A device and test method for measuring the apparent density of powder materials based on exhaust method
By designing an exhaust gas measurement device for powder materials, the problems of gas path blockage, internal leakage, gas leakage and temperature unevenness in the determination of apparent density of powder materials are solved, and higher measurement accuracy and automation are achieved.
Patent Information
- Application Number
- CN202210404058.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-18
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2042-04-18
AI Technical Summary
During the process of measuring the apparent density of powder materials, there are problems such as gas circuit blockage, valve leakage, gas leakage, uneven temperature and pressure fluctuations, resulting in a decrease in measurement accuracy.
A measurement device based on exhaust method is designed, including a gas filtration and guidance system, a gas temperature stability and measurement system, an upper end cover sealing and fastening system, a gas circuit chamber integration module, a lower end cover sealing and fastening system and an absolute pressure sensor , seat-mounted solenoid valve and filter element are used to correct the gas temperature through a temperature sensor, reduce the pipe diameter and air leakage point, and improve sealing.
Effectively prevent gas circuit blockage and internal leakage, keep gas temperature uniform, reduce gas leakage, improve measurement accuracy, and realize automated apparent density measurement of powder materials.
Smart Images

Figure CN114965155B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of material density determination, and in particular to a device and a testing method for determining the apparent density of powder materials based on an exhaust method. Background Art
[0002] The apparent volume is the sum of the volume occupied by the material's solid skeleton and the volume occupied by closed pores. The apparent density refers to the ratio of the material's mass to its apparent volume. The traditional method for measuring the apparent density is the liquid displacement method. This method has many disadvantages: it cannot measure materials that react or dissolve with liquids; the measured materials are easily damaged; a lot of waste liquid is generated; and because the liquid has surface tension, it is difficult for it to enter the gaps between the particles of the powder material and the microporous channels inside the porous material, resulting in an increase in the volume of the liquid displaced and a smaller measured value.
[0003] The exhaust method is a non-destructive measurement method that uses inert gas to replace liquid. Gas molecules enter the gaps between material particles and the internal open pores, and the open skeleton volume can be calculated, which improves the measurement accuracy. However, the exhaust method has the following main problems in measuring the apparent density of powder materials:
[0004] (1) Gas path blockage
[0005] Powder materials are mostly lightweight components. During the measurement process, high-pressure gas enters the material formed by the accumulation of powder materials. During the pressure equalization stage, the rapid reduction in pressure causes the gas to be released from the material. The powder materials will also accumulate in narrow gas paths or valves with the flow of gas, causing gas path blockage. The measured value gradually increases and the measurement accuracy decreases.
[0006] (2) Valve internal leakage
[0007] When the powder material enters the sealing point of the valve with the air flow, the powder will be deposited on the sealing pad due to the narrowing of the air path, causing the valve to fail to seal. During the pressure equalization stage, the gas will flow out through the valve, forming an internal leakage phenomenon. The more powder accumulates, the worse the valve sealing is, the more serious the internal leakage is, and the smaller the measured value is.
[0008] (3) Gas leakage
[0009] The exhaust method uses inert gas as the measuring medium. Pressure sensors, pipe joints, switch valves, etc. are usually connected to the sample chamber and reference chamber by threads. When the pressure is relatively high, the gas is easy to leak from the threads, and the conservation of mass in the measurement process is difficult to ensure.
[0010] (4) Uneven temperature
[0011] The gas source is mostly high-pressure gas cylinders, whose temperature is greatly affected by the storage location. The gas flows from the gas source to the measurement point through pipelines of different materials and temperature fields, and the gas temperature varies greatly. During the measurement process, due to the length and thickness of the connecting pipeline, it is difficult for the test gas temperature to be at the same temperature, and the temperature of each part of the gas is uneven. At the same time, because the gas is in a closed space, the actual temperature of the gas cannot be measured quickly and accurately.
[0012] (5) Pressure fluctuation
[0013] The gas source pressure is difficult to control due to different operations of the tester. As the use time increases, the gas source pressure continues to decrease. The external environmental pressure varies greatly with factors such as seasons, day and night, and weather. The absolute pressure used in the test process also fluctuates accordingly. Since gas is a compressible medium, changes in pressure will affect the measurement results.
[0014] The use of gas path chamber integrated modules and seat-mounted solenoid valves can reduce the dead volume and leakage points of the connecting pipeline, and the use of sealing gaskets instead of threads can improve the air tightness. The internal filter element can prevent powder materials from entering the gas path and valve with the air flow. During calibration, a large volume dense solid block and a small volume dense solid block of known volume are used as calibration objects to measure the large volume coefficient of the large volume dense solid block under different intake pressures to form a reference table. When the user calibrates, it is only necessary to measure the small volume coefficient corresponding to the small volume dense solid block under a certain intake pressure, and obtain the large volume coefficient corresponding to the large volume dense solid block under the same intake pressure through interpolation operation, and further calculate the volume of the sample chamber and the reference chamber. A temperature sensor is placed in the exhaust port channel to directly measure the temperature of the gas at different stages and calibrate the calculation formula. During measurement, the maximum deviation value of the known time period is calculated according to the accuracy and range of the pressure sensor, and the pressure change curve in the data acquisition time period is fitted by the least squares method. The maximum deviation value of the known time period and the slope of the curve are compared to identify the air tightness characteristics of the intake valve, equalizing valve and exhaust valve. Therefore, a device and a test method for determining the apparent density of powder materials based on the exhaust method are specially designed. Summary of the invention
[0015] The present invention provides a device and a testing method for measuring the apparent density of powder materials based on an exhaust method in order to solve the problems of air path blockage and valve internal leakage caused by powder blowing away during the measurement of the apparent density of powder materials, as well as the problems of gas leakage, uneven temperature and pressure fluctuation during the test process.
[0016] The device includes a gas filtering and guiding system, a gas temperature stabilization and measurement system, an upper end cover sealing and fastening system, a gas path chamber integration module, a lower end cover sealing and fastening system, an absolute pressure sensor and a sample cup;
[0017] The gas filtration and guide system includes an intake valve, a pressure equalizing valve, an exhaust valve, a top filter, a filter element, a bottom filter, an upper O-ring and a lower O-ring.
[0018] The air intake valve comprises an air intake valve inlet, an air intake valve outlet, an air intake valve right through hole and an air intake valve left through hole. An air intake valve inlet sealing gasket is arranged at the air intake valve inlet, an air intake valve outlet sealing gasket is arranged at the air intake valve outlet, the air intake valve inlet and the air intake valve outlet are arranged vertically, and an air intake valve right through hole and an air intake valve left through hole are arranged horizontally between the air intake valve inlet and the air intake valve outlet;
[0019] The structures of the pressure equalizing valve and the exhaust valve are the same as those of the intake valve. The pressure equalizing valve includes a pressure equalizing valve inlet, a pressure equalizing valve outlet, a right through hole of the pressure equalizing valve and a left through hole of the pressure equalizing valve. A pressure equalizing valve inlet sealing gasket is arranged at the pressure equalizing valve inlet, and a pressure equalizing valve outlet sealing gasket is arranged at the pressure equalizing valve outlet. The exhaust valve includes an exhaust valve inlet, an exhaust valve outlet, an exhaust valve right through hole and an exhaust valve left through hole. An exhaust valve inlet sealing gasket is arranged at the exhaust valve inlet, and an exhaust valve outlet sealing gasket is arranged at the exhaust valve outlet.
[0020] The gas temperature stabilization and measurement system includes an inverted cone joint, a ferrule, a capillary copper spiral tube and a temperature sensor. One end of the capillary copper spiral tube is a capillary copper spiral tube outlet, and the other end is a capillary copper spiral tube inlet.
[0021] The upper end cover sealing and fastening system includes a screw cap, an upper end cover sealing blind plate, a rear pin, an upper end cover O-ring and a front pin. The inner wall of the screw cap is provided with a screw cap internal thread. The upper end cover sealing blind plate circular ring is vertically provided with a front pin hole and a rear pin hole at symmetrical positions. The inner wall of the upper end cover sealing blind plate circular ring is provided with an upper end cover O-ring sealing groove.
[0022] The lower end cover sealing and fastening system comprises a lower end cover sealing blind plate, a lower end cover rear sealing bolt, a lower end cover left sealing bolt, a lower end cover right sealing bolt, a lower end cover front fastening bolt, a lower end cover O-ring, a lower end cover right fastening bolt and a lower end cover left fastening bolt. A lower end cover O-ring sealing groove is arranged on the annular inner wall of the lower end cover sealing blind plate, and the lower end cover O-ring is placed in the lower end cover O-ring sealing groove. A lower end cover rear sealing through hole, a lower end cover left sealing through hole and a lower end cover right sealing through hole are provided on the lower surface of the lower end cover sealing blind plate, and a lower end cover left fastening through hole, a lower end cover front fastening through hole and a lower end cover right fastening through hole are provided on the upper surface of the lower end cover sealing blind plate.
[0023] The gas path chamber integrated module includes a sample chamber, a filter hole and a reference chamber. The sample chamber is located at the upper part of the gas path chamber integrated module. The sample chamber is surrounded by an upper end cover sealing blind plate, an upper end cover O-ring, a pressure taking hole, a sample chamber inlet and a sample chamber outlet to form a sealed cavity. The sample cup is placed in the sample chamber. The lower part of the sample chamber is a filter hole. The reference chamber is located at the lower part of the gas path chamber integrated module. The reference chamber is surrounded by a reference chamber inlet, a reference chamber outlet, a lower end cover O-ring and a lower end cover sealing blind plate to form a sealed cavity.
[0024] An outer sealing thread of the gas path chamber integrated module is arranged on the upper outer surface of the gas path chamber integrated module, a front positioning hole and a rear positioning hole are vertically arranged on the upper plane of the gas path chamber integrated module, a rear fastening threaded hole of the lower end cover, a left fastening threaded hole of the lower end cover and a right fastening threaded hole of the lower end cover are vertically opened on the lower plane, a sample chamber inlet, an air inlet, a left threaded hole of the air inlet valve and a right threaded hole of the air inlet valve are arranged on the upper part of the front end plane of the gas path chamber integrated module, the air inlet is connected to the external gas source interface through a fine hole channel and a coarse hole channel, the sample chamber inlet is connected to the sample chamber through a fine hole channel, a sample chamber outlet, a reference chamber inlet, a uniform pressure chamber outlet are arranged in the middle of the front end plane of the gas path chamber integrated module The left threaded hole of the pressure equalizing valve and the right threaded hole of the pressure equalizing valve, the sample chamber outlet is connected to the filter hole through a fine-pore channel, the filter hole is connected to the lower part of the sample chamber, the reference chamber inlet is connected to the reference chamber through a fine-pore channel, the reference chamber is located below the filter hole, and the reference chamber outlet, exhaust port, exhaust valve left threaded hole and exhaust valve right threaded hole are provided at the lower part of the front end plane of the gas path chamber integrated module, the exhaust port is connected to the gas temperature measuring channel through a fine-pore channel, the gas temperature measuring channel runs through the left side surface of the gas path chamber integrated module, the reference chamber outlet is connected to the reference chamber through a fine-pore channel, one side of the sample chamber is connected to the pressure taking hole through a pressure taking channel, and an absolute pressure sensor is arranged at the pressure taking hole.
[0025] The inlet of the air intake valve is aligned with the air inlet, the outlet of the air intake valve is aligned with the inlet of the sample chamber, the fastening screw is screwed into the right threaded hole of the air intake valve through the right through hole of the air intake valve, and the fastening screw is screwed into the left threaded hole of the air intake valve through the left through hole of the air intake valve. After the fastening screw is tightened, the air intake valve is sealed with the gas path chamber integrated module through the air intake valve inlet sealing gasket and the air intake valve outlet sealing gasket;
[0026] The inlet of the pressure equalizing valve is aligned with the outlet of the sample chamber, the outlet of the pressure equalizing valve is aligned with the inlet of the reference chamber, the fastening screw is screwed into the right threaded hole of the pressure equalizing valve through the right through hole of the pressure equalizing valve, and the fastening screw is screwed into the left threaded hole of the pressure equalizing valve through the left through hole of the pressure equalizing valve. After the fastening screw is tightened, the pressure equalizing valve is sealed with the gas path chamber integrated module through the pressure equalizing valve inlet sealing gasket and the pressure equalizing valve outlet sealing gasket;
[0027] The exhaust valve inlet is aligned with the reference chamber outlet, the exhaust valve outlet is aligned with the exhaust port, the fastening screw is screwed into the right threaded hole of the exhaust valve through the right through hole of the exhaust valve, and the fastening screw is screwed into the left threaded hole of the exhaust valve through the left through hole of the exhaust valve. After the fastening screw is tightened, the exhaust valve is sealed with the gas path chamber integrated module through the exhaust valve inlet sealing gasket and the exhaust valve outlet sealing gasket.
[0028] The top filter is folded and wrapped around the top of the filter element, the upper O-ring is used to fasten the folded top filter and placed in the upper O-ring sealing groove, the bottom filter is folded and wrapped around the bottom of the filter element, the lower O-ring is used to fasten the folded bottom filter and placed in the lower O-ring sealing groove to form a filter assembly, the filter assembly is installed in the filter hole, the upper O-ring and the lower O-ring cooperate with the filter hole to filter the powder material.
[0029] The inlet of the capillary copper spiral tube is connected to the external gas source, and the outlet of the capillary copper spiral tube passes through the inverted cone joint and the ferrule in sequence and is placed in the hole corresponding to the external gas source interface. The inverted cone joint and the external gas source interface are connected by a fastening thread. The ferrule is made of soft material. During the tightening process of the inverted cone joint, the radial surface of the ferrule is squeezed to form a seal with the surrounding of the channel. The temperature sensor is placed in the gas temperature measurement channel.
[0030] The front pin is connected to the front pin hole by threads, the rear pin is connected to the rear pin hole by threads, the upper end cover O-ring is placed in the upper end cover O-ring sealing groove, the front pin is placed in the front positioning hole, and the rear pin is placed in the rear positioning hole;
[0031] The screw cap is placed above the upper end cover sealing blind plate, and the screw cap is rotated clockwise to press the upper end cover sealing blind plate tightly. The upper end cover sealing blind plate forms a seal with the gas path chamber integrated module through the upper end cover O-ring.
[0032] The rear sealing bolt of the lower end cover passes through the rear sealing through hole of the lower end cover from bottom to top, and is screwed into the rear fastening threaded hole of the lower end cover. The left sealing bolt of the lower end cover passes through the left sealing through hole of the lower end cover from bottom to top, and is screwed into the left fastening threaded hole of the lower end cover. The right sealing bolt of the lower end cover passes through the right sealing through hole of the lower end cover from bottom to top, and is screwed into the right fastening threaded hole of the lower end cover. The rear sealing bolt of the lower end cover, the left sealing bolt of the lower end cover, and the right sealing bolt of the lower end cover press the O-ring of the lower end cover to the bottom end of the gas path chamber integrated module through the sealing blind plate of the lower end cover to form a seal for the reference chamber.
[0033] The front fastening bolt of the lower end cover, the right fastening bolt of the lower end cover and the left fastening bolt of the lower end cover respectively pass through the front fastening through hole of the lower end cover, the right fastening through hole of the lower end cover and the left fastening through hole of the lower end cover from top to bottom and are connected with the corresponding threads on the lower end stable fixture to fix the device.
[0034] The absolute pressure sensor is connected to the gas path chamber integrated module at the pressure tapping hole through a thread.
[0035] The material of the gas path chamber integrated module is a non-metallic material with a low thermal conductivity, which can reduce the heat loss of the gas and stabilize the gas temperature. It is generally organic glass with a thermal conductivity of 0.14W / (m·K) to 0.2W / (m·K).
[0036] The intake valve, equalizing valve and exhaust valve are all seat-mounted solenoid valves, which are sealed with the smooth surface through sealing gaskets.
[0037] The application method of the device comprises the following steps:
[0038] S1: Determination of large volume coefficient under different inlet pressures: The determination of large volume coefficient (volume 5mL~15mL) under different inlet pressures refers to changing the inlet pressure by 5kPa every time between the absolute pressure of 130kPa and 230kPa, and determining the volume coefficient corresponding to the known large volume dense solid block; specifically:
[0039] Place the sample cup in the sample cavity, put a large dense solid block of known volume in the sample cup, align the rear pin and front pin of the upper end cover sealing blind plate with the rear positioning hole and front positioning hole of the gas path chamber integrated module respectively, and tighten the screw cap in a clockwise direction;
[0040] The large volume coefficient measurement includes three stages: exhaust, intake and pressure equalization.
[0041] During the exhaust phase, adjust the external gas source pressure to make the absolute intake pressure reach 130 kPa, open the intake valve, pressure equalizing valve and exhaust valve in sequence, close the intake valve after 5 seconds, read the pressure and temperature data after 30 seconds, read once every 100 ms, and read 20 times in 2 seconds. The median value of the 20 pressure data and the median value of the temperature data are used as the background pressure and background temperature, respectively;
[0042] During the intake phase, open the intake valve and read the temperature data. Read it once every 100ms for 20 consecutive times within 2 seconds. The median of the 20 temperature data is used as the intake temperature. Close the equalizing valve and the exhaust valve in turn. Close the intake valve after 30 seconds. Read the pressure data after 30 seconds. Read it once every 100ms for 20 consecutive times within 2 seconds. The median of the 20 pressure data is used as the intake pressure.
[0043] During the pressure equalization stage, open the pressure equalization valve, read the pressure data after 30 seconds, read it once every 100ms, read it 20 times in 2 seconds, and the median of the 20 pressure data is used as the pressure equalization pressure. Open the exhaust valve and read the temperature data, read it once every 100ms, read it 20 times in 2 seconds, and the median of the 20 temperature data is used as the pressure equalization temperature.
[0044] According to the law of conservation of mass, the number of moles of gas in the free space when a large-volume dense solid block is placed in the sample cavity during the intake phase is equal to the number of moles of gas in the free space when a large-volume dense solid block is placed in the sample cavity during the equalization phase and in the free space of the reference cavity. The ratio of the free space volume when a large-volume dense solid block is placed in the sample cavity to the free space volume of the reference cavity is calculated, which is the large volume coefficient when the intake pressure is an absolute pressure of 130 kPa.
[0045] Raise the intake pressure to 135 kPa, continue the three stages of exhaust, intake and pressure equalization, obtain the maximum volume coefficient when the intake pressure is 135 kPa absolute pressure, continue to increase the pressure by 5 kPa, until the maximum volume coefficient is obtained when the intake pressure is 230 kPa, so as to form a reference table of maximum volume coefficients under different intake pressures;
[0046] S2: Determination of small volume coefficient (volume 2mL~5mL) under constant inlet pressure: According to the material pressure requirement, determine the inlet pressure to be a constant value P1; place the sample cup in the sample chamber, put a small volume dense solid block of known volume in the sample cup, align the rear pin and front pin of the upper end cover sealing blind plate with the rear positioning hole and front positioning hole of the gas path chamber integrated module respectively, and tighten the screw cap in a clockwise direction;
[0047] The small volume coefficient measurement includes three stages: exhaust, intake and pressure equalization.
[0048] In the exhaust stage, adjust the external gas source pressure to P1, open the intake valve, pressure equalizing valve and exhaust valve in sequence, close the intake valve after 5 seconds, read the pressure and temperature data after 30 seconds, read once every 100ms, and read 20 times continuously within 2 seconds. The median value of the 20 pressure data and the median value of the temperature data are used as the background pressure and background temperature respectively;
[0049] During the intake phase, open the intake valve and read the temperature data. Read it once every 100ms for 20 times in 2 seconds. The median of the 20 temperature data is used as the intake temperature. Close the equalizing valve and the exhaust valve in turn. Close the intake valve after 30 seconds. Read the pressure data after 30 seconds. Read it once every 100ms for 20 times in 2 seconds. The median of the 20 pressure data is used as the intake pressure.
[0050] During the pressure equalization stage, open the pressure equalization valve, read the pressure data after 30 seconds, read it once every 100ms, read it 20 times in 2 seconds, and the median of the 20 pressure data is used as the pressure equalization pressure. Open the exhaust valve and read the temperature data, read it once every 100ms, read it 20 times in 2 seconds, and the median of the 20 temperature data is used as the pressure equalization temperature.
[0051] According to the law of conservation of mass, the number of moles of gas in the free space when a small-volume dense solid block is placed in the sample cavity during the intake phase is equal to the number of moles of gas in the free space when a small-volume dense solid block is placed in the sample cavity during the pressure equalization phase and in the free space of the reference cavity. The ratio of the free space volume when a small-volume dense solid block is placed in the sample cavity to the free space volume of the reference cavity is calculated, which is the small volume coefficient when the intake pressure is P1.
[0052] S3: Determination of sample apparent density under constant inlet pressure: The large volume coefficient corresponding to the constant inlet pressure P1 is calculated by interpolation from the large volume coefficient reference table under different inlet pressures, and the free space volume of the reference cavity and the free space volume when the sample cup is placed in the sample cavity are calculated in combination with the small volume coefficient when the inlet pressure is constant P1;
[0053] Keep the inlet pressure equal to P1, open the screw cap in a counterclockwise direction, take out the sample cup, weigh a sample of known mass, place the sample cup with the sample in the sample chamber, align the rear pin and front pin of the upper end cover sealing blind plate with the rear positioning hole and front positioning hole of the gas path chamber integrated module respectively, and tighten the screw cap in a clockwise direction;
[0054] The apparent density of the sample under constant inlet pressure is determined in three stages: exhaust, intake and pressure equalization.
[0055] In the exhaust stage, the intake valve, pressure equalizing valve and exhaust valve are opened in sequence, and the intake valve is closed after 5 seconds. The pressure and temperature data are read after 30 seconds, once every 100ms, and read 20 times continuously within 2 seconds. The median value of the 20 pressure data and the median value of the temperature data are used as the background pressure and background temperature respectively;
[0056] During the intake phase, open the intake valve and read the temperature data. Read it once every 100ms for 20 consecutive times within 2 seconds. The median of the 20 temperature data is used as the intake temperature. Close the equalizing valve and the exhaust valve in turn. Close the intake valve after 30 seconds. Read the pressure data after 30 seconds. Read it once every 100ms for 20 consecutive times within 2 seconds. The median of the 20 pressure data is used as the intake pressure.
[0057] During the pressure equalization stage, open the pressure equalization valve, read the pressure data after 30 seconds, read it once every 100ms, read it 20 times in 2 seconds, and the median of the 20 pressure data is used as the pressure equalization pressure. Open the exhaust valve and read the temperature data, read it once every 100ms, read it 20 times in 2 seconds, and the median of the 20 temperature data is used as the pressure equalization temperature.
[0058] According to the law of conservation of mass, the number of moles of gas in the free space of the sample chamber when the sample is placed in the air intake stage is equal to the number of moles of gas in the free space of the sample chamber when the sample is placed in the pressure equalization stage and the free space of the reference chamber. The ratio of the free space volume of the sample chamber when the sample is placed in the sample to the free space volume of the reference chamber is calculated. The free space volume of the reference chamber is a known quantity, so the free space volume of the sample chamber when the sample is placed can be calculated. The volume of the sample is then calculated from the free space volume when the sample cup is placed in the sample chamber. The apparent density of the sample is calculated based on the sample mass.
[0059] The beneficial effects of the above technical solution of the present invention are as follows:
[0060] In the above scheme, the gas path chamber integration module integrates the pipeline through which the gas flows with the chamber for storing the sample, replaces the external pipeline with the internal channel, shortens the pipeline length, reduces the pipeline diameter, and improves the uniformity of the gas temperature; a seat-mounted solenoid valve is used to reduce the joint parts, reduce the leakage points, improve the sealing of the module, and reduce gas leakage; a filter hole is set below the sample chamber of the gas path chamber integration module for placing the filter component, which effectively prevents the powder material from entering the downstream channel and the seat-mounted solenoid valve part, and avoids gas path blockage and gas leakage; a temperature sensor is placed in the gas temperature measurement channel to measure the temperature of the gas in the three stages of exhaust, intake and equalization, correct the calculation results, and reduce the error caused by uneven temperature; the large volume coefficient corresponding to the intake pressure of a certain constant value is calculated by interpolation in the large volume coefficient reference table under different intake pressures, and the free space volume of the reference chamber and the free space volume when the sample cup is placed in the sample chamber are calculated in combination with the small volume coefficient when the intake pressure is a certain constant value, so that the apparent density of the sample under test can be measured at one time; the test process is fully automated. BRIEF DESCRIPTION OF THE DRAWINGS
[0061] Figure 1 It is an exploded diagram of the structure of the device for measuring the apparent density of powder materials based on the exhaust method of the present invention;
[0062] Figure 2 It is a schematic diagram of the three-dimensional structure of the gas path chamber integrated module in the device for measuring the apparent density of powder materials based on the exhaust method of the present invention;
[0063] Figure 3 It is a front view of the gas path chamber integrated module in the device for measuring the apparent density of powder materials based on the exhaust method of the present invention;
[0064] Figure 4 It is a top view of the gas path chamber integrated module in the device for measuring the apparent density of powder materials based on the exhaust method of the present invention;
[0065] Figure 5 It is a left view of the gas path chamber integrated module in the device for measuring the apparent density of powder materials based on the exhaust method of the present invention.
[0066] in:
[0067] 100-intake valve, 101-intake valve inlet gasket, 102-intake valve inlet, 103-intake valve outlet gasket, 104-intake valve outlet, 105-intake valve right through hole, 106-intake valve left through hole,
[0068] 107-pressure equalizing valve, 108-pressure equalizing valve inlet sealing gasket, 109-pressure equalizing valve inlet, 110-pressure equalizing valve outlet sealing gasket, 111-pressure equalizing valve outlet, 112-pressure equalizing valve right through hole, 113-pressure equalizing valve left through hole,
[0069] 114-top filter screen, 115-filter element, 116-upper O-ring sealing groove, 117-lower O-ring sealing groove, 118-bottom filter screen, 119-upper O-ring, 120-lower O-ring,
[0070] 121-exhaust valve, 122-exhaust valve inlet gasket, 123-exhaust valve inlet, 124-exhaust valve outlet gasket, 125-exhaust valve outlet, 126-exhaust valve right through hole, 127-exhaust valve left through hole,
[0071] 200-inverted cone connector, 201-ferrule, 202-capillary copper spiral tube, 203-capillary copper spiral tube outlet, 204-capillary copper spiral tube inlet, 205-temperature sensor,
[0072] 300-screw cap, 301-screw cap internal thread, 302-front pin hole, 303-upper end cover sealing blind plate, 304-upper end cover O-ring sealing groove, 305-rear pin hole, 306-rear pin, 307-upper end cover O-ring, 308-front pin,
[0073] 400-gas path chamber integrated module, 401-absolute pressure sensor, 402-pressure hole, 403-pressure channel, 404-sample chamber, 405-filter hole, 406-reference chamber, 407-rear fastening threaded hole of lower end cover, 408-left fastening threaded hole of lower end cover, 409-gas temperature measurement channel, 410-exhaust port, 411-left threaded hole of exhaust valve, 412-right threaded hole of exhaust valve, 413-reference chamber outlet, 414- Right fastening threaded hole of the lower end cover, 415-reference chamber inlet, 416-right threaded hole of the pressure equalizing valve, 417-left threaded hole of the pressure equalizing valve, 418-sample chamber outlet, 419-external gas source interface, 420-sample chamber inlet, 421-left threaded hole of the air inlet valve, 422-right threaded hole of the air inlet valve, 423-air inlet, 424-external sealing thread of the air path chamber integrated module, 425-front positioning hole, 426-rear positioning hole, 427-sample cup,
[0074] 500-lower end cover sealing blind plate, 501-lower end cover rear sealing through hole, 502-lower end cover O-ring sealing groove, 503-lower end cover left fastening through hole, 504-lower end cover rear sealing bolt, 505-lower end cover left sealing bolt, 506-lower end cover right sealing bolt, 507-lower end cover left sealing through hole, 508-lower end cover front fastening through hole, 509-lower end cover right sealing through hole, 510-lower end cover right fastening through hole, 511-lower end cover front fastening bolt, 512-lower end cover O-ring, 513-lower end cover right fastening bolt, 514-lower end cover left fastening bolt. DETAILED DESCRIPTION
[0075] In order to make the technical problems, technical solutions and advantages to be solved by the present invention more clear, a detailed description will be given below with reference to the accompanying drawings and specific embodiments.
[0076] The invention provides a device and a testing method for measuring the apparent density of powder materials based on an exhaust method.
[0077] like Figure 1 As shown, the device includes a gas filtering and guiding system, a gas temperature stabilization and measurement system, an upper end cover sealing and fastening system, a gas path chamber integrated module 400, a lower end cover sealing and fastening system, an absolute pressure sensor 401 and a sample cup 427,
[0078] The gas filtering and guiding system includes an inlet valve 100, a pressure equalizing valve 107, an exhaust valve 121, a top filter 114, a filter element 115, a bottom filter 118, an upper O-ring 119 and a lower O-ring 120.
[0079] The air intake valve 100 includes an air intake valve inlet 102, an air intake valve outlet 104, an air intake valve right through hole 105 and an air intake valve left through hole 106. An air intake valve inlet sealing gasket 101 is arranged at the air intake valve inlet 102, and an air intake valve outlet sealing gasket 103 is arranged at the air intake valve outlet 104. The air intake valve inlet 102 and the air intake valve outlet 104 are arranged vertically, and the air intake valve right through hole 105 and the air intake valve left through hole 106 are arranged horizontally between the air intake valve inlet 102 and the air intake valve outlet 104.
[0080] The structures of the pressure equalizing valve 107 and the exhaust valve 121 are the same as those of the intake valve 100. The pressure equalizing valve 107 includes a pressure equalizing valve inlet 109, a pressure equalizing valve outlet 111, a pressure equalizing valve right through hole 112 and a pressure equalizing valve left through hole 113. A pressure equalizing valve inlet sealing gasket 108 is provided at the pressure equalizing valve inlet 109, and a pressure equalizing valve outlet sealing gasket 110 is provided at the pressure equalizing valve outlet 111; the exhaust valve 121 includes an exhaust valve inlet 123, an exhaust valve outlet 125, an exhaust valve right through hole 126 and an exhaust valve left through hole 127. An exhaust valve inlet sealing gasket 122 is provided at the exhaust valve inlet 123, and an exhaust valve outlet sealing gasket 124 is provided at the exhaust valve outlet 125;
[0081] The gas temperature stabilization and measurement system includes an inverted cone joint 200, a ferrule 201, a capillary copper spiral tube 202 and a temperature sensor 205. One end of the capillary copper spiral tube 202 is a capillary copper spiral tube outlet 203, and the other end is a capillary copper spiral tube inlet 204;
[0082] The upper end cover sealing and fastening system comprises a screw cap 300, an upper end cover sealing blind plate 303, a rear pin 306, an upper end cover O-ring 307 and a front pin 308. The inner wall of the screw cap 300 is provided with a screw cap internal thread 301. The upper end cover sealing blind plate 303 is vertically provided with a front pin hole 302 and a rear pin hole 305 at a symmetrical position of the ring. The upper end cover O-ring sealing groove 304 is provided on the inner wall of the ring of the upper end cover sealing blind plate 303.
[0083] The lower end cover sealing and fastening system comprises a lower end cover sealing blind plate 500, a lower end cover rear sealing bolt 504, a lower end cover left sealing bolt 505, a lower end cover right sealing bolt 506, a lower end cover front fastening bolt 511, a lower end cover O-ring 512, a lower end cover right fastening bolt 513 and a lower end cover left fastening bolt 514. The lower end cover sealing blind plate 500 is provided with a lower end cover O-ring sealing groove 502 on the annular inner wall thereof, and the lower end cover O-ring 512 is placed in the lower end cover O-ring sealing groove 502. The lower end cover sealing blind plate 500 is provided with a lower end cover rear sealing through hole 501, a lower end cover left sealing through hole 507 and a lower end cover right sealing through hole 509 penetrating therethrough on the lower surface thereof, and the lower end cover sealing blind plate 500 is provided with a lower end cover left fastening through hole 503, a lower end cover front fastening through hole 508 and a lower end cover right fastening through hole 510 penetrating therethrough on the upper surface thereof.
[0084] like Figure 2 , Figure 3 , Figure 4 and Figure 5 As shown, the gas path chamber integrated module 400 includes a sample chamber 404, a filter hole 405 and a reference chamber 406. The sample chamber 404 is located at the upper part of the gas path chamber integrated module 400. The sample chamber 404 is surrounded by the upper end cover sealing blind plate 303, the upper end cover O-ring 307, the pressure taking hole 402, the sample chamber inlet 420 and the sample chamber outlet 418 to form a sealed cavity. The sample cup 427 is placed in the sample chamber 404. The lower part of the sample chamber 404 is the filter hole 405. The reference chamber 406 is located at the lower part of the gas path chamber integrated module 400. The reference chamber 406 is surrounded by the reference chamber inlet 415, the reference chamber outlet 413, the lower end cover O-ring 512 and the lower end cover sealing blind plate 500 to form a sealed cavity.
[0085] An outer sealing thread 424 of the gas path chamber integrated module is arranged on the upper outer surface of the gas path chamber integrated module 400, a front positioning hole 425 and a rear positioning hole 426 are vertically arranged on the upper plane of the gas path chamber integrated module 400, a rear fastening threaded hole 407 of the lower end cover, a left fastening threaded hole 408 of the lower end cover and a right fastening threaded hole 414 of the lower end cover are vertically opened on the lower plane, a sample chamber inlet 420, an air inlet 423, an air inlet valve left threaded hole 421 and an air inlet valve right threaded hole 422 are arranged on the upper part of the front end plane of the gas path chamber integrated module 400, the air inlet 423 is connected to the external gas source interface 419 through a fine hole channel and a coarse hole channel, the sample chamber inlet 420 is connected to the sample chamber 404 through a fine hole channel, a sample chamber outlet 418, a reference chamber inlet 415 and a pressure equalizing valve left threaded hole 417 are arranged in the middle part of the front end plane of the gas path chamber integrated module 400 and the right threaded hole 416 of the pressure equalizing valve, the sample chamber outlet 418 is connected to the filter hole 405 through a fine-pore channel, the filter hole 405 is connected to the lower part of the sample chamber 404, the reference chamber inlet 415 is connected to the reference chamber 406 through a fine-pore channel, the reference chamber 406 is located below the filter hole 405, and the lower part of the front end plane of the gas path chamber integrated module 400 is provided with a reference chamber outlet 413, an exhaust port 410, an exhaust valve left threaded hole 411 and an exhaust valve right threaded hole 412, the exhaust port 410 is connected to the gas temperature measurement channel 409 through a fine-pore channel, the gas temperature measurement channel 409 runs through the left side surface of the gas path chamber integrated module 400, the reference chamber outlet 413 is connected to the reference chamber 406 through a fine-pore channel, one side of the sample chamber 404 is connected to the pressure taking hole 402 through the pressure taking channel 403, and an absolute pressure sensor 401 is arranged at the pressure taking hole 402.
[0086] As described above, the inlet valve inlet 102 is aligned with the inlet port 423, the inlet valve outlet 104 is aligned with the sample chamber inlet 420, the fastening screw is screwed into the right threaded hole 422 of the inlet valve through the right through hole 105 of the inlet valve, and the fastening screw is screwed into the left threaded hole 421 of the inlet valve through the left through hole 106 of the inlet valve. After the fastening screw is tightened, the inlet valve 100 is sealed with the gas path chamber integrated module 400 through the inlet valve inlet gasket 101 and the inlet valve outlet gasket 103;
[0087] The pressure equalizing valve inlet 109 is aligned with the sample chamber outlet 418, the pressure equalizing valve outlet 111 is aligned with the reference chamber inlet 415, the fastening screw is screwed into the right threaded hole 416 of the pressure equalizing valve through the right through hole 112 of the pressure equalizing valve, and the fastening screw is screwed into the left threaded hole 417 of the pressure equalizing valve through the left through hole 113 of the pressure equalizing valve. After the fastening screw is tightened, the pressure equalizing valve 107 is sealed with the gas path chamber integrated module 400 through the pressure equalizing valve inlet sealing gasket 108 and the pressure equalizing valve outlet sealing gasket 110;
[0088] The exhaust valve inlet 123 is aligned with the reference chamber outlet 413, the exhaust valve outlet 125 is aligned with the exhaust port 410, the fastening screw is screwed into the exhaust valve right threaded hole 412 through the exhaust valve right through hole 126, and the fastening screw is screwed into the exhaust valve left threaded hole 411 through the exhaust valve left through hole 127. After the fastening screw is tightened, the exhaust valve 121 is sealed with the air path chamber integrated module 400 through the exhaust valve inlet sealing gasket 122 and the exhaust valve outlet sealing gasket 124.
[0089] The top filter screen 114 is folded and wrapped around the upper end of the filter element 115, the upper O-ring 119 is used to fasten the folded top filter screen 114 and is placed in the upper O-ring sealing groove 116, the bottom filter screen 118 is folded and wrapped around the lower end of the filter element 115, the lower O-ring 120 is used to fasten the folded bottom filter screen 118 and is placed in the lower O-ring sealing groove 117 to form a filter assembly, the filter assembly is installed in the filter hole 405, the upper O-ring 119 and the lower O-ring 120 cooperate with the filter hole 405 to filter the powder material.
[0090] The capillary copper spiral tube inlet 204 is connected to the external gas source, and the capillary copper spiral tube outlet 203 passes through the inverted cone joint 200 and the ferrule 201 in sequence, and is placed in the hole corresponding to the external gas source interface 419. The inverted cone joint 200 is connected to the external gas source interface 419 by a fastening thread. The ferrule 201 is made of soft material. During the tightening process of the inverted cone joint 200, the radial surface of the ferrule 201 is squeezed to form a seal with the surrounding of the channel. The temperature sensor 205 is placed in the gas temperature measurement channel 409.
[0091] The front pin 308 is connected to the front pin hole 302 by threads, the rear pin 306 is connected to the rear pin hole 305 by threads, the upper end cover O-ring 307 is placed in the upper end cover O-ring sealing groove 304, the front pin 308 is placed in the front positioning hole 425, and the rear pin 306 is placed in the rear positioning hole 426;
[0092] The rotary cover 300 is placed above the upper end cover sealing blind plate 303 , and the rotary cover 300 is rotated clockwise to press the upper end cover sealing blind plate 303 , and the upper end cover sealing blind plate 303 forms a seal with the gas path chamber integrated module 400 through the upper end cover O-ring 307 .
[0093] The rear sealing bolt 504 of the lower end cover passes through the rear sealing through hole 501 of the lower end cover from bottom to top, and is screwed into the rear fastening threaded hole 407 of the lower end cover. The left sealing bolt 505 of the lower end cover passes through the left sealing through hole 507 of the lower end cover from bottom to top, and is screwed into the left fastening threaded hole 408 of the lower end cover. The right sealing bolt 506 of the lower end cover passes through the right sealing through hole 509 of the lower end cover from bottom to top, and is screwed into the right fastening threaded hole 414 of the lower end cover. The rear sealing bolt 504 of the lower end cover, the left sealing bolt 505 of the lower end cover, and the right sealing bolt 506 of the lower end cover press the lower end cover O-ring 512 to the bottom end of the gas path chamber integrated module 400 through the lower end cover sealing blind plate 500, so as to form a seal for the reference chamber 406.
[0094] The front fastening bolt 511 of the lower end cover, the right fastening bolt 513 of the lower end cover and the left fastening bolt 514 of the lower end cover respectively pass through the front fastening through hole 508 of the lower end cover, the right fastening through hole 510 of the lower end cover and the left fastening through hole 503 of the lower end cover from top to bottom and are connected to the corresponding threads on the lower end stable fixture to fix the device.
[0095] The absolute pressure sensor 401 is connected to the gas path chamber integrated module 400 at the pressure taking hole 402 through threads.
[0096] The gas path chamber integrated module 400 is made of a non-metallic material with a low thermal conductivity.
[0097] The intake valve 100, the pressure equalizing valve 107 and the exhaust valve 121 are all seat-mounted solenoid valves, which are sealed with the smooth surface through sealing gaskets.
[0098] The application method of the device comprises the following steps:
[0099] S1: Determination of large volume coefficient under different intake pressures: The determination of large volume coefficient under different intake pressures refers to changing the intake pressure by 5 kPa every time between the absolute pressure of 130 kPa and 230 kPa, and determining the volume coefficient corresponding to the known large volume dense solid block; specifically:
[0100] Place the sample cup 427 in the sample chamber 404, put a large dense solid block of known volume in the sample cup 427, align the rear pin 306 and the front pin 308 of the upper end cover sealing blind plate 303 with the rear positioning hole 426 and the front positioning hole 425 of the gas path chamber integrated module 400 respectively, and tighten the screw cap 300 in a clockwise direction;
[0101] The large volume coefficient measurement includes three stages: exhaust, intake and pressure equalization.
[0102] In the exhaust stage, the external gas source pressure is adjusted to make the absolute intake pressure reach 130 kPa, and the intake valve 100, the pressure equalizing valve 107 and the exhaust valve 121 are opened in sequence. After 5 seconds, the intake valve 100 is closed, and the pressure and temperature data are read after 30 seconds, once every 100 ms, and 20 times in a row within 2 seconds. The median value of the 20 pressure data and the median value of the temperature data are used as the background pressure and the background temperature, respectively;
[0103] In the intake stage, the intake valve 100 is opened, and the temperature data is read once every 100ms, and the reading is continuously read 20 times within 2 seconds. The median value of the 20 temperature data is used as the intake temperature. The equalizing valve 107 and the exhaust valve 121 are closed in sequence. After 30 seconds, the intake valve 100 is closed. After 30 seconds, the pressure data is read once every 100ms, and the reading is continuously read 20 times within 2 seconds. The median value of the 20 pressure data is used as the intake pressure.
[0104] During the pressure equalization stage, the pressure equalization valve 107 is opened, and the pressure data is read after 30 seconds. The pressure data is read once every 100 ms, and the reading is continuously read 20 times within 2 seconds. The median value of the 20 pressure data is used as the pressure equalization pressure. The exhaust valve 121 is opened, and the temperature data is read once every 100 ms, and the reading is continuously read 20 times within 2 seconds. The median value of the 20 temperature data is used as the pressure equalization temperature.
[0105] According to the law of conservation of mass, the number of moles of gas in the free space of the sample chamber 404 when a large-volume dense solid block is placed in the intake stage is equal to the number of moles of gas in the free space of the sample chamber 404 when a large-volume dense solid block is placed in the pressure equalization stage and the free space of the reference chamber 406. The ratio of the free space volume of the sample chamber 404 when a large-volume dense solid block is placed in the reference chamber 406 is calculated, which is the large volume coefficient when the intake pressure is an absolute pressure of 130 kPa.
[0106] Raise the intake pressure to 135 kPa, continue the three stages of exhaust, intake and pressure equalization, obtain the maximum volume coefficient when the intake pressure is 135 kPa absolute pressure, continue to increase the pressure by 5 kPa, until the maximum volume coefficient is obtained when the intake pressure is 230 kPa, so as to form a reference table of maximum volume coefficients under different intake pressures;
[0107] S2: Determination of small volume coefficient under constant inlet pressure: According to the material pressure requirement, the inlet pressure is determined to be a constant value P1; the sample cup 427 is placed in the sample chamber 404, a small volume dense solid block of known volume is placed in the sample cup 427, the rear pin 306 and the front pin 308 of the upper end cover sealing blind plate 303 are respectively aligned with the rear positioning hole 426 and the front positioning hole 425 of the gas path chamber integrated module 400, and the screw cap 300 is tightened in a clockwise direction;
[0108] The small volume coefficient measurement includes three stages: exhaust, intake and pressure equalization.
[0109] In the exhaust stage, the external gas source pressure is adjusted to P1, and the intake valve 100, the pressure equalizing valve 107 and the exhaust valve 121 are opened in sequence. After 5 seconds, the intake valve 100 is closed, and the pressure and temperature data are read after 30 seconds. The reading is performed every 100 ms, and the reading is performed 20 times in a row within 2 seconds. The median value of the 20 pressure data and the median value of the temperature data are used as the background pressure and the background temperature, respectively.
[0110] In the intake stage, the intake valve 100 is opened, and the temperature data is read once every 100ms, and the reading is continuously read 20 times within 2 seconds. The median of the 20 temperature data is used as the intake temperature. The equalizing valve 107 and the exhaust valve 121 are closed in sequence. After 30 seconds, the intake valve 100 is closed. After 30 seconds, the pressure data is read once every 100ms, and the reading is continuously read 20 times within 2 seconds. The median of the 20 pressure data is used as the intake pressure.
[0111] During the pressure equalization stage, the pressure equalization valve 107 is opened, and the pressure data is read after 30 seconds. The pressure data is read once every 100 ms, and the reading is continuously read 20 times within 2 seconds. The median value of the 20 pressure data is used as the pressure equalization pressure. The exhaust valve 121 is opened, and the temperature data is read once every 100 ms, and the reading is continuously read 20 times within 2 seconds. The median value of the 20 temperature data is used as the pressure equalization temperature.
[0112] According to the law of conservation of mass, the number of moles of gas in the free space of the sample chamber 404 when a small-volume dense solid block is placed in the intake stage is equal to the number of moles of gas in the free space of the sample chamber 404 when a small-volume dense solid block is placed in the pressure equalization stage and the free space of the reference chamber 406. The ratio of the free space volume of the sample chamber 404 when a small-volume dense solid block is placed in the reference chamber 406 is calculated, which is the small volume coefficient when the intake pressure is P1.
[0113] S3: Determination of sample apparent density under constant inlet pressure: The large volume coefficient corresponding to the inlet pressure of constant value P1 is calculated by interpolation from the large volume coefficient reference table under different inlet pressures, and the free space volume of the reference cavity 406 and the free space volume when the sample cup 427 is placed in the sample cavity 404 are calculated in combination with the small volume coefficient when the inlet pressure is constant value P1;
[0114] Keep the inlet pressure equal to P1, open the screw cap 300 in a counterclockwise direction, take out the sample cup 427, weigh a sample of known mass, place the sample cup 427 with the sample in the sample chamber 404, align the rear pin 306 and the front pin 308 of the upper end cover sealing blind plate 303 with the rear positioning hole 426 and the front positioning hole 425 of the gas path chamber integrated module 400 respectively, and tighten the screw cap 300 in a clockwise direction;
[0115] The apparent density of the sample under constant inlet pressure is determined in three stages: exhaust, intake and pressure equalization.
[0116] In the exhaust stage, the intake valve 100, the pressure equalizing valve 107 and the exhaust valve 121 are opened in sequence, and the intake valve 100 is closed after 5 seconds. The pressure and temperature data are read after 30 seconds, once every 100ms, and read 20 times continuously within 2 seconds. The median value of the 20 pressure data and the median value of the temperature data are used as the background pressure and the background temperature respectively;
[0117] In the intake stage, the intake valve 100 is opened, and the temperature data is read once every 100ms, and the reading is continuously read 20 times within 2 seconds. The median value of the 20 temperature data is used as the intake temperature. The equalizing valve 107 and the exhaust valve 121 are closed in sequence. After 30 seconds, the intake valve 100 is closed. After 30 seconds, the pressure data is read once every 100ms, and the reading is continuously read 20 times within 2 seconds. The median value of the 20 pressure data is used as the intake pressure.
[0118] During the pressure equalization stage, the pressure equalization valve 107 is opened, and the pressure data is read after 30 seconds. The pressure data is read once every 100 ms, and the reading is continuously read 20 times within 2 seconds. The median value of the 20 pressure data is used as the pressure equalization pressure. The exhaust valve 121 is opened, and the temperature data is read once every 100 ms, and the reading is continuously read 20 times within 2 seconds. The median value of the 20 temperature data is used as the pressure equalization temperature.
[0119] According to the law of conservation of mass, the number of moles of gas in the free space of the sample chamber 404 when the sample is placed in the air intake stage is equal to the number of moles of gas in the free space of the sample chamber 404 when the sample is placed in the pressure equalization stage and the free space of the reference chamber 406. The ratio of the volume of the free space of the sample chamber 404 when the sample is placed to the volume of the free space of the reference chamber 406 is calculated. The volume of the free space of the reference chamber 406 is a known quantity, and the volume of the free space of the sample chamber 404 when the sample is placed can be calculated. The volume of the sample is then calculated from the volume of the free space when the sample cup 427 is placed in the sample chamber 404, and the apparent density of the sample is calculated based on the mass of the sample.
[0120] The specific test process is as follows:
[0121] S1: Determination of large volume coefficient under different intake pressures: The determination of large volume coefficient under different intake pressures refers to changing the intake pressure by 5 kPa every time between the absolute pressure of 130 kPa and 230 kPa, and determining the volume coefficient C corresponding to the known large volume dense solid block. 130bs , C 135bs , C 140bs ,…,C 230bs ; Wherein, large volume refers to a large volume dense solid block with a volume between 5mL and 15mL;
[0122] Place the sample cup 427 in the sample chamber 404 and put a known volume V in the sample cup 427. bs The large volume dense solid block, align the rear pin 306 and the front pin 308 of the upper end cover sealing blind plate 303 with the rear positioning hole 426 and the front positioning hole 425 of the gas path chamber integrated module 400 respectively, and tighten the screw cover 300 in a clockwise direction;
[0123] The large volume coefficient measurement includes three stages: exhaust, intake and pressure equalization.
[0124] During the exhaust phase, the external gas source pressure is adjusted to make the absolute intake pressure reach 130 kPa, and the intake valve 100, the pressure equalizing valve 107 and the exhaust valve 121 are opened in sequence. After 5 seconds, the intake valve 100 is closed. After 30 seconds, the pressure and temperature data are read once every 100 ms, and read 20 times continuously within 2 seconds. The median value of the 20 pressure data and the median value of the temperature data are respectively used as the background pressure P 130bsb and background temperature T 130bsb ,
[0125] During the intake phase, open the intake valve 100° and read the temperature data every 100ms. Read the data 20 times in a row within 2 seconds. The median value of the 20 temperature data is taken as the intake temperature T. 130bsf , close the pressure equalizing valve 107 and the exhaust valve 121 in turn, close the intake valve 100 after 30 seconds, read the pressure data after 30 seconds, read it every 100ms, read it 20 times in a row within 2 seconds, and the median of the 20 pressure data is taken as the intake pressure P 130bsf ,
[0126] During the pressure equalization stage, the pressure equalization valve 107 is opened, and the pressure data is read after 30 seconds, once every 100ms, and 20 times in a row within 2 seconds. The median value of the 20 pressure data is taken as the pressure equalization pressure P 130bse , open the exhaust valve 121, read the temperature data, read it every 100ms, read it 20 times in 2 seconds, and the median of the 20 temperature data is taken as the pressure equalization temperature T 130bse ,
[0127] According to the law of conservation of mass, the number of moles of gas in the free space of the sample chamber 404 during the air intake phase is equal to the number of moles of gas in the free space of the sample chamber 404 and the reference chamber 406 during the pressure equalization phase, that is:
[0128]
[0129] V fbs V is the free space volume after a large volume of dense solid block is placed in the sample chamber 404, r is the free space volume of the reference cavity 406, R is the universal gas constant, and the free space volume V of the sample cavity 404 when a large volume of dense solid block is placed is calculated.fbs With reference to the free space volume V of cavity 406 r The ratio is the maximum volume coefficient C when the intake pressure is 130 kPa absolute pressure. 130bs ,Right now:
[0130]
[0131] Raise the intake pressure to 135kPa, continue the exhaust, intake and pressure equalization stages, and obtain the maximum volume coefficient when the intake pressure is 135kPa absolute pressure, until the maximum volume coefficient is obtained when the intake pressure is 230kPa; form a reference table C for the maximum volume coefficient under different intake pressures 130bs , C 135bs , C 140bs ,…,C 230bs ;
[0132] S2: Determination of small volume coefficient under constant inlet pressure: According to the material pressure requirement, the inlet pressure is determined to be a certain constant value;
[0133] Place the sample cup 427 in the sample chamber 404 and put a known volume V in the sample cup 427. ss A small volume dense solid block (small volume refers to a volume between 2mL and 5mL) is used to align the rear pin 306 and the front pin 308 of the upper end cover sealing blind plate 303 with the rear positioning hole 426 and the front positioning hole 425 of the gas path chamber integrated module 400, respectively, and the screw cap 300 is tightened in a clockwise direction;
[0134] The small volume coefficient measurement includes three stages: exhaust, intake and pressure equalization.
[0135] During the exhaust phase, the external gas source pressure is adjusted to a constant value, and the intake valve 100, the pressure equalizing valve 107 and the exhaust valve 121 are opened in sequence. After 5 seconds, the intake valve 100 is closed, and the pressure and temperature data are read after 30 seconds. The reading is performed every 100 ms, and the reading is performed 20 times in a row within 2 seconds. The median value of the 20 pressure data and the median value of the temperature data are respectively used as the background pressure P xssb and background temperature T xssb ,
[0136] During the intake phase, open the intake valve 100° and read the temperature data every 100ms. Read the data 20 times in a row within 2 seconds. The median value of the 20 temperature data is taken as the intake temperature T. xssf , close the pressure equalizing valve 107 and the exhaust valve 121 in turn, close the intake valve 100 after 30 seconds, read the pressure data after 30 seconds, read it every 100ms, read it 20 times in a row within 2 seconds, and the median of the 20 pressure data is taken as the intake pressure P xssf ,
[0137] During the pressure equalization stage, the pressure equalization valve 107 is opened, and the pressure data is read after 30 seconds, once every 100ms, and 20 times in a row within 2 seconds. The median value of the 20 pressure data is taken as the pressure equalization pressure P xsse , open the exhaust valve 121, read the temperature data, read it every 100ms, read it 20 times in 2 seconds, and the median of the 20 temperature data is taken as the pressure equalization temperature T xsse ,
[0138] According to the law of conservation of mass, the number of moles of gas in the free space of the sample chamber 404 during the air intake phase is equal to the number of moles of gas in the free space of the sample chamber 404 when a small volume of dense solid block is placed during the pressure equalization phase and in the free space of the reference chamber 406, that is:
[0139]
[0140] V fss V is the free space volume after a small volume of dense solid block is placed in the sample chamber 404. r is the free space volume of the reference cavity 406, R is the universal gas constant, and the free space volume V of the sample cavity 404 when a small volume dense solid block is placed is calculated. fss With reference to the free space volume V of cavity 406 r The ratio of the intake pressure to the minimum volume coefficient C when the intake pressure is a constant value xss ,Right now:
[0141]
[0142] S3: Determination of sample apparent density at constant inlet pressure: Refer to the table for interpolation of the bulk coefficient at different inlet pressures to calculate the bulk coefficient C corresponding to a constant inlet pressure. xbs ,Right now:
[0143]
[0144] Combined with the small volume coefficient C when the intake pressure is a certain constant value xss ,Right now:
[0145]
[0146] Calculate the free space volume V of the reference cavity 406 r and the free space volume V when the sample cup 427 is placed in the sample chamber 404 fc ;
[0147]
[0148]
[0149] Keep the intake pressure the same as that in the step of measuring the small volume coefficient under constant intake pressure, open the screw cap 300 in a counterclockwise direction, take out the sample cup 427, weigh a sample of known mass m, place the sample cup 427 with the sample in the sample chamber 404, align the rear pin 306 and the front pin 308 of the upper end cover sealing blind plate 303 with the rear positioning hole 426 and the front positioning hole 425 of the gas path chamber integrated module 400, respectively, and tighten the screw cap 300 in a clockwise direction;
[0150] The apparent density of the sample under constant inlet pressure is determined in three stages: exhaust, intake and pressure equalization.
[0151] During the exhaust phase, the intake valve 100, the pressure equalizing valve 107 and the exhaust valve 121 are opened in sequence. After 5 seconds, the intake valve 100 is closed. After 30 seconds, the pressure and temperature data are read once every 100 ms. The reading is continuously read 20 times within 2 seconds. The median value of the 20 pressure data and the median value of the temperature data are respectively used as the background pressure P xsb and background temperature T xsb ,
[0152] During the intake phase, open the intake valve 100° and read the temperature data every 100ms. Read the data 20 times in a row within 2 seconds. The median value of the 20 temperature data is taken as the intake temperature T. xsf , close the pressure equalizing valve 107 and the exhaust valve 121 in turn, close the intake valve 100 after 30 seconds, read the pressure data after 30 seconds, read it every 100ms, read it 20 times in a row within 2 seconds, and the median of the 20 pressure data is taken as the intake pressure P xsf ,
[0153] During the pressure equalization stage, the pressure equalization valve 107 is opened, and the pressure data is read after 30 seconds, once every 100ms, and 20 times in a row within 2 seconds. The median value of the 20 pressure data is taken as the pressure equalization pressure P xse , open the exhaust valve 121, read the temperature data, read it every 100ms, read it 20 times in 2 seconds, and the median of the 20 temperature data is taken as the pressure equalization temperature T xse According to the law of conservation of mass, the number of moles of gas in the free space of the sample chamber 404 when the sample is placed in the intake phase is equal to the number of moles of gas in the free space of the sample chamber 404 and the free space of the reference chamber 406 when the sample is placed in the pressure equalization phase, that is:
[0154]
[0155] The free space volume V of the sample chamber 404 when the sample is placed is calculated fs With reference to the free space volume V of cavity 406 r The ratio is:
[0156]
[0157] Reference cavity 406 free space volume V r As a known quantity, the free space volume V of the sample chamber 404 when the sample is placed can be calculated fs ,Right now:
[0158] V fs =C xs V r
[0159] Then, the free space volume V when the sample cup 427 is placed in the sample chamber 404 is fc Calculate the volume V of the sample s ,Right now:
[0160] V s =V fc -V fs
[0161] The apparent density ρ of the sample is calculated according to the sample mass m, that is:
[0162] ρ=m / V s
[0163] The device and the testing method for measuring the apparent density of powder materials based on the exhaust method of the present invention are used to measure the apparent density of powder materials.
[0164] This will be described below with reference to specific embodiments.
[0165] Example 1
[0166] The embodiment of the present invention measures the apparent density of floating beads of powder material.
[0167] Using a 7.8868 mL large volume dense block, the C at an absolute pressure of 150 kPa was measured 150bs is 0.91349, C at an absolute pressure of 155 kPa 155bs is 0.91329, using a small volume dense block of 2.3201 mL to measure C at an absolute pressure of 152 kPa 152ss is 2.2996, and the volume coefficient C of the corresponding large volume dense block is obtained by interpolation calculation 152bs for:
[0168]
[0169]
[0170]
[0171]
[0172] Take 3.1425g of powder material beads and place them in a sample cup to determine their volume coefficient C 152s is 1.8097, then the free space volume V of the sample chamber when the sample is placed fs for:
[0173] V fs =C 152s V r =1.8097×4.0157=7.2672mL
[0174] The volume of the floating beads is:
[0175] V s =V fc -V fs =11.5547-7.2672=4.2875mL
[0176] The apparent density ρ of the floating beads is:
[0177] ρ=m / V s =3.1425 / 4.2875=0.7329g / mL
[0178] The above is a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A device for measuring the apparent density of powder materials based on the exhaust method, characterized in that: It includes a gas filtering and guiding system, a gas temperature stabilization and measurement system, an upper end cover sealing and fastening system, a gas path chamber integration module, a lower end cover sealing and fastening system, an absolute pressure sensor and a sample cup; The gas filtering and guiding system includes an intake valve, a pressure equalizing valve, an exhaust valve, a top filter, a filter element, a bottom filter, an upper O-ring and a lower O-ring; The air intake valve comprises an air intake valve inlet, an air intake valve outlet, an air intake valve right through hole and an air intake valve left through hole. An air intake valve inlet sealing gasket is arranged at the air intake valve inlet, an air intake valve outlet sealing gasket is arranged at the air intake valve outlet, the air intake valve inlet and the air intake valve outlet are arranged vertically, and an air intake valve right through hole and an air intake valve left through hole are arranged horizontally between the air intake valve inlet and the air intake valve outlet; The structures of the pressure equalizing valve and the exhaust valve are the same as those of the intake valve. The pressure equalizing valve includes a pressure equalizing valve inlet, a pressure equalizing valve outlet, a right through hole of the pressure equalizing valve and a left through hole of the pressure equalizing valve. A pressure equalizing valve inlet sealing gasket is arranged at the pressure equalizing valve inlet, and a pressure equalizing valve outlet sealing gasket is arranged at the pressure equalizing valve outlet. The exhaust valve includes an exhaust valve inlet, an exhaust valve outlet, an exhaust valve right through hole and an exhaust valve left through hole. An exhaust valve inlet sealing gasket is arranged at the exhaust valve inlet, and an exhaust valve outlet sealing gasket is arranged at the exhaust valve outlet. The gas temperature stabilization and measurement system includes an inverted cone joint, a ferrule, a capillary copper spiral tube and a temperature sensor. One end of the capillary copper spiral tube is a capillary copper spiral tube outlet, and the other end is a capillary copper spiral tube inlet. The upper end cover sealing and fastening system includes a screw cap, an upper end cover sealing blind plate, a rear pin, an upper end cover O-ring and a front pin. The inner wall of the screw cap is provided with a screw cap internal thread. The upper end cover sealing blind plate circular ring is vertically provided with a front pin hole and a rear pin hole at symmetrical positions. The inner wall of the upper end cover sealing blind plate circular ring is provided with an upper end cover O-ring sealing groove. The lower end cover sealing and fastening system comprises a lower end cover sealing blind plate, a lower end cover rear sealing bolt, a lower end cover left sealing bolt, a lower end cover right sealing bolt, a lower end cover front fastening bolt, a lower end cover O-ring, a lower end cover right fastening bolt and a lower end cover left fastening bolt. A lower end cover O-ring sealing groove is arranged on the annular inner wall of the lower end cover sealing blind plate, and the lower end cover O-ring is placed in the lower end cover O-ring sealing groove. A lower end cover rear sealing through hole, a lower end cover left sealing through hole and a lower end cover right sealing through hole are provided on the lower surface of the lower end cover sealing blind plate, and a lower end cover left fastening through hole, a lower end cover front fastening through hole and a lower end cover right fastening through hole are provided on the upper surface of the lower end cover sealing blind plate. The gas path chamber integrated module includes a sample chamber, a filter hole and a reference chamber. The sample chamber is located at the upper part of the gas path chamber integrated module. The sample chamber is surrounded by an upper end cover sealing blind plate, an upper end cover O-ring, a pressure taking hole, a sample chamber inlet and a sample chamber outlet to form a sealed cavity. The sample cup is placed in the sample chamber. The lower part of the sample chamber is a filter hole. The reference chamber is located at the lower part of the gas path chamber integrated module. The reference chamber is surrounded by a reference chamber inlet, a reference chamber outlet, a lower end cover O-ring and a lower end cover sealing blind plate to form a sealed cavity. An outer sealing thread of the gas path chamber integrated module is arranged on the upper outer surface of the gas path chamber integrated module, a front positioning hole and a rear positioning hole are vertically arranged on the upper plane of the gas path chamber integrated module, a rear fastening threaded hole of the lower end cover, a left fastening threaded hole of the lower end cover and a right fastening threaded hole of the lower end cover are vertically opened on the lower plane, a sample chamber inlet, an air inlet, a left threaded hole of the air inlet valve and a right threaded hole of the air inlet valve are arranged on the upper part of the front end plane of the gas path chamber integrated module, the air inlet is connected to the external gas source interface through a fine hole channel and a coarse hole channel, the sample chamber inlet is connected to the sample chamber through a fine hole channel, a sample chamber outlet, a reference chamber inlet, a uniform pressure chamber outlet are arranged in the middle of the front end plane of the gas path chamber integrated module The left threaded hole of the pressure equalizing valve and the right threaded hole of the pressure equalizing valve, the sample chamber outlet is connected to the filter hole through a fine-pore channel, the filter hole is connected to the lower part of the sample chamber, the reference chamber inlet is connected to the reference chamber through a fine-pore channel, the reference chamber is located below the filter hole, and the reference chamber outlet, exhaust port, exhaust valve left threaded hole and exhaust valve right threaded hole are provided at the lower part of the front end plane of the gas path chamber integrated module, the exhaust port is connected to the gas temperature measuring channel through a fine-pore channel, the gas temperature measuring channel runs through the left side surface of the gas path chamber integrated module, the reference chamber outlet is connected to the reference chamber through a fine-pore channel, one side of the sample chamber is connected to the pressure taking hole through a pressure taking channel, and an absolute pressure sensor is arranged at the pressure taking hole.
2. The device for measuring the apparent density of powder materials based on the exhaust method according to claim 1, characterized in that: The inlet of the air inlet valve is aligned with the air inlet port, the outlet of the air inlet valve is aligned with the inlet of the sample chamber, the fastening screw is screwed into the right threaded hole of the air inlet valve through the right through hole of the air inlet valve, and the fastening screw is screwed into the left threaded hole of the air inlet valve through the left through hole of the air inlet valve. After the fastening screw is tightened, the air inlet valve is sealed with the air path chamber integrated module through the air inlet valve inlet sealing gasket and the air inlet valve outlet sealing gasket; The inlet of the pressure equalizing valve is aligned with the outlet of the sample chamber, the outlet of the pressure equalizing valve is aligned with the inlet of the reference chamber, the fastening screw is screwed into the right threaded hole of the pressure equalizing valve through the right through hole of the pressure equalizing valve, and the fastening screw is screwed into the left threaded hole of the pressure equalizing valve through the left through hole of the pressure equalizing valve. After the fastening screw is tightened, the pressure equalizing valve is sealed with the gas path chamber integrated module through the pressure equalizing valve inlet sealing gasket and the pressure equalizing valve outlet sealing gasket; The exhaust valve inlet is aligned with the reference chamber outlet, the exhaust valve outlet is aligned with the exhaust port, the fastening screw is screwed into the right threaded hole of the exhaust valve through the right through hole of the exhaust valve, and the fastening screw is screwed into the left threaded hole of the exhaust valve through the left through hole of the exhaust valve. After the fastening screw is tightened, the exhaust valve is sealed with the gas path chamber integrated module through the exhaust valve inlet sealing gasket and the exhaust valve outlet sealing gasket.
3. The device for measuring the apparent density of powder materials based on the exhaust method according to claim 1, characterized in that: The top filter screen is folded and wrapped around the upper end of the filter core, the upper end O-ring is fastened to tighten the folded top filter screen and placed in the upper end O-ring sealing groove, the bottom filter screen is folded and wrapped around the lower end of the filter core, the lower end O-ring is fastened to tighten the folded bottom filter screen and placed in the lower end O-ring sealing groove to form a filter assembly, the filter assembly is installed in the filter hole, the upper end O-ring and the lower end O-ring cooperate with the filter hole to filter the powder material.
4. The device for measuring the apparent density of powder materials based on the exhaust method according to claim 1, characterized in that: The inlet of the capillary copper spiral tube is connected to the external gas source, and the outlet of the capillary copper spiral tube passes through the inverted cone joint and the ferrule in sequence and is placed in the hole corresponding to the external gas source interface. The inverted cone joint and the external gas source interface are connected by a fastening thread. The ferrule is made of soft material. During the tightening process of the inverted cone joint, the radial surface of the ferrule is squeezed to form a seal with the surrounding of the channel. The temperature sensor is placed in the gas temperature measurement channel.
5. The device for measuring the apparent density of powder materials based on the exhaust method according to claim 1, characterized in that: The front pin is connected to the front pin hole by threads, the rear pin is connected to the rear pin hole by threads, the upper end cover O-ring is placed in the upper end cover O-ring sealing groove, the front pin is placed in the front positioning hole, and the rear pin is placed in the rear positioning hole; The screw cap is placed above the upper end cover sealing blind plate, and the screw cap is rotated clockwise to press the upper end cover sealing blind plate tightly. The upper end cover sealing blind plate forms a seal with the gas path chamber integrated module through the upper end cover O-ring.
6. The device for measuring the apparent density of powder materials based on the exhaust method according to claim 1, characterized in that: The rear sealing bolt of the lower end cover passes through the rear sealing through hole of the lower end cover from bottom to top and is screwed into the rear fastening threaded hole of the lower end cover. The left sealing bolt of the lower end cover passes through the left sealing through hole of the lower end cover from bottom to top and is screwed into the left fastening threaded hole of the lower end cover. The right sealing bolt of the lower end cover passes through the right sealing through hole of the lower end cover from bottom to top and is screwed into the right fastening threaded hole of the lower end cover. The rear sealing bolt of the lower end cover, the left sealing bolt of the lower end cover and the right sealing bolt of the lower end cover press the O-ring of the lower end cover to the bottom end of the gas path chamber integrated module through the sealing blind plate of the lower end cover to form a seal for the reference chamber. The front fastening bolt of the lower end cover, the right fastening bolt of the lower end cover and the left fastening bolt of the lower end cover respectively pass through the front fastening through hole of the lower end cover, the right fastening through hole of the lower end cover and the left fastening through hole of the lower end cover from top to bottom and are connected with the corresponding threads on the lower end stable fixture to fix the device.
7. The device for measuring the apparent density of powder materials based on the exhaust method according to claim 1, characterized in that: The absolute pressure sensor is connected to the gas path chamber integrated module at the pressure taking hole through a thread.
8. The device for measuring the apparent density of powder materials based on the exhaust method according to claim 1, characterized in that: The gas path chamber integrated module is made of organic glass with a thermal conductivity of 0.14 W / (m·K) to 0.2 W / (m·K).
9. The device for measuring the apparent density of powder materials based on the exhaust method according to claim 1, characterized in that: The air inlet valve, pressure equalizing valve and exhaust valve are all seat-mounted solenoid valves, which are sealed with the smooth surface through sealing gaskets.
10. The application method of the device for measuring the apparent density of powder materials based on the exhaust method according to claim 1, characterized in that: The steps include: S1: Determination of large volume coefficient under different intake pressures: The determination of large volume coefficient under different intake pressures refers to changing the intake pressure by 5 kPa every time between the absolute pressure of 130 kPa and 230 kPa, and determining the volume coefficient corresponding to a known large volume dense solid block; specifically: Place the sample cup in the sample cavity, put a large dense solid block of known volume in the sample cup, align the rear pin and front pin of the upper end cover sealing blind plate with the rear positioning hole and front positioning hole of the gas path chamber integrated module respectively, and tighten the screw cap in a clockwise direction; The large volume coefficient measurement includes three stages: exhaust, intake and pressure equalization. During the exhaust phase, adjust the external gas source pressure to make the absolute intake pressure reach 130 kPa, open the intake valve, pressure equalizing valve and exhaust valve in sequence, close the intake valve after 5 seconds, read the pressure and temperature data after 30 seconds, read once every 100 ms, and read 20 times in 2 seconds. The median value of the 20 pressure data and the median value of the temperature data are used as the background pressure and background temperature, respectively; During the intake phase, open the intake valve and read the temperature data. Read it once every 100ms for 20 consecutive times within 2 seconds. The median of the 20 temperature data is used as the intake temperature. Close the equalizing valve and the exhaust valve in turn. Close the intake valve after 30 seconds. Read the pressure data after 30 seconds. Read it once every 100ms for 20 consecutive times within 2 seconds. The median of the 20 pressure data is used as the intake pressure. During the pressure equalization stage, open the pressure equalization valve, read the pressure data after 30 seconds, read it once every 100ms, read it 20 times in 2 seconds, and the median of the 20 pressure data is used as the pressure equalization pressure. Open the exhaust valve and read the temperature data, read it once every 100ms, read it 20 times in 2 seconds, and the median of the 20 temperature data is used as the pressure equalization temperature. According to the law of conservation of mass, the number of moles of gas in the free space when a large-volume dense solid block is placed in the sample cavity during the intake phase is equal to the number of moles of gas in the free space when a large-volume dense solid block is placed in the sample cavity during the equalization phase and in the free space of the reference cavity. The ratio of the free space volume when a large-volume dense solid block is placed in the sample cavity to the free space volume of the reference cavity is calculated, which is the large volume coefficient when the intake pressure is an absolute pressure of 130 kPa. Raise the intake pressure to 135 kPa, continue the exhaust, intake and pressure equalization stages, obtain the maximum volume coefficient when the intake pressure is 135 kPa absolute pressure, continue to increase the pressure by 5 kPa, until the maximum volume coefficient is obtained when the intake pressure is 230 kPa, so as to form a reference table of maximum volume coefficients under different intake pressures; S2: Determination of small volume coefficient under constant inlet pressure: According to the material pressure requirement, determine the inlet pressure to be a constant value P1; place the sample cup in the sample chamber, put a small volume dense solid block of known volume in the sample cup, align the rear pin and front pin of the upper end cover sealing blind plate with the rear positioning hole and front positioning hole of the gas path chamber integrated module respectively, and tighten the screw cap in a clockwise direction; The small volume coefficient measurement includes three stages: exhaust, intake and pressure equalization. In the exhaust stage, adjust the external gas source pressure to P1, open the intake valve, pressure equalizing valve and exhaust valve in sequence, close the intake valve after 5 seconds, read the pressure and temperature data after 30 seconds, read once every 100ms, and read 20 times continuously within 2 seconds. The median value of the 20 pressure data and the median value of the temperature data are used as the background pressure and background temperature respectively; During the intake phase, open the intake valve and read the temperature data. Read it once every 100ms for 20 consecutive times within 2 seconds. The median of the 20 temperature data is used as the intake temperature. Close the equalizing valve and the exhaust valve in turn. Close the intake valve after 30 seconds. Read the pressure data after 30 seconds. Read it once every 100ms for 20 consecutive times within 2 seconds. The median of the 20 pressure data is used as the intake pressure. During the pressure equalization stage, open the pressure equalization valve, read the pressure data after 30 seconds, read it once every 100ms, read it 20 times in 2 seconds, and the median of the 20 pressure data is used as the pressure equalization pressure. Open the exhaust valve and read the temperature data, read it once every 100ms, read it 20 times in 2 seconds, and the median of the 20 temperature data is used as the pressure equalization temperature. According to the law of conservation of mass, the number of moles of gas in the free space when a small-volume dense solid block is placed in the sample cavity during the intake phase is equal to the number of moles of gas in the free space when a small-volume dense solid block is placed in the sample cavity during the pressure equalization phase and in the free space of the reference cavity. The ratio of the free space volume when a small-volume dense solid block is placed in the sample cavity to the free space volume of the reference cavity is calculated, which is the small volume coefficient when the intake pressure is P1. S3: Determination of sample apparent density under constant inlet pressure: The large volume coefficient corresponding to the constant inlet pressure P1 is calculated by interpolation from the large volume coefficient reference table under different inlet pressures, and the free space volume of the reference cavity and the free space volume when the sample cup is placed in the sample cavity are calculated in combination with the small volume coefficient when the inlet pressure is constant P1; Keep the inlet pressure equal to P1, open the screw cap in a counterclockwise direction, take out the sample cup, weigh a sample of known mass, place the sample cup with the sample in the sample chamber, align the rear pin and front pin of the upper end cover sealing blind plate with the rear positioning hole and front positioning hole of the gas path chamber integrated module respectively, and tighten the screw cap in a clockwise direction; The apparent density of the sample under constant inlet pressure is determined in three stages: exhaust, intake and pressure equalization. In the exhaust stage, the intake valve, pressure equalizing valve and exhaust valve are opened in sequence, and the intake valve is closed after 5 seconds. The pressure and temperature data are read after 30 seconds, once every 100ms, and read 20 times continuously within 2 seconds. The median value of the 20 pressure data and the median value of the temperature data are used as the background pressure and background temperature respectively; During the intake phase, open the intake valve and read the temperature data. Read it once every 100ms for 20 consecutive times within 2 seconds. The median of the 20 temperature data is used as the intake temperature. Close the equalizing valve and the exhaust valve in turn. Close the intake valve after 30 seconds. Read the pressure data after 30 seconds. Read it once every 100ms for 20 consecutive times within 2 seconds. The median of the 20 pressure data is used as the intake pressure. During the pressure equalization stage, open the pressure equalization valve, read the pressure data after 30 seconds, read it once every 100ms, read it 20 times in 2 seconds, and the median of the 20 pressure data is used as the pressure equalization pressure. Open the exhaust valve and read the temperature data, read it once every 100ms, read it 20 times in 2 seconds, and the median of the 20 temperature data is used as the pressure equalization temperature. According to the law of conservation of mass, the number of moles of gas in the free space of the sample chamber when the sample is placed in the air intake stage is equal to the number of moles of gas in the free space of the sample chamber when the sample is placed in the pressure equalization stage and the free space of the reference chamber. The ratio of the free space volume of the sample chamber when the sample is placed in the sample to the free space volume of the reference chamber is calculated. The free space volume of the reference chamber is a known quantity, so the free space volume of the sample chamber when the sample is placed can be calculated. The volume of the sample is then calculated from the free space volume when the sample cup is placed in the sample chamber. The apparent density of the sample is calculated based on the sample mass.
