Combined construction method of forced collapse and natural caving of overburden in the process of transition from open-pit method to caving method

By combining forced caving and natural caving in steeply dipping, medium-thick ore bodies, the problems of long construction period, high cost and poor safety of traditional overburden construction methods have been solved, achieving efficient and safe overburden construction and ore recovery.

CN115012932BActive Publication Date: 2024-11-15GUANGXI UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210730846.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-24
Publication Date
2024-11-15
Estimated Expiration
2042-06-24

AI Technical Summary

Technical Problem

In the deep mining of steeply dipping, medium-thick ore bodies, traditional overburden construction methods suffer from problems such as long construction periods, high costs, poor safety, and high ore dilution rates. In particular, when transitioning from open-cut to caving methods, the question of how to construct an overburden layer to meet the applicable conditions of the subsequent caving method has not yet been effectively resolved.

Method used

The method of forced caving and natural caving of the overburden is adopted. The top pillar, inter-pillar, and footwall surrounding rock are blasted in the steeply dipping medium-thick ore body. The bottom structure is extracted using the open field method, and the bottom structure is extracted using a loader. The vibration of blasting is used to enhance the degree of fragmentation of the hanging wall surrounding rock, and the overburden is formed by natural caving.

Benefits of technology

It improves the construction efficiency of the overburden, increases the ore recovery rate, ensures blasting safety, makes full use of the natural caving characteristics, provides a continuous overburden for subsequent mining, and reduces construction costs and safety risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115012932B_ABST
    Figure CN115012932B_ABST
Patent Text Reader

Abstract

A method for combining forced collapse and natural fall of the overburden during the transition from open pit method to caving method comprises the following steps: (1) calculating the required overburden thickness of the caving method; (2) drilling blastholes for the lower wall surrounding rock, upper wall surrounding rock, top pillar, bottom pillar and intermediate pillar respectively for subsequent forced collapse, natural fall and pillar recovery; (3) blasting the top pillar, intermediate pillar on one side of the constructed overburden and the lower wall surrounding rock with a millisecond delay; (4) then treating the bottom pillar of the open pit method as a segment of the pillarless segmented caving method for recovery, and using a scraper to mine with a flat bottom structure; (5) as the bottom pillar of the open pit method is recovered and the subsequent caving method of the ore body is carried out, the exposed area of ​​the upper wall surrounding rock of the goaf gradually increases, and after reaching the limit exposure area, the upper wall surrounding rock naturally falls, and the falling waste rock forms another part of the overburden. The present invention provides an overburden construction method for the transition from open pit method to caving method mining of medium-deep steeply inclined medium-thick ore bodies.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a method for constructing an overburden layer by means of a caving method, in particular to a method for constructing an overburden layer by combining forced caving and natural falling, which is suitable for the process of converting an open-field method to a caving method for a steeply inclined medium-thick ore body. Background Art

[0002] For low-value, steeply inclined, medium-thick ore bodies, which account for a large proportion of my country's resource reserves, the ground stress increases and the degree of ore rock fragmentation intensifies as the burial depth of the ore body increases. If the traditional staged mine room method is used for mining, the ore depletion rate increases and mining accidents are frequent. It is generally believed that when entering medium-deep mining, there are three main directions for adjusting the open-site method: one is to improve it to a top-controlled open-site method, the second is to switch to a backfill method, and the third is to switch to a caving method. Among them, the caving method has certain advantages in production cost, safety and process continuity, especially when the surface allows caving; and the conversion from the open-site method to the caving method requires consideration of how to construct the covering layer to meet the applicable conditions of the subsequent caving method.

[0003] At present, the main methods of overburden construction in the caving mining method in the mining manual are: (1) artificial backfilling of waste rock; (2) natural caving; (3) forced caving; (4) temporarily leaving ore as the overburden. These four methods have different conditions for use and each has its own advantages and disadvantages. Artificial backfilling of waste rock is mainly used when open-pit mining is converted to underground mining; natural caving requires that the upper wall surrounding rock is unstable, but the timing of caving and the process of overburden formation are difficult to control; forced caving requires excavation in the upper wall surrounding rock, which has a long construction period and high construction cost; temporarily leaving ore as the overburden will accumulate ore, which is actually a backlog of funds. Summary of the invention

[0004] The present invention aims at the deep mining of steeply inclined medium-thick ore bodies, and proposes a combined construction method of forced collapse of the overburden layer and natural fall in the process of converting from the open-pit method to the caving method. First, the top pillar, intermediate pillar, and lower wall surrounding rock are blasted in sequence, wherein the loose medium produced by the first blasting part is used as a buffer layer for the later blasting part, and the bottom structure of the open-pit method is used for mining, and the waste rock of the forced collapse of the lower wall surrounding rock is retained in the mining area to form the main part of the overburden layer; then the bottom pillar of the open-pit method is regarded as a segment of the no-bottom-pillar segmented caving method for recovery, and the flat-bottom structure of the scraper is used for mining.

[0005] In order to better construct the covering layer, the upper wall surrounding rock drilling tunnels and lower wall surrounding rock drilling tunnels perpendicular to the connecting road were excavated in each segmented horizontal ore pillar of the original open field method, and bundled medium-deep holes were excavated in each segmented horizontal upper wall surrounding rock drilling tunnel to strengthen the crushing degree of the upper wall surrounding rock through the blasting vibration of the top pillar, intermediate pillar, lower wall surrounding rock and bottom pillar. With the subsequent mining and ore release work, the exposed area of ​​the upper wall surrounding rock in the goaf gradually increases. After reaching the limit exposure area, the upper wall surrounding rock naturally falls, and the falling waste rock forms another part of the covering layer.

[0006] The technical solution of the present invention is: a construction method combining forced collapse and natural caving of the overburden layer in the process of converting the open field method to the caving method, comprising the following steps:

[0007] (1) Calculate the required cover thickness for caving method;

[0008] The theoretical formula for calculating the required cover thickness for the caving method is:

[0009]

[0010] Where H is the thickness of the cover layer m; h is the segment height m; N i is the number of layers, r% is the waste rock mixing rate, k% is the ore recovery rate; γ 矿 is the specific gravity of ore, γ 废 is the specific gravity of waste rock;

[0011] (2) The rock drilling tunnels in the upper and lower wall of each segment of the intermediate pillars drill bundle-shaped medium-deep holes into the upper and lower wall surrounding rocks respectively, among which the medium-deep holes in the upper wall surrounding rock provide weakened structural surfaces for natural caving, and the medium-deep holes in the lower wall surrounding rock serve as blast holes for forced collapse; the segmented rock drilling tunnels located in the intermediate pillars drill vertical parallel medium-deep holes into the intermediate pillars, the rock drilling tunnels located in the top pillars drill horizontal medium-deep holes into the top pillars, and the mining tunnels located in the bottom pillars drill vertical shallow holes into the bottom pillars and peach-shaped ore pillars;

[0012] (3) After the blasthole construction is completed, the top pillar, the intermediate pillar on the side of the constructed overburden, and the lower wall surrounding rock are blasted by millisecond delay blasting. The delayed blasting must ensure that the top pillar collapses first, then the intermediate pillar collapses, and finally the lower wall surrounding rock is forcibly collapsed. The loose medium produced by the first blasting part serves as a buffer layer for the later blasting part, and the waste rock forced to collapse from the lower wall surrounding rock is retained in the stope to form the main part of the overburden;

[0013] (4) The bottom pillar of the open field method is then recovered as a segment of the no-pillar sublevel caving method. The spacing between each row of blastholes is 1.3 to 1.7 m. 3 to 5 rows of blastholes are blasted in each cycle. The caving step distance of each cycle of the bottom pillar is about 4 to 6 m. The bottom pillar belongs to the extrusion blasting unit with a consumption of 0.4 to 0.6 kg / t. The ore is removed by a scraper with a flat bottom structure.

[0014] (5) The blasting vibration effect on the top pillar, intermediate pillar, lower wall surrounding rock and bottom pillar is used to strengthen the degree of crushing of the upper wall surrounding rock. With the recovery of the bottom pillar and the caving mining method, the covering layer gradually decreases, and the exposed area of ​​the upper wall surrounding rock in the empty area gradually increases. After reaching the limit exposure area, the upper wall surrounding rock naturally falls off, and the falling waste rock forms another part of the covering layer.

[0015] The calculation of the required covering layer thickness by the caving method in step (1) is to determine the covering layer thickness according to the empirical method and the theoretical calculation method respectively, and the covering layer thickness is selected as the larger value according to different calculation methods.

[0016] The specifications of the upper and lower wall surrounding rock drilling tunnels in step (2) are 2×2m 2 The thickness of the top column is 6 to 10m, the width of the intermediate column is 6 to 10m, the thickness of the bottom column is 8 to 12m, and the specification of the top column rock drilling tunnel is 2×2m 2 The length of the medium-deep holes in the upper wall surrounding rock is 10 to 23 meters, the length of the medium-deep holes in the lower wall surrounding rock is 8 to 26 meters, the vertical parallel medium-deep holes in the intermediate columns are 6 to 8 meters, the horizontal medium-deep holes in the top columns are 6 to 23 meters, and the shallow holes in the bottom columns are 3 to 6 meters.

[0017] The millisecond delay blasting described in step (3) is 20 to 300 ms, the top column and intermediate column blasted first serve as a buffer layer with a thickness of 18 to 24 m, and the thickness of the lower wall surrounding rock cover layer of the forced blasting is ≥ 20 m.

[0018] The maximum exposed area of ​​the surrounding rock of the upper wall of the void area described in step (5) is determined comprehensively based on the Laubscher collapse diagram and the Matthews stability diagram.

[0019] Compared with the prior art, the advantages of the present invention are:

[0020] (1) The combination of forced caving and natural caving technology improves the structural efficiency of the overburden;

[0021] (2) Improved the recovery rate of pillar ore from open-pit method to block cave method;

[0022] (3) Make full use of the buffer layer to ensure the safety of blasting during the construction of the overburden layer;

[0023] (4) Make full use of the natural fall characteristics of the upper rock, and the fall of waste rock can provide a partial cover layer for subsequent mining. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 This is the cross-sectional diagram II of the blasthole arrangement diagram of the combined construction method of forced collapse and natural fall of the overburden layer in the process of converting from open field method to caving method.

[0025] Figure 2 This is the blasthole arrangement diagram II-II cross-section diagram of the combined construction method of forced collapse and natural fall of the overburden layer in the process of converting from open field method to caving method.

[0026] Figure 3 This is the cross-sectional view of the blasting II of the top pillar, intermediate pillar and lower wall surrounding rock in the combined construction method of forced collapse and natural fall of the covering layer during the conversion from open-field method to caving method.

[0027] Figure 4 This is the II-II cross-section diagram of the blasting of the top pillar, intermediate pillar and lower wall surrounding rock in the combined construction method of forced collapse and natural fall of the covering layer during the conversion from open-field method to caving method.

[0028] Figure 5 This is a schematic diagram of the recovery of top pillars, intermediate pillars and ore bottom pillars using a combined construction method of forced collapse of the overburden layer and natural caving during the conversion from open-site method to caving method.

[0029] Marked in the figure are: stage transportation tunnel 1; bottom pillar 2; bottom pillar recovery blasthole 3; peach-shaped ore pillar 4; peach-shaped ore pillar recovery blasthole 5; electric rake road 6; intermediate pillar 7; intermediate pillar recovery blasthole 8; unmined ore body in the next stage 9; upper wall rock fissure 10; intermediate pillar pedestrian ventilation shaft 11; intermediate pillar segmented rock drilling tunnel 12; top pillar rock drilling tunnel 13; goaf 14; top pillar 15; top pillar recovery blasthole 16; funnel 17; medium-deep hole in the lower wall surrounding rock 18; lower wall surrounding rock drilling tunnel 19; upper wall surrounding rock drilling tunnel 20; medium-deep hole in the upper wall surrounding rock 21; lower wall forced collapse covering layer 22; recovered top pillar and intermediate pillar ore 23; lower wall surrounding rock fissure 24; upper wall naturally fallen ore 25, lower wall surrounding rock 26, upper wall surrounding rock 27. DETAILED DESCRIPTION

[0030] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments.

[0031] This embodiment is an example of a combined construction method of forced collapse and natural fall of the overburden layer in the process of converting the open field method to the caving method described in the present invention, comprising the following steps:

[0032] (1) Calculate the required cover thickness for caving method;

[0033] According to the requirements of "Underground Mining of Metallic Ore Deposits", the thickness of the overburden should be greater than the height of two sections (12m per section), about ≥24m;

[0034] The theoretical formula for calculating the thickness of the cover layer is:

[0035]

[0036] Where H is the thickness of the covering layer (m); h is the segment height (12m); N i The number of layers is 2, r% is the waste rock mixing rate of 30%, and k% is the ore recovery rate of 80%; γ 矿 The specific gravity of the ore is 2.7t / m 3 , γ 废 The specific gravity of waste rock is 2.65t / m 3 .

[0037] According to the theoretical formula, the thickness of the covering layer is 20.38m. According to the larger value of different methods, the thickness of the covering layer should be ≥24m;

[0038] (2) The upper wall surrounding rock drilling tunnels 20 and the lower wall surrounding rock drilling tunnels 19 located in all the segments within the intermediate pillars 7 drill bundled upper wall surrounding rock medium-deep holes 21 and lower wall surrounding rock medium-deep holes 18 into the upper wall surrounding rock 27 and the lower wall surrounding rock 26 respectively, wherein the upper wall surrounding rock medium-deep holes 21 provide weakened structural surfaces for natural caving, and the lower wall surrounding rock medium-deep holes 18 serve as blast holes for forced collapse. The segmented drilling tunnels 12 located in the intermediate pillars drill vertical parallel intermediate pillar recovery blast holes 8 into the intermediate pillars 7, the top pillar drilling tunnels 13 drill horizontal top pillar recovery blast holes 16 into the top pillar 15, and the electric rake road 6 located in the bottom pillar 2 drills vertical bottom pillar recovery blast holes 3 and peach-shaped pillar recovery blast holes 5 into the bottom pillar 2 and the peach-shaped ore pillar 4;

[0039] (3) After the blasthole construction is completed, the top pillar 15, the intermediate pillar 7 on the side of the constructed overburden, and the surrounding rock of the lower wall are blasted with a delay time of 100 to 300 ms. The delayed blasting must ensure that the top pillar 15 collapses first, then the intermediate pillar 7 collapses, and finally the surrounding rock 26 of the lower wall collapses. The forced collapse of the covering layer 22 of the lower wall is retained in the stope to form the main part of the covering layer;

[0040] (4) The bottom pillar 2 and peach-shaped pillar 4 of the open-field method are then regarded as a segment of the bottom-pillarless segmented caving method for recovery. Three rows of blastholes are blasted in each cycle, with a row spacing of 1.8 m. The step distance of caving in each cycle is 5.4 m, and the unit consumption is 0.54 kg / t. A shovel loader is used to transport the ore out of the stage tunnel 1.

[0041] (5) The blasting vibration effect on the top pillar 15, the intermediate pillar 7, the lower wall surrounding rock, and the bottom pillar 2 is used to strengthen the degree of crushing of the upper wall surrounding rock 27. With the recovery of the bottom pillar and the caving mining, the covering layer gradually decreases, and the exposed area of ​​the upper wall surrounding rock in the empty area gradually increases. After reaching the limit exposure area, the upper wall surrounding rock 27 falls off, forming the naturally fallen waste rock 25 of the upper wall, which forms another part of the covering layer.

Claims

1. A construction method combining forced collapse of the overburden layer and natural fall in the process of converting the open field method to the caving method, characterized in that: The steps include: (1) Calculate the required cover thickness for caving method; The theoretical formula for calculating the thickness of the cover layer required for the collapse method is: Where H is the thickness of the cover layer m; h is the height of the segments m; N i It is the number of layers, r% is the mixing rate of waste stone, k% is the ore recovery rate; γ 矿 is the specific gravity of ore, γ 废 is the specific gravity of waste rock; (2) The rock drilling tunnels in the upper and lower wall of each segment of the intermediate pillars drill bundle-shaped medium-deep holes into the upper and lower wall surrounding rocks respectively, among which the medium-deep holes in the upper wall surrounding rock provide weakened structural surfaces for natural caving, and the medium-deep holes in the lower wall surrounding rock serve as blast holes for forced collapse; the segmented rock drilling tunnels located in the intermediate pillars drill vertical parallel medium-deep holes into the intermediate pillars, the rock drilling tunnels located in the top pillars drill horizontal medium-deep holes into the top pillars, and the mining tunnels located in the bottom pillars drill vertical shallow holes into the bottom pillars and peach-shaped ore pillars; (3) After the blasthole construction is completed, the top pillar, the intermediate pillar on the side of the constructed overburden, and the lower wall surrounding rock are blasted by millisecond delay blasting. The delayed blasting must ensure that the top pillar collapses first, then the intermediate pillar collapses, and finally the lower wall surrounding rock is forcibly collapsed. The loose medium produced by the first blasting part serves as a buffer layer for the later blasting part, and the waste rock forced to collapse from the lower wall surrounding rock is retained in the stope to form the main part of the overburden; (4) The bottom pillar of the open field method is then recovered as a segment of the no-pillar sublevel caving method. The spacing between each row of blastholes is 1.3 to 1.7 m. 3 to 5 rows of blastholes are blasted in each cycle. The caving step distance of each cycle of the bottom pillar is about 4 to 6 m. The bottom pillar belongs to the extrusion blasting unit with a consumption of 0.4 to 0.6 kg / t. The ore is removed by a scraper with a flat bottom structure. (5) The blasting vibration effect on the top pillar, intermediate pillar, lower wall surrounding rock and bottom pillar is used to strengthen the degree of crushing of the upper wall surrounding rock. With the recovery of the bottom pillar and the caving mining method, the covering layer gradually decreases, and the exposed area of ​​the upper wall surrounding rock in the empty area gradually increases. After reaching the limit exposure area, the upper wall surrounding rock naturally falls off, and the falling waste rock forms another part of the covering layer.

2. The combination construction method of the forced collapse and natural collapse of the cover layer during the empty field method turning and collapse method according to claim 1, characterized in that, The required cover layer thickness of the calculating collapse method described in step (1) is to determine the cover layer thickness according to empirical and theoretical calculation methods, and the cover layer thickness is selected according to different calculation methods.

3. The construction method of combined forced collapse and natural fall of the overburden layer in the process of converting the open-pit method to the caving method according to claim 1, characterized in that: Specifications of upper and lower plate surrounding rock drilling tunnels described in step (2) 2×2m 2 The thickness of the top column is 6 to 10m, the width of the said intercolumn is 6 to 10m, the thickness of the said bottom column is 8 to 12m, and the specification of the said top column is 2×2m 2 The length of the medium-deep holes in the upper wall surrounding rock is 10 to 23 meters, the length of the medium-deep holes in the lower wall surrounding rock is 8 to 26 meters, the vertical parallel medium-deep holes in the intermediate columns are 6 to 8 meters, the horizontal medium-deep holes in the top columns are 6 to 23 meters, and the shallow holes in the bottom columns are 3 to 6 meters.

4. The construction method of combined forced collapse and natural fall of the overburden layer in the process of converting the open-pit method to the caving method according to claim 1, characterized in that: The millisecond delay blasting described in step (3) is 20 to 300ms, the top column and intercolumn that blast first are 18 to 24m as buffer layer, and the thickness of the lower surrounding rock cover layer for forced blasting is ≥20m.

5. The method of combining the forced collapse and natural collapse of the cover layer during the empty field method turning and collapse method according to claim 1, characterized in that, The limit exposed area of ​​the upper plate rock in the empty zone described in step (5) is determined comprehensively based on the Laubsher collapse diagram and the Matthews stability diagram.