A permanent fault crossing method for offshore flexible DC submarine cable
By using a hybrid converter valve in which a full-bridge submodule is connected in series with a half-bridge submodule in the offshore wind power flexible DC transmission system, the permanent fault crossing of the submarine cable is realized, the problem of offshore wind power system outage is solved, and the efficiency of the wind farm is improved. operational efficiency and grid stability.
Patent Information
- Application Number
- CN202210573563.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-05-23
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2042-05-23
AI Technical Summary
Submarine cable faults in offshore wind power flexible DC transmission systems are mostly permanent faults. Existing technology cannot achieve permanent fault crossing of offshore flexible DC submarine cables, resulting in long system outage time and seriously affecting the operational efficiency of wind farms.
A hybrid flexible-DC converter valve is constructed by using full-bridge submodules with negative-level output capability in series with half-bridge submodules. By dynamically adjusting the number of negative voltage submodules and switching operations, the DC voltage at the outlet of the converter valve is reduced and reduced. Boost the voltage, ride through temporary faults, and switch to earth return operation during the fault, ensuring that the system does not stop operating until the faulty submarine cable is repaired and the normal transmission mode is restored.
It realizes the permanent fault ride-through of offshore wind power flexible DC submarine cables, reduces system outage time, ensures the operational efficiency of wind farms, and improves the safe and stable operation level of the power grid.
Smart Images

Figure CN115173456B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of offshore wind power flexible direct current transmission, and in particular to a method for crossing a permanent fault of an offshore flexible direct current submarine cable. Background Art
[0002] Compared with onshore wind power, offshore wind power has abundant wind energy resources, stable unit operation, large single unit capacity, large energy output, and higher annual utilization hours. At the same time, because the unit is far from the coast, it has little visual impact, little negative environmental impact, and does not occupy precious land resources. Moreover, with the development of offshore resources, offshore wind power has gradually expanded to the deep sea, and offshore wind power has also expanded to long distances and large capacities. AC transmission is greatly limited in transmission distance and capacity due to its capacitive current and other problems, and flexible DC transmission has become the preferred solution for long-distance, large-capacity offshore wind power to access the AC grid.
[0003] Most submarine cable failures in offshore wind power flexible DC transmission systems are permanent failures, requiring isolation of the faulty submarine cable and replacement with a new one. In engineering, the flexible DC transmission system usually trips directly after the line protection detects asymmetric voltages on the positive and negative poles. After the submarine cable maintenance is completed, the converter station is put back into operation. Since submarine cable maintenance is difficult and time-consuming, the system is shut down for a long time, which seriously affects the operating efficiency of the wind farm.
[0004] Currently, the offshore wind power flexible DC transmission systems put into operation all use converter valves composed of half-bridge sub-modules connected in series, such as Figure 4 As shown, the half-bridge submodule includes two IGBT devices T1 and T2, two diodes D1 and D2 connected in anti-parallel with the IGBT, a capacitor C, and a voltage-equalizing resistor R. However, this type of converter valve does not have the ability to ride through faults, and this transmission method cannot achieve the ride-through of permanent faults in offshore flexible DC submarine cables.
[0005] In addition, the DC transmission project in the prior art uses a full-bridge submodule with negative level output capability in series with a half-bridge submodule to construct a hybrid flexible DC converter valve, such as Figure 5 As shown in the figure, the full-bridge submodule includes four IGBT devices T1, T2, T3, T4, four diodes D1, D2, D3, D4 connected in anti-parallel with the IGBT, capacitor C, and voltage-equalizing resistor R. By reducing the DC voltage of the converter station to near zero voltage after detecting the overhead line fault, the non-locking ride-through of the transient fault of the overhead line is achieved. However, since the main connection of the project adopts the design of DC side grounding, that is, the neutral bus is connected to the grounding electrode through the grounding lead, this transmission method cannot achieve the ride-through of permanent faults of the offshore flexible DC submarine cable overhead line. Summary of the invention
[0006] The purpose of the present invention is to provide a method for permanent fault riding of an offshore flexible direct current submarine cable. A hybrid flexible direct current converter valve is constructed by connecting a full-bridge submodule with a negative level output capability in series with a half-bridge submodule in the converter valve. After a fault occurs, the DC voltage at the converter valve outlet is reduced by dynamically adjusting the number of negative voltage submodules put into the onshore converter valve, thereby achieving temporary fault riding. Through the switching operation, the system is switched to earth return line operation, connected to the repaired submarine cable, and the system enters the normal transmission mode of wind power, thereby achieving permanent fault riding.
[0007] To achieve the above object, the present invention provides a method for crossing a permanent fault of an offshore flexible DC submarine cable, the method comprising the following steps:
[0008] If a permanent fault occurs in the DC submarine cable, the pole control device receives the DC voltage imbalance alarm signal sent by the line protection and starts the DC step-down operation control function;
[0009] During a fault, the modulation wave command is calculated based on the positive and negative DC line voltage values;
[0010] The converter station control system reduces the DC voltage at the converter valve outlet based on the modulation wave instruction while maintaining the AC voltage support capability, so that the system operates at reduced voltage and achieves temporary fault ride-through;
[0011] The first switching operation isolates the faulty submarine cable, puts it into the grounding point, and switches it to earth return line operation, continuously delivering power to the AC power grid, realizing fault repair without stopping the system;
[0012] After the maintenance of the DC submarine cable is connected, the converter valve enters zero DC voltage operation;
[0013] During the second switching operation, the converter valve boosts the pressure and the system enters the normal transmission mode of wind power, achieving permanent fault ride-through.
[0014] As a preferred solution, the first switching operation is to close the grounding switch of the converter station and the line isolation switch of the faulty submarine cable, and the system switches to the earth return line to transmit power.
[0015] Furthermore, the second switching operation specifically involves closing the line isolation switch of the faulty submarine cable, grounding the switch at the converter station, and boosting the converter valve, so that the system enters the normal transmission mode of wind power.
[0016] As a preferred solution, the converter valve is composed of a half-bridge submodule and a full-bridge submodule with negative level output capability connected in series, and the system voltage reduction or boost is achieved by the full-bridge submodule.
[0017] As a preferred solution, the converter valve executes the modulation wave instruction, and the full-bridge sub-modules of the upper and lower bridge arms output negative voltages alternately to achieve system step-down operation.
[0018] As a preferred solution, after the converter valve enters zero DC voltage operation, the half-bridge sub-modules and full-bridge sub-modules of the upper and lower bridge arms both output positive voltage to achieve system boost operation.
[0019] As a preferred solution, the line control protection device of the offshore converter station sends a DC voltage unbalance protection alarm signal, and the DC voltage unbalance protection criterion is: Δ=|UDP+UDN|>U_set, where UDP is the positive pole line voltage, UDN is the negative pole line voltage, and U_set is the protection constant.
[0020] Beneficial effects of the present invention:
[0021] The method described in the present invention is aimed at offshore wind power flexible direct current transmission. A full-bridge submodule with negative level output capability is connected in series with a half-bridge submodule to construct a hybrid flexible direct current converter valve in the converter valve. When a permanent fault occurs in the submarine cable of the flexible direct current transmission system, the onshore converter station quickly adjusts the DC voltage reference value and the DC side outlet voltage amplitude by quickly detecting the DC positive and negative line voltages, that is, by dynamically adjusting the number of negative voltage submodules put into the onshore converter valve, the DC voltage at the converter valve outlet is reduced, thereby realizing temporary fault riding, while avoiding the action of the lightning arrester and the insulation breakdown of the primary equipment. The faulty submarine cable is isolated by the first switching operation, and the offshore converter station and the onshore converter station are grounded respectively. When the fault occurs, the AC power fluctuates briefly. After the system switches to earth return line operation, it can continuously transmit power to the AC power grid, ensuring that the system does not stop while completing the maintenance of the faulty submarine cable. The submarine cable after maintenance is connected, and after the DC voltage is stable, the converter valve is boosted by the second switching operation, and the system enters the normal transmission mode of wind power, thereby realizing permanent fault riding.
[0022] This invention enhances the operation and control means of the flexible direct current system, reduces the amount of machine cutting and load shedding, and improves the safe and stable operation level of the power grid while increasing the converter station's ability to absorb new energy. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 is a flow chart of the fault ride-through method of the present invention;
[0024] Figure 2 It is a schematic diagram of the main wiring scheme of the present invention;
[0025] Figure 3 This is a wiring diagram of an onshore converter valve;
[0026] Figure 4 It is the topological structure of the half-bridge submodule;
[0027] Figure 5 It is a full-bridge submodule topology;
[0028] Figure 6a It is a schematic diagram of the operation mode of the full-bridge submodule (positive input);
[0029] Figure 6b It is a schematic diagram of the operation mode of the full-bridge submodule (negative input);
[0030] Figure 6c It is a schematic diagram of the operation mode of the full-bridge submodule (cut away);
[0031] Figure 6d It is a schematic diagram of the operation mode of the full-bridge submodule (locked);
[0032] Figure 7 This is the internal circuit diagram of the onshore converter valve;
[0033] Figure 8 This is the waveform diagram of the onshore converter valve output;
[0034] Fig. 9 It is a crossing waveform diagram of the present invention;
[0035] The components in the figure are numbered as follows:
[0036] Onshore converter station 1, onshore converter valve 11, offshore converter station 2, offshore converter valve 21, offshore wind farm 3, offshore transformer 4, onshore transformer 5, energy consumption branch 6, onshore AC power grid 7, permanent fault ride-through module 10. DETAILED DESCRIPTION
[0037] In order to make the technical problems solved by the present invention, the technical solutions adopted and the technical effects achieved clearer, the technical solutions of the present invention are further described below in conjunction with the accompanying drawings and through specific implementation methods. It is understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for the convenience of description, only the parts related to the present invention are shown in the accompanying drawings, not all.
[0038] In the description of the present invention, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance. Among them, the terms "first position" and "second position" are two different positions.
[0039] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, and it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0040] The present invention relates to a method for crossing a permanent fault of an offshore flexible direct current submarine cable. Figure 1 As shown, the method comprises the following steps:
[0041] S1: A permanent fault occurs in the DC submarine cable. The pole control device receives the DC voltage imbalance alarm signal sent by the line protection and starts the DC step-down operation control function.
[0042] The pole control device receives the DC voltage unbalance protection alarm signal sent by the line control and protection device of the offshore converter station and puts the DC voltage reduction operation control function into operation. The DC voltage unbalance protection criterion is: Δ=|UDP+UDN|>U_set, where UDP is the positive pole line voltage, UDN is the negative pole line voltage, and U_set is the protection setting.
[0043] Determine whether the DC voltage unbalance reaches the target; if yes, proceed to the next step; if no, continue to wait for the step-down regulation.
[0044] S2: During a fault, the modulation wave command is calculated based on the positive and negative DC line voltage values.
[0045] The DC voltage value that needs to be reduced is determined by the positive and negative DC line voltage values, and the modulation wave instruction is calculated.
[0046] S3: Based on the modulation wave instruction, the onshore converter station control system reduces the DC voltage at the onshore converter valve outlet while maintaining the AC voltage support capability, so that the system operates at reduced voltage, achieves temporary fault ride-through, and avoids insulation breakdown.
[0047] The onshore flexible DC converter valve executes the modulation wave command, and the full-bridge sub-modules of the upper and lower bridge arms alternately output negative voltage to achieve system step-down operation.
[0048] S4: The first switching operation isolates the faulty submarine cable, puts it into grounding point, switches it to earth return line operation, and continuously supplies power to the AC power grid, so as to achieve fault repair without stopping the system.
[0049] The first switching operation specifically involves closing the grounding switches at the exit of the offshore converter station and the entrance of the onshore converter station, and the line isolation switches of the positive DC submarine cable and the negative DC submarine cable to realize power transmission through the earth return line.
[0050] Determine whether the submarine cable maintenance is completed; if yes, proceed to the next step; if not, continue to wait for the submarine cable maintenance.
[0051] S5: After the maintenance, the DC submarine cable is connected and the onshore converter valve enters zero DC voltage operation.
[0052] After the faulty submarine cable is repaired, the fault disappears and the DC side outlet voltage of the onshore converter valve is reduced to near zero voltage.
[0053] S6: The second switching operation is performed, and then the onshore converter valve is boosted to enter the normal transmission mode of wind power, achieving permanent fault ride-through.
[0054] The second switching operation specifically involves closing the line isolation switches of the positive DC submarine cable and the negative DC submarine cable, and the grounding switches at the exit of the offshore converter station and the entrance of the onshore converter station to prevent the switches from closing and disconnecting live lines, and the system enters the normal transmission mode of wind power.
[0055] The main wiring scheme of the permanent fault ride-through system is as follows Figure 2 As shown, the system includes an offshore wind farm 3, an offshore converter station 2, an onshore converter station 1, and an onshore AC power grid 7 connected in series in sequence; an offshore transformer 4 arranged in series between the offshore wind farm 3 and the offshore converter station 2, and an onshore transformer 5 arranged in series between the onshore converter station 1 and the onshore AC power grid 7. The system also includes a flexible DC submarine cable permanent fault crossing module 10 arranged in parallel between the offshore converter station 2 and the onshore converter station 1.
[0056] The offshore wind farm 3 inputs three-phase AC power into the AC power grid, connects to the submarine AC cable through the wind turbine side transformer, and accesses the busbar of the offshore busbar booster station; the busbar connection cable is connected to the offshore transformer 4 and connected to the offshore converter station 2; the offshore converter station 2 is connected to the onshore converter station 1 through the submarine DC cable; the onshore converter station 1 is connected to the onshore transformer 5 and the onshore AC power grid through the onshore AC cable.
[0057] A first grounding point and a second grounding point connected in parallel are provided in the permanent fault crossing module 10, and a positive DC submarine cable and a negative DC submarine cable connected in parallel are provided between the first grounding point and the second grounding point; the input end of the onshore converter station 1 is connected in series with the first grounding point, and the output end of the onshore converter station 1 is connected in series with the onshore transformer 5 and the onshore AC power grid 7 in sequence; the input end of the offshore converter station 2 is connected in series with the offshore transformer 4 and the offshore wind farm 3 in sequence, and the output end of the offshore converter station 2 is connected in series with the second grounding point.
[0058] Both the first grounding point and the second grounding point are provided with grounding switches. The first grounding point is provided with grounding switches S1.Q21 and S1.Q22 respectively, and the second grounding point is provided with grounding switches S2.Q21 and S2.Q22 respectively.
[0059] Both the positive DC submarine cable and the negative DC submarine cable are equipped with line isolation switches. The positive DC submarine cable is equipped with line isolation switches S1.Q11 and S2.Q11 at both ends, and the negative DC submarine cable is equipped with line isolation switches S1.Q12 and S2.Q12 at both ends.
[0060] An energy consumption branch 6 is provided between the input end of the onshore converter station 1 and the first grounding point. When a DC cable fails, the system power cannot be delivered, the capacitors in the full-bridge and half-bridge submodules will be charged, and the system voltage will continue to rise. In order to protect the power transmission system, the energy consumption branch 6 will absorb part of the power, thereby reducing the system voltage. Usually, a power consumption resistor is added to the energy consumption branch 6 to directly consume the increased power of the capacitor.
[0061] The onshore converter station 1 is provided with an onshore converter valve 11, and the offshore converter station 2 is provided with an offshore converter valve 21. The onshore converter valve 11 and the offshore converter valve 21 are both composed of a plurality of full-bridge submodules and a plurality of half-bridge submodules. The system voltage reduction and voltage increase are all completed by the onshore converter valve 11. Here, the internal structure of the onshore converter valve 11 is further studied and analyzed. Figures 3 to 8 shown.
[0062] Figure 3 This is a primary wiring diagram of an onshore converter valve, with three-phase AC power A, B, and C input to its input terminals. The bridge arm refers to the submodule string (SM1, SM2...SMn) between the commutation reactor and the DC pole line P or N, which includes an upper bridge arm at the P pole and a lower bridge arm at the N pole; both the upper bridge arm and the lower bridge arm are composed of multiple full-bridge submodules and multiple half-bridge submodules connected in series. The upper bridge arm, the lower bridge arm, and the commutation reactor together constitute a phase unit. The DC voltage Udc is output between the P pole and the N pole.
[0063] Figure 4 It is a half-bridge submodule topology structure, including two IGBT devices T1 and T2 connected in parallel with the input and output ends of the submodule, a capacitor device C connected in series with T1, a diode D1 connected in reverse parallel with T1, a diode D2 connected in reverse parallel with T2, and a voltage-equalizing resistor.
[0064] Figure 5 It is a full-bridge submodule topology structure, including four IGBT devices T1, T2, T3, and T4 connected in parallel with the input and output ends of the submodule; four diodes D1, D2, D3, and D4 connected in reverse parallel with the IGBT; a capacitor device C and a voltage-equalizing resistor.
[0065] Figures 6a to 6d This is a schematic diagram of the full-bridge submodule operation mode. By turning on and off the IGBT, the current flow direction is forced to change, so that the onshore converter valve 11 can achieve the purpose of boosting and reducing the voltage. There are four specific situations:
[0066] Positive input, T1 and T4 are turned on, T2 and T3 are turned off, the current directions are shown in Figure a, and the full-bridge sub-module outputs a positive voltage Uc.
[0067] Negative input, T1 and T4 are turned off, T2 and T3 are turned on, and the current directions are shown in Figure b. The full-bridge sub-module outputs a negative voltage Uc.
[0068] Cut off, T1, T3 are turned on and T2, T4 are turned off, or T1, T3 are turned off and T2, T4 are turned on, the current directions are shown in Figure c, and the full-bridge sub-module outputs zero voltage.
[0069] Locked, T1, T2, T3, and T4 are all turned off, and the current direction is shown in Figure d. The full-bridge sub-module outputs positive voltage or negative voltage.
[0070] Figure 7 This is the internal circuit diagram of the onshore converter valve. Figure 3 It can be seen that its input terminal inputs three-phase AC power A, B, C, the input terminal AC voltages are uca, ucb, ucc, and the input terminal AC currents are isa, isb, isc. There are three upper bridge arms and three lower bridge arms in the onshore converter valve, L is the commutation reactor, upa, upb, upc are the voltages in the upper bridge arm, ipa, ipb, ipc are the currents in the upper bridge arm, una, unb, unc are the voltages in the lower bridge arm, ina, inb, inc are the currents in the lower bridge arm, Idc is the DC current in the bridge arm, and Udc is the DC voltage in the bridge arm.
[0071] Under normal operating conditions, the voltages of the upper and lower bridge arms are both positive; however, during step-down operation, the voltage of the bridge arm may be negative. This is because the full-bridge submodule operates with negative input and outputs negative voltage, causing the upper and lower bridge arms to alternately show negative values.
[0072] Figure 8 It is a waveform diagram of the onshore converter valve output. Uref1 to Uref6 are the voltages of the three upper bridge arms and the three lower bridge arms respectively. It can be seen that in normal operation, the voltages are all greater than 0; when a fault occurs, the fault time shown in the figure is 1 second, the DC voltage Udc drops to 0, the bridge arm voltage will drop to a negative value, the upper bridge arm and the lower bridge arm alternately show negative values, but the AC voltage Us remains stable.
[0073] Fig. 9For the crossing waveform diagram of the present invention, a corresponding simulation platform is built in the electromagnetic transient simulation software PSCAD / EMTDC. This embodiment assumes that a permanent fault occurs in the negative DC submarine cable, and a simulation verification is performed on the grounding fault of the negative submarine cable. If a permanent fault occurs in the positive DC submarine cable, its grounding method and the generated waveform diagram are similar to this, and no further examples are given. However, if a fault occurs in which the positive and negative lines are grounded at the same time, the power sent by the offshore converter station 2 will preferentially flow through the loop composed of the grounding points of the positive and negative lines, and will no longer flow through the onshore converter station 1. The system cannot maintain normal power transmission and needs to trip.
[0074] The fault time in the figure is 1 second, and from top to bottom are DC positive voltage, DC negative voltage, AC grid active power, three-phase AC valve side voltage, and three-phase AC valve side current. It can be seen from the figure that at the moment of the fault, the AC grid active power, valve side AC voltage and current fluctuate briefly, and remain basically stable after 0.05 seconds, so that when a permanent fault occurs, the system can be kept running without stopping to carry out cable maintenance work, thereby improving the safe and stable operation level of the power grid.
[0075] The system parameters in this embodiment are shown in the following table:
[0076]
[0077]
[0078] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.
Claims
1. A method for crossing a permanent fault of an offshore flexible DC submarine cable, characterized in that: The method comprises the following steps: If a permanent fault occurs in the DC submarine cable, the pole control device receives the DC voltage imbalance alarm signal sent by the line protection and starts the DC step-down operation control function; During a fault, the modulation wave command is calculated based on the positive and negative DC line voltage values; The converter station control system reduces the DC voltage at the onshore converter valve outlet based on the modulation wave instruction while maintaining the AC voltage support capacity, so that the system operates at reduced voltage and achieves temporary fault ride-through; The first switching operation isolates the faulty submarine cable, puts it into the grounding point, and switches it to earth return line operation, continuously delivering power to the AC power grid, realizing fault repair without stopping the system; After the maintenance of the DC submarine cable is connected, the onshore converter valve enters zero DC voltage operation; During the second switching operation, the onshore converter valve boosts the pressure, and the system enters the normal transmission mode of wind power, achieving permanent fault ride-through. The system includes an offshore converter station and an onshore converter station connected in series, and a flexible DC submarine cable permanent fault crossing module arranged in parallel between the offshore converter station and the onshore converter station, wherein the onshore converter valve is arranged in the onshore converter station; a first grounding point and a second grounding point connected in parallel are arranged in the flexible DC submarine cable permanent fault crossing module, the input end of the onshore converter station is connected in series with the first grounding point, and the output end of the offshore converter station is connected in series with the second grounding point; a positive DC submarine cable and a negative DC submarine cable connected in parallel are arranged between the first grounding point and the second grounding point.
2. The method for traversing a permanent fault of an offshore flexible DC submarine cable according to claim 1, characterized in that: The first switching operation involves closing the grounding switch of the converter station and the line isolation switch of the faulty submarine cable, and the system switches to the earth return line to transmit power.
3. The method for traversing a permanent fault of an offshore flexible DC submarine cable according to claim 2, characterized in that: The second switching operation specifically involves closing the line isolation switch of the faulty submarine cable, the grounding switch of the branch converter station, and the voltage boosting of the onshore converter valve, so that the system enters the normal transmission mode of wind power.
4. The method for traversing a permanent fault of an offshore flexible DC submarine cable according to claim 1, characterized in that: The onshore converter valve is composed of a half-bridge submodule and a full-bridge submodule with negative level output capability connected in series, and the system voltage reduction or boost is achieved by the full-bridge submodule.
5. The method for traversing a permanent fault of an offshore flexible DC submarine cable according to claim 4, characterized in that: The onshore converter valve executes the modulation wave instruction, and the full-bridge sub-modules of the upper and lower bridge arms output negative voltages alternately to achieve system step-down operation.
6. The method for traversing a permanent fault of an offshore flexible DC submarine cable according to claim 4, characterized in that: After the onshore converter valve enters zero DC voltage operation, the half-bridge sub-modules and full-bridge sub-modules of the upper and lower bridge arms all output positive voltage to achieve system boost operation.
7. The method for traversing a permanent fault of an offshore flexible DC submarine cable according to any one of claims 1 to 6, characterized in that: The line control protection device of the offshore converter station sends a DC voltage unbalance protection alarm signal. The DC voltage unbalance protection criterion is: Δ=|UDP+UDN|>U_set, where UDP is the positive pole line voltage, UDN is the negative pole line voltage, and U_set is the protection constant.