developing a high-performance assembled frame tunnel joint, ultra-high performance concrete UHPC embedded steel sleeve / prestressed combined anchor was used to improve construction efficiency while reducing the impact of the joint on the overall strength of the tunnel, ensuring that the tunnel has good integrity, seismic resistance and waterproofness. This technology can solve some of the problems existing in current frame tunnel joints. Summary of the invention

[0004] The object of the present invention is to provide a high-performance assembled frame tunnel joint and a construction method thereof, so as to solve the problems of low strength and poor integrity of the joint in the background technology.

[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is:

[0006] A high-performance assembled frame tunnel joint structure comprises an upper prefabricated part, a lower prefabricated part and a prestressed connection column, wherein the upper prefabricated part at the butt joint end surface where the upper prefabricated part is connected to the lower prefabricated part is respectively provided with an upper prefabricated part prestressed channel and exposed steel bars; the lower prefabricated part prestressed channel of the lower prefabricated part corresponds to the position of the upper prefabricated part prestressed channel of the upper prefabricated part, the upper prefabricated part prestressed channel passes through the upper prefabricated part, and the lower prefabricated part prestressed channel passes through the lower prefabricated part. The lower prefabricated part is provided with an embedded steel sleeve at the position corresponding to the exposed steel bar, the exposed steel bar is inserted into the embedded steel sleeve, and the space between the exposed steel bar and the embedded steel sleeve is filled with ultra-high performance concrete UHPC; the prestressed connecting column is arranged in the prestressed channel of the upper prefabricated part and the prestressed channel of the lower prefabricated part, and the prestressed threaded steel bars of the prestressed connecting column extend out of the upper prefabricated part and the lower prefabricated part; the grouting hole is arranged on the lower prefabricated part, and the grouting hole is connected with the prestressed channel of the lower prefabricated part.

[0007] The prestressed ducts of the upper prefabricated part are evenly spaced and distributed on the center line of the butt end surface where the upper prefabricated part is connected to the lower prefabricated part, and exposed steel bars are evenly spaced and distributed on both sides of the prestressed ducts of the upper prefabricated part.

[0008] The sizes of the butt ends of the upper prefabricated part and the lower prefabricated part are consistent.

[0009] The upper prefabricated part and the lower prefabricated part are in a rectangular shape after being butt-jointed.

[0010] The prestressed connecting column is a concrete column with prestressed threaded steel bars exposed at both ends.

[0011] The embedded steel sleeve is fixed on the steel cage in the lower prefabricated part by bolts.

[0012] The exposed steel bars extend from the steel cage in the upper prefabricated part.

[0013] The construction method of the tunnel joint structure comprises the following steps:

[0014] (1) Casting upper prefabricated parts and lower prefabricated parts;

[0015] (2) Place the lower prefabricated component horizontally, insert the prestressed threaded steel bars into the reserved prestressed holes, and anchor them to the bottom of the component with corresponding nuts;

[0016] (3) Ultra-high performance concrete (UHPC) is poured into the embedded steel sleeve of the lower prefabricated part, and the exposed steel bars of the upper prefabricated part are inserted into the corresponding embedded steel sleeve of the lower prefabricated part by relying on the gravity of the upper prefabricated part;

[0017] (4) The prestressed threaded steel bars are tensioned at the top of the upper prefabricated part. After tensioning, they are anchored with nuts. Concrete is grouting through the grouting holes reserved in the lower prefabricated part to form a prestressed connecting column. After grouting, maintenance is carried out.

[0018] The beneficial effects of the present invention are as follows:

[0019] 1. Using ultra-high performance concrete (UHPC) materials for prefabricated frame tunnel joints and adding steel fibers to the grouting material can effectively improve the tensile properties, effectively inhibit the development of cracks during the bond failure process, reduce the crack width and improve the ductility of the components.

[0020] 2. Use gravity grouting to reduce the defects that may be caused by traditional pressure grouting, that is, first grouting the grouting material and the cushion layer, and then splicing the components to ensure the visualization of the construction process, the transparency of the grouting quality, and simplify the construction;

[0021] 3. The slurry overflowed from the ultra-high performance concrete (UHPC) grouting during the docking process between the upper prefabricated parts and the lower prefabricated parts can fill the contact surface, which can enhance the waterproof ability of the joint and the integrity of the upper and lower prefabricated parts;

[0022] 4. Through-type prestressed tension anchorage (prestress size is controllable) is used to form prestressed connecting columns in the wall, which can give full play to the compressive capacity of concrete and strengthen the overall synergistic force between components;

[0023] 5. The "double anchoring" effect can enhance the bite force between the upper and lower prefabricated parts and improve the bending resistance of the joint. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic diagram of the three-dimensional structure of the assembled frame tunnel joint of the present invention.

[0025] Figure 2 It is a schematic diagram of the local structure of the butt joint end face of the assembled frame tunnel joint of the present invention.

[0026] Figure 3 It is a structural schematic diagram of the connection between the embedded steel sleeve of the assembled frame tunnel joint of the present invention and the lower prefabricated steel cage and the exposed steel bars.

[0027] Figure 4 It is a schematic diagram of the prestressed connecting column structure of the assembled frame tunnel joint of the present invention.

[0028] Figure 5 It is a schematic diagram of the structure of the assembled frame tunnel joint of the present invention after being assembled.

[0029] Marked in the figure: upper prefabricated part 1, lower prefabricated part 2, upper prefabricated part prestressed channel 3, lower prefabricated part prestressed channel 4, exposed steel bar 5, embedded steel sleeve 6, prestressed connecting column 7, ultra-high performance concrete UHPC 8, limit bolt 9, adjusting bolt 10, nut 11, prestressed threaded steel bar 12, concrete 13, lower prefabricated part steel cage 14, grouting hole 15. DETAILED DESCRIPTION

[0030] The technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0031] Example 1

[0032] This embodiment is a structural example of the high-performance assembled frame tunnel joint described in the present invention.

[0033] The high-performance assembled frame tunnel joint structure of the present invention comprises an upper prefabricated part 1, a lower prefabricated part 2 and a prestressed connection column 7. An upper prefabricated part prestressed channel 3 and an exposed steel bar 5 are respectively provided on the upper prefabricated part 1 at the butt end surface where the upper prefabricated part 1 and the lower prefabricated part 2 are connected. A lower prefabricated part prestressed channel 4 is provided at the positions corresponding to the upper prefabricated part prestressed channel 3 at both ends of the lower prefabricated part 2 connected to the upper prefabricated part. The upper prefabricated part prestressed channel 3 penetrates the upper prefabricated part 1, and the lower prefabricated part prestressed channel 4 penetrates the lower prefabricated part 2; an embedded steel sleeve 6 is provided at the position corresponding to the exposed steel bar 5 of the lower prefabricated part 2, the exposed steel bar 5 on the upper prefabricated part 1 is inserted into the embedded steel sleeve 6, and ultra-high performance concrete UHPC is filled between the exposed steel bar 5 and the embedded steel sleeve 6; the prestressed connection column 7 is provided in the upper prefabricated part prestressed channel 3 and the lower prefabricated part prestressed channel 4.

[0034] The upper prefabricated prestressed ducts 3 are evenly spaced and distributed on the center line of the butt end face of the upper prefabricated 1, and exposed steel bars 5 are evenly spaced and distributed on both sides of the upper prefabricated prestressed ducts 3. The corresponding butt end faces of the upper prefabricated 1 and the lower prefabricated 2 are the same end faces, and the upper prefabricated 1, the lower prefabricated 2 and the prestressed connecting column 7 are in a "mouth" shape after being assembled.

[0035] The prestressed connecting column 7 is not a complete connecting column before installation, but an integral shape formed after pouring concrete. Before installation, the prestressed connecting column 7 is only a steel cage with prestressed threaded steel bars 12 arranged at the axial position. Both ends of the prestressed threaded steel bars 12 extend out of the steel cage body. The length of the prestressed threaded steel bars 12 is greater than the height of the upper prefabricated part and the lower prefabricated part after combination.

[0036] When manufacturing the lower prefabricated part 2 , the embedded steel sleeve 6 is fixed to the steel cage 14 in the lower prefabricated part 2 by adjusting bolts 10 in two directions inside the sleeve, which can strengthen the connection between the embedded steel sleeve 6 and the lower prefabricated part 2 .

[0037] The exposed steel bars 5 extending from the steel cage in the upper prefabricated part 1 can strengthen the connection between the exposed steel bars and the upper prefabricated part.

[0038] Adding steel fibers to ultra-high performance concrete (UHPC) grouting materials can effectively improve the tensile properties, effectively inhibit the development of cracks during bond failure, reduce crack width and improve the ductility of components.

[0039] The double anchoring of the prestressed connecting column 7 and the exposed steel bars 5 and the embedded steel sleeve 6 can enhance the bite force between the upper prefabricated component 1 and the lower prefabricated component 2, thereby improving the bending resistance of the joint.

[0040] Example 2

[0041] This embodiment is an example of the high-performance assembled frame tunnel joint construction method of the present invention, comprising the following steps:

[0042] (1) Casting the upper prefabricated part 1 and the lower prefabricated part 2: Multiple upper prefabricated parts and lower prefabricated parts are prepared as needed. A prestressed channel 3 is reserved in the upper prefabricated part, a steel sleeve 6 is embedded in the lower prefabricated part, the steel sleeve is fixed to the steel cage 14 of the lower prefabricated part by adjusting bolts 10, the position is limited by limit bolts 9, and a prestressed channel 4 of the lower prefabricated part is reserved.

[0043] (2) Anchoring of prestressed threaded steel bars 12: Place the lower prefabricated component horizontally, insert prestressed threaded steel bars into the prestressed hole, and anchor them to the bottom of the lower prefabricated component with nuts 11.

[0044] (3) Anchoring of embedded steel sleeves: First, ultra-high performance concrete UHPC 8 is poured into the embedded steel sleeves. Then, the upper prefabricated part is lifted to be aligned with the lower prefabricated part. The exposed steel bars 5 in the upper prefabricated part are slowly inserted into the embedded steel sleeves of the lower prefabricated part by gravity for anchoring. At the same time, the prestressed threaded steel bars are passed through the prestressed holes of the upper prefabricated part.

[0045] (4) Prestressed connection column 7: After the prestressed threaded steel bar successfully passes through the prestressed hole of the upper prefabricated component, it is tensioned at one end and prestressed at the top of the upper prefabricated component and anchored with a nut 11. After tensioning and anchoring are completed, concrete 13 is injected through the grouting hole 15 reserved in the lower prefabricated component to form a prestressed connection column.

[0046] The above-described embodiments are only preferred embodiments of the present invention and are not intended to limit the present invention. A person skilled in the art or ordinary person may make several improvements and changes without departing from the principles of the present invention. Such improvements and changes shall be deemed to be within the scope of protection of the present invention.

Claims

1. A construction method for a high-performance assembled frame tunnel joint structure, the high-performance assembled frame tunnel joint structure comprising an upper prefabricated part (1), a lower prefabricated part (2) and a prestressed connection column (7), wherein the upper prefabricated part (1) at the butt end surface where the upper prefabricated part (1) and the lower prefabricated part (2) are connected is provided with an upper prefabricated part prestressed hole (3) and exposed steel bars (5); the lower prefabricated part prestressed hole (4) of the lower prefabricated part (2) corresponds to the position of the upper prefabricated part prestressed hole (3) of the upper prefabricated part, the upper prefabricated part prestressed hole (3) passes through the upper prefabricated part (1), and the lower prefabricated part prestressed hole (4) The lower prefabricated part (2) is penetrated; a pre-buried steel sleeve (6) is provided at a position of the lower prefabricated part (2) corresponding to the exposed steel bar (5), the exposed steel bar (5) is inserted into the pre-buried steel sleeve (6), and ultra-high performance concrete (UHPC) is filled between the exposed steel bar (5) and the pre-buried steel sleeve (6); a prestressed connection column (7) is provided in the prestressed channel (3) of the upper prefabricated part and the prestressed channel (4) of the lower prefabricated part, and the prestressed threaded steel bar (12) of the prestressed connection column (7) extends out of the upper prefabricated part and the lower prefabricated part; a grouting hole (15) is provided on the lower prefabricated part (2), and the grouting hole (15) is penetrated by the prestressed channel (4) of the lower prefabricated part; The prestressed holes (3) of the upper prefabricated part are evenly spaced and distributed on the center line of the butt joint surface where the upper prefabricated part (1) and the lower prefabricated part (2) are connected, and exposed steel bars (5) are evenly spaced and distributed on both sides of the prestressed holes (3) of the upper prefabricated part; the sizes of the butt joint ends of the upper prefabricated part (1) and the lower prefabricated part (2) are consistent; the prestressed connection column (7) is a concrete column with prestressed threaded steel bars exposed at both ends; the embedded steel sleeve (6) is fixed to the steel cage in the lower prefabricated part (2) by bolts; the exposed steel bars (5) extend from the steel cage in the upper prefabricated part (1); the specific steps of the construction method are as follows: 1) Casting upper prefabricated parts and lower prefabricated parts; 2) Place the lower prefabricated component horizontally, insert the prestressed threaded steel bars into the reserved prestressed holes, and anchor them to the bottom of the component with corresponding nuts; 3) Pour ultra-high performance concrete UHPC into the embedded steel sleeve of the lower prefabricated part, and the exposed steel bars of the upper prefabricated part are inserted into the corresponding embedded steel sleeve of the lower prefabricated part by relying on the gravity of the upper prefabricated part; 4) The prestressed threaded steel bars are tensioned at the top of the upper prefabricated part. After tensioning, they are anchored with nuts. Concrete is grouting through the grouting holes reserved in the lower prefabricated part to form a prestressed connecting column. After grouting, maintenance is carried out.

2. A construction method for a high-performance assembled frame tunnel joint structure according to claim 1, It is characterized in that The upper prefabricated part and the lower prefabricated part are in a rectangular shape after being butt-jointed.

Citation Information

Patent Citations

  • Ultra-high-performance concrete-common concrete shield tunnel segment and construction method thereof

    CN112443337A

  • Assembly type frame tunnel connector structure

    CN113882873A