High-level filling method for coal mine roof
Through the high-level filling method of the coal mine roof, the advanced layout of grouting holes and coal gangue slurry solves the problem of underground filling technology affecting production continuity, realizes green disposal of coal gangue and rapid filling of the filling space, reduces costs, and adapts to different conditions. Working surface improves filling efficiency.
Patent Information
- Application Number
- CN202211145078.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-09-20
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2042-09-20
AI Technical Summary
The existing underground filling technology affects the continuity of normal coal mine production, with high cost, large investment, long construction period, poor adaptability, low positioning accuracy, insufficient filling volume, and difficulty in quickly and effectively processing coal-based solid waste.
The high-level filling method of the coal mine roof is adopted. By laying out grouting holes in advance before mining, the location and spacing of the holes are determined according to the drilling parameters, and the slurry made of solid waste such as coal gangue is used for filling, so as to achieve rapid filling of the filling space and avoid Stop production and reduce costs.
It realizes green disposal of coal gangue and rapid filling of filling space, reduces coal mine production costs, ensures production continuity, adapts to different working surfaces, absorbs a large amount of solid waste, and improves filling efficiency.
Smart Images

Figure CN115387845B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of coal mining, and in particular to a method for high-position filling of a coal mine roof. Background Art
[0002] In the process of coal mining and washing, a large amount of solid waste such as coal gangue will be generated, accounting for about 15% to 20% of the total raw coal. At present, most of the coal gangue is basically piled up and stored nearby, which brings great harm and serious impact to the local ecological environment; in addition, coal products are widely used in coal-to-oil, thermal power generation, etc., which produce coal-based solid wastes such as fly ash, gasification slag, and desulfurized gypsum. The use of underground filling technology to treat coal-based solid waste is the most reliable, thorough and lowest-cost green disposal method. It not only solves the problem of coal-based solid waste accumulation, reduces land pollution, but also reduces and alleviates surface subsidence. At present, there are four common filling process technology systems: solid direct filling, paste filling, high-water material filling, and overburden separation grouting filling. The application of these filling technologies has successfully achieved the goals of controlling surface subsidence, releasing "three-down" pressure coal, treating solid waste, and safe production, and achieved the purpose of comprehensive management.
[0003] At present, the underground filling technology has the following problems:
[0004] 1. Backfill mining increases the cost of raw coal production. Backfill mining requires filling coal gangue into the goaf. As far as coal production itself is concerned, it will inevitably lead to an increase in the cost of a ton of coal. The increased cost is generally tens or even hundreds of yuan, which reduces the profit margin of coal production.
[0005] 2. Affecting normal production continuity. Existing filling technology often requires the working face to stop working and production during the filling period.
[0006] 3. Backfill mining requires large investment and a long construction period. In addition to large investments, the backfill system generally takes about a year to be put into operation, which limits the speed and timeliness of backfill mining.
[0007] 4. The existing technical solutions have poor adaptability. The existing methods are difficult to provide specific technical solutions based on specific working surfaces.
[0008] 5. The current overburden separation grouting filling mining technology mainly relies on drilling holes from the ground to the goaf for injection, which is not suitable for high-yield and high-efficiency deep mining in mines, and has problems of low positioning accuracy and high cost.
[0009] 6. Insufficient filling volume. The low-position grouting technology currently used for filling has limited filling volume and is difficult to consume a large amount of coal-based solid waste. Summary of the invention
[0010] The main object of the present invention is to provide a method for high-level filling of coal mine roof, so as to solve the problem that the underground filling technology in the prior art affects the normal production connection.
[0011] To achieve the above object, the present invention provides a method for high-level filling of coal mine roof, including: determining the drilling parameters of grouting holes; arranging the grouting holes in advance before coal mining, drilling a plurality of grouting holes in sequence on the roof, and arranging the grouting holes in sequence along the extension direction of the roadway; during coal mining, when the coal mining reaches the stage where the roof activity initially forms a filling space, grouting is carried out into the filling space through the grouting holes communicated with the filling space until the grouting stops when the advancing of the working face causes the drilling holes to collapse and cannot be grouted anymore, and this grouting process is repeated as the coal mining progresses.
[0012] Further, the drilling parameters include the drilling height h, depth l, inclination angle α relative to the horizontal plane, azimuth angle θ relative to the roadway plane, and the spacing distance d between adjacent grouting holes.
[0013] Further, when determining the drilling parameters of the grouting holes, the parameters of the overlying strata are determined, including the initial weighting interval L1, periodic fracture interval L2, and the height H of the main roof; the initial weighting interval L1 is used to determine the opening position of the grouting holes; the periodic fracture interval L2 is used to determine the spacing distance d, and d < L2 / 2, and at the same time, the value of the spacing distance d is determined according to the flow characteristics of the grouting material; the height H of the main roof is used to determine the drilling height h, and h > H.
[0014] Further, when determining the drilling parameters of the grouting holes, the depth l, inclination angle α, and azimuth angle θ are determined according to the on-site observation results and the model simulation results.
[0015] Further, when drilling the grouting holes, the grouting holes are drilled obliquely upward from the side of the air roadway close to the machine roadway.
[0016] Further, when drilling the grouting holes, the grouting holes are drilled obliquely upward on the sides of the air roadway and the machine roadway close to each other.
[0017] Further, the drilling parameters of the grouting holes in the air roadway are not exactly the same as those of the grouting holes in the machine roadway.
[0018] Further, when arranging the grouting holes in advance, a main grouting pipe is arranged in the air roadway, and a valve is set on the main grouting pipe. The main grouting pipe is connected to the external pump body pipeline and the grouting holes, and grouting is carried out into the filling space through the main grouting pipe and the grouting holes.
[0019] Further, when arranging the grouting holes in advance, main grouting pipes are arranged in both the air roadway and the machine roadway.
[0020] Further, the slurry materials during grouting include coal gangue, fly ash, gasification slag, desulfurized gypsum, and cement.
[0021] By applying the technical solution of the present invention, the grouting holes are pre-arranged according to the determined drilling parameters before coal mining by adopting the advance layout method. In the subsequent coal mining, as the filling space is generated and continuously expanded by coal mining, a slurry made of solid waste such as coal gangue can be injected into the filling space through the corresponding grouting holes, so that the filling space can be filled in time with solid waste such as coal gangue. In this way, the green disposal of coal gangue and the filling of the filling space are realized, and the solution is low in cost, does not affect the normal production of the coal mine, can be deployed quickly, can adapt to working faces with different lithologies, and can also absorb a large amount of solid waste. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] The drawings constituting a part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0023] Figure 1 A flow chart showing a method for high-level filling of a coal mine roof according to the present invention is shown;
[0024] Figure 2 A schematic diagram of grouting hole drilling in the high-position filling method of the coal mine roof of the present invention is shown;
[0025] Figure 3 Shows Figure 2 Side view of
[0026] Figure 4 The schematic diagram shows the structure when grouting holes are drilled in both the air tunnel and the machine tunnel.
[0027] The above drawings include the following reference numerals:
[0028] 10. Grouting hole; 20. Air tunnel; 30. Machine tunnel; 40. Grouting main pipe; 50. Valve; 60. Working face. DETAILED DESCRIPTION
[0029] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0030] It should be noted that, unless otherwise specified, all technical and scientific terms used in this application have the same meanings as commonly understood by ordinary technicians in the technical field to which this application belongs.
[0031] In the present invention, unless otherwise specified, the directional words used, such as "up, down, top, bottom", usually refer to the directions shown in the drawings, or to the components themselves in the vertical, perpendicular or gravity directions; similarly, for ease of understanding and description, "inside and outside" refer to the inside and outside relative to the outline of each component itself, but the above-mentioned directional words are not used to limit the present invention.
[0032] In order to solve the problem that the underground filling technology in the prior art affects the normal production continuity, the present invention provides a method for high-position filling of coal mine roof.
[0033] like Figures 1 to 3 A method for high-position filling of a coal mine roof is shown, comprising: determining drilling parameters of a grouting hole 10; pre-arranging the grouting holes 10 before coal mining, drilling a plurality of grouting holes 10 on the roof in sequence, and arranging the grouting holes 10 in sequence along the extension direction of the tunnel; during coal mining, when the coal mining is carried out to the point where the roof movement initially forms a filling space, grouting is carried out into the filling space through the grouting holes 10 connected to the filling space, and grouting is stopped until the working face 60 advances and the drill hole collapses and can no longer be filled, and the grouting process is repeated as the coal mine is mined.
[0034] This embodiment adopts the method of advance layout, and the grouting holes 10 are pre-arranged according to the determined drilling parameters before coal mining. During subsequent coal mining, as the filling space is generated and continuously expanded by coal mining, a slurry made of solid waste such as coal gangue can be injected into the filling space through the corresponding grouting holes 10, so that the filling space can be filled in time with solid waste such as coal gangue. In this way, the green disposal of coal gangue and the filling of the filling space are realized, and the solution is low in cost, does not affect the normal production of the coal mine, can be deployed quickly, can adapt to working faces with different lithologies, and can also accommodate a large amount of solid waste.
[0035] It should be noted that the filling space initially formed by the roof activity, that is, after the working face advances forward, the goaf area directly collapses, and the basic top rock layer is thick and hard. During the advancement of the working face 60, it will be exposed above the working face 60, thereby providing filling space for grouting. The timing of the initial formation of the filling space is generally obtained through drilling observation. Generally, within a mining working face, due to similar geological conditions, the distance between the initially formed filling space and the working face does not change much with the advancement of the working face. After the working face 60 advances and the borehole collapses, it cannot be filled again, that is, the grouting pump body stabilizes the pressure again, or the filling space is filled with the injection material as much as possible and cannot be filled again. The timing is generally determined by the grouting volume. When grouting is impossible, it means that the borehole has collapsed or is full.
[0036] like Figure 2 and Figure 3 As shown, since the working face 60 for coal mining advancement is generally obliquely below the filling space, the grouting holes 10 are generally drilled obliquely upward. Therefore, the drilling parameters of this embodiment include the drilling height h, the depth l, the inclination angle α relative to the horizontal plane, the azimuth angle θ relative to the roadway plane, and the spacing distance d between the grouting holes 10. The drilling height h is the vertical distance between the top and bottom ends of the grouting hole 10; the depth is the length between the two ends of the grouting hole 10; the azimuth angle θ relative to the roadway plane is the azimuth angle relative to the vertical plane where the roadway is located; the spacing distance d is the distance between two adjacent grouting holes 10, so as to ensure that as the coal mining work progresses, different grouting holes 10 can cooperate with different filling spaces respectively. Of course, the drilling parameters are not limited to the parameters described in this embodiment, and they can be adjusted accordingly as needed.
[0037] In this embodiment, when determining the drilling parameters of the grouting holes 10, for the opening position of the grouting holes 10, the spacing distance d, and the drilling height h, they are mainly determined by the parameters of the overlying strata. Therefore, before determining the above parameters, it is first necessary to determine the parameters of the overlying strata, specifically including the initial weighting interval L1, the periodic fracture interval L2, and the basic roof height H. The specific determination method can be determined by numerical simulation and on-site observation. After determining the parameters of the initial weighting interval L1, the periodic fracture interval L2, and the basic roof height H, the specific parameters of the opening position of the grouting holes 10, the spacing distance d, and the drilling height h can be determined. Specifically, the initial weighting interval L1 is used to determine the opening position of the grouting holes 10; the periodic fracture interval L2 is used to determine the spacing distance d, and d < L2 / 2, and at the same time, the value of the spacing distance d is determined according to the flow characteristics of the grouting material; the basic roof height H is used to determine the drilling height h, and h > H.
[0038] The above parameters l, α, θ, h are construction parameters, which actually represent the spatial relationship between two points, that is, the spatial relationship between the starting point of the drilling hole and the highest point of the filling space. After d is determined, the starting point of the drilling hole is determined. By observing, numerical simulation, etc., the position of the initially formed goaf is determined, that is, the position of the filling space is determined, and then the drilling hole is determined, and the above parameters are determined. At the same time, the reason for using d < L2 / 2 is considered from two aspects. It is necessary to complete the filling before the roof fractures. On the one hand, the roof fracture will cause the loss of the filling space. On the other hand, timely filling can effectively slow down the roof subsidence. The flow characteristics of the grouting material are data obtained based on experiments. For example, assuming that the periodic fracture interval of the roof is 50m, then d should be less than 25m, and the flow radius of the material is only 10m, then the selected d is 20m.
[0039] Similarly, when determining the drilling parameters of the grouting hole 10, the depth l, inclination α, and azimuth θ are determined based on the on-site observation results and model simulation results. The main thing is to ensure that the grouting hole 10 is drilled to a position where a filling space will appear during coal mining, thereby ensuring that grouting can be subsequently performed into the filling space through the grouting hole 10. The specific parameters can be determined based on the actual on-site conditions.
[0040] In this embodiment, the tunnel generally includes two tunnels, the air tunnel 20 and the machine tunnel 30, and both tunnels are opened along the coal mining advancement direction. When drilling the grouting holes 10 in the machine tunnel 30, the grouting holes 10 are drilled obliquely upward from the side of the air tunnel 20 close to the machine tunnel 30. If the filling capacity of the air tunnel 20 is difficult to meet the requirements of grouting, the grouting holes 10 can also be arranged on the side of the machine tunnel 30, that is, the grouting holes 10 are drilled obliquely upward on the sides of the air tunnel 20 and the machine tunnel 30 close to each other, and the determination and layout of the drilling parameters of the grouting holes 10 in the machine tunnel 30 can be carried out in the same way as the air tunnel 20.
[0041] It should be noted that the drilling parameters of the grouting holes 10 of the airway 20 are not exactly the same as those of the grouting holes 10 of the machine road 30. This is because in actual coal mining, the height, extension direction, etc. of the airway 20 and the machine road 30 are not exactly the same. Therefore, when drilling the grouting holes 10 in the machine road 30, the drilling parameters and positions of the grouting holes 10 in the airway 20 cannot be directly used. Some parameters and positions need to be re-determined according to the situation of the machine road 30 to ensure that the grouting holes 10 in the machine road 30 and the airway 20 can be matched.
[0042] In this embodiment, while the grouting holes 10 are arranged in advance, the grouting main pipe 40 is arranged in the air lane 20, and a valve 50 is provided on the grouting main pipe 40, and the grouting main pipe 40 is connected with the external pump body pipeline and the grouting holes 10. In this way, the external grouting pump body can grout into the filling space through the grouting main pipe 40 and the grouting holes 10, and when grouting is not needed, the grouting main pipe 40 can be closed by the valve 50 to realize the control of grouting.
[0043] When grouting holes 10 are drilled in both the machine tunnel 30 and the air tunnel 20, grouting main pipes 40 need to be arranged in both the air tunnel 20 and the machine tunnel 30 while the grouting holes 10 are arranged in advance, so as to realize grouting of the two tunnels, and valves 50 are set on the grouting main pipes 40 for on-off control.
[0044] Preferably, the slurry materials used in grouting in this embodiment include coal gangue, fly ash, gasified slag, desulfurized gypsum and cement, and the components thereof can be mixed in a certain proportion to form a slurry of a certain concentration.
[0045] In order to better explain the filling method of this embodiment, a specific embodiment is listed below.
[0046] Based on the "three-zone" lithology overlying a working face 60, a numerical model was established through computer. The simulation results restored the pressure pattern and damage of the overlying strata caused by mining. Starting from the opening of the cutting eye at the working face 60, as the working face 60 continued to advance along the strike, the stress equilibrium state of the overlying strata in the filling space behind the working face 60 was broken, and the stress began to redistribute.
[0047] When the working face 60 advanced 17m, the roof rock strata began to crack. As the work continued to advance, cracks in the direct roof gradually developed and were destroyed one after another. The destroyed shelters were hinged and connected, and the roof collapsed irregularly.
[0048] When working face 60 advanced 20m, working face 60 experienced the first pressure, and the height of the collapse zone was 10m at this time; as working face 60 continued to advance, the basic roof bent and sank under the influence of gravity, and when mining reached 58m, the basic roof produced significant delamination, and the second pressure occurred. As the basic roof continued to collapse, the compressive stress in front of working face 60 decreased significantly, resulting in an obvious "two-zone" feature of the overburden. At this time, the height of the collapse zone was 16.75m, and the height of the fracture zone was 28.72m.
[0049] Based on the above model simulation results and combined with field observation results, two schemes were designed.
[0050] Plan 1: 10 grouting holes are arranged in advance in the ventilation tunnel 20
[0051] The layout parameters of the "three-band" high-position grouting holes covering the working surface 60 are determined as follows: depth l = 30m, spacing d = 25m, inclination α = 30°, azimuth θ = 20°-30°, height h = 22m, the aperture size of the grouting hole 10 is 160mm, and a grouting main pipe 40 with a diameter of 150mm is selected.
[0052] Option 2: Grouting holes 10 are arranged in advance in both machine tunnel 30 and ventilation tunnel 20
[0053] In order to further improve the filling effect, a solution is adopted in which grouting holes 10 are arranged in both the machine tunnel 30 and the air tunnel 20. Figure 4 As shown. The arrangement of the air tunnel 20 is the same as that of Scheme 1. Since the elevation of the machine tunnel 30 is lower than that of the air tunnel 20, its drilling angle is higher than that of the air tunnel 20. Specifically, the depth l, spacing d, and hole diameter of the grouting holes 10 in the machine tunnel 30 are the same as those in Scheme 1, but the inclination angle β = 50°, the azimuth angle θ2 = 20°-30°, and the height h2 = 16m.
[0054] It should be noted that, the multiple in the above embodiments refers to at least two.
[0055] From the above description, it can be seen that the above embodiments of the present invention achieve the following technical effects:
[0056] 1. Solved the problem that the downhole filling technology in the existing technology affects the normal production continuity;
[0057] 2. Solid waste such as coal gangue can be used to fill the filling space in time, thus realizing the green disposal of coal gangue and the filling of the filling space;
[0058] 3. The solution has low cost and does not affect the normal production of coal mines;
[0059] 4. It can be deployed quickly, can adapt to working faces with different rock properties, and can also absorb large amounts of solid waste.
[0060] Obviously, the above-described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0061] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.
[0062] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the numbers used in this way can be interchanged where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein.
[0063] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for high-position filling of coal mine roof, characterized in that: Including: Determine the drilling parameters of the grouting holes (10); Before coal mining, conduct the advanced layout of the grouting holes (10). Drill a plurality of the grouting holes (10) in sequence on the roof, and the grouting holes (10) are arranged in sequence along the extension direction of the roadway; During coal mining, when coal mining reaches the stage where the roof activity initially forms a filling space, grout into the filling space through the grouting holes (10) communicated with the filling space until grouting stops when the working face (60) advances and the boreholes collapse and cannot be grouted anymore. Repeat this grouting process as the coal mining progresses; The drilling parameters include the drilling height h, depth l, inclination angle α relative to the horizontal plane, azimuth angle θ relative to the roadway plane, and the spacing distance d between the grouting holes (10); When determining the drilling parameters of the grouting holes (10), Determine the parameters of the overlying strata, including the initial weighting interval L1, periodic fracture interval L2, and the height H of the main roof; The initial weighting interval L1 is used to determine the opening position of the grouting holes (10); The periodic fracture interval L2 is used to determine the spacing distance d, and d < L2 / 2. At the same time, determine the value of the spacing distance d according to the flow characteristics of the grouting material; The height H of the main roof is used to determine the drilling height h, and h > H; 2. The method for high-position filling of coal mine roof according to claim 1, characterized in that: When determining the drilling parameters of the grouting holes (10), determine the depth l, inclination angle α, and azimuth angle θ according to the on-site observation results and model simulation results; 3. The method for high-position filling of coal mine roof according to claim 1, characterized in that: When drilling the grouting holes (10), start drilling the grouting holes (10) obliquely upward from the side of the air roadway (20) close to the machine roadway (30); 4. The method for high-position filling of coal mine roof according to claim 3, characterized in that: When drilling the grouting holes (10), drill the grouting holes (10) obliquely upward on the sides of the air roadway (20) and the machine roadway (30) close to each other; 5. The method for high-position filling of coal mine roof according to claim 4, characterized in that: The drilling parameters of the grouting holes (10) in the air roadway (20) are not exactly the same as those of the grouting holes (10) in the machine roadway (30); 6. The method for high-position filling of coal mine roof according to claim 1, characterized in that: When conducting the advanced layout of the grouting holes (10), arrange a main grouting pipe (40) in the air roadway (20), and set a valve (50) on the main grouting pipe (40). Connect the main grouting pipe (40) with the external pump pipeline and the grouting holes (10), and grout into the filling space through the main grouting pipe (40) and the grouting holes (10); 7. The method for high-position filling of coal mine roof according to claim 6, characterized in that: When conducting the advanced layout of the grouting holes (10), arrange the main grouting pipe (40) in both the air roadway (20) and the machine roadway (30); 8. The method for high-position filling of coal mine roof according to claim 1, characterized in that: The slurry material during grouting includes coal gangue, fly ash, gasification slag, desulfurized gypsum, and cement.