A method for safe launching and receiving of pipe jacking under high water pressure conditions

By reinforcing the working well and receiving well area under high water pressure conditions, and receiving the pipe jacking machine head underwater, safety risks such as backflow, pushback and well flooding during pipe jacking construction have been solved, and pipe jacking has been achieved. Safe origination and stable reception.

CN115306408BActive Publication Date: 2024-10-01NUCLEAR IND WELL LANE CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211161710.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-23
Publication Date
2024-10-01
Estimated Expiration
2042-09-23

AI Technical Summary

Technical Problem

Under high water pressure conditions, pipe jacking construction involves safety risks such as backflow at the start, pipe being pushed back, kowtow, and well flooding. It is difficult for existing technology to effectively overcome these problems.

Method used

By reinforcing the inlet of the working well, the outlet of the receiving well and the backrest area behind the working well, installing a pipeline stop device, receiving the head of the pipe jacking machine underwater, and using guide rail components and water stop devices to avoid sand and water intrusion and ensure the stability of the pipeline Advance and receive safely.

Benefits of technology

It realizes that the pipe jacking can be started safely under high water pressure without being pushed back, avoiding the phenomena of sand, water and head knocking, ensuring construction safety and pipeline stability, and reducing construction risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115306408B_ABST
    Figure CN115306408B_ABST
Patent Text Reader

Abstract

A method for safely launching and receiving a jacking pipe under high water pressure conditions comprises the following steps: 1: installing a guide rail assembly at the lower end of a pipeline before laying the pipeline, and installing a receiving device in a receiving well; 2: reinforcing a working well inlet, a receiving well outlet and a backrest area behind the working well by means of high-pressure jetting piles, so as to form a reinforced area around the working well inlet, the receiving well outlet and the backrest area behind the working well; 3: installing a water stop device between the working well inlet and the pipeline, and between the receiving well outlet and the pipeline; 4: installing a stop device on the pipeline close to one end of the working well; and 5: receiving a head of a jacking machine underwater. The present invention reinforces the working well inlet, the receiving well outlet and the backrest area behind the working well, and installs a pipeline stop device, so that the jacking pipe can be safely launched under high water pressure and will not be pushed back into the working well; at the same time, underwater receiving, installation of a water stop device and other technologies are adopted to avoid sand and water gushing, so as to facilitate and safely remove the head of the jacking machine.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of trenchless pipe jacking construction under high water pressure, and in particular relates to a method for safely launching and receiving pipe jacking under high water pressure conditions. Background Art

[0002] Trenchless construction refers to the use of various rock and soil drilling equipment and technical means to excavate a very small part of the surface through guiding and directional drilling, etc. Generally refers to a small area of ​​excavation at the entrance and exit, and a new construction technology for laying, replacing and repairing various underground pipelines. It will not hinder traffic, will not damage green spaces and vegetation, and will not affect the normal life and work order of shops, hospitals, schools and residents. It solves the interference of traditional excavation construction on residents' lives, damage and adverse effects on traffic, environment, and the foundations of surrounding buildings, and therefore has a higher social and economic effect.

[0003] The advantages of trenchless technology are obvious, and among trenchless technologies with a diameter less than or equal to 4m, the advantages of pipe jacking are more obvious and are widely used in the fields of electricity, petrochemicals, water supply, drainage, etc. In today's rapid economic and technological development, crossing lakes, rivers and seas are becoming more and more common. However, pipe jacking excavation technology under high water pressure conditions is different from pipe jacking excavation technology without water and with lower water pressure. The excavation difficulty is increased and there are greater construction safety risks, such as: there is a risk of lake water, river water or sea water backflowing into the working well when the pipe jacking machine is started; there is a risk that the pipe jacking machine and the pipeline are pushed back to the working well by high water pressure; there is a risk of the head of the pipe jacking machine "knocking" as soon as it passes through the working well; there is a risk of flooding the well or sand and water gushing when the pipe jacking machine is received.

[0004] For example, the application number is CN201921677800.1, and the name is a water-stopping device for the exit of a jacking construction, which includes a steel casing on a concrete well wall, and the steel casing includes a side plate located on the horizontal side of the concrete well wall, and the side of the side plate is provided with a rubber plate, an annular steel plate and a fan-shaped steel plate in sequence, and the rubber plate, the annular steel plate and the fan-shaped steel plate are fixed to the side plate by bolts. This technical solution achieves water-stopping of the exit of the receiving well, avoiding sand and water gushing from the exit, but it cannot overcome the problems of the jacking machine and the pipeline being pushed back under high water pressure, and the pipe machine just "knocking".

[0005] For example, the application number is CN202021251777.2, and the name is a device for preventing the retreat of a pipe jacking construction in a high water pressure and highly permeable formation, which includes a plurality of clamp structures arranged around the pipe jacking, and the clamp structures are fixed with brake pads on the side facing the pipe jacking, and also includes an assembled fixed ring frame arranged around the pipe jacking for fixing the clamp structure, and the clamp structure is provided with a wire rope through hole, and also includes a winch, and the output end of the winch is connected and fixed with a wire rope, and also includes a detachable assembled fixed bracket for connecting and fixing with the fixed ring frame and a working well bottom plate arranged on the surface layer for fixing with the fixed bracket, and the wire rope is connected and fixed with the working well bottom plate after passing through the wire rope through hole. This technical solution avoids the retreat of the pipeline and helps the pipe jacking overcome the head pressure, but it cannot overcome the risk of sand and water gushing from the cave entrance or flooding of the well.

[0006] Therefore, faced with the many unfavorable factors and safety risks brought by high water pressure to pipe jacking construction, a method for safe initiation and reception of pipe jacking under high water pressure conditions was developed to address these unfavorable factors and safety risks. Summary of the invention

[0007] The present invention aims to overcome the defects in the above-mentioned prior art and provide a method for safely launching and receiving a jacking pipe under high water pressure conditions. By reinforcing the entrance of the working well, the exit of the receiving well and the backrest area behind the working well, and installing a pipeline stop device, the jacking pipe can be safely launched under high water pressure and will not be pushed back into the working well. At the same time, underwater receiving, installation of water-stopping devices and other technologies are adopted to avoid sand and water gushing, so as to facilitate and safely remove the head of the jacking machine.

[0008] In order to achieve the above purpose, the technical solution adopted by the present invention is: a method for safely launching and receiving pipe jacking under high water pressure conditions, comprising:

[0009] Step 1: The working well leads to the receiving well through a passage, a pipeline is installed in the passage, a guide rail assembly is installed at the lower end of the pipeline before laying the pipeline, and a receiving device is installed in the receiving well;

[0010] Step 2: The working well inlet, the receiving well outlet and the backrest area of ​​the working well are reinforced by high-pressure jet grouting piles or three-axis mixing piles to form a reinforcement area around the working well inlet, the receiving well outlet and the backrest area of ​​the working well, wherein the reinforcement area respectively connects the working well inlet and the pipeline, the receiving well outlet and the pipeline, and the backrest area of ​​the working well and the surrounding soil;

[0011] Step 3: Install water-stopping devices between the working well inlet and pipeline, and between the receiving well outlet and pipeline;

[0012] Step 4: Install a stop device on the pipe near one end of the working well.

[0013] As a preferred solution of the present invention, it includes step 5: receiving the head of the pipe jacking machine underwater.

[0014] As a preferred solution of the present invention, the guide rail assembly includes a guide rail base and a guide rail, and the guide rail base is welded to the embedded parts on the bottom plate of the working well; the receiving device is composed of a cast receiving base, and the receiving base is located in the receiving well, and the receiving base can lift the head of the pipe jacking machine, or the receiving device is composed of a plurality of extended guide rails, and the extended guide rails are located in the receiving well to lift the head of the pipe jacking machine.

[0015] As a preferred solution of the present invention, at least three reinforcement areas are arranged around the entrance of the working shaft, at least three reinforcement areas are arranged around the exit of the receiving shaft, and at least three reinforcement areas are arranged around the backrest area behind the working shaft; the height dimension of the reinforcement area is between 1.5m and 2m, and the length dimension of the reinforcement area is equal to the length dimension of the head of the pipe jacking machine or is 2m longer than the length dimension of the head of the pipe jacking machine.

[0016] As a preferred embodiment of the present invention, the cement strength grade of the high-pressure jet grouting piles in the reinforcement area is not less than 42.5 grade fresh ordinary Portland cement; the slurry water-cement ratio of the high-pressure jet grouting piles is 1.0, and the addition amount is not less than 25%.

[0017] As a preferred solution of the present invention, the water-stopping device comprises a first steel casing and a second steel casing, and the diameter of the first steel casing is larger than the diameter of the second steel casing.

[0018] As a preferred solution of the present invention, the first steel casing and the second steel casing include a first-layer steel frame, a rubber ring, an inflatable airbag, and a mounting base; a rubber ring is arranged on the outer surface of the first-layer steel frame on one side facing the working well entrance and the receiving well exit, and the rubber ring is fixed to the first-layer steel frame by screws, and an inflatable airbag is arranged in the first-layer steel frame, and the inflatable airbag is covered with a layer of rubber ring, and the inflatable airbag changes its size by inflation and deflation, and the mounting base is used for the installation of the first steel casing and the second steel casing in the pipeline.

[0019] As a preferred solution of the present invention, the first steel casing and the second steel casing include a first steel frame, a second steel frame, a rubber ring, an inflatable airbag, and a mounting base; a rubber ring is arranged on the outer surface of the first steel frame on one side facing the working well entrance and the receiving well exit, a rubber ring is arranged between the first steel frame and the second steel frame, the first steel frame and the second steel frame are connected by axially arranged screws, and the screws pass through the rubber rings between the first steel frame and the second steel frame, inflatable airbags are arranged in the first steel frame and the second steel frame, and the inflatable airbags are covered with a layer of rubber rings, and the inflatable airbags change their size by inflation and deflation, and the mounting base is used for the installation of the first steel casing and the second steel casing in the pipeline.

[0020] As a preferred embodiment of the present invention, the anti-retreat device includes an iron block installed on the guide rail assembly, there are two iron blocks and both are located at the lower end of the pipe, one end of the iron block is welded to the pipe, and the other end of the iron block is welded to the guide rail assembly.

[0021] As a preferred embodiment of the present invention, the step of receiving the head of the pipe jacking machine underwater includes: step 51, pouring a receiving base in a receiving well; step 52, filling the receiving well with clay and pouring water; step 53, grouting and reinforcing between the pipeline and the channel; step 54, taking out the head of the pipe jacking machine.

[0022] The beneficial effects of the present invention are:

[0023] 1. The present invention proposes a method for safely launching and receiving pipe jacking under high water pressure conditions, which ensures that the pipe moves forward in a specified direction by installing a guide rail assembly at the lower end of the pipe, and installing a receiving device in the receiving well to prevent the pipe jacking machine from failing to obtain stable support when arriving at the receiving well and thus causing a knock.

[0024] 2. The method for safely launching and receiving pipe jacking under high water pressure conditions proposed by the present invention uses high-pressure jet grouting piles or three-axis mixing piles to reinforce the working well entrance, receiving well exit, and backrest area of ​​the working well, ensuring that the working well, receiving well, and pipeline are stably established in the original position to avoid them from moving away from the original position. Furthermore, it prevents the pipe jacking machine shuttling inside from knocking due to changes in the positions of the working well, receiving well, and pipeline.

[0025] 3. In the method for safely launching and receiving pipe jacking under high water pressure conditions proposed by the present invention, water-stopping devices need to be installed between the entrance of the working well and the pipeline, and between the exit of the receiving well and the pipeline, so as to prevent a large amount of groundwater and sediment from rushing into the gap and the inlet and outlet of the pipeline, causing the surface above the cave to collapse, and even causing accidents, which will affect the safety of surrounding structures and underground pipelines.

[0026] 4. The anti-retraction device of the method for safely launching and receiving pipe jacking under high water pressure conditions proposed by the present invention can be used to prevent the backward trend of the pipeline, help the pipeline that has been pushed into the channel to overcome the high water pressure, and reduce the risk of the pipeline and the pipe jacking machine inside it being pushed back into the working well by the high water pressure.

[0027] 5. The method for safely launching and receiving pipe jacking under high water pressure conditions proposed by the present invention ensures the pressure balance in the pipeline and the receiving well through the underwater receiving pipe jacking machine head, which can effectively avoid the problem of water and sand gushing in the receiving well. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 is a plan view of an embodiment of the present invention;

[0029] Figure 2 is a side schematic diagram of an embodiment of the present invention;

[0030] Figure 3 is a schematic diagram of the three-dimensional structure of the reinforcement area according to an embodiment of the present invention;

[0031] Figure 4 is a schematic diagram of the structure of a receiving base according to an embodiment of the present invention;

[0032] Figure 5 is a schematic diagram of the extended guide rail structure of an embodiment of the present invention;

[0033] Figure 6 The structure of the water stop device of the embodiment of the present invention is shown in FIG. Figure 1 ;

[0034] Figure 7 The structure of the water stopping device of the embodiment of the present invention is shown in FIG. Figure 2 ;

[0035] Figure 8 It is a schematic structural diagram of a retreat-stopping device according to an embodiment of the present invention;

[0036] Fig. 9 It is a schematic diagram of the structure of the grouting hole in the pipeline according to an embodiment of the present invention;

[0037] The reference numerals in the figure are: working shaft 1, receiving shaft 2, reinforcement area 3, pipeline 4, guide rail assembly 5, pipe jacking machine head 6, receiving device 7, channel 8, working shaft entrance 9, receiving shaft exit 10, working shaft rear backrest area 11, jack 12, tool pipe 13, grouting hole 14, pipe segment 41, guide rail base 51, guide rail 52, receiving base 71, extension guide rail 72, water stop device 100, first steel casing 101, second steel casing 102, anti-retraction device 200, iron block 201, first layer steel frame 1011, second layer steel frame 1012, rubber ring 1013, inflatable airbag 1014, installation base 1015. DETAILED DESCRIPTION

[0038] The embodiments of the present invention are described in detail below with reference to the accompanying drawings.

[0039] like Figure 1-Figure 9 As shown, a method for safely launching and receiving pipe jacking under high water pressure conditions includes:

[0040] Step 1: The working well 1 leads to the receiving well 2 through the channel 8, the pipeline 4 is installed in the channel 8, the guide rail assembly 5 is installed at the lower end of the pipeline 4 before the pipeline 4 is laid, and the receiving device 7 is installed in the receiving well 2;

[0041] Step 2: The working well inlet 9, the receiving well outlet 10 and the working well backrest area 11 are reinforced by high-pressure jet grouting piles or three-axis mixing piles to form a reinforcement area 3 surrounding the working well inlet 9, the receiving well outlet 10 and the working well backrest area 11, wherein the reinforcement area 3 respectively connects the working well inlet 9 and the pipeline 4, the receiving well outlet 10 and the pipeline 4, and the working well backrest area 11 and the surrounding soil;

[0042] Step 3: Install a water stopping device 100 between the working well inlet 9 and the pipeline 4, and between the receiving well outlet 10 and the pipeline 4;

[0043] Step 4: Install the anti-retraction device 200 on the pipeline 4 near one end of the working well 1.

[0044] Step 5: Receive the pipe jacking machine head 6 underwater.

[0045] Specifically, a guide rail assembly 5 is installed at the lower end of the pipeline 4, which guides the pipeline 4 to ensure that the pipeline 4 moves forward in the designed direction, and a receiving device 7 is installed in the receiving well 2 to prevent the jacking machine from failing to obtain stable support when arriving at the receiving well 2 and thus causing a banging phenomenon.

[0046] The working well 1 and the receiving well 2 are connected by a channel 8, the entrance of the working well 1 into the channel 8 is the working well entrance 9, the exit of the channel 8 to the receiving well 2 is the receiving well exit 10, the backrest area 11 at the back of the working well is the location where the power element is installed in the working well, and the power element provides initial power for the pipe jacking machine to drill holes; the working well entrance 9, the receiving well exit 10, and the backrest area 11 at the back of the working well are reinforced by high-pressure rotary jet piles or three-axis mixing piles to ensure that the working well 1, the receiving well 2, and the pipeline 4 are stably established in the original position to avoid them from being separated from the original position, and further, to avoid the pipe jacking machine shuttling therein from kowtow due to the change in the position of the working well 1, the receiving well 2, and the pipeline 4, the kowtow phenomenon being the phenomenon that the head of the pipe jacking machine sinks and the tail rises.

[0047] There is a certain gap between the pipeline 4 and the working well entrance 9 or the pipeline 4 and the receiving well exit 10. If the gap is not water-stopped, groundwater and silt will flow from the gap into the channel 8, thereby affecting the normal operation in the channel 8. On the other hand, groundwater and silt are also easy to flow directly into the pipeline 4 through the outlet and inlet of the pipeline 4, affecting the normal operation of the pipeline 4. Therefore, a water-stop device 100 needs to be installed between the working well entrance 9 and the pipeline 4, and between the receiving well exit 10 and the pipeline 4, to prevent a large amount of groundwater and silt from pouring into the gap and the outlet and inlet of the pipeline 4, causing the surface collapse of the upper part of the hole, and even causing accidents, which will affect the safety of surrounding structures and underground pipelines.

[0048] Under high water pressure conditions, when parts such as the jacking iron between the pipe 4 and the jack 12 need to be replaced or maintained, there is a gap between the pipe 4 and the jack 12, and the pipe 4 will be pushed back into the working well 1 under the action of the high water pressure. The installation of the anti-retreat device 200 can be used to prevent the backward trend of the pipe 4, help the pipe 4 that has been pushed into the channel 8 to overcome the high water pressure, and reduce the risk of the pipe 4 and the pipe jacking machine inside it being pushed back into the working well 1 by the high water pressure.

[0049] The underwater receiving pipe jacking machine head 6 ensures the pressure balance in the pipeline 4 and the receiving well 2, and can effectively avoid the problem of water and sand gushing in the receiving well 2.

[0050] The guide rail assembly 5 includes a guide rail base 51 and a guide rail 52, and the guide rail base 51 is welded to the embedded parts on the bottom plate of the working well 1; the receiving device 7 is composed of a cast receiving base 71, and the receiving base 71 is located in the receiving well 2, and the receiving base 71 can lift the head 6 of the pipe jacking machine, or the receiving device 7 is composed of a plurality of extended guide rails 72, and the extended guide rails 72 are located in the receiving well 2 to lift the head 6 of the pipe jacking machine.

[0051] Specifically, the pipeline 4 is placed on the guide rail assembly 5 before jacking. When the pipeline 4 enters the channel 8, the guide rail assembly 5 assumes the guiding function to ensure that the pipe section of the pipeline 4 moves forward according to the designed distance. The guide rail 52 is made of 45kg / m heavy-duty steel rails. The guide rail base 51 of the guide rail assembly 5 is placed on the bottom plate of the working well 1 and welded to the embedded parts on the bottom plate 1, so that the entire guide rail assembly 5 will not be displaced during use, forming a stable and firm guide support.

[0052] At the same time, the guide rail assembly 5 may sometimes produce left and right or high and low deviations during the jacking construction process. The preventive measures are as follows: first, reinforce or replace the guide rail 52; second, correct the offset guide rail 52 and fix it with a firm support or welded anchor steel bars; third, reinforce the bottom plate of the working pit 1.

[0053] For heavier pipe jacking machines or tunnel boring machines, they should be prevented from knocking when reaching the receiving shaft 2. On the one hand, some hard clay can be filled in the lower part of the receiving shaft 2 or a support plate can be poured in the lower part of the hole with low-grade concrete. The support plate is the receiving base 71, which can lift the pipe jacking machine or tunnel boring machine to prevent it from knocking. Alternatively, a short extension guide rail 72 can be pre-installed in the receiving shaft 2 to lift the pipe jacking machine or tunnel boring machine to prevent it from knocking.

[0054] At least three working shaft entrance openings 9 are arranged in the reinforcement area 3, at least three receiving shaft exit openings 10 are arranged in the reinforcement area 3, and at least three rear backrest areas 11 of the working shaft are arranged in the reinforcement area 3; the height dimension of the reinforcement area 3 is between 1.5m and 2m, and the length dimension of the reinforcement area 3 is equal to the length dimension of the head 6 of the pipe jacking machine or is 2m longer than the length dimension of the head 6 of the pipe jacking machine.

[0055] The cement strength grade of the high-pressure jet grouting piles in the reinforcement area 3 is not less than 42.5 grade fresh ordinary Portland cement; the slurry water-cement ratio of the high-pressure jet grouting piles is 1.0, and the addition amount is not less than 25%. In order to improve the anti-seepage effect, appropriate water glass can be added.

[0056] Specifically, when the working well 1 and the receiving well 2 are established in the center of a lake, river or sea, the head 6 of the pipe jacking machine is followed by a 2m long tool pipe 13. Therefore, in order to adapt to the power of the head 6 of the pipe jacking machine during operation, the length dimension of the reinforcement area 3 is the length dimension of the head 6 of the pipe jacking machine; and when the working well entrance 9 and the receiving well exit 10 are established in the center of a lake, river or sea, the length dimension of the reinforcement area 3 should be the total length dimension of the head 6 of the pipe jacking machine and the tool pipe 13.

[0057] Among them, the construction of reinforcement area 3 must undergo on-site hole drilling test, and the construction parameters such as grouting pressure in reinforcement area 3 are determined after the on-site hole drilling test.

[0058] After the construction of reinforcement area 3 is completed, the unconfined compressive strength of reinforcement area 3 is greater than or equal to 0.8Mpa, and the permeability coefficient is less than or equal to 1x10 -7 cm / s.

[0059] The water-stopping device 100 comprises a first steel casing 101 and a second steel casing 102 . The diameter of the first steel casing 101 is greater than the diameter of the second steel casing 102 .

[0060] The first steel casing 101 and the second steel casing 102 include a first-layer steel frame 1011, a rubber ring 1013, an inflatable airbag 1014, and a mounting base 1015; a rubber ring 1013 is arranged on the outer surface of the first-layer steel frame 1011 on one side facing the entrance of the working shaft 1 and the exit of the receiving shaft 2, and the rubber ring 1013 is fixed to the first-layer steel frame 1011 by screws, and an inflatable airbag 1014 is arranged in the first-layer steel frame 1011, and the inflatable airbag 1014 is covered with a layer of rubber ring. The inflatable airbag 1014 changes its size by inflation and deflation, and the mounting base 1015 is used for the installation of the first steel casing 101 and the second steel casing 102 in the pipeline 4.

[0061] On the other hand, the first steel casing 101 and the second steel casing 102 may also include a first steel frame 1011, a second steel frame 1012, a rubber ring 1013, an inflatable airbag 1014, and a mounting base 1015; the first steel frame 1011 is provided with a rubber ring 1013 on the outer surface of one side facing the entrance of the working well 1 and the exit of the receiving well 2, and a rubber ring 1013 is provided between the first steel frame 1011 and the second steel frame 1012. The frames 1012 are connected by axially arranged screws, and the screws pass through the rubber ring 1013 between the first steel frame 1011 and the second steel frame 1012. Inflatable airbags 1014 are arranged in the first steel frame 1011 and the second steel frame 1012. The inflatable airbags 1014 are covered with a layer of rubber ring. The inflatable airbags 1014 change their size by inflation and deflation. The mounting base 1015 is used for the installation of the first steel casing 101 and the second steel casing 102 in the pipeline 4.

[0062] Specifically, the diameter of the first steel casing 101 is larger than the diameter of the second steel casing 102, and the jacking machine can quickly enter the channel 8 from the first steel casing 101. In order to avoid the jacking machine from knocking when exiting the hole, the diameter of the second steel casing 102 is smaller than the diameter of the first steel casing 101.

[0063] The first steel frame 1011, the second steel frame 1012, the rubber ring 1013, the inflatable airbag 1014, and the mounting base 1015 constitute the first steel casing 101 and the second steel casing 102. The first steel frame 1011 and the second steel frame 1012 are connected by screws. A rubber ring 1013 is also provided between the first steel frame 1011 and the second steel frame 1012. The double-layer rubber ring 1013 and the double-layer inflatable airbag 1014 are used to seal the working well entrance 9 and the pipeline 4, and the receiving well exit 10 and the pipeline 4.

[0064] The first steel casing 101 and the second steel casing 102 can be composed of a first-layer steel frame 1011, a rubber ring 1013, an inflatable airbag 1014, and a mounting base 1015, or can be composed of a first-layer steel frame 1011, a second-layer steel frame 1012, a rubber ring 1013, an inflatable airbag 1014, and a mounting base 1015. After adding the second-layer steel frame 1012, the first steel casing 101 and the second steel casing 102 have a multi-layer waterproof structure and have better waterproofness than the former. The structure of the first steel casing 101 and the second steel casing 102 can be flexibly modified according to specific waterproof requirements.

[0065] The quality requirements of rubber ring 1013 are very high. Its elongation is greater than 300%, and its Shore hardness is within the range of 50±5 degrees. It must also have a certain wear resistance and a large breaking force.

[0066] The rubber ring 1013 is fixedly connected to the surface of the first layer of steel frame 1011 by screws. The rubber ring 1013 faces the entrance of the working well 1 and the exit of the receiving well 2. The rubber ring 1013 performs the first sealing of the hole when the head 6 of the jacking machine is not completely in the entrance and exit of the pipeline 4, so as to prevent groundwater and sediment from flowing into the pipeline 4 and the channel 8 from the gap; the inflatable airbag 1014 is located in the middle of the first layer of steel frame 1011, and becomes larger through external inflation. The inflatable airbag 1014 faces the inside of the pipeline 4 and is a thick rubber ring. When the inlet and outlet openings of the pipeline 4 are completely entered, the inflatable airbag 1014 is used to perform a second seal on the opening of the pipeline 4. The pressure inside the inflatable airbag 1014 is greater than the pressure of the external mud. The inflatable airbag 1014 is pressed from the outside to the inside to seal the inlet and outlet openings of the pipeline 4, avoiding sand and water gushing from the pipeline 4 and the channel 8, causing the surface above the opening to collapse, and even causing accidents, endangering the safety of surrounding structures and underground pipelines.

[0067] The anti-retraction device 200 includes an iron block 201 installed on the guide rail assembly 5. There are two iron blocks 201 and both are located at the lower end of the pipe 4. One end of the iron block 201 is welded to the pipe 4, and the other end of the iron block 201 is welded to the guide rail assembly 5.

[0068] Specifically, under high water pressure conditions, during the jacking process of the pipeline 4, the first 50 meters is particularly obvious. When the jacking iron and other parts between the pipeline 4 and the jack 12 need to be replaced or maintained, there is a gap between the jack 12 and the pipeline 4 that has been jacked. The gap time is relatively long. After this time is greater than 1 hour, the pipeline 4 is at risk of being pushed back into the working well 1 by the high water pressure. During this gap period, two inverted triangle iron blocks 201 need to be welded on the track supporting the pipeline 4 to prevent the backward trend of the pipeline 4 and help the pipeline 4 that has been jacked into the soil to overcome the head pressure. When the jacking iron and other parts are replaced or maintained, the anti-retreat device 200 is removed and the operation continues.

[0069] The steps of receiving the head of the pipe jacking machine underwater include: step 51, pouring a receiving base in the receiving well 2; step 52, filling clay and water in the receiving well 2; step 53, grouting and reinforcing between the pipeline 4 and the channel 8; step 54, taking out the head of the pipe jacking machine 6.

[0070] Specifically, when the pipe jacking machine breaks the hole, it will inevitably cause an imbalance in the internal and external pressures. In order to prevent mud and sand from gushing out of the gap between the pipeline 4 and the receiving well outlet 10, causing excessive surface settlement or end stratum collapse accidents, underwater receiving technology is used.

[0071] The pipeline 4 is composed of a plurality of pipe segments 41 .

[0072] The technical steps of underwater receiving of the pipe jacking machine mainly include: step 51, pouring a receiving base in the receiving well 2, the receiving base can be poured into a platform with mortar, and a groove is reserved inside the receiving base, and the groove is used to guide the head 6 of the pipe jacking machine; step 52, after the concrete of the receiving well outlet 10 is broken, clay is backfilled into the receiving well 2, so that the lower part of the pipe jacking machine is supported by soil after passing through the receiving well outlet 10, and the backfilled clay should be compacted. In order to ensure that the internal and external pressures are balanced when the jacking machine head 6 receives, clean water is injected into the receiving well 2 after backfilling the clay to ensure safe reception. Considering the buoyancy generated by the muddy water after the jacking machine head 6 completely enters the receiving well 2, the buoyancy of the jacking machine head 6 at different stages should be calculated to control the liquid level of the muddy water to ensure that the jacking machine head 6 does not float up; step 53, grouting reinforcement between the pipeline 4 and the channel 8, after the jacking machine head 6 completely enters the receiving well 2, the water in the receiving well 2 is pumped out, and concrete is poured in the gap between the receiving well outlet 10 and the pipeline 4 to completely isolate the exposed soil. Then, the pipe segment 41 at the end of the pipeline 4 is grouted and reinforced through the grouting hole 14 on the pre-buried steel ring in the pipeline 4. During the grouting process, pay close attention to the situation of the receiving well outlet 10. Once leakage is found, the grouting should be stopped immediately and plugged. Ensure that the receiving well outlet 10 is grouted densely and the tunnel door ring is tightly plugged. The ten-ring pipe segment 41 near the receiving well exit 10 is grout-filled through the secondary grouting hole, wherein the jacking machine head 6 is followed by a 2m tool pipe 13 of the same size as the head, and the tool pipe 13 is left in the channel 8, which can avoid the inconsistency between the size of the jacking machine head 6 and the pipeline 4, resulting in water gushing around again when the jacking machine head 6 is gas-cut in the subsequent steps; step 54, take out the jacking machine head 6, wait for the ten-ring pipe segment 41 near the receiving well 2 to be grout-cut after solidification, gas-cut the jacking machine head 6, and lift it out of the receiving well 2 by a floating crane or a car crane to complete the underwater jacking construction operation.

[0073] Although this article makes use of the following figures more frequently: working shaft 1, receiving shaft 2, reinforcement area 3, pipeline 4, guide rail assembly 5, pipe jacking machine head 6, receiving device 7, channel 8, guide rail base 51, guide rail 52, receiving base 71, extended guide rail 72, water stop device 100, first steel casing 101, second steel casing 102, anti-retraction device 200, iron block 201, first layer steel frame 1011, second layer steel frame 1012, rubber ring 1013, inflatable airbag 1014 and other terms, the possibility of using other terms is not excluded; these terms are used only to more conveniently describe and explain the essence of the present invention; interpreting them as any additional restrictions is contrary to the spirit of the present invention.

Claims

1. A method for safe launching and receiving of pipe jacking under high water pressure conditions, characterized in that: include Step 1: The working well (1) leads to the receiving well (2) through a passage (8), a pipeline (4) is installed in the passage (8), a guide rail assembly (5) is installed at the lower end of the pipeline (4) before the pipeline (4) is laid, and a receiving device (7) is installed in the receiving well (2), wherein the receiving device (7) is composed of a cast receiving base (71), the receiving base (71) is located in the receiving well (2), and the receiving base (71) can realize the lifting of the head (6) of the pipe jacking machine; Step 2: The working well inlet (9), the receiving well outlet (10) and the working well backrest area (11) are reinforced by high-pressure jet grouting piles or three-axis mixing piles to form a reinforcement area (3) surrounding the working well inlet (9), the receiving well outlet (10) and the working well backrest area (11). The reinforcement area (3) respectively connects the working well inlet (9) and the pipeline (4), the receiving well outlet (10) and the pipeline (4), and the working well backrest area (11) and the surrounding soil. When the working well inlet (9) and the receiving well outlet (10) are located in the center of a lake, a river or a sea, the length of the reinforcement area (3) should be the total length of the pipe jacking machine head (6) and the tool pipe (13); Step 3: installing a water-stopping device (100) between the working well inlet (9) and the pipeline (4), and between the receiving well outlet (10) and the pipeline (4), wherein the water-stopping device (100) comprises a first steel casing (101) and a second steel casing (102), wherein the diameter of the first steel casing (101) is greater than the diameter of the second steel casing (102); Step 4: Install a stopper (200) on the pipeline (4) near one end of the working well (1).

2. A method for safe launching and receiving of pipe jacking under high water pressure conditions according to claim 1, characterized in that: The method comprises step 5: receiving the head (6) of the pipe jacking machine underwater.

3. The method for safe launching and receiving of pipe jacking under high water pressure conditions according to claim 1, characterized in that: The guide rail assembly (5) comprises a guide rail base (51) and a guide rail (52), wherein the guide rail base (51) is welded to an embedded part on the bottom plate of the working well (1); or the receiving device (7) is composed of a plurality of extended guide rails (72), wherein the extended guide rails (72) are located in the receiving well (2) and can lift the head (6) of the pipe jacking machine.

4. The method for safe launching and receiving of pipe jacking under high water pressure conditions according to claim 1, characterized in that: At least three of the reinforcement areas (3) are arranged around the working shaft entrance (9), at least three of the reinforcement areas (3) are arranged around the receiving shaft exit (10), and at least three of the reinforcement areas (3) are arranged around the working shaft rear backrest area (11); the height of the reinforcement area (3) is between 1.5m and 2m, and the length of the reinforcement area (3) is equal to the length of the pipe jacking machine head (6) or is 2m longer than the length of the pipe jacking machine head (6).

5. A method for safe launching and receiving of pipe jacking under high water pressure conditions according to claim 4, characterized in that: The cement strength grade of the high-pressure jet grouting piles in the reinforcement area (3) is not less than 42.5 grade fresh ordinary Portland cement; the slurry water-cement ratio of the high-pressure jet grouting piles is 1.0, and the mixing amount is not less than 25%.

6. A method for safe launching and receiving of pipe jacking under high water pressure conditions according to claim 5, characterized in that: The first steel casing (101) and the second steel casing (102) comprise a first steel frame (1011), a rubber ring (1013), an inflatable airbag (1014), and a mounting base (1015); a rubber ring (1013) is arranged on the outer surface of one side of the first steel frame (1011) facing the entrance of the working well (1) and the exit of the receiving well (2); the rubber ring (1013) is fixed to the first steel frame (1011) by screws; an inflatable airbag (1014) is arranged in the first steel frame (1011); the inflatable airbag (1014) is covered with a layer of rubber ring; the inflatable airbag (1014) changes its size by inflation and deflation; and the mounting base (1015) is used for installing the first steel casing (101) and the second steel casing (102) in the pipeline (4).

7. A method for safe launching and receiving of pipe jacking under high water pressure conditions according to claim 5, characterized in that: The first steel casing (101) and the second steel casing (102) comprise a first steel frame (1011), a second steel frame (1012), a rubber ring (1013), an inflatable airbag (1014), and a mounting base (1015); a rubber ring (1013) is arranged on the outer surface of one side of the first steel frame (1011) facing the entrance of the working shaft (1) and the exit of the receiving shaft (2); a rubber ring (1013) is arranged between the first steel frame (1011) and the second steel frame (1012); and the first steel frame (1011) and the second steel frame (1012) are provided with a plurality of inflatable airbags (1014). The first steel frame (1011) and the second steel frame (1012) are connected by axially arranged screws, and the screws pass through the rubber ring (1013) between the first steel frame (1011) and the second steel frame (1012). An inflatable airbag (1014) is arranged in the first steel frame (1011) and the second steel frame (1012), and the inflatable airbag (1014) is covered with a layer of rubber ring. The inflatable airbag (1014) changes its size by inflation and deflation. The mounting base (1015) is used for mounting the first steel casing (101) and the second steel casing (102) in the pipeline (4).

8. The method for safe launching and receiving of pipe jacking under high water pressure conditions according to claim 1, characterized in that: The anti-retraction device (200) comprises an iron block (201) mounted on the guide rail assembly (5), wherein there are two iron blocks (201) and both are located at the lower end of the pipe (4), one end of the iron block (201) is welded to the pipe (4), and the other end of the iron block (201) is welded to the guide rail assembly (5).

9. A method for safe launching and receiving of pipe jacking under high water pressure conditions according to claim 2, characterized in that: The steps of receiving the head of the pipe jacking machine underwater include: step 51, pouring a receiving base in the receiving well (2); step 52, filling the receiving well (2) with clay and pouring water; step 53, grouting and reinforcing between the pipeline (4) and the channel (8); step 54, taking out the head of the pipe jacking machine (6).