A generalized modeling method for optimal scheduling of multi-energy complementary systems in parks
Through the method of hierarchical modeling and classification labeling, a general model of the multi-energy complementary system in the park is established, and the mixed integer linear programming solver is used to solve the problem of low efficiency of scheduling analysis of the multi-energy complementary system in the existing technology, and realize the system Optimized scheduling and model scalability.
Patent Information
- Application Number
- CN202110510900.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-05-11
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2041-05-11
AI Technical Summary
The existing technology is difficult to effectively establish and optimize the mathematical model of the multi-energy complementary system in the park, resulting in low efficiency of scheduling analysis of the multi-energy complementary system in the park and the inability to achieve comprehensive optimal scheduling of the system.
Using a general modeling method, the multi-energy complementary system in the park is divided into energy devices, energy subsystems and multi-energy complementary main systems. Through classification labels and model layering, energy subsystems and comprehensive energy system models are established, using mixed integer linear The planning solver generates an optimal dispatch plan.
It improves the model versatility and scalability of multi-energy complementary systems, provides a technical basis for system optimization and scheduling, reduces model maintenance costs, and realizes optimal scheduling of more complex systems.
Smart Images

Figure CN115330008B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of energy dispatching of a multi-energy complementary system in a park, and in particular to a universal modeling method for optimizing dispatching of a multi-energy complementary system in a park. Background Art
[0002] The prerequisite for using mathematical programming algorithms to optimize the scheduling analysis of the multi-energy complementary system in the park is to establish a mathematical model of the multi-energy complementary system in the park. The so-called mathematical model refers to the description of the control objectives and operation constraints of the multi-energy complementary system by applying mathematical language through abstraction and simplification, and the problem can be solved by computer programs. When building a model of a more complex system, the system is usually decomposed into multiple smaller subsystems for modeling, and then the models of each subsystem are combined to form a model of the entire system. Therefore, this patent proposes a universal modeling method for optimizing the scheduling of the multi-energy complementary system in the park, summarizes the operation and control characteristics of each device in the multi-energy complementary park, creates category labels such as energy type, energy flow direction, functional attributes, etc. for different devices, and establishes a universal model of each classified device according to the classification label, and uses the pipe network device model to connect devices with the same energy medium to form an energy subsystem model, splits the energy coupling device into the energy conversion relationship between the receiving / source end equipment and different ports under the corresponding energy medium, and uses the energy coupling device to connect subsystems of different energy categories to form a comprehensive energy system model of the park. The model is solved using a mixed integer linear programming solver to generate an optimized scheduling plan, providing strategic guidance for improving the operating efficiency of the multi-energy complementary system. Summary of the invention
[0003] The purpose of the present invention is to realize the universal modeling of the multi-energy complementary system of the park, provide a classification method for multi-energy complementary devices, reduce the classification categories of the devices on the basis of ensuring the main operating characteristics of the devices, improve the versatility of the device model, and realize the modeling of various energy devices through two types of parameters: operation restriction and optimization and regulation; regard the energy pipeline network as a special type of energy storage device, and use the pipeline network equipment to connect different devices of the same energy type by matching the device number with the pipeline network input / output port number to form each energy medium subsystem model; split the energy coupling device into source and receiving devices corresponding to different energy media, as well as energy conversion relationships, and use the energy coupling device to realize the connection of different energy medium subsystems to form a multi-energy complementary main system model, so as to facilitate the use of a mixed integer linear programming solver to solve the model, and provide a technical basis for the optimal scheduling of a comprehensive energy system including energy media such as electricity, heat, cooling, and natural gas. According to the hierarchical modeling method of equipment, energy subsystems, and multi-energy complementary main systems, the modeling of more complex multi-energy complementary systems is realized, and the versatility and extensibility of the model are improved.
[0004] The technical solution adopted by the present invention is:
[0005] A generalized modeling method for optimizing the scheduling of a multi-energy complementary system in a park, comprising:
[0006] Step 1: Classify the energy devices of source, grid, load and storage in the multi-energy complementary system of the park according to the number of device ports, energy medium flow direction, energy medium type, functional attributes of the device, etc., and set attribute labels for the energy devices;
[0007] Step 2: Divide the parameters of various devices into two categories: operating limit constraints and optimization control constraints, establish models of various devices, and use buffer devices to interconnect devices under the same energy type to build an energy subsystem model;
[0008] Step 3: Split the coupling devices between different energy media into receiving / source devices under the corresponding energy media and the conversion relationship model between different energy media. Use the established conversion relationship between different energy media to connect the source devices and receiving devices under different energy media, so as to integrate the subsystems of different energy media and form a comprehensive energy system model of the park.
[0009] Step 4: Select the corresponding optimization target and use optimization solvers such as Lpsolve and Cplex to solve the established park comprehensive energy system model to obtain the optimization scheduling plan results.
[0010] Furthermore, the devices in the park's multi-energy complementary system can be divided into different energy medium devices such as electricity, steam, water, heat (cold) according to the type of energy medium; according to the number of ports of the device, it can be divided into single-port devices (such as loads, power supplies, heat sources, etc.), dual-port devices (such as energy storage, and public network interfaces), and multi-port devices (such as energy buses); according to the flow direction of the energy medium, it can be divided into inflow type, outflow type, inflow / outflow can occur simultaneously type, inflow / outflow cannot occur simultaneously type. According to the functional attributes of the device, it can be divided into control type devices with predictive information, control type devices without predictive information, storage buffer type devices, etc.
[0011] Furthermore, three types of enumerated attribute labels are set for the devices in the park's multi-energy complementary system, namely, device function type, device energy medium type, and device energy medium flow type.
[0012] The device function type is used to limit the classification of functional attributes of the device participating in optimized scheduling. It is an identifier for modeling the device in an object-oriented manner. It is divided into control types without predictive information, control types with predictive information, energy storage types, pipeline types, external interface types, etc. The specific types can be increased or decreased according to on-site needs. For each type of functional attribute, corresponding operating limit parameters and optimized operating parameters need to be set.
[0013] The energy medium type of the device is used to limit the type of energy subsystem to which the device belongs, stipulating that the devices in the park can and can only be in one type of energy medium. The energy medium types can be divided into electricity, steam, water, heat (cold), etc., and can be increased or decreased according to the actual usage needs of the park's optimized scheduling.
[0014] The energy medium flow type is used to specify the energy medium flow direction of the device, and is used to realize the interconnection of various devices in the park. The energy medium flow direction can be divided into three categories: source end, load end, and buffer. The source end type device indicates that the device generates the corresponding energy medium, the load end type device indicates that the device consumes the corresponding energy medium, and the buffer type device indicates that the device acts as a buffer for the energy medium through storage, transmission, etc.
[0015] Furthermore, when modeling the device, the parameters of the device of each functional type are divided into two categories: operating limit parameters and optimization and control parameters, and modeled separately.
[0016] Furthermore, the operation limit constraints of the devices without predictive information control are established, including:
[0017] The power limit of the device, that is, the energy output or absorbed by the device in a period of time must be greater than the minimum energy that the device can output or absorb in the same period of time, and less than the maximum energy that the device can output or absorb in the same period of time;
[0018] The restriction of the planned power change of the device, that is, the energy change between two planned sections of the device within a certain period of time must be greater than the maximum power reduction and less than the maximum power increase;
[0019] The start and stop times of the device are limited, that is, the number of times the device starts and stops within a certain period of time must be less than the maximum start and stop times specified for the device.
[0020] Other operating restriction constraints that require special construction (such as boiler combustion control constraints, generator operation control constraints, etc.) can be constructed based on inheriting the operating restriction parameters of the above-mentioned control devices that do not have predictive information.
[0021] Furthermore, operation restriction constraints of predictive information control devices are established, including:
[0022] The power deviation limit of the device is that the energy output or absorbed by the device within a certain period of time must be greater than the lower limit of the deviation from the predicted value and less than the upper limit of the deviation from the predicted value;
[0023] The power limit of the device, that is, the energy output or absorbed by the device in a period of time must be greater than the minimum energy that the device can output or absorb in the same period of time, and less than the maximum energy that the device can output or absorb in the same period of time;
[0024] The restriction of the planned power change of the device, that is, the energy change between two planned sections of the device within a certain period of time must be greater than the maximum power reduction and less than the maximum power increase;
[0025] Other operating restriction parameters that require special construction (such as operating restriction constraints on heating load, etc.) can be constructed on the basis of inheriting the operating restriction parameters of the above-mentioned predictive information control devices.
[0026] Furthermore, operational restrictions on energy storage devices are established, including:
[0027] The storage and release power limit of the device, that is, the energy output or absorbed by the device in a period of time must be greater than the minimum energy that the device can output or absorb in the same period of time, and less than the maximum energy that the device can output or absorb in the same period of time;
[0028] The storage and release state restrictions of the device, that is, restricting whether the storage and release states of the device can occur simultaneously at a certain time section (for energy storage devices such as batteries and heat storage, it is generally stipulated that the storage and release states of the device cannot occur at the same time). 0-1 variables can be used to implement constraints on the operating state of the device;
[0029] The limit of the change of the storage and release power of the device, that is, the change of the storage and release energy between two planned sections of the device within a certain period of time must be greater than the maximum power reduction and less than the maximum power increase;
[0030] The capacity limit of the device, that is, the device capacity at each time section of the plan must be greater than the minimum energy storage capacity specified for the device and less than the maximum energy storage capacity specified for the device;
[0031] The capacity limit of the device at the beginning and end of the scheduling plan, that is, the value limit of the energy storage device at the beginning and end of the scheduling plan. Generally, the capacity of the energy storage device at the end of the scheduling plan is equal to the capacity at the initial time, so as to meet the requirements of the cycle state of storage and release. The initial capacity value of the energy storage device can be selected according to the actual control needs;
[0032] Other operating restriction parameters that require special construction (such as hierarchical regulation restrictions on gas tank capacity) can be constructed on the basis of inheriting the operating restriction parameters of the above-mentioned energy storage devices.
[0033] Furthermore, pipeline devices include wires, water supply pipes, gas supply pipes, heat supply pipes, and busbar connection points in various energy medium pipeline networks. Pipeline devices can be regarded as a special type of energy storage device. Their operation restriction parameters can be inherited from energy storage devices and are only distinguished from general energy storage devices when configuring parameter values. For example, the capacity of wires, water supply pipes, and gas supply pipes can be set to 0, indicating that this type of device does not have energy storage capacity and does not restrict the time when energy storage and release occur.
[0034] Furthermore, the optimization control constraints of the control device without prediction information are established, including:
[0035] Investment cost, that is, the one-time investment in purchasing and installing equipment at the initial stage of use planning converted into annual expenses during the life cycle, that is, the initial investment cost of equivalent annual value;
[0036] Fuel cost, i.e. the cost of fuel combustion which is proportional to the output energy of the device with predictive information control;
[0037] Operation and maintenance costs, i.e. the costs incurred for operation and maintenance that are proportional to the energy output or consumption of devices with predictive information control;
[0038] Start-stop costs, that is, the costs incurred due to changes in the start-stop status of equipment, are introduced to limit the frequent start-stop of the device, improve the feasibility of the optimized scheduling plan, and avoid the impact of frequent start-stop during the operation cycle on the operating life of the device.
[0039] The power variation cost, i.e., the cost incurred due to the power variation of the device, can be introduced into the optimization process to evenly distribute the power of the device without predictive information control within an optimized scheduling period, thereby improving the controllability of the device and avoiding sudden changes in the device power that affect its service life.
[0040] Other optimization and control constraints that require special construction (such as the cost of staged combustion in the boiler) can be constructed on the basis of inheriting the above-mentioned optimization and control constraints of the control device that does not have predictive information.
[0041] Furthermore, an optimization control constraint with a predictive information control device is established, including:
[0042] The penalty cost for deviation from the predicted power value, that is, the penalty cost when the planned power value of the device deviates from the predicted power value. The predicted power value gives the expected power value of the device with prediction information control in the planning stage. If the planned power value deviates from the predicted value, it may result in the phenomenon of reducing the device power or increasing the device power, so the deviation value needs to be punished;
[0043] Energy supply benefits, that is, the benefits generated when supplying predictable energy user loads such as electricity, gas, and heat. The benefits can be introduced into the optimization and regulation constraints in the form of negative costs;
[0044] Investment costs, fuel costs, operation and maintenance costs, start-stop costs, power change costs, etc. can be constructed by referring to the corresponding cost forms of devices that do not have predictive information control.
[0045] Other optimization and control constraints that require special construction can be constructed on the basis of inheriting the above-mentioned optimization and control constraints with predictive information control devices.
[0046] Furthermore, the optimization and regulation costs of energy storage buffer devices are established, including:
[0047] The investment cost can be constructed by referring to the investment cost of the control device without predictive information;
[0048] Operation and maintenance costs, which need to be separately calculated in proportion to the absorbed energy and released energy;
[0049] The start-stop cost requires separately building the cost of the energy storage device absorbing and releasing energy when the start-stop state changes;
[0050] The power variation cost requires separately constructing the cost of the energy storage device absorbing and releasing energy in adjacent time sections of the optimal scheduling;
[0051] The cost of exchanging energy with the external energy network. If the corresponding energy storage buffer device exchanges energy with the external energy network, such as the power bus exchanging electricity with the large power grid, it is necessary to consider the cost or benefit of the energy bus purchasing or selling energy media from the external energy network. The impact of time-of-use electricity prices can be considered, and the difference between the cost of purchasing electricity from the large power grid and the income from selling electricity to the large power grid in each time period of the dispatch cycle is accumulated to form a cost function for exchanging power with the large power grid.
[0052] Other optimization and control constraints that require special construction can be constructed on the basis of inheriting the optimization and control constraints of the above-mentioned energy storage buffer device.
[0053] Furthermore, it is stipulated that each multi-energy complementary device in the park can and can only belong to one type of energy medium, and the corresponding energy medium enumeration type is assigned to it, such as the generator belongs to the source end device in the electric energy medium, the heating boiler belongs to the source end device in the thermal energy medium, the power load belongs to the load end device in the electric energy medium, and the heating load belongs to the load end device in the thermal energy medium. The energy subsystem model is composed of devices belonging to the same energy medium type. If an energy device involves the conversion of multiple energy types during the optimization and scheduling process, it is necessary to regard the device as an energy coupling device for modeling (see below for the specific modeling method). For example, in the optimization process of the multi-energy complementary system, both the optimization of the gas system and the optimization of the power supply system are included, and the gas generator needs to be modeled as a coupling device; if in the optimization process of the multi-energy complementary system, both the optimization of the gas system and the optimization of the heating system are included, the coal-fired boiler needs to be modeled as a coupling device. The specific classification method needs to be determined according to the usage scenario of the optimization scheduling algorithm. If the energy type of the input and output ports of the device is the same as the energy type involved in the optimization scheduling algorithm, the device needs to be regarded as a coupled device; if only one of the energy types of the input or output ports of the device belongs to the energy type involved in the optimization scheduling algorithm, the device is defined as an input or output device of the corresponding energy type.
[0054] Furthermore, a globally unique number is assigned to each device, and based on the input and output device numbers recorded by the buffer device, the device with the number under the same energy medium type is searched, the output port of the source-end device is connected to the input port of the buffer device (that is, the output power of the source-end device is set equal to the input power of the buffer device), and the input port of the load-end device is connected to the output port of the buffer device (that is, the input power of the receiving-end device is set equal to the output power of the buffer device). The source-end device and the receiving-end device belonging to the same energy medium are combined through the buffer device to generate an energy subsystem model.
[0055] Furthermore, the coupling device connected to different energy media is split into a source device and a receiving device under the corresponding energy medium, and an energy coupling relationship model between the source and receiving devices obtained by the splitting. The receiving device obtained by the splitting is a simulation of the input end of the coupling device, which can be modeled with reference to the receiving device without a predictive information control device in the corresponding energy medium; the source device obtained by the splitting is a simulation of the output end of the corresponding coupling device, which can be modeled with reference to the source device without a predictive information control device in the corresponding energy medium; the coupling relationship model obtained by the splitting is the conversion relationship between the input end and the output end of the coupling device, and the coupling relationship is divided into a constant efficiency relationship, a curve efficiency relationship, and a regional efficiency relationship.
[0056] Furthermore, the constant efficiency relation constraint is:
[0057]
[0058] The above formula (1) represents the output of the nth port of the coupling device in the tth scheduling period: Should be equal to the input of the coupling device and conversion efficiency k nn The constant coupling relationship indicates a conversion relationship with constant efficiency between the output and input of the coupling device.
[0059] Furthermore, the curve efficiency relation constraint is:
[0060]
[0061] The above formula (2) represents the output of the nth port of the coupling device in the tth scheduling period: Should be equal to the input quantity of the coupling device Substituting into the device efficiency model f(·) for calculation, the curvilinear efficiency relationship represents the conversion relationship between the output and input of the coupling device with a variable efficiency curve.
[0062] Furthermore, the regional efficiency relation constraint is:
[0063]
[0064] The above formula (3) represents the output of the nth port of the coupling device in the tth scheduling period: The input quantities of the coupling device should be Substitute the upper limit model of device efficiency g j (·) (where subscript j = 1, 2, ..., n; n ≥ 1) calculates the upper limit of the output and the input Substitute into the device efficiency upper limit model h k (·) (where subscript k = 1, 2, ..., n; n ≥ 1) is calculated to obtain the output lower limit.
[0065] Furthermore, if it is necessary to use a linear programming model to optimize the system scheduling, it is necessary to use a piecewise linearization method to piecewise linearize equations (2) to (3).
[0066] Furthermore, by utilizing coupling devices between different energy types, the input quantity of the receiving device in a certain type of energy medium obtained by splitting the coupling device is used as the input quantity of the coupling relationship obtained by splitting the coupling device, and the output quantity of the source device in another type of energy medium obtained by splitting the coupling device is used as the output quantity of the coupling relationship obtained by splitting the coupling device. Subsystems of different energy types are connected by utilizing coupling relationships, thereby realizing the combination of energy subsystems and generating a system model of a comprehensive energy control device.
[0067] Furthermore, in each scheduling cycle, according to different optimization target selection modes (the selectable optimization targets include: reducing the operating cost of the system, reducing the system operating expenses; reducing the adjustment frequency of the controllable device, increasing the service life of the device, etc.), the above-mentioned operation restriction constraints and optimization control constraint condition parameters in the optimization model are adjusted to generate a mixed integer linear programming model for optimal scheduling, which is solved by linear solvers such as Cplex and lpsolve to obtain the operation control plan for the corresponding time section.
[0068] Beneficial effects:
[0069] The present invention realizes the modeling of a more complex park multi-energy complementary system according to the hierarchical modeling method of energy devices, energy subsystems, and multi-energy complementary main systems. On the premise of meeting the optimization scheduling and use requirements of the park multi-energy complementary system, each energy device is classified and modeled from three aspects: energy type, energy flow direction, and functional attributes through the method of classification and enumeration. The pipeline network model and the coupling device model are used to respectively realize the modeling of the energy subsystem and the multi-energy complementary system based on the idea of modular interconnection, which improves the versatility of the model, reduces the model maintenance cost, and makes the model have strong scalability, providing a valuable model solution for the optimization scheduling problem of the multi-energy complementary system. BRIEF DESCRIPTION OF THE DRAWINGS
[0070] Figure 1 This is the structural diagram of the multi-energy complementary system;
[0071] Figure 2 The execution process of the generalized modeling method for optimizing the scheduling of multi-energy complementary systems in parks;
[0072] Figure 3 A diagram illustrating the method of modeling a coupling device;
[0073] Figure 4 It is the relationship curve of the coupling device constant efficiency;
[0074] Figure 5 It is the curve relationship diagram of the coupling device curve efficiency;
[0075] Figure 6 is a curve diagram showing the relationship between the area efficiency of the coupling device;
[0076] Figure 7 It is the energy flow diagram of the system to be modeled;
[0077] Figure 8 This is a diagram of the system optimization model obtained by modeling using the patented method. DETAILED DESCRIPTION
[0078] The invention is further described below with reference to the accompanying drawings and specific embodiments.
[0079] refer to Figure 1 As shown, the research object of the present invention is a park multi-energy complementary system, including:
[0080] The internal system model of each energy medium and the energy conversion device model between different energy media;
[0081] The internal system model of each energy medium includes energy supply-end equipment (i.e. source-end equipment), energy consumption-end equipment (i.e. receiving-end equipment), energy storage equipment, interface equipment between the park energy system and the external energy public network (such as the substation interface with the external large power grid, the heat exchange station interface with the external heating network, etc.), and pipeline equipment representing the topological relationship of internal equipment connection (including two-port lines and multi-port buses), etc. Equipment of the same energy type is connected into an energy subsystem model through pipeline devices. The energy in the system is generated by supply-end equipment or external public network access, transmitted through pipelines, buffered and stored in energy storage equipment, consumed by energy consumption-end equipment, or output to the Internet at the external public network interface. Each energy subsystem interacts with other different types of energy subsystems through energy type conversion devices.
[0082] In each energy device, the supply-side equipment provides energy to the outside world, and its energy flow direction is defined as output; the consumption-side device obtains energy from the outside world, and its energy flow direction is defined as input; the storage device and the external public network interface can both obtain energy from the outside world and output energy to the outside world. It has dual ports for energy input and output, but generally, energy input and output will not occur at the same time on a certain optimized time section; pipeline devices include two types of devices: line and bus. Among them, line devices are energy transmission devices with dual ports, and bus devices are energy node devices with multiple ports for energy aggregation and forwarding. Generally, energy input and output can occur simultaneously on a certain optimized time section.
[0083] Before optimizing the multi-energy complementary system in the park, it is necessary to use prediction technology to provide prior knowledge for the system optimization and scheduling. The prediction objects of the system are generally only supply-side equipment and consumer-side equipment. According to whether the energy production / consumption of the device is predicted, the consumer-side equipment and supply-side equipment can be divided into two categories: prediction and non-prediction. Among them, the prediction type device uses the predicted value as the baseline to regulate the output power at each time section during the optimization and scheduling process, but when the control plan value of the device deviates from the predicted value, a corresponding penalty amount will be set; in the process of optimization and scheduling, the non-prediction type device formulates the control plan as a general controllable device under the condition of meeting the operation constraints.
[0084] Energy type conversion devices realize the coupling and conversion of energy between different energy subsystems. They are generally dual-port or multi-port devices. The conversion device absorbs energy from one energy medium, and after conversion inside the device, releases energy in another energy medium. Therefore, for the energy subsystem that absorbs energy, the conversion device is an energy consumption end device; for the energy subsystem that releases energy, the conversion device is an energy supply end device. The energy absorbed and released by the conversion device needs to satisfy the energy conversion relationship inside the device. This conversion relationship is the energy coupling relationship of the device. Currently, the common energy coupling relationships include constant efficiency relationship, curve efficiency relationship and regional efficiency relationship. The constant coupling relationship indicates that the energy of the input and output ports of the conversion device satisfies a constant efficiency relationship on the optimized time section. The curve efficiency relationship indicates that the energy of the input and output ports of the conversion device satisfies a variable efficiency curve relationship on each optimized time section. The regional efficiency relationship indicates that the output energy of the conversion device satisfies the upper and lower limit constraints of the energy obtained by the input energy conversion.
[0085] The optimization scheduling process of the park's multi-energy complementary system is to obtain the operating constraints and control cost equations of each device on the basis of modeling the above-mentioned multi-energy complementary system devices, and then integrate the operating constraints and control costs of each device in the system on the basis of determining the optimization control target, generate the park's optimization control mathematical model, and use the mathematical programming solver to solve the mathematical model to obtain the system's operation control plan. Therefore, accurate modeling of the park's multi-energy complementary system is a prerequisite for optimizing the park's scheduling. An excellent park multi-energy complementary system model can not only accurately reflect the operating characteristics of the device, but also has a certain degree of scalability and universality to meet the needs of future expansion of the park.
[0086] refer to Figure 2 As shown, the main steps of the generalized modeling method for optimizing the scheduling of the multi-energy complementary system in the park according to the present invention include:
[0087] Step 1: Classify the various types of energy devices in the park, such as source, grid, load, and storage, according to the number of device ports, energy medium flow direction, energy medium type, and functional attributes of the device, and set attribute labels for the energy devices;
[0088] Step 2: Divide the model parameters of various devices into operation limit constraints and optimization control constraints, establish models of various equipment, and use pipeline or busbar devices to construct devices under the same energy type into energy subsystem models;
[0089] Step 3: Split the coupling devices between different energy media into the receiving / source end devices under the corresponding energy media and the conversion relationship model between different energy media. Use the established coupling device model to integrate the devices of different energy media to form a comprehensive energy system model of the park;
[0090] Step 4: Select the corresponding optimization goal and use optimization solvers such as Lpsolve and Cplex to solve the established optimization scheduling model to obtain the optimization scheduling plan results.
[0091] refer to Figure 1 The comprehensive energy system structure of the park shown first realizes the classification of the park equipment.
[0092] The devices in the multi-energy complementary system of the park can be divided into different energy medium devices such as electricity, steam, water, heat (cold) according to the type of energy medium; according to the number of ports of the device, it can be divided into single-port devices (such as loads, power supplies, heat sources, etc.), dual-port devices (such as energy storage, and interfaces with the public network), and multi-port devices (such as energy buses); according to the flow direction of the energy medium, it can be divided into inflow type, outflow type, inflow / outflow can occur simultaneously type, inflow / outflow cannot occur simultaneously type. According to the functional attributes of the device, it can be divided into control type devices with predictive information, control type devices without predictive information, storage buffer type devices, etc.
[0093] Three types of enumerated attribute labels are set for the devices in the park's multi-energy complementary system: device function type, device energy medium type, and device energy medium flow type. The device function type is used to limit the classification of functional attributes of the device participating in the optimal scheduling. It is an identifier for modeling the device in an object-oriented manner. It is divided into a control type without predictive information, a control type with predictive information, an energy storage type, a pipeline type, an external interface type, etc. The specific type can be increased or decreased according to the needs of the site. For each type of functional attribute, corresponding operation limit parameters and optimized operation parameters need to be set; the energy medium type to which the device belongs is used to limit the type of energy subsystem to which the device belongs, and stipulates that the device in the park can and can only be in one energy medium. The energy medium type can be divided into electricity, steam (steam), water, heat (cold), etc., which can be increased or decreased according to the actual use needs of the park's optimal scheduling; the energy medium flow direction type is used to specify the energy medium flow direction of the device, which is used to realize the interconnection of various devices in the park. The energy medium flow direction can be divided into three categories: source end, load end, and buffer. The source end type device indicates that the device generates the corresponding energy medium, the load end type device indicates that the device consumes the corresponding energy medium, and the buffer type device indicates that the device acts as a buffer of the energy medium through storage, transmission, etc.
[0094] After completing the classification of energy media, it is necessary to introduce operating limit parameters and optimize control parameters to complete the modeling of devices without predictive information control, devices with predictive information control, and energy storage buffer devices.
[0095] Establish operating restrictions for devices that do not have predictive information control, including:
[0096] The power limit of the device, that is, the energy output or absorbed by the device in a period of time must be greater than the minimum energy that the device can output or absorb in the same period of time, and less than the maximum energy that the device can output or absorb in the same period of time;
[0097] The restriction of the planned power change of the device, that is, the energy change between two planned sections of the device within a certain period of time must be greater than the maximum power reduction and less than the maximum power increase;
[0098] The start and stop times of the device are limited, that is, the number of times the device starts and stops within a certain period of time must be less than the maximum start and stop times specified for the device.
[0099] Other operation restriction constraints that require special construction (such as boiler combustion control constraints, generator operation control constraints, etc.) can be constructed based on the inheritance of the above-mentioned operation restriction parameters of the control devices without prediction information;
[0100] Establish operating restriction constraints for devices with predictive information control, including:
[0101] The power deviation limit of the device is the limit of the deviation from the predicted value, that is, the energy output or absorbed by the device within a certain period of time must be greater than the lower limit of the deviation from the predicted value and less than the upper limit of the deviation from the predicted value;
[0102] The power limit of the device, that is, the energy output or absorbed by the device in a period of time must be greater than the minimum energy that the device can output or absorb in the same period of time, and less than the maximum energy that the device can output or absorb in the same period of time;
[0103] The restriction of the planned power change of the device, that is, the energy change between two planned sections of the device within a certain period of time must be greater than the maximum power reduction and less than the maximum power increase;
[0104] Other operation restriction parameters that require special construction (such as operation restriction constraints of heating load, etc.) can be constructed based on the inheritance of the operation restriction parameters of the above-mentioned devices with predictive information control;
[0105] Establish operating restrictions on energy storage buffer devices, including:
[0106] The storage and release power limit of the device, that is, the energy output or absorbed by the device in a period of time must be greater than the minimum energy that the device can output or absorb in the same period of time, and less than the maximum energy that the device can output or absorb in the same period of time;
[0107] The storage and release state restrictions of the device, that is, restricting whether the storage and release states of the device can occur simultaneously at a certain time section (for energy storage devices such as batteries and heat storage, it is generally stipulated that the storage and release states of the device cannot occur at the same time). 0-1 variables can be used to implement constraints on the operating state of the device;
[0108] The limit of the change of the storage and release power of the device, that is, the change of the storage and release energy between two planned sections of the device within a certain period of time must be greater than the maximum power reduction and less than the maximum power increase;
[0109] The capacity limit of the device, that is, the device capacity at each time section of the plan must be greater than the minimum energy storage capacity specified for the device and less than the maximum energy storage capacity specified for the device;
[0110] The capacity limit of the device at the beginning and end of the scheduling plan, that is, the value limit of the energy storage device at the beginning and end of the scheduling plan. Generally, the capacity of the energy storage device at the end of the scheduling plan is equal to the capacity at the initial time, so as to meet the requirements of the cycle state of storage and release. The initial capacity value of the energy storage device can be selected according to the actual control needs;
[0111] Other operating limit parameters that require special construction (such as hierarchical control limits of gas tank capacity) can be constructed based on the inheritance of the operating limit parameters of the above energy storage devices;
[0112] Pipeline devices include wires, water supply pipes, gas supply pipes, heat supply pipes, and busbar connection points in various energy medium pipe networks. Pipeline devices can be regarded as a special type of energy storage device. Their operation restriction parameters can be inherited from energy storage devices. They are only distinguished from general energy storage devices when configuring parameter values. For example, the capacity of wires, water supply pipes, and gas supply pipes can be set to 0, indicating that this type of device does not have energy storage capacity, and does not limit the time of energy storage and release.
[0113] Establish optimization control constraints for control devices without predictive information, including:
[0114] Investment cost, that is, the one-time investment in purchasing and installing equipment at the initial stage of use planning converted into annual expenses during the life cycle, that is, the initial investment cost of equivalent annual value;
[0115] Fuel cost, i.e. the cost of fuel combustion which is proportional to the output energy of the device with predictive information control;
[0116] Operation and maintenance costs, i.e. the costs incurred for operation and maintenance that are proportional to the energy output or consumption of devices with predictive information control;
[0117] Start-stop costs, that is, the costs incurred due to changes in the start-stop status of equipment, are introduced to limit the frequent start-stop of the device, improve the feasibility of the optimized scheduling plan, and avoid the impact of frequent start-stop during the operation cycle on the operating life of the device.
[0118] The power variation cost, i.e., the cost incurred due to the power variation of the device, can be introduced into the optimization process to evenly distribute the power of the device without predictive information control within an optimized scheduling period, thereby improving the controllability of the device and avoiding sudden changes in the device power that affect its service life.
[0119] Other optimization and control constraints that require special construction (such as the cost of staged combustion in the boiler) can be constructed on the basis of inheriting the above-mentioned optimization and control constraints of the control device that does not have predictive information.
[0120] Establishing optimization control constraints for predictive information control devices, including:
[0121] The penalty cost for deviation from the predicted power value, that is, the penalty cost when the planned power value of the device deviates from the predicted power value. The predicted power value gives the expected power value of the device with prediction information control in the planning stage. If the planned power value deviates from the predicted value, it may result in the phenomenon of reducing the device power or increasing the device power, so the deviation value needs to be punished;
[0122] Energy supply benefits, that is, the benefits generated when supplying predictable energy user loads such as electricity, gas, and heat. The benefits can be introduced into the optimization and regulation constraints in the form of negative costs;
[0123] Investment costs, fuel costs, operation and maintenance costs, start-stop costs, power change costs, etc. can be constructed by referring to the corresponding cost forms of devices that do not have predictive information control.
[0124] Other optimization and control constraints that require special construction can be constructed on the basis of inheriting the above-mentioned optimization and control constraints with predictive information control devices.
[0125] The cost of optimizing and regulating the establishment of energy storage buffer devices includes:
[0126] The investment cost can be constructed by referring to the investment cost of the control device without predictive information;
[0127] Operation and maintenance costs, which need to be separately calculated in proportion to the absorbed energy and released energy;
[0128] The start-stop cost requires separately building the cost of the energy storage device absorbing and releasing energy when the start-stop state changes;
[0129] The power variation cost requires separately constructing the cost of the energy storage device absorbing and releasing energy in adjacent time sections of the optimal scheduling;
[0130] The cost of exchanging energy with the external energy network. If the corresponding energy storage buffer device exchanges energy with the external energy network, such as the power bus exchanging electricity with the large power grid, it is necessary to consider the cost or benefit of the energy bus purchasing or selling energy media from the external energy network. The impact of time-of-use electricity prices can be considered, and the difference between the cost of purchasing electricity from the large power grid and the income from selling electricity to the large power grid in each time period of the dispatch cycle is accumulated to form a cost function for exchanging power with the large power grid.
[0131] Other optimization and control constraints that require special construction can be constructed on the basis of inheriting the optimization and control constraints of the above-mentioned energy storage buffer device.
[0132] It is stipulated that the devices in the multi-energy complementary system of the park can and can only belong to one type of energy medium, and the corresponding energy medium enumeration type is assigned to it, and the energy subsystem model is constructed by the devices belonging to the same energy medium type. The process of constructing the energy subsystem model is: assign a globally unique number identifier to each device, search for the device with the same energy medium type according to the input and output device numbers recorded by the buffer device, connect the output port of the source end device with the input port of the buffer device (that is, set the output power of the source end device to be equal to the input power of the buffer device), connect the input port of the load end device with the output port of the buffer device (that is, set the input power of the load end device to be equal to the output power of the buffer device), and combine the source end device and the load end device belonging to the same energy medium through the buffer device to generate the energy subsystem model.
[0133] because Figure 1 The energy conversion device in the system has couplings between multiple energy types and does not belong to a single energy medium. It is necessary to split the energy conversion device and split the coupling devices connected to different energy media into source-end devices and load-end devices under the corresponding energy media, as well as the energy coupling relationship model between the split source / load-end devices.
[0134] See also Figure 3 The modeling method of the park coupling device is explained.
[0135] An electric boiler is a device that converts electrical energy into thermal energy. Its input energy is electrical energy and its output energy is thermal energy. If the optimization of a certain park's energy system is to be carried out, it is necessary to consider the optimization of the park's power supply system and heating system at the same time. In this case, the electric boiler is defined as an energy conversion device in the optimization scheduling system. The electric boiler is divided into three parts: boiler power consumption model, boiler heating model, and boiler electric-heat coupling conversion relationship model.
[0136] The boiler power consumption model obtained by the splitting is introduced into the power subsystem as a load-end device to simulate the power consumption characteristics of the electric boiler. Its electric energy comes from the power supply or energy storage device of the power subsystem. Its modeling process can refer to the load-end equipment inside the power subsystem that does not have a predictive information control device for modeling.
[0137] The boiler heating model obtained by the splitting is introduced into the thermal subsystem as the source-end device to simulate the heat generation characteristics of the electric boiler. The heat energy generated will be supplied to the heat load or stored by the heat storage device. The modeling process can be modeled by referring to the source-end device in the thermal subsystem that does not have a predictive information control device.
[0138] The boiler electric-thermal coupling model obtained by splitting is a coupling relationship model independent of the power optimization part and the thermal optimization part, and realizes the model of the coupling relationship between the power consumption and heat production of the electric boiler. The coupling relationship is divided into three categories: constant efficiency relationship, curve efficiency relationship and regional efficiency relationship. According to actual use needs, you can choose a certain type of coupling relationship model.
[0139] See also Figure 4 The constant coupling relationship is explained.
[0140] The constant efficiency relation constraint is:
[0141]
[0142] The above formula (1) represents the output of the nth port of the coupling device in the tth scheduling period: Should be equal to the input of the coupling device and conversion efficiency k nn The constant coupling relationship indicates a conversion relationship with constant efficiency between the output and input of the coupling device.
[0143] The transformation matrix It is usually a sparse matrix. Figure 4 The coupling relationship model shown is a special form of the constant efficiency relationship, namely Indicates the input quantity of the coupling device The increase in its output Will increase in equal proportion.
[0144] See also Figure 5 The constraints on the curve efficiency relationship are explained.
[0145] The curve efficiency relation constraint is:
[0146]
[0147] The above formula (2) represents the output of the nth port of the coupling device in the tth scheduling period: Should be equal to the input quantity of the coupling device Substituting into the device efficiency model f(·) to obtain the calculated result, the curvilinear efficiency relationship represents the conversion relationship between the output and input of the coupling device with a variable efficiency curve;
[0148] The device efficiency model f(·) is generally a high-order function of the input quantity. Figure 5 In the coupling relationship model shown in the example, Where a, b, c are coefficients, mS and nS are input quantities The upper and lower limits of .
[0149] When constructing a linear optimization model, for high-order transformation relationships The high-order model can be linearized using the piecewise linearization method. Figure 5 In the above example, the high-order model can be passed through the points (mS,0) and (P e1 ,P h1 ), (P e2 ,P h2 ), (P e3 ,P h3 ), (P e4 ,P h4 ), (nS,P H ) etc. for piecewise linearization.
[0150] See also Figure 6 The constraints on regional efficiency relations are explained.
[0151] The regional efficiency relation constraint is:
[0152]
[0153] The above formula (3) represents the output of the nth port of the coupling device in the tth scheduling period: The input quantities of the coupling device should be Substitute the upper limit model of device efficiency g j (·) (where subscript j = 1, 2, ..., n; n ≥ 1) calculates the upper limit of the output and the input Substitute into the device efficiency upper limit model h k (·) (where subscript k = 1, 2, ..., n; n ≥ 1) is calculated to obtain the output lower limit.
[0154] where g j (·) and h k (·) For input, limit The piecewise function of the running region, Figure 6 In the regional coupling relationship model exemplified in the example, the output of the coupling relationship is With input The following relationship is satisfied:
[0155]
[0156] Among them, (x1, y1), (x2, y2), (x3, y3), (x4, y4) are the area g j (·) and h k (·) The boundary point of the function, usually set as the input is a non-negative value, the output limitation.
[0157] If g j (·) and h k (·) is a high-order nonlinear function, it is necessary to use the piecewise linearization method to linearize the upper and lower limit functions so as to adapt to the linear optimization solver.
[0158] By utilizing coupling devices between different energy types, the input quantity of the load-end device in a certain type of energy medium obtained by splitting the coupling device is used as the input quantity of the coupling relationship obtained by splitting the coupling device, and the output quantity of the source-end device in another type of energy medium obtained by splitting the coupling device is used as the output quantity of the coupling relationship obtained by splitting the coupling device. Subsystems of different energy types are connected using coupling relationships, thereby realizing the combination of energy subsystems and generating a system model of a comprehensive energy control device.
[0159] See also Figure 7 A specific park model that requires optimized scheduling is described.
[0160] Figure 7 This is an energy flow diagram of a park to be optimized, where arrows indicate the direction of energy flow. It can be seen that the energy used in the park includes solar energy, natural gas, coke oven gas, biogas, pulverized coal, solar energy, wind energy, electricity, etc. Energy generation devices include solar thermal panels, natural gas gas turbines, coke oven gas gas turbines, biogas gas turbines, coal-fired boilers, photovoltaic cells, wind turbines, etc. Energy conversion devices include waste heat boilers, water source heat pumps, sewage source heat pumps, ground source heat pumps, steam-water heat exchange stations, etc. Energy buffer storage devices include low-temperature heat storage, high-temperature heat storage, electricity storage, pipeline thermal capacity heat storage, etc. Energy consumption devices include heating load, steam load, power load, etc.
[0161] If necessary Figure 7 To optimize the park system shown in Figure 7 Each type of equipment is modeled separately, there are many models, and the modeling process is complicated. In the later stage, each type of model needs to be maintained separately. The system modeling level is not clear and the maintenance process is complicated.
[0162] See also Figure 8This is a diagram of the system optimization model obtained by modeling using the patented method.
[0163] according to Figure 7 The energy type device in the park divides the park energy system into three sub-energy systems: electricity, steam, and heating, and adds a primary energy combustion system to split the comprehensive energy system into four subsystems.
[0164] These four sub-energy systems are energy-coupled through gas turbine + waste heat boiler, heat pump, steam-water conversion device, etc., and these energy coupling devices need to be split, such as splitting the energy coupling device composed of natural gas gas turbine + waste heat boiler into gas turbine 1# in the primary energy combustion subsystem, gas turbine power generation in the power subsystem, heating waste heat boiler 1# in the heating subsystem, steam waste heat boiler 1# in the steam supply subsystem, and the energy coupling relationship between the above devices.
[0165] In the primary energy combustion subsystem, natural gas, coke oven gas, biogas, and pulverized coal are defined as source energy, and these primary energy sources are equivalent to devices without predictive information control for modeling; gas turbine 1#, gas turbine 2#, gas turbine 3#, pulverized coal combustion, etc. are defined as load-side consumption equipment, and these devices are equivalent to devices without predictive information control for modeling. The source and load-side equipment are connected using a pipeline network to form a primary energy combustion subsystem.
[0166] In the power subsystem, gas turbine power generation, photovoltaic power generation, wind power generation, etc. are defined as source-end devices, and gas turbine power generation is modeled as a device without predictive information control, and photovoltaic power generation and wind power generation are modeled as devices with predictive information control; water source heat pumps, sewage source heat pumps, ground source heat pumps, power loads, etc. are defined as load-end devices, and water source heat pumps, sewage source heat pumps, and ground source heat pumps are modeled as devices without predictive information control, and power loads are modeled as devices with predictive information control; batteries are defined as energy storage devices, and buffer device models are used for modeling; power buses are defined as bus devices to achieve the convergence and distribution of electric energy, and buffer device models are used for modeling. Since electric energy cannot be stored in the bus, the capacity of the buffer device needs to be set to 0; purchased electricity is defined as an interface with the external system, and buffer device models are used for modeling. The source, load, and storage-end devices are connected using power connection lines according to the topological relationship of the energy flow diagram to form a power energy subsystem.
[0167] In the heating subsystem, heating waste heat boiler 1#, heating water source heat pump, heating sewage source heat pump, heating ground source heat pump, heating steam heat conversion, heating waste heat boiler 2#, heating waste heat boiler 3#, heating coal-fired flue gas, etc. are defined as source-end devices, and these devices are equivalent to devices without predictive information regulation for modeling; heating load is defined as load-end device, and heating load is equivalent to devices with predictive information regulation for modeling; heat storage device is defined as energy storage device, and buffer device model is used for modeling; heating bus is defined as bus device, and heating resources are converged and distributed, and buffer model is used for modeling. Use thermal pipe network to connect source, load and storage end devices according to the topological relationship of energy flow diagram to form heating energy subsystem, and regard thermal pipe network as special energy storage device, which can realize the storage of heating energy, but does not limit the input and output port energy to be non-zero at the same time in a time section.
[0168] In the steam subsystem, steam waste heat boiler 1#, steam waste heat boiler 2#, steam waste heat boiler 3#, steam coal-fired boiler, solar thermal device, etc. are defined as source-end devices, and the solar thermal device is equivalent to a device with predictive information control for modeling, and the remaining devices are defined as devices without predictive information control for modeling; steam load and steam-heat conversion device are defined as load-end devices, and steam load is equivalent to a device with predictive information control for modeling, and steam-heat conversion device is equivalent to a device without predictive information control for modeling; steam energy storage device is defined as energy storage device, and buffer device model is used for modeling; steam bus is defined as busbar device to realize the convergence of steam resources in different directions, and buffer model is used for modeling. Use steam pipe network to connect source load storage devices according to the topological relationship of energy flow diagram to form steam energy subsystem.
[0169] Each energy subsystem is connected into a comprehensive energy system optimization model through the coupling relationship model obtained by splitting the coupling device. All models except the coupling relationship in the model are marked with a unique device number to facilitate the definition and implementation of the algorithm.
[0170] In each dispatching cycle, according to different optimization target selection modes, the operation restriction constraints and optimization control constraint parameters in the above-mentioned park integrated energy system optimization model are adjusted to generate a mixed integer linear programming model for optimal dispatching, which is solved by linear solvers such as Cplex and lpsolve to obtain the operation control plan for the corresponding time section.
[0171] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A generalized modeling method for optimizing the scheduling of multi-energy complementary systems in parks. Its characteristics are: include: Step 1: Classify various energy devices in the park's multi-energy complementary system, including source, grid, load and storage, according to the device's energy medium flow type, energy medium type and function type, and set attribute labels for the energy devices; Step 2: Divide the parameters of various energy devices into two categories: operation limit constraints and optimization control constraints, establish models of various energy devices, and use buffer devices to interconnect energy devices of the same energy type to construct an energy subsystem model; Step 3: Split the coupling devices between different energy media into source devices and receiving devices under the corresponding energy media and the conversion relationship between different energy media. Use the established conversion relationship between different energy media to connect the source devices and receiving devices under different energy media to form a comprehensive energy system model of the park. By using coupling devices between different energy types, the input quantity of the receiving device in a certain type of energy medium obtained by splitting the coupling device is used as the input quantity of the conversion relationship obtained by splitting the coupling device, and the output quantity of the source device in another type of energy medium obtained by splitting the coupling device is used as the output quantity of the conversion relationship obtained by splitting the coupling device. The energy subsystem models of different energy types are connected by using the conversion relationship, thereby realizing the combination of energy subsystem models to form a comprehensive energy system model of the park; Step 4: Select the optimization target, solve the established park comprehensive energy system model, and obtain the optimization scheduling plan result.
2. The method according to claim 1, Its characteristic is that the steps 1 sets three types of enumerated attribute labels for energy devices, namely, device function type, device energy medium type, and device energy medium flow type. The device function type is used to limit the functional attribute classification of energy devices participating in optimal scheduling. It is an identifier for modeling energy devices in an object-oriented manner. It is divided into a control class without predictive information, a control class with predictive information, an energy storage class, a pipeline class, and an external interface class. For each type of functional attribute, it is necessary to set the parameters of the energy device consisting of the corresponding operating limit parameters and optimized operating parameters; the energy medium type to which the device belongs is used to limit the energy medium to which the energy device belongs. The subsystem type specifies that the energy device within the multi-energy complementary system of the park can and can only be in one type of energy medium. The energy medium types are divided into electricity, steam, water, and heat / cold. The device energy medium flow type is used to specify the energy medium flow direction of the energy device, which is used to realize the interconnection of various energy devices within the multi-energy complementary system of the park. The energy medium flow direction is divided into three categories: source end, load end, and buffer. The source end type energy device indicates that the energy device generates the corresponding energy medium, the load end type energy device indicates that the energy device consumes the corresponding energy medium, and the buffer type energy device indicates that the energy device acts as a buffer for the energy medium through storage and transmission.
3. The method according to claim 2, Its characteristics are: Establish operating restrictions for control-type energy devices without forecast information, including: The power limit of the energy device, that is, the energy output or absorbed by the energy device in a period of time must be greater than the minimum energy that the energy device can output or absorb in the same period of time, and less than the maximum energy that the energy device can output or absorb in the same period of time; The restriction on the planned power change of the energy device, that is, the energy change between two planned sections of the energy device within a certain period of time must be greater than the maximum power reduction and less than the maximum power increase; The number of starts and stops of energy devices must be limited, that is, the number of starts and stops of energy devices within a certain period of time must be less than the maximum number of starts and stops specified for the energy device; Establish operating restrictions for control-type energy devices with forecast information, including: The power deviation of the energy device from the predicted value is limited, that is, the energy output or absorbed by the energy device within a certain period of time must be greater than the lower limit of the deviation from the predicted value and less than the upper limit of the deviation from the predicted value; The power limit of the energy device, that is, the energy output or absorbed by the energy device in a period of time must be greater than the minimum energy that the energy device can output or absorb in the same period of time, and less than the maximum energy that the energy device can output or absorb in the same period of time; The restriction on the planned power change of the energy device, that is, the energy change between two planned sections of the energy device within a certain period of time must be greater than the maximum power reduction and less than the maximum power increase; Establish operating restrictions for energy storage devices, including: The storage and release power limit of the energy device, that is, the energy output or absorbed by the energy device within a period of time must be greater than the minimum energy that the energy device can output or absorb within the same period of time, and less than the maximum energy that the energy device can output or absorb within the same period of time; The storage and release state restrictions of energy devices, that is, whether the storage and release states of energy devices can occur simultaneously at a certain time section; The restriction on the change of storage and release power of energy devices, that is, the change of storage and release power between two planned sections of energy devices within a certain period of time must be greater than the maximum power reduction and less than the maximum power increase; The capacity limit of the energy device, that is, the capacity of the energy device at each time section of the plan must be greater than the minimum energy storage capacity specified for the energy device and less than the maximum energy storage capacity specified for the energy device; The capacity limit of the energy device at the beginning and end of the scheduling plan, that is, the value limit of the energy device at the beginning and end of the scheduling plan; Establish optimal control constraints for control-type energy devices without prediction information, including: Investment cost, that is, the one-time investment in purchasing and installing equipment at the beginning of the planning period converted into annual expenses during the life cycle; Fuel cost, i.e. the cost of fuel combustion which is proportional to the output energy of the regulated energy device without forecast information; Operation and maintenance costs, i.e. the costs incurred for operation and maintenance that are proportional to the energy output or consumption of energy devices that do not have predictive information control; Start-stop costs, i.e. the costs incurred due to changes in the start-stop status of energy devices; Power variation costs, i.e. costs incurred due to power variations of energy installations; Establish optimal control constraints for control-type energy devices with predictive information, including: The penalty cost for deviation from the predicted power value, i.e., the penalty cost when the planned power value of the energy device deviates from the predicted power value; Energy supply revenue, i.e., revenue generated when supplying electricity, gas, and heat to predictable energy users; Investment cost, that is, the one-time investment in purchasing and installing equipment at the beginning of the planning period converted into annual expenses during the life cycle; Fuel cost, i.e. the cost of fuel combustion which is proportional to the output energy of the control energy device with forecast information; Operation and maintenance costs, i.e. the costs incurred for operation and maintenance that are proportional to the energy output or consumption of energy devices with predictive information control; Start-stop costs, i.e. the costs incurred due to changes in the start-stop status of energy devices; Power variation costs, i.e. costs incurred due to power variations of energy installations; Establish optimized control costs for energy storage devices, including: Investment cost, that is, the one-time investment in purchasing and installing equipment at the beginning of the planning period converted into annual expenses during the life cycle; Operation and maintenance costs, i.e. the operation and maintenance costs that are proportional to the energy absorbed and released by the energy device; Start-stop costs, i.e. the costs associated with energy devices absorbing and releasing energy and changing their start-stop states; Power variation cost, i.e., the cost of the variation in energy absorption and release of energy by energy devices within adjacent time sections of optimal scheduling; The cost of exchanging energy with the external energy network, that is, the cost or income of purchasing or selling energy media from the external energy network when the energy device exchanges energy with the external energy network.
4. The method according to claim 1, Its characteristics are: In step 1, each energy device is assigned a globally unique number.
5. The method according to claim 4, Its characteristics are: In step 2, according to the input and output device numbers recorded by the buffer device, search for energy devices with the same energy medium type and the output port of the source device is connected to the input port of the buffer device, and the input port of the receiving device is connected to the output port of the buffer device. The source device and the receiving device belonging to the same energy medium are combined through the buffer device to generate an energy subsystem model, wherein the buffer device is a pipe network device or a busbar device.
6. The method according to claim 1, Its characteristics are: The receiving device obtained by splitting in step 3 is a simulation of the input end of the corresponding coupling device; the source device obtained by splitting is a simulation of the output end of the corresponding coupling device; the conversion relationship model obtained by splitting is the conversion relationship between the input end and the output end of the coupling device, and the conversion relationship is divided into a constant efficiency relationship, a curve efficiency relationship and a regional efficiency relationship.
7. The method according to claim 6, Its characteristics are: The constraints of the constant efficiency relation are: In the formula, They represent the input quantity of the nth input terminal and the output quantity of the nth output terminal of the coupling device in the tth scheduling period, respectively. nn It represents the conversion efficiency; The constraints on the curvilinear efficiency relation are: In the formula, f(·) represents the device efficiency model; The constraints of the regional efficiency relation are: In the formula, g j (·) represents the upper limit model of device efficiency, h k (·) represents the lower limit model of device efficiency, j = 1, 2, …, n, n ≥ 1, k = 1, 2, …, n.
8. The method according to claim 7, Its characteristics are: When the linear programming model is used to optimize the system scheduling, the piecewise linearization method is used to piecewise linearize equations (2) to (3).
9. The method according to claim 1, Its characteristic is that In each scheduling cycle, according to different optimization target selection modes, the operating restriction constraints and optimization control constraint parameters in the park's integrated energy system model are adjusted, and a mixed integer linear programming model for optimal scheduling is generated and solved to obtain the optimal scheduling plan for the corresponding time section.
Citation Information
Patent Citations
Power transmission plan and pumping energy storage power generation plan optimization method and system
CN108365637A
A multi-mode combined cooling, heating and power micro-grid system considering ice storage air conditioning
CN109004686A
