A method for rapid tunnel construction in semi-coal and rock tunnels

Through the combined use of drilling pre-splitting and mechanized equipment, the coal seam is excavated first and then the rock layer is excavated, which solves the problems of low tunneling efficiency and coal and rock mixing in semi-coal and rock tunnels, realizes layered excavation and separated transportation of coal and rock, and improves resource utilization. rate and coal quality.

CN115288719BActive Publication Date: 2024-10-29UNIV OF SCI & TECH BEIJING
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210963948.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-11
Publication Date
2024-10-29
Estimated Expiration
2042-08-11

AI Technical Summary

Technical Problem

When existing coal mine excavation equipment is excavation in semi-coal and rock tunnels, the excavation efficiency is low and the coal and rock are mixed, resulting in low resource utilization efficiency, loss of coal resources, or degradation of coal quality.

Method used

Drilling pre-splitting and mechanized equipment are used to carry out efficient excavation. The coal seam is excavated first and then the rock layer is excavated. The space formed by the coal seam excavation is used for tunnel support, and the rock is loosened through drilling cracking and vibration blasting to achieve layered excavation and separation of coal and rock. transportation.

Benefits of technology

It improves the excavation efficiency of semi-coal and rock tunnels, avoids the mixing of coal and rock, improves resource utilization and coal quality, and enhances the stability and construction efficiency of the tunnels.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115288719B_ABST
    Figure CN115288719B_ABST
Patent Text Reader

Abstract

The invention discloses a method for quickly forming a semi-coal-rock tunnel, wherein the coal seam thickness is 0.5m-1.3m, the tunnel height is more than 2 times the coal seam height, the rock layer is relatively soft, the rock layer is on the upper side and the coal layer is on the lower side: drilling and pre-crack the rock section of the tunnel, then cutting and transporting out, supporting the tunnel roof; mining the coal seam and transporting the coal out; under the above dimensions, and the rock is relatively hard, the coal seam is on the upper side and the rock layer is on the lower side: mining the coal seam and transporting the coal out; breaking the rock and transporting the rock slag out, the coal seam and the rock layer are staggered in excavation, the coal seam excavation is ahead of the rock layer excavation, and supporting the tunnel roof; the coal seam thickness is 1.3m-2.5m, the tunnel height is greater than the coal seam thickness and not greater than twice the coal seam thickness, the coal seam is on the upper side and the rock layer is on the lower side: mining the coal seam and transporting out, supporting the tunnel roof; drilling and pre-crack the rock layer, and slag-scraping and transporting the rock out. The present invention can improve the semi-coal-rock tunnel excavation efficiency and resource utilization rate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel excavation, and in particular to a method for quickly forming a semi-coal-rock tunnel. Background Art

[0002] When the existing coal mine excavation equipment is excavating semi-coal-rock tunnels, it usually uses blasting and comprehensive excavation to excavate the entire section in one go, that is, the excavation equipment not only has to excavate the coal seam, but also has to excavate a large amount of hard rock. Since the semi-coal-rock tunnels need to excavate a large amount of hard rock, both methods have the problems of difficult excavation and low excavation efficiency. On the other hand, it is very easy to cause coal and rock mixing during the excavation process, the workload of coal and rock separation is large, and the resource utilization efficiency is low. The excavated coal and rock are usually transported together, resulting in the loss of coal resources, or the mixing of rocks in the coal leads to the deterioration of coal quality. Summary of the invention

[0003] The purpose of the present invention is to provide a method for rapid tunneling of a semi-coal-rock tunnel to solve the problems existing in the above-mentioned prior art, which can greatly improve the efficiency of semi-coal-rock tunnel excavation and realize the separation and transportation of coal and rock, which is conducive to improving resource utilization.

[0004] To achieve the above object, the present invention provides the following solutions:

[0005] The present invention provides a method for rapid tunneling of semi-coal-rock tunnels, including the following working conditions:

[0006] Working condition 1: The thickness of the coal seam is 0.5m-1.3m, the tunnel height is more than 2 times the coal seam height, and the rock layer is soft, the rock layer is on the top and the coal seam is on the bottom. The tunneling includes the following steps:

[0007] S1, drilling and pre-splitting the rock section of the tunnel, then cutting and transporting the rock out, and supporting the tunnel roof;

[0008] S2, mining the coal seam and transporting the coal out;

[0009] Working condition 2: The thickness of the coal seam is 0.5m-1.3m, the tunnel height is more than 2 times the coal seam height, and the rock is hard. The coal seam is on the top and the rock layer is on the bottom. The tunneling includes the following steps:

[0010] S1, mining the coal seam and transporting the coal out;

[0011] S2, breaking the rock and transporting the rock slag out, and staggering the coal seam excavation and the rock seam excavation, with the coal seam excavation ahead of the rock seam excavation, to support the tunnel roof;

[0012] Working condition 3: The coal seam thickness is 1.3m-2.5m, the tunnel height is greater than the coal seam thickness but not greater than twice the coal seam thickness, the coal seam is on the top and the rock layer is on the bottom. The tunneling includes the following steps:

[0013] S1, mining the coal seam, transporting the coal out, and supporting the tunnel roof;

[0014] S2, after the coal seam has been mined for a certain distance, the rock layer behind it is drilled and pre-cracked, and then the rock is scraped, crushed and transported out.

[0015] Preferably, the device used in the working condition one includes a first driving mechanism, a first drilling pre-splitting mechanism, a cutting mechanism, a first supporting mechanism, a first conveying mechanism, a first coal mining machine and a second conveying mechanism; the first drilling pre-splitting mechanism, the cutting mechanism and the first supporting mechanism are all installed on the first driving mechanism and powered by the first driving mechanism; the first drilling pre-splitting mechanism is used to drill and pre-splitting the rock section of the tunnel; the cutting mechanism is used to cut the rock and transport the generated rock blocks out through the first conveying mechanism; the first supporting mechanism is used to anchor the tunnel roof; the first coal mining machine and the second conveying mechanism are both located below the first conveying mechanism; and the first coal mining machine is used to mine the coal seam and transport the coal blocks out through the second conveying mechanism.

[0016] Preferably, the first conveying mechanism includes a first belt conveyor and a plurality of first lifting frames, the plurality of first lifting frames are arranged along the length direction of the first belt conveyor and installed at the lower end of the first belt conveyor, and the first lifting frame is used to support the first belt conveyor, and the first lifting frame can be raised and lowered to realize the folding or lowering of the lower end of the first lifting frame.

[0017] Preferably, the second conveying mechanism includes a second belt conveyor and a plurality of first belt supports, the plurality of first belt supports are arranged along the length direction of the second belt conveyor and installed at the lower end of the second belt conveyor, and the first belt supports are used to support the second belt conveyor.

[0018] Preferably, the devices used in the working conditions 2 and 3 include a second coal mining machine, a second driving mechanism, a second supporting mechanism, a third conveying mechanism, a coal-gangue separation and conveying mechanism, a second drilling pre-splitting mechanism, a slag removal mechanism, a third driving mechanism and a fourth conveying mechanism. The second coal mining machine and the second supporting mechanism are both installed on the second driving mechanism and powered by the second driving mechanism. The second coal mining machine is used to mine coal seams and transport coal blocks to the coal-gangue separation and conveying mechanism via the third conveying mechanism. The second drilling pre-splitting mechanism, the slag removal mechanism, the third driving mechanism and the fourth conveying mechanism are all located below the third conveying mechanism, and the third driving mechanism is used to power the second drilling pre-splitting mechanism and the slag removal mechanism. The second drilling pre-splitting mechanism is used to drill and pre-split the rock section of the tunnel. The slag removal mechanism is used to crush the pre-splitting rock and transport the crushed rock blocks to the coal-gangue separation and conveying mechanism via the fourth conveying mechanism. The coal-gangue separation and conveying mechanism is used to transport coal blocks and rock blocks separately.

[0019] Preferably, the third conveying mechanism includes a third belt conveyor and a plurality of suspension brackets, wherein the plurality of suspension brackets are arranged along the length direction of the third belt conveyor and installed on the upper end of the third belt conveyor, and the suspension brackets are used to hoist the third belt conveyor, and the upper end of the suspension bracket is hoisted to the tunnel roof by an anchor rod or an anchor cable.

[0020] Preferably, the fourth conveying mechanism includes a fourth belt conveyor and a plurality of second belt supports, the plurality of second belt supports are arranged along the length direction of the fourth belt conveyor and installed at the lower end of the fourth belt conveyor, and the second belt supports are used to support the fourth belt conveyor.

[0021] Preferably, the coal-gangue separation and conveying mechanism includes a gangue belt conveyor, a coal transport belt conveyor, a plurality of third belt brackets and a plurality of connecting brackets, the upper end surface of the coal transport belt conveyor is not higher than the upper end surface of the third conveying mechanism, and the coal transport belt conveyor is used to receive and convey the coal blocks on the third conveying mechanism, the upper end surface of the gangue belt conveyor is not higher than the upper end surface of the fourth conveying mechanism, and the gangue belt conveyor is used to receive and convey the rock blocks on the fourth conveying mechanism, the connecting bracket is installed between the coal transport belt conveyor and the gangue belt conveyor, and is used to support the coal transport belt conveyor, and the third belt bracket is installed at the lower end of the gangue belt conveyor and is used to support the gangue belt conveyor.

[0022] Preferably, in the second working condition, the coal seam excavation is 40m-60m ahead of the rock stratum excavation.

[0023] Compared with the prior art, the present invention has achieved the following technical effects:

[0024] The semi-coal-rock tunnel rapid tunneling method provided by the present invention directly uses mechanized equipment to efficiently excavate softer rocks after they are cracked and loosened by drilling, and excavates the rock layer first and then the coal layer, so that the rock space excavated first can provide sufficient height space for support, and tunnel support can be carried out in time following the rock excavation equipment;

[0025] For harder rocks, mechanized equipment is difficult to break efficiently. The coal seam is excavated first, and then the rock layer. The space formed by coal seam excavation is used to form a free surface in the rock layer. The rock is loosened by drilling and vibration blasting. At the same time, since the rock layer of this type of tunnel is hard, the tunnel can maintain its own stability after the coal seam is excavated for a certain distance, so it can be supported uniformly after the excavation of the lower rock layer is completed;

[0026] For tunnels with thick coal seams, the coal seam is excavated first and then the rock stratum. The space formed by coal seam excavation is used to form a free surface in the rock stratum, and drilling and vibration blasting are used to loosen the rock. The coal seam space excavated in this type of tunnel can provide sufficient height space for support, and tunnel support can be carried out in time with the coal excavation equipment.

[0027] By adopting the above method, the coal excavation and rock excavation working faces are staggered and arranged in a step-like manner as a whole, so as to realize the layered excavation of coal seams and rock strata, and the separate transportation of coal blocks and rock blocks, and achieve a high degree of parallelism of coal and rock excavation operations, avoid the mixed transportation of coal and rock, resulting in loss of coal resources, or the mixing of rocks in coal leading to deterioration of coal quality, and at the same time, breaking the rock before excavation can improve the excavation efficiency, thereby improving the overall work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0029] Figure 1 It is a schematic diagram of the structure of the device used when the present invention is in working condition one;

[0030] Figure 2 yes Figure 1 The main view;

[0031] Figure 3 It is a structural schematic diagram of the device used when the present invention is in working condition two and working condition three;

[0032] Figure 4 yes Figure 3 The main view;

[0033] Figure 5This is a schematic diagram of the present invention in working condition 2 when digging into a coal seam;

[0034] Figure 6 This is a schematic diagram of the present invention in working condition 2, when pre-splitting the rock formation by drilling;

[0035] Figure 7 This is a schematic diagram of the present invention in working condition 2 when the rock formation is broken;

[0036] Figure 8 This is a schematic diagram of the present invention in working condition 2 and full-section support;

[0037] In the figure: 1-first drilling pre-splitting mechanism, 2-cutting mechanism, 3-first supporting mechanism, 4-first driving mechanism, 5-first belt conveyor, 6-first lifting frame, 7-first coal mining machine, 8-second belt conveyor, 9-first belt support, 10-second coal mining machine, 11-second driving mechanism, 12-second supporting mechanism, 13-suspension support, 14-third belt conveyor, 15-slag scraping mechanism, 16-second drilling pre-splitting mechanism, 17-third driving mechanism, 18-fourth belt conveyor, 19-second belt support, 20-third belt support, 21-waste belt conveyor, 22-connecting support, 23-coal conveyor belt, 24-anchor cable, 100-rock layer, 200-coal layer. DETAILED DESCRIPTION

[0038] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0039] The purpose of the present invention is to provide a method for quickly forming a semi-coal-rock tunnel, so as to solve the technical problems that the existing semi-coal-rock tunnel excavation efficiency is low and the coal-rock mixture affects the resource utilization.

[0040] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0041] like Figure 1-Figure 8 As shown, this embodiment provides a method for rapid tunneling of a semi-coal-rock tunnel, including the following working conditions:

[0042] Working condition 1: the thickness of coal seam 200 is 0.5m-1.3m, the tunnel height is more than twice the height of coal seam 200, and the rock layer is soft, the rock layer 100 is on the top and the coal seam 200 is on the bottom. The tunneling includes the following steps:

[0043] S1, drilling and pre-cracking the rock section of the tunnel to reduce the rock strength to improve the excavation efficiency, and then cutting and transporting the rock. The excavated rock space can provide sufficient height space for support, and the tunnel roof can be supported by anchor cables 24 in time with the excavation of the rock layer 100;

[0044] S2, when the tunnel rock section is excavated forward for a certain distance, the coal seam 200 is mined and the coal is transported out. The excavation of the coal seam 200 and the excavation of the rock layer 100 can also work and transport at the same time without interfering with each other;

[0045] Working condition 2: the thickness of coal seam 200 is 0.5m-1.3m, the tunnel height is more than 2 times the height of coal seam 200, and the rock is hard. Coal seam 200 is on the top and rock layer 100 is on the bottom. The tunneling includes the following steps:

[0046] S1, mining the coal seam 200 and transporting the coal out;

[0047] S2, break the rock and transport the rock slag out, and the excavation of the coal seam 200 and the rock layer 100 are staggered, the excavation of the coal seam 200 is ahead of the excavation of the rock layer 100, and the coal seam 200 is 40m-60m ahead of the rock layer 100, and the tunnel roof is supported. For the above-mentioned harder rocks, mechanized equipment is difficult to break the rocks efficiently. Therefore, the coal seam 200 is excavated first and then the rock layer 100 is excavated. The space formed by the excavation of the coal seam 200 is used to form a free surface of the rock layer 100, and the rock is loosened by drilling and vibration blasting. At the same time, since the rock layer 100 of this type of tunnel is hard, the tunnel can maintain its own stability after the coal seam 200 is excavated for a certain distance, so it can be supported uniformly after the excavation of the lower rock layer 100 is completed; the above-mentioned processes can also be carried out in parallel to improve construction efficiency.

[0048] Working condition 3: the thickness of the coal seam 200 is 1.3m-2.5m, the tunnel height is greater than the thickness of the coal seam 200 and not greater than twice the thickness of the coal seam 200, the coal seam 200 is on the top and the rock layer 100 is on the bottom, and the tunnel formation includes the following steps:

[0049] S1, mining the coal seam 200 and transporting the coal out, using the space formed by the excavation of the coal seam 200 to form a free surface of the rock layer 100. The space of the coal seam 200 excavated by such a tunnel can provide sufficient height space for support, and the tunnel roof can be supported in time with the excavation of the coal seam 200;

[0050] S2, after the coal seam 200 is mined for a certain distance, the rock layer 100 located behind is drilled and pre-cracked, and then the rock is scraped, crushed and transported out.

[0051] By adopting the above method, the coal excavation and rock excavation working faces are staggered and arranged in a stepped manner as a whole, so as to realize the layered excavation of the coal seam 200 and the rock layer 100, and the separate transportation of coal blocks and rock blocks, and achieve highly parallel coal and rock excavation operations, avoid the mixed transportation of coal and rock, resulting in loss of coal resources, or the mixing of rocks in coal and resulting in deterioration of coal quality, and at the same time, breaking the rock before excavating the rock layer 100 can improve the excavation efficiency, thereby improving the overall work efficiency.

[0052] Specifically, the device used in working condition 1 includes a first driving mechanism 4, a first drilling pre-splitting mechanism 1, a cutting mechanism 2, a first supporting mechanism 3, a first conveying mechanism, a first coal mining machine 7 and a second conveying mechanism. The first drilling pre-splitting mechanism 1, the cutting mechanism 2 and the first supporting mechanism 3 are all installed on the first driving mechanism 4 and powered by the first driving mechanism 4. The first drilling pre-splitting mechanism 1 is used to drill and pre-split different positions of the rock section of the tunnel to reduce the rock strength, facilitate rapid excavation of the rock layer 100, improve the excavation efficiency, and cut the rock layer 100. The cutting mechanism 2 is used to cut the rock and transport the cut rock blocks out through the first conveying mechanism. The first supporting mechanism 3 is used to support the tunnel roof with anchor cables 24. The first coal mining machine 7 and the second conveying mechanism are both located below the first conveying mechanism, which conforms to the tunnel characteristics of the rock layer 100 above and the coal layer 200 below, and allows the excavation of the coal layer 200 and the excavation of the rock layer 100 to operate in parallel without affecting each other. The first coal mining machine 7 is used to mine the coal layer 200 and transport the coal blocks out through the second conveying mechanism, which can avoid the mixing of coal blocks and rock blocks and affect the quality of coal resources. At the same time, the first drilling pre-splitting mechanism 1 and the cutting mechanism 2 are both existing mature products, and their specific structures and working principles are consistent with the existing technology, which will not be repeated here.

[0053] The first conveying mechanism includes a first belt conveyor 5 and a plurality of first lifting frames 6. The plurality of first lifting frames 6 are arranged along the length direction of the first belt conveyor 5 and are installed at the lower end of the first belt conveyor 5. The first lifting frame 6 is used to support the first belt conveyor 5 without affecting the transmission of the first belt conveyor 5, thereby ensuring the stable transportation of rock blocks. The first lifting frame 6 can be lifted and lowered to realize the folding or lowering of the lower end of the first lifting frame 6. While the first lifting frame 6 is used to stably support the first belt conveyor 5, when the first coal mining machine 7 reaches the corresponding position of the first lifting frame 6, the first lifting frame 6 can be lifted to avoid affecting the normal coal mining of the first coal mining machine 7. Moreover, by adjusting the height of the first lifting frame 6, the height of the first belt conveyor 5 can be adjusted.

[0054] The second conveying mechanism includes a second belt conveyor 8 and a plurality of first belt supports 9. The plurality of first belt supports 9 are arranged along the length direction of the second belt conveyor 8 and installed at the lower end of the second belt conveyor 8. The first belt supports 9 are used to support the second belt conveyor 8 to achieve stable transportation of coal blocks through the second belt conveyor 8.

[0055] The devices used in working conditions 2 and 3 include a second coal mining machine 10, a second driving mechanism 11, a second supporting mechanism 12, a third conveying mechanism, a coal-gangue separation and conveying mechanism, a second drilling pre-splitting mechanism 16, a slag removal mechanism 15, a third driving mechanism 17 and a fourth conveying mechanism. The second coal mining machine 10 and the second supporting mechanism 12 are both installed on the second driving mechanism 11 and powered by the second driving mechanism 11. The second coal mining machine 10 is used to mine the coal seam 200, and transport the coal blocks to the coal-gangue separation and conveying mechanism through the third conveying mechanism, and then send the coal blocks out through the coal-gangue separation and conveying mechanism. The second drilling pre-splitting mechanism 16, the slag removal mechanism 15, the third driving mechanism 17 and the fourth conveying mechanism are all located below the third conveying mechanism, in accordance with the coal seam 200. 0 on top and rock layer 100 below, and the coal seam 200 excavation and rock layer 100 excavation are carried out in parallel without affecting each other. The third driving mechanism 17 is used to provide power for the second drilling pre-splitting mechanism 16 and the slag removal mechanism 15. The second drilling pre-splitting mechanism 16 is used to drill and pre-split different positions of the rock layer 100 section of the roadway to reduce the rock strength, facilitate the rapid excavation of the rock layer 100, and improve the excavation efficiency. The slag removal mechanism 15 is used to crush the pre-splitting rock, and transport the crushed rock blocks to the coal gangue separation and transportation mechanism through the fourth transportation mechanism, and then send the rock blocks out through the coal gangue separation and transportation mechanism. The coal gangue separation and transportation mechanism is used to transport coal blocks and rock blocks separately to avoid mixing of coal blocks and rock blocks and affecting the quality of coal resources. The second drilling pre-splitting mechanism 16 and the slag removal mechanism 15 are both existing mature products, and their specific structures and working principles are consistent with the existing technology, which will not be repeated here.

[0056] The third conveying mechanism includes a third belt conveyor 14 and a plurality of suspension brackets 13. The plurality of suspension brackets 13 are arranged along the length direction of the third belt conveyor 14 and installed on the upper end of the third belt conveyor 14. The suspension brackets 13 are used to hoist the third belt conveyor 14. The upper end of the suspension brackets 13 is hoisted to the tunnel roof through anchor rods or anchor cables 24 to ensure stable transmission of the third belt conveyor 14 to realize the transportation of coal blocks, and the hoisting design will not affect the excavation of the rock layer 100.

[0057] The fourth conveying mechanism includes a fourth belt conveyor 18 and a plurality of second belt supports 19. The plurality of second belt supports 19 are arranged along the length direction of the fourth belt conveyor 18 and installed at the lower end of the fourth belt conveyor 18. The second belt supports 19 are used to support the fourth belt conveyor 18 to achieve stable conveying of rock blocks through the fourth belt conveyor 18.

[0058] The coal-gangue separation and conveying mechanism comprises a gangue belt conveyor 21, a coal conveying belt conveyor 23, a plurality of third belt brackets 20 and a plurality of connecting brackets 22. The upper end surface of the coal conveying belt conveyor 23 is not higher than the upper end surface of the third conveying mechanism, so as to ensure that the coal blocks on the third conveying mechanism can fall onto the coal conveying belt conveyor 23. The upper end surface of the gangue belt conveyor 21 is not higher than the upper end surface of the fourth conveying mechanism, so as to ensure that the rock blocks on the fourth conveying mechanism can fall onto the gangue belt conveyor 21. The connecting bracket 22 is installed between the coal conveying belt conveyor 23 and the gangue belt conveyor 21, and is used to support the coal conveying belt conveyor 23, so that the coal conveying belt conveyor 23 is parallel to the gangue belt conveyor 21 and is arranged in layers, so as to facilitate the separate conveying of coal blocks and rock blocks. The third belt bracket 20 is installed at the lower end of the gangue belt conveyor 21 and is used to support the gangue belt conveyor 21. For the above-mentioned belt conveyors, all are telescopic belt conveyors.

[0059] The present specification uses specific examples to illustrate the principles and implementation methods of the present invention. The above examples are only used to help understand the method and core idea of ​​the present invention. At the same time, for those skilled in the art, according to the idea of ​​the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.

Claims

1. A method for rapid tunneling of semi-coal and rock tunnels. Features: The following conditions are included: Working condition 1: The thickness of the coal seam is 0.5m-1.3m, the tunnel height is more than 2 times the coal seam height, and the rock layer is soft, the rock layer is on the top and the coal seam is on the bottom. The tunneling includes the following steps: S1, drilling and pre-splitting the rock section of the tunnel, then cutting and transporting the rock out, and supporting the tunnel roof; S2, mining the coal seam and transporting the coal out; The device used in the working condition 1 includes a first driving mechanism, a first drilling pre-splitting mechanism, a cutting mechanism, a first supporting mechanism, a first conveying mechanism, a first coal mining machine and a second conveying mechanism. The first drilling pre-splitting mechanism, the cutting mechanism and the first supporting mechanism are all installed on the first driving mechanism and powered by the first driving mechanism. The first drilling pre-splitting mechanism is used to drill and pre-split the rock section of the tunnel. The cutting mechanism is used to cut the rock and transport the generated rock blocks out through the first conveying mechanism. The first supporting mechanism is used to anchor the tunnel roof. The first coal mining machine and the second conveying mechanism are both located below the first conveying mechanism, and the first coal mining machine is used to mine the coal seam and transport the coal blocks out through the second conveying mechanism. Working condition 2: The thickness of the coal seam is 0.5m-1.3m, the tunnel height is more than 2 times the coal seam height, and the rock is hard. The coal seam is on the top and the rock layer is on the bottom. The tunneling includes the following steps: S1, mining the coal seam and transporting the coal out; S2, breaking the rock and transporting the rock slag out, and staggering the coal seam excavation and the rock seam excavation, with the coal seam excavation ahead of the rock seam excavation, to support the tunnel roof; Working condition 3: The thickness of the coal seam is 1.3m-2.5m, the tunnel height is greater than the thickness of the coal seam but not greater than twice the thickness of the coal seam, the coal seam is on the top and the rock layer is on the bottom. The tunneling includes the following steps: S1, mining the coal seam, transporting the coal out, and supporting the tunnel roof; S2, after the coal seam is mined for a certain distance, the rock layer behind is drilled and pre-cracked, and then the rock is scraped, crushed and transported out; The devices used in the working conditions 2 and 3 include a second coal mining machine, a second driving mechanism, a second supporting mechanism, a third conveying mechanism, a coal-gangue separation and conveying mechanism, a second drilling pre-splitting mechanism, a slag removal mechanism, a third driving mechanism and a fourth conveying mechanism. The second coal mining machine and the second supporting mechanism are both installed on the second driving mechanism and powered by the second driving mechanism. The second coal mining machine is used to mine coal seams and transport coal blocks to the coal-gangue separation and conveying mechanism via the third conveying mechanism. The second drilling pre-splitting mechanism, the slag removal mechanism, the third driving mechanism and the fourth conveying mechanism are all located below the third conveying mechanism, and the third driving mechanism is used to provide power for the second drilling pre-splitting mechanism and the slag removal mechanism. The second drilling pre-splitting mechanism is used to drill and pre-split the rock section of the tunnel. The slag removal mechanism is used to crush the pre-splitting rock and transport the crushed rock blocks to the coal-gangue separation and conveying mechanism via the fourth conveying mechanism. The coal-gangue separation and conveying mechanism is used to transport coal blocks and rock blocks separately. The coal-gangue separation and conveying mechanism includes a gangue belt conveyor, a coal transport belt conveyor, a plurality of third belt brackets and a plurality of connecting brackets. The upper end surface of the coal transport belt conveyor is not higher than the upper end surface of the third conveying mechanism, and the coal transport belt conveyor is used to receive and convey the coal blocks on the third conveying mechanism. The upper end surface of the gangue belt conveyor is not higher than the upper end surface of the fourth conveying mechanism, and the gangue belt conveyor is used to receive and convey the rock blocks on the fourth conveying mechanism. The connecting bracket is installed between the coal transport belt conveyor and the gangue belt conveyor and is used to support the coal transport belt conveyor. The third belt bracket is installed at the lower end of the gangue belt conveyor and is used to support the gangue belt conveyor.

2. The method for rapid tunneling of semi-coal-rock tunnel according to claim 1, Features: The first conveying mechanism includes a first belt conveyor and a plurality of first lifting frames, wherein the plurality of first lifting frames are arranged along the length direction of the first belt conveyor and installed at the lower end of the first belt conveyor, and the first lifting frames are used to support the first belt conveyor, and the first lifting frames can be raised and lowered to realize the folding or lowering of the lower end of the first lifting frames.

3. The method for rapid tunneling of semi-coal-rock tunnel according to claim 1, Features: The second conveying mechanism includes a second belt conveyor and a plurality of first belt supports, wherein the plurality of first belt supports are arranged along the length direction of the second belt conveyor and installed at the lower end of the second belt conveyor, and the first belt supports are used to support the second belt conveyor.

4. The method for rapid tunneling of semi-coal-rock tunnel according to claim 1, Features: The third conveying mechanism includes a third belt conveyor and a plurality of suspension brackets, wherein the plurality of suspension brackets are arranged along the length direction of the third belt conveyor and installed on the upper end of the third belt conveyor, and the suspension brackets are used to hoist the third belt conveyor, and the upper end of the suspension brackets is hoisted to the tunnel roof by anchor rods or anchor cables.

5. The method for rapid tunneling of semi-coal-rock tunnel according to claim 1, Features: The fourth conveying mechanism includes a fourth belt conveyor and a plurality of second belt brackets, wherein the plurality of second belt brackets are arranged along the length direction of the fourth belt conveyor and installed at the lower end of the fourth belt conveyor, and the second belt brackets are used to support the fourth belt conveyor.

6. The semi-coal-rock tunnel rapid tunneling method according to claim 1, Features: In the second working condition, the coal seam excavation is 40m-60m ahead of the rock stratum excavation.

Citation Information

Patent Citations

  • High gas outburst coal mine thin coal seam half-coal-rock top cutting roadway fast excavation system

    CN106812532A

  • Method of forming anti-impact weak structural layer of roadway by detonating cracking of coal rock

    CN111255465A