A kind of pre-embedded technology of concrete wire box without decorative surface

By machining grooves and holes in the wooden board and using steel wire ropes and lifting devices, the problem of damage during the removal of junction boxes in traditional fair-faced concrete structures was solved, achieving high-quality visual effects and construction efficiency.

CN115354856BActive Publication Date: 2024-11-26SCEGC NO 6 CONSTR ENG GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211031721.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-26
Publication Date
2024-11-26
Estimated Expiration
2042-08-26

AI Technical Summary

Technical Problem

Traditional exposed concrete structures with embedded junction boxes are prone to damage to the external corners of the recessed areas and uneven edges during removal, resulting in a lack of visual appeal and difficulty in ensuring quality.

Method used

The process of pre-embedding decorative concrete junction boxes is adopted. By processing grooves and flat steel holes in the wooden board, and using steel wire ropes in conjunction with a lifting device, the wooden board is gradually lifted out of the concrete structure, avoiding damage to the external corners of the grooves.

Benefits of technology

This method allows for the removal of junction boxes without damaging the edges and corners of the recessed areas in the concrete wall, improving the appearance of the junction box recesses and ensuring both construction quality and speed.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115354856B_ABST
    Figure CN115354856B_ABST
Patent Text Reader

Abstract

A process for pre-embedding a wire box in a concrete without a decorative surface comprises the following steps: the first step: processing a wooden board 3 before pre-embedding the wire box; the second step: cutting a 40mm×2mm flat steel 2 to a suitable length and punching a 6mm flat steel hole 17; the third step: cutting a PVC wire trough; the fourth step: embedding the processed flat steel 2 into the processed wooden board 3, and then attaching the wire box 1 to the wooden board 3 and tightening two bolts 5 at the back to fix the wire box, and after the wire box is fixed, closing a large template on the other side of the wall and pouring concrete; the fifth step: after pouring the concrete and removing the large template 4, lift out the 20mm flat steel 2 in the groove on the front side of the wooden board 3; finally, passing a steel wire rope 14 through the flat steel hole 17 and slowly pulling out the wooden board 3 with a special lifting device, so as to ensure that the positive angle in the wall groove is not damaged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building construction, and in particular provides a decorative surface-free concrete wire box pre-embedding process. Background Art

[0002] The decorative surface-free concrete wire box embedding process is a combination of combined wire box embedding parts and embedded parts removal devices, which can effectively improve the aesthetics of the embedded wire box. It has the advantages of strong targeting, strong turnover, easy disassembly and installation, and is often used in fair-faced concrete structures.

[0003] The traditional bare concrete structure embedded junction box is to install a wooden board in front of the junction box, and then use two bolts to pass through the wooden board and the large template at the diagonal of the junction box and then install nuts to fix it. When the concrete is poured and waits for it to solidify, the wooden board in the front of the junction box is generally removed with tools such as screwdrivers and hammers. This can easily cause damage to the positive corners of the junction box groove and uneven edges and corners, which cannot achieve visual beauty and is difficult to guarantee quality.

[0004] Therefore, it is necessary to improve the molding effect of the traditional bare concrete structure pre-buried wire box and provide a decorative surface-free concrete wire box pre-buried process. Summary of the invention

[0005] The purpose of the present invention is to provide a pre-embedded process for a concrete wire box without a decorative surface, which can remove a wooden board workpiece from a solidified concrete structure without damaging the positive angle of a groove.

[0006] The technical solution of the present invention is as follows:

[0007] A decorative surface-free concrete wire box pre-embedding process comprises the following steps:

[0008] Step 1: Before embedding the wire box, the wooden board 3 is processed into a suitable size, and then a 40mm×2mm groove is planed out in the middle, both sides and front of the back of the wooden board 3 using a wood planer;

[0009] Step 2: Take a 40mm×2mm flat steel 2 and cut it to a suitable length, the length = the length of the bottom of the board + the length of the side of the board × 2 + 20mm × 2; then use a bench drill to drill a 6mm hole 17 in the flat steel 5mm inward from both ends of the longitudinal edge of the flat steel 2;

[0010] Step 3: Cut the PVC cable duct to the same length as the 3 long sides of the board, cut the cross section diagonally, and make it into an "L" shape after cutting. Make sure the length of one side is consistent with the thickness of the board, and leave 20mm on the other side;

[0011] Step 4: embed the processed flat steel 2 into the processed wooden board 3, bend the flat steel 2 into two 90° on the side of the wooden board 3 to clamp the wooden board, and at the same time, stick the processed PVC parts 7 to the wooden board 3 with universal glue; one side of the "L" shape is stuck on the side of the wooden board 3, and the other side is stuck on the front of the wooden board 3; after the assembly is completed, after the wall reinforcement is tied and the large template 4 on the front of the wall is in place, fix the wooden board to the corresponding position of the large template 4 on the front, then stick the wire box 1 to the wooden board 3 and tighten the two wire box fixing screws 5 behind it to fix the wire box. After the wire box is fixed, close the large template on the other side of the wall and pour concrete;

[0012] Step 5: After pouring the concrete and removing the large formwork 4, lift out the 20mm flat steel 2 in the groove on the front of the wooden board 3 to form a 90° angle with the wall; finally, use the steel wire rope 14 to pass through the flat steel hole 17 and use the lifting device to slowly pull out the wooden board 3 to ensure that the positive angle in the wall groove is not damaged.

[0013] The beneficial effects of the present invention are:

[0014] The present invention passes a steel wire rope through the flat steel holes on the device connecting parts and the wooden board processing parts, and uses the socket wrench on the rotating device to gradually pull the wooden board processing parts out of the concrete structure, without causing damage to the edges and corners of the groove on the concrete wall, which is beneficial to improving the visual effect of the junction box groove after the wooden board is removed. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 Schematic diagram of pre-embedded concrete box for free decorative surface;

[0016] Figure 2 To avoid the need for decorative concrete wire box embedded back diagram;

[0017] Figure 3 To avoid the need for decorative surface concrete box embedded front diagram;

[0018] Figure 4 This is a schematic diagram of the lifting device when viewed from above;

[0019] Figure 5 It is a schematic diagram of the top view structure of the lifting device.

[0020] Among them: 1. wire box, 2. flat steel, 3. wooden board, 4. large template, 5. wire box fixing screw, 6. fixing nut, 7. PVC processed parts, 8. frame, 9. movable legs, 10. connecting parts, 11. socket wrench, 12. support sleeve, 13. long hole, 14. wire rope, 15. gasket, 16. support rod, 17. flat steel hole, 18. support steel plate, 19. rubber pad, 20. movable screw. DETAILED DESCRIPTION

[0021] A decorative surface-free concrete wire box pre-embedded process, such as Figure 2 , Figure 3 The processing sequence of the wire box parts shown is as follows:

[0022] Step 1: Before embedding the wire box, process the wooden board 3. Use a piece of wooden board 3 to process it into a suitable size. Then use a wood planer to plane out 40mm×2mm grooves in the middle of the back, on both sides and on the front of the wooden board 3. When planing the board, it should be noted that the groove on the front of the wooden board 3 does not need to be planed through, and only needs to be planeed 20mm from the side.

[0023] Step 2: Take a 40mm×2mm flat steel 2 and cut it to a suitable length, length = length of the bottom of the board + length of the side of the board × 2 + 20mm × 2. Then use a bench drill to drill a 6-diameter flat steel hole 17 5mm inward at both ends of the longitudinal edge of the flat steel 2.

[0024] Step 3: Cut the PVC cable duct to the same length as the 3 long sides of the board, cut the cross section diagonally, and make it into an "L" shape after cutting. Make sure that the length of one side is consistent with the thickness of the board, and leave 20mm on the other side. Adding this device can reduce the friction with the concrete during demolition.

[0025] Step 4: embed the processed flat steel 2 into the processed wooden board 3, bend the flat steel 2 into two 90° on the side of the wooden board 3 to clamp the wooden board, and at the same time stick the processed PVC parts 7 to the wooden board 3 with universal glue, with one side of the "L" shape pasted on the side of the wooden board 3 and the other side pasted on the front of the wooden board 3. After the assembly is completed, after the wall reinforcement is tied and the large front template 4 of the wall is in place, fix the wooden board to the corresponding position of the large front template 4, then stick the wire box 1 to the wooden board 3 and tighten the two wire box fixing screws 5 on the back to fix the wire box. After the wire box is fixed, close the large template on the other side of the wall and pour concrete.

[0026] Step 5: After pouring the concrete and removing the large formwork 4, lift out the 20mm flat steel 2 in the front groove of the wooden board 3 to form a 90° angle with the wall. Finally, use the steel wire 14 to pass through the flat steel hole 17 and use the lifting device to slowly pull out the wooden board 3 to ensure that the positive angle in the wall groove is not damaged.

[0027] like Figure 4 , Figure 5 As shown, the lifting device is a device that can remove the wooden board 3 from the concrete wall without damaging the outer corner of the groove, and includes a frame 8, which is welded into an "F" shape by 30 angle steels.

[0028] The front of the frame 8 is equipped with a fixed leg, which is welded to the front of the frame 8; the frame 8 is provided with a long hole 13 that runs through the frame 8, and the movable leg 9 is movably installed in the long hole 13 of the frame 8 through the movable screw 20, the gasket 15 and the fixed nut 6. The position of the movable leg 9 can be adjusted left and right according to the size of the wooden board 3 to be removed. When in use, the size of the removable wooden board can be adjusted by the movable leg on the movable frame, so that the lifting device has a wider range of application.

[0029] A supporting steel plate 18 is provided at the bottom end of the fixed supporting leg and the movable supporting leg 9 , and a rubber pad 19 is installed at the bottom of the supporting steel plate 18 .

[0030] A connecting piece 10 that passes through the frame 8 is installed on the top of the frame 8. The connecting piece 10 is made of a Ф12mm bolt. A gasket 15 and a fixing nut 6 are installed on the top of the connecting piece 10; a Ф6mm through hole is opened at the bottom of the connecting piece 10 for passing the steel wire rope 14 of the flat steel embedded in the lifting wooden board; Ф6mm flat steel holes 17 are set 5mm inward at both ends of the longitudinal edge of the flat steel 2, and the steel wire rope 14 passes through the bottom of the connecting piece 10 and is respectively fixed in the flat steel holes 17 at both ends.

[0031] The socket wrench 11 is L-shaped, and a connecting buckle for rotating the fixing nut 6 is provided at the front of the socket wrench 11, and the inner contour of the connecting buckle is consistent with the outer contour of the fixing nut 6. The rear of the socket wrench 11 is an upturned handle.

[0032] The front part of the frame 8 is welded with a convex support sleeve 12, and a 16mm Ø support rod 16 is sleeved in the support sleeve 12. The length of the support rod 16 is set in a variety of different specifications. When the lifting device is used, the support rod 16 can play a good supporting role for the lifting device, which is more stable when used. When in use, the support sleeve 12 acts on the connecting piece to pull the wooden board workpiece outward, which is more labor-saving.

[0033] The process principle of this device is:

[0034] 30 angle steels are welded into an "F" shape, and the position of one of the movable legs 9 can be adjusted according to the size of the wooden board 3 to be removed, and the movement is achieved by opening a long hole 13 in the frame 8 and adding a movable screw 20. Then a connecting piece 10 is installed at the frame 8, which is made of a 12mm bolt. One end of the bolt has a 6mm hole, which is used to pass through the steel wire 14 of the pre-buried flat steel for lifting the wooden board. The other end is installed with a fixing nut 6 and rotated with a socket wrench 11. Under the lever force of the socket wrench 11, the wooden board 3 can be pulled out in a time-saving and labor-saving manner without damaging the positive angle at the groove. The device has a support steel plate 18 welded to the wall-attached part of the frame 8 and a rubber pad 19 pasted to protect the wood-grain wall from damage during the lifting process; a 10cm long support sleeve 12 is welded at the bottom of the device because during the use of the device, the worker fixes the device with one hand and rotates the socket wrench 11 with the other hand, which is not conducive to exerting force at a high place and may cause safety accidents. Therefore, a Ф16mm support rod 16 is added to the device. When in use, the support rod is inserted into the Ф25mm support sleeve 12 welded on the frame to increase stability. Because the pre-buried wire boxes are divided into different types and the elevation is fixed, the length of the support rod 16 can be processed to a few more according to the project requirements, such as 30cm for sockets and 130cm for switches, so as to increase the convenience of use.

[0035] like Figure 1 As shown, a wire box 1 is placed on a wooden board 3, a wire box fixing screw 5 is installed at the diagonal position of the back of the wire box 1, passes through the wooden board 3 and the large template 4, and a fixing nut 6 is installed on the outside of the large template 4 to fix the wire box. Installing a wooden board at the front end of the wire box can ensure that the displacement, skewness and other problems of the wire box after pouring concrete can be covered by the finished cover plate to achieve an aesthetic effect. When used, it can ensure construction quality, reduce construction difficulty and speed up construction.

[0036] Matters not covered by the present invention are known technologies.

[0037] The above embodiments are only for illustrating the technical concept and features of the present invention, and their purpose is to enable people familiar with the technology to understand the content of the present invention and implement it accordingly, and they cannot be used to limit the protection scope of the present invention. Any equivalent changes or modifications made according to the spirit of the present invention should be included in the protection scope of the present invention.

Claims

1. A process for pre-embedding concrete wire boxes without decorative surface, characterized in that: The following steps are involved: Step 1: Before embedding the junction box, the wooden board (3) is processed into a suitable size, and then a 40 mm×2 mm groove is planed in the middle of the back, both sides and the front of the wooden board 3 using a wood planer; Step 2: Take a 40mm×2mm flat steel (2) and cut it to a suitable length, the length = the length of the bottom of the wooden board + the length of the side of the wooden board × 2 + 20mm × 2; then use a bench drill to drill 6mm holes (17) in the flat steel at 5mm inwards from both ends of the longitudinal edge of the flat steel (2); Step 3: Cut the PVC cable duct to the same length as the long side of the board (3), and cut the cross section diagonally to form an "L" shape. Make sure that the length of one side is consistent with the thickness of the board, and leave 20mm on the other side. Step 4: embed the processed flat steel (2) into the processed wooden board (3), bend the flat steel (2) into two 90° angles on the side of the wooden board (3) to clamp the wooden board, and at the same time, glue the processed PVC processing part (7) to the wooden board (3) with a universal glue; one side of the "L" shape is glued to the side of the wooden board (3), and the other side is glued to the front of the wooden board (3); after the assembly is completed, after the wall reinforcement is tied and the large template (4) on the front of the wall is in place, fix the wooden board to the corresponding position of the large template (4) on the front, then stick the wire box (1) to the wooden board (3) and tighten the two wire box fixing screws (5) on the back to fix the wire box. After the wire box is fixed, close the large template on the other side of the wall and pour concrete; Step 5: After pouring the concrete and removing the large formwork (4), lift out the 20 mm flat steel (2) in the front groove of the wooden board (3) to form a 90° angle with the wall surface; finally, use the steel wire rope (14) to pass through the hole (17) of the flat steel and use the lifting device to slowly pull out the wooden board (3), so as to ensure that the positive angle in the wall groove is not damaged.

2. The process for pre-embedding concrete wire boxes without decorative surface according to claim 1 is characterized in that: A lifting device is used in the second to fifth steps, and the lifting device includes a frame (8), a socket wrench (11), a flat steel (2) and a steel wire rope (14); A fixed leg is installed at the front of the frame (8), and the fixed leg is welded to the front of the frame (8); a long hole (13) is provided on the frame (8) and passes through the frame (8); the movable leg (9) is movably installed in the long hole (13) of the frame (8) by means of a movable screw (20), a gasket (15) and a fixing nut (6); the position of the movable leg (9) can be adjusted left and right according to the size of the wooden board (3) to be removed; A connecting piece (10) penetrating the frame (8) is installed on the top of the frame (8), the connecting piece (10) is made of a φ12 mm bolt, and a gasket (15) and a fixing nut (6) are installed on the top of the connecting piece (10); a φ6 mm through hole is provided at the bottom of the connecting piece (10) for passing a steel wire rope (14) embedded in the flat steel of the lifting wooden board; φ6 mm flat steel holes (17) are provided 5 mm inward at both ends of the longitudinal edge of the flat steel (2), and the steel wire rope (14) passes through the bottom of the connecting piece (10) and is fixed in the flat steel holes (17) at both ends respectively; The socket wrench (11) is L-shaped, and a connecting buckle for rotating the fixing nut (6) is provided at the front of the socket wrench (11), wherein the inner contour of the connecting buckle is consistent with the outer contour of the fixing nut (6).

3. The process for pre-embedding concrete wire boxes without decorative surface according to claim 2 is characterized in that: The frame (8) is welded into an "F" shape by (30) angle steels.

4. The process for pre-embedding concrete wire boxes without decorative surface according to claim 2 is characterized in that: A supporting steel plate (18) is provided at the bottom end of the fixed supporting leg and the movable supporting leg (9), and a rubber pad (19) is installed at the bottom of the supporting steel plate (18).

5. The process for pre-embedding concrete wire boxes without decorative surface according to claim 2 is characterized in that: The rear portion of the socket wrench (11) is an upturned handle.

6. The process for pre-embedding concrete wire boxes without decorative surface according to claim 2 is characterized in that: An outwardly protruding support sleeve (12) is welded to the front of the frame body (8).

7. The process for pre-embedding concrete wire boxes without decorative surface according to claim 6 is characterized in that: A φ16 mm support rod (16) is sleeved in the support sleeve (12).

8. The process for pre-embedding concrete wire boxes without decorative surface according to claim 7 is characterized in that: The length of the support rod (16) is set to have a variety of different specifications.