Steel bar binding and positioning device for prefabricated approach bridge box girder of high-pile wharf
By designing a prefabricated box girder steel bar binding and positioning device for the approach bridge of high-pile wharf that includes an integral triangular bracket and bottom steel bar positioning rods, the problems of quality fluctuations in the thickness and quality of the steel protective layer and low banding efficiency are solved, achieving efficient banding and safe disengagement, and reducing construction costs.
Patent Information
- Application Number
- CN202210754926.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-30
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2042-06-30
AI Technical Summary
In the existing technology, during the binding process of prefabricated box girder steel bars for the approach bridge of the high pile wharf, the thickness and quality of the steel protective layer fluctuates greatly, the binding efficiency is low, and it is inconvenient to separate the box girder from the device, which poses safety hazards and high construction costs.
A prefabricated box girder steel bar binding and positioning device for the approach bridge of high pile wharf is designed including an integral triangular bracket, bottom steel bar positioning rods and bottom formwork. Through the combination of triangular frame, vertical steel bar positioning angle steel, connecting rods and transverse steel bar support rods, the Efficient positioning and binding of steel bars, and easy detachment of box beams from the device after the binding is completed.
It improves the quality and efficiency of steel bar binding, reduces the amount of labor, saves construction costs, ensures the safe separation of box beams from the device, and improves the yield of finished products.
Smart Images

Figure CN115070935B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of wharf engineering construction, and in particular to a reinforcement binding and positioning device for a prefabricated approach bridge box girder of a high-pile wharf. Background Art
[0002] Water transport projects have high requirements on the quality of the thickness of the concrete steel bar protective layer. The prefabricated box girders of the high-pile wharf approach bridges have a lot of reinforcement. The migrant workers are highly mobile, and some of them are not skilled in the steel bar tying of prefabricated box girders, resulting in large fluctuations in the quality of the steel bar protective layer and low steel bar tying construction efficiency.
[0003] In response to the above problems, many existing technologies have designed positioning auxiliary devices that are convenient for box girder reinforcement binding. For example, Chinese patent CN201720984017.4 discloses a box girder reinforcement binding positioning auxiliary device, including a box girder reinforcement binding pedestal, two positioning frames fixedly arranged on two symmetrical corners of the box girder reinforcement binding pedestal, and the positioning frames include angle steel, T-shaped support frames, distribution reinforcement positioning teeth and legs. Although the box girder reinforcement binding positioning auxiliary device uses simple materials, is simple to operate, and can be applied to box girders with different web slopes, the device can only facilitate the binding of the transverse reinforcements on the side of the box girder according to the spacing, and is not convenient for the binding of vertical reinforcements and the subsequent separation of the box girder from the device. Another example is Chinese patent CN201120063608.0, which discloses a steel bar binding jig for the bottom web of a prefabricated box beam, including a bottom plate binding part and a web binding part, wherein the bottom plate binding part includes a plurality of bottom plate concrete foundations, a cross beam, and bottom plate steel bar positioning grooves, and the web binding part includes two sets of web plate concrete foundations, a bracket, and a plurality of web plate steel bar positioning grooves. Although this patent can reduce the time for making beam pedestals and box beam templates and save beam yard construction costs, it is easy to damage the box beam or cause dangerous accidents if the operation is improper when the prefabricated box beam bottom web steel bars are hoisted into the template as a whole after the steel bar binding is completed.
[0004] Therefore, technical personnel in this field are in urgent need of designing a box girder reinforcement binding and positioning device, which can not only improve the quality and efficiency of box girder binding, save construction costs while reducing labor, but also ensure easy separation of the box girder from the device to facilitate the gradual progress of subsequent work. Summary of the invention
[0005] In view of this, the purpose of the present invention is to provide a reinforcement binding and positioning device for a prefabricated box girder of a high-pile wharf approach bridge, which can save manpower and material resources while improving work efficiency, and can also facilitate the smooth progress of subsequent separation and other work.
[0006] In order to achieve the above objectives, this application provides the following technical solutions:
[0007] A reinforcement binding and positioning device for a prefabricated box girder of a high-pile wharf approach bridge comprises two integral triangular brackets, a bottom reinforcement positioning rod and a bottom formwork, wherein the two integral triangular brackets are respectively placed closely on both sides of the bottom formwork, and the bottom reinforcement positioning rod is placed in the middle of the bottom formwork.
[0008] Preferably, the integral triangular support comprises a plurality of triangular frames, vertical steel bar positioning angle steels, connecting rods and transverse steel bar support rods;
[0009] The vertical steel bar positioning angle steel is vertically welded to the vertical bars of the plurality of triangular frames;
[0010] The connecting rod passes through a plurality of triangular frames and is welded to the same position of each triangular frame;
[0011] The transverse steel bar support rod is vertically welded to the vertical rod of the triangular frame.
[0012] Preferably, the triangular frame comprises a first right-angled side, a second right-angled side, a hypotenuse, a first transition side, a second transition side and a third transition side;
[0013] One end of the first right angle side is vertically welded to one end of the first transfer side;
[0014] One end of the second transfer side is vertically welded to an appropriate position of the first transfer side, and the other end is vertically welded to one end of the second right-angle side;
[0015] The two ends of the hypotenuse are respectively welded to the other end of the first right angle side and the other end of the second right angle side;
[0016] One end of the third transition edge is vertically welded to a proper position of the second right-angle edge, and the other end is vertically welded to a proper position of the hypotenuse, and the other end of the first transition edge is vertically welded to a proper position of the third transition edge.
[0017] Preferably, the vertical steel bar positioning angle steel is vertically welded to the first right-angled side of the multiple triangular frames; the connecting rod is vertically welded to the third transition side of the multiple triangular frames; and the transverse steel bar support rod is welded to the first right-angled side of the triangular frame.
[0018] Preferably, a plurality of transverse steel bar support rods are provided and are parallel to the first transition edge of the triangular frame.
[0019] Preferably, the bottom layer steel bar positioning rod is formed by welding two angle steels in double pieces and vertically slotted according to the spacing of the bottom layer stirrups.
[0020] Preferably, the triangular frame and the connecting rod are made of No. 5 channel steel.
[0021] Preferably, the vertical steel bar positioning angle steel is grooved on one side according to the vertical steel bar spacing.
[0022] Preferably, the transverse steel bar support rod is made of 16 plain round steel bars and is 20 cm long.
[0023] A construction method for a prefabricated box girder reinforcement binding and positioning device for a high-pile wharf approach bridge, characterized in that it comprises the following steps:
[0024] Step 1: Place the two welded integral triangular brackets tightly on both sides of the bottom mold, and place the bottom steel bar positioning rod in the middle of the bottom mold, and use square wood to support the bottom;
[0025] Step 2: Place the fixed box girder side transverse and vertical reinforcements according to the positions of the slots on the transverse reinforcement support rods and the vertical reinforcement positioning angles on the integral triangular bracket, and place the bottom transverse reinforcements according to the slots on the bottom reinforcement positioning rods, and then tie the reinforcements;
[0026] Step 3: After the reinforcement is tied, remove the integral triangular brackets on both sides of the bottom formwork, and place the bottom concrete pads under the tied box beam, pull out the square wood and the bottom reinforcement positioning rods, and tie the side pads of the box beam at the same time;
[0027] Step 4: After the formwork is installed, pour the concrete.
[0028] Compared with the prior art, the present invention has the following beneficial effects:
[0029] 1. The present invention provides a prefabricated box girder reinforcement binding and positioning device for a high-pile wharf approach bridge, which solves the problem of needing to draw lines on the bottom mold or frequently measure and control the spacing of the reinforcements and adjust the positions of the reinforcements before binding the reinforcements for each beam, thereby ensuring the quality of the reinforcement spacing and the thickness of the reinforcement protective layer and improving the construction efficiency.
[0030] 2. The reinforcement binding and positioning device for prefabricated box beams of high-pile wharf approach bridges provided by the present invention facilitates the separation of the box beams from the device and the subsequent concrete pouring work, thereby reducing manpower and material resources while improving the box beam yield rate. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can also be obtained based on these drawings without creative work. In all drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, each element or part is not necessarily drawn according to the actual scale.
[0032] Figure 1 A cross-sectional view of the reinforcement binding and positioning device for the prefabricated box girder of the high-pile wharf approach bridge provided by the present invention;
[0033] Figure 2 A top view of the reinforcement binding and positioning device for the prefabricated box girder of the high-pile wharf approach bridge provided by the present invention;
[0034] Figure 3 A side view of the reinforcement binding and positioning device for the prefabricated box girder of the high-pile wharf approach bridge provided by the present invention;
[0035] Figure 4 This is a schematic diagram of the structural composition of a triangular frame in the reinforcement binding and positioning device for a prefabricated box girder of a high-pile wharf approach bridge provided by the present invention.
[0036] In the figure: 1. triangular frame; 101. first right-angled side; 102. second right-angled side; 103. hypotenuse; 104. first transition side; 105. second transition side; 106. third transition side; 2. vertical steel bar positioning angle steel; 3. connecting rod; 4. transverse steel bar support rod; 5. bottom steel bar positioning rod. DETAILED DESCRIPTION
[0037] To make the purpose, technical scheme and advantages of the embodiment of the present application clearer, the technical scheme in the embodiment of the present application will be clearly and completely described below in conjunction with the accompanying drawings in the embodiment of the present application. Obviously, the described embodiment is a part of the embodiment of the present application, rather than all of the embodiments. In the following description, specific details such as specific configuration and components are provided only to help fully understand the embodiments of the present application. Therefore, it should be clear to those skilled in the art that various changes and modifications can be made to the embodiments described herein without departing from the scope and spirit of the present application. In addition, for clarity and brevity, the description of known functions and structures is omitted in the embodiment.
[0038] It should be understood that the references to "one embodiment" or "this embodiment" throughout the specification mean that the specific features, structures, or characteristics associated with the embodiment are included in at least one embodiment of the present application. Therefore, the references to "one embodiment" or "this embodiment" appearing throughout the specification do not necessarily refer to the same embodiment. In addition, these specific features, structures, or characteristics may be combined in any suitable manner in one or more embodiments.
[0039] In addition, the present application may repeat reference numerals and / or letters in different examples. This repetition is for the purpose of simplicity and clarity, and does not in itself indicate the relationship between the various embodiments and / or settings discussed.
[0040] The term "and / or" in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can mean: A exists alone, B exists alone, and A and B exist at the same time. The term " / and" in this article describes another type of association object relationship, indicating that there can be two relationships. For example, A / and B can mean: A exists alone, and A and B exist alone. In addition, the character " / " in this article generally indicates that the previous and next associated objects are in an "or" relationship.
[0041] The term "at least one" in this article is merely a description of the association relationship of associated objects, indicating that there may be three relationships. For example, at least one of A and B can mean: A exists alone, A and B exist at the same time, and B exists alone.
[0042] It should also be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusions.
[0043] Example 1
[0044] This embodiment introduces the structural composition of the triangular frame in the reinforcement binding and positioning device for the prefabricated box girder of the high-pile wharf approach bridge.
[0045] Please refer to Figure 4 , Figure 4 This is a schematic diagram of the structural composition of a triangular frame in the reinforcement binding and positioning device for a prefabricated box girder of a high-pile wharf approach bridge provided by the present invention.
[0046] The triangular frame 1 includes a first right-angled side 101, a second right-angled side 102, a hypotenuse 103, a first transition side 104, a second transition side 105 and a third transition side 106;
[0047] One end of the first right-angle side 101 is vertically welded to one end of the first transition side 104;
[0048] One end of the second transfer edge 105 is vertically welded to an appropriate position of the first transfer edge 104, and the other end is vertically welded to one end of the second right-angle edge 102;
[0049] The two ends of the hypotenuse are respectively welded to the other end of the first right-angled side 101 and the other end of the second right-angled side 102;
[0050] One end of the third transition edge 106 is vertically welded to a proper position of the second right-angled edge 102 , and the other end is vertically welded to a proper position of the hypotenuse. The other end of the first transition edge 104 is vertically welded to a proper position of the third transition edge 106 .
[0051] Furthermore, the triangular frame 1 is made of No. 5 channel steel.
[0052] Example 2
[0053] Based on the above-mentioned embodiment 1, this embodiment introduces the structural composition of the reinforcement binding and positioning device for the prefabricated box girder of the high-pile wharf approach bridge.
[0054] Please refer to Figure 1 , Figure 1 This is a cross-sectional view of the reinforcement binding and positioning device for the prefabricated box girder of the high-pile wharf approach bridge provided by the present invention; please refer to Figure 2 , Figure 2 This is a top view of the reinforcement binding and positioning device for the prefabricated box girder of the high-pile wharf approach bridge provided by the present invention; please refer to Figure 3 , Figure 3 A side view of the reinforcement binding and positioning device for the prefabricated box girder of the high-pile wharf approach bridge provided by the present invention;
[0055] The reinforcement binding and positioning device for the prefabricated box girder of the high-pile wharf approach bridge comprises a triangular frame 1, a vertical reinforcement positioning angle steel 2, a connecting rod 3, a transverse reinforcement support rod 4, a bottom reinforcement positioning rod 5 and a bottom mold;
[0056] The plurality of triangular frames 1 are arranged in parallel and equidistantly on both sides of the bottom mold;
[0057] The vertical steel bar positioning angle steel 2 is vertically welded to the appropriate position of the first right angle side 101 of the plurality of triangular frames 1 on one side of the bottom mold;
[0058] The connecting rod 3 is vertically welded to the appropriate position of the third transition edge 106 of the multiple triangular frames 1 on one side of the bottom mold, and is used to connect the multiple triangular frames 1 on one side of the bottom mold;
[0059] The transverse steel bar support rod 4 is welded to the first right-angled side 101 of the triangular frame 1;
[0060] The bottom layer of steel bar positioning rod 5 is arranged in the middle of the bottom mold.
[0061] Furthermore, a total of four vertical steel bar positioning angle steels 2 are provided.
[0062] Furthermore, the vertical steel bar positioning angle steel 2 is grooved on one side according to the vertical steel bar spacing.
[0063] Furthermore, the connecting rod 3 is made of No. 5 channel steel.
[0064] Furthermore, the transverse steel bar support rod 4 is made of 16 plain round steel bars and is 20 cm long.
[0065] Furthermore, the bottom steel bar positioning rod 5 is formed by welding two angle steels, and is vertically grooved according to the spacing of the bottom stirrups.
[0066] Example 3
[0067] Based on the above-mentioned embodiments 1 and 2, this embodiment introduces a construction method of a prefabricated box girder reinforcement binding and positioning device for a high-pile wharf approach bridge, including the following steps:
[0068] Step 1: Place two welded integral triangular brackets tightly on both sides of the bottom mold, and place the bottom steel bar positioning rod 5 in the middle of the bottom mold, and use square wood to support the bottom;
[0069] Step 2: Place the fixed box girder side transverse reinforcement and vertical reinforcement in accordance with the positions of the slots on the transverse reinforcement support rod 4 and the vertical reinforcement positioning angle steel 2 on the integral triangular support, and place the bottom transverse reinforcement in accordance with the slots on the bottom reinforcement positioning rod 5, and then tie the reinforcement;
[0070] Step 3: After the reinforcement is tied, remove the integral triangular brackets on both sides of the bottom form, and pad the bottom concrete pads under the tied box beam, pull out the square wood and the bottom reinforcement positioning rod 5, and tie the side pads of the box beam at the same time;
[0071] Step 4: After the formwork is installed, pour the concrete.
[0072] The above is only a preferred embodiment of the present invention, and is not any formal or substantial limitation of the present invention. It should be pointed out that ordinary technicians in this technical field can make several improvements and supplements without departing from the method of the present invention, and these improvements and supplements should also be regarded as the protection scope of the present invention. Any technician familiar with this profession, without departing from the spirit and scope of the present invention, can make some changes, modifications and evolutions made by using the technical content disclosed above, which are equivalent embodiments of the present invention; at the same time, any equivalent changes, modifications and evolutions made to the above embodiments based on the essential technology of the present invention are still within the scope of the technical solution of the present invention.
Claims
1. A reinforcement binding and positioning device for prefabricated box beams of high-pile wharf approach bridges, characterized in that: It comprises two integral triangular supports, a bottom steel bar positioning rod (5) and a bottom mold, wherein the two integral triangular supports are respectively placed closely on both sides of the bottom mold, and the bottom steel bar positioning rod (5) is placed in the middle of the bottom mold; The integral triangular support comprises a plurality of triangular frames (1), vertical steel bar positioning angle steels (2), connecting rods (3) and transverse steel bar support rods (4); The vertical steel bar positioning angle steel (2) is vertically welded to the vertical bars of the plurality of triangular frames (1); The connecting rod (3) passes through a plurality of triangular frames (1) and is welded to the same position of each triangular frame (1); The transverse steel bar support rod (4) is vertically welded to the vertical rod of the triangular frame (1); The triangular frame (1) comprises a first right-angled side (101), a second right-angled side (102), a hypotenuse (103), a first transition side (104), a second transition side (105) and a third transition side (106); One end of the first right-angle side (101) is vertically welded to one end of the first transition side (104); One end of the second transfer edge (105) is vertically welded to an appropriate position of the first transfer edge (104), and the other end is vertically welded to one end of the second right-angle edge (102); The two ends of the hypotenuse (103) are respectively welded to the other end of the first right-angled side (101) and the other end of the second right-angled side (102); One end of the third transition edge (106) is vertically welded to an appropriate position of the second right-angle edge (102), and the other end is vertically welded to an appropriate position of the hypotenuse (103), and the other end of the first transition edge (104) is vertically welded to an appropriate position of the third transition edge (106).
2. The reinforcement binding and positioning device for prefabricated box beam of high-pile wharf approach bridge according to claim 1 is characterized in that: The vertical steel bar positioning angle steel (2) is vertically welded to the first right-angled side (101) of the plurality of triangular frames (1); the connecting rod (3) is vertically welded to the third transition side (106) of the plurality of triangular frames (1); and the transverse steel bar supporting rod (4) is welded to the first right-angled side (101) of the triangular frame (1).
3. The reinforcement binding and positioning device for prefabricated box beam of high-pile wharf approach bridge according to claim 2 is characterized in that: A plurality of transverse steel bar support rods (4) are provided and are parallel to the first transition edge (104) of the triangular frame (1).
4. The reinforcement binding and positioning device for prefabricated box beam of high-pile wharf approach bridge according to claim 1 is characterized in that: The bottom steel bar positioning rod (5) is formed by welding two angle steels in double pieces and vertically slotted according to the spacing of the bottom stirrups.
5. The reinforcement binding and positioning device for prefabricated box beam of high-pile wharf approach bridge according to claim 2 is characterized in that: The triangular frame (1) and the connecting rod (3) are made of No. 5 channel steel.
6. The reinforcement binding and positioning device for prefabricated box beam of high-pile wharf approach bridge according to claim 2 is characterized in that: The vertical steel bar positioning angle steel (2) is grooved on one side according to the vertical steel bar spacing.
7. The reinforcement binding and positioning device for prefabricated box beams of high-pile wharf approach bridge according to claim 3 is characterized in that: The material of the transverse steel bar support rod (4) is 16 plain round steel bar, 20 cm long.
8. The construction method of the high-pile wharf approach bridge prefabricated box girder reinforcement binding and positioning device according to any one of claims 1 to 7, characterized in that: The following steps are involved: Step 1: Place two welded integral triangular brackets tightly on both sides of the bottom mold, and place the bottom steel bar positioning rod (5) in the middle of the bottom mold, and use square wood to support the bottom; Step 2: Place the transverse and vertical reinforcements on the side of the fixed box beam in accordance with the positions of the slots on the transverse reinforcement support rod (4) and the vertical reinforcement positioning angle steel (2) on the integral triangular support, and place the bottom transverse reinforcement in accordance with the slots on the bottom reinforcement positioning rod (5), and then tie the reinforcements; Step 3: After the reinforcement is tied, remove the integral triangular brackets on both sides of the bottom form, and place the bottom concrete pads under the tied box beam, pull out the square wood and the bottom reinforcement positioning rods (5), and tie the box beam side pads at the same time; Step 4: After the formwork is installed, pour the concrete.
Citation Information
Patent Citations
Method for installing steel bars of prefabricated box girder by adopting standard frame
CN108501201A
Precast box beam steel reinforcement cage jig
CN108582466A
Novel box girder steel reinforcement framework binding rack
CN111660430A
Reinforcing steel bar binding jig for precast box beam bottom web plates
CN201998323U
Steel bar binding positioning frame
CN204126285U