A method for repairing piers, columns and pile structural components in intertidal zones
Through the repair method of the closed sleeve and FRP grid cloth combined with high toughness mortar, the construction problems and durability of the concrete components in the intertidal zone of the ocean in the alternate environment of wet and dry environment are solved, and efficient repair results are achieved, satisfying energy saving and reduction The need for improved displacement and mechanical performance.
Patent Information
- Application Number
- CN202211173954.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-09-26
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2042-09-26
AI Technical Summary
Concrete components in the intertidal zone of the ocean are prone to damage under harsh chlorine corrosion environments, and existing restoration technologies are difficult to effectively deal with construction problems and durability problems in alternate environments of dry and wet.
The repair method of the closed sleeve and FRP grid cloth combined with high toughness mortar is adopted. By adjusting the sleeve shape and matching the components, the FRP grid cloth is wrapped and injected with high toughness mortar, using fresh water to reduce the chloride ion concentration, ensuring that the mortar is drying It solidifies under the environment and ensures sealing through hinges and sealing strips.
The restoration of concrete components in high chloride ion environment is achieved, the mechanical properties and durability of the restoration layer are improved, the deformation and cracking of the components are controlled, the erosion of chloride ion is reduced, the demand for energy conservation and emission reduction is met, and the on-site construction is simplified. .
Smart Images

Figure CN115418979B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of repairing concrete components such as columns, piers, piles, etc. in the intertidal zone of the ocean, and in particular to a repairing method for piers, columns, piles, etc. in the intertidal zone. Background Art
[0002] According to statistics, the houses built between the 1950s and the early 1970s account for about 38% of the total number of houses in the country, and there are great safety hazards; according to the US Department of Labor's prediction of the hottest industries in the next century, the building maintenance and reinforcement industry is considered to be one of the nine hottest industries. The aging problems of houses, roads and bridges are becoming more and more obvious, especially in harsh environments such as bridges in freeze-thaw, acid, alkali, and salt environments. In order to achieve the purpose of reducing carbon emissions and saving resources, it is feasible and effective to use repair and reinforcement solutions instead of reconstruction; at the same time, although marine concrete structures are subject to the comprehensive influence of multiple environmental effects such as chloride salts and carbonization, studies have shown that the corrosion of chloride ions is the main factor leading to the premature destruction of marine concrete structures. Therefore, it is necessary to carry out the durability design of marine concrete structures against the corrosion of chloride salts; the intertidal zone in the ocean is dry and wet alternately, the chloride ion concentration is high, and the construction is difficult. There are certain difficulties in the treatment of damaged concrete components in such environments. For this reason, a repair method for piers, columns, and pile structural components in the intertidal zone is provided. Summary of the invention
[0003] The purpose of the present invention is to provide a method for repairing piers, columns and pile structural members in intertidal zones in view of the defects of the prior art, so as to solve the problems raised by the above-mentioned background technology.
[0004] To achieve the above object, the present invention provides the following technical solution: a method for repairing piers, columns, and pile structural components in the intertidal zone, the specific steps of which are as follows:
[0005] S1: Adjust the shape and size of the closed sleeve according to the component to be repaired so that it can fit closely with the repaired component, and set sealing strips at the upper and lower ends and the opening, and perform pressure filling to test the sealing performance on site;
[0006] S2: Use FRP mesh cloth to wrap the repaired component. It is necessary to drill holes on the surface of the component and insert pins to fix the FRP mesh cloth;
[0007] S3: Install the closing sleeve; the sleeve is opened and closed by connecting the hinges and is bolted closed on the other side, and then the sealing performance is checked by inflating with air or water;
[0008] S4: fresh water is injected from the upper first connecting pipe, and water is discharged through the lower second connecting pipe. During the whole process, the chlorine ion concentration is measured by a residual chlorine meter. When the chlorine ion concentration reaches a limit value, the valve of the second connecting pipe is closed to stop water injection;
[0009] S5: the second connecting pipe is connected to the grouting pipe, the valves on the first connecting pipe and the second connecting pipe are opened, high-toughness mortar is injected from the second connecting pipe, and the grouting is stopped after the mortar is discharged from the upper hole, the valve on the second connecting pipe is closed, and the grouting pipe is removed;
[0010] S6: After 24 hours, the sealing sleeve is removed and the repair is completed.
[0011] As a preferred technical solution of the present invention, the closed sleeve in S1 is composed of a first sleeve arc plate and a second sleeve arc plate, and the first sleeve arc plate and the second sleeve arc plate are connected by a connecting hinge.
[0012] As a preferred technical solution of the present invention, a first arc-shaped sealing strip is installed on the top and bottom of the first sleeve arc plate, a second arc-shaped sealing strip is installed on the top and bottom of the second sleeve arc plate, a first connecting pipe is welded on one side of the top of the second sleeve arc plate, a second connecting pipe is welded on the bottom of one side of the first sleeve arc plate, and hand valves are installed on the first connecting pipe and the second connecting pipe.
[0013] As a preferred technical solution of the present invention, the first sleeve arc plate is welded to the first connecting plate, the second sleeve arc plate is welded to the second connecting plate, the first rubber pad is bonded to the first connecting plate, and the second rubber plate is bonded to the second connecting plate.
[0014] As a preferred technical solution of the present invention, the first arc-shaped sealing strip is bonded to the top and bottom of the first sleeve arc-shaped plate, and the second arc-shaped sealing strip is bonded to the top and bottom of the second sleeve arc-shaped plate.
[0015] As a preferred technical solution of the present invention, bolt holes are provided on the first connecting plate and the second connecting plate, and the first connecting plate and the second connecting plate are fixedly connected by bolts.
[0016] As a preferred technical solution of the present invention, the high-toughness mortar injected into the closed sleeve in S5 is a cement-based composite material reinforced with polyvinyl alcohol fibers. It can exhibit the characteristics of strain hardening and multi-crack cracking in the tensile area of the axial tension test and the pure bending section under the four-point bending test. The ultimate bending strain can reach more than 3%, and the maximum crack is controlled below 0.1 mm.
[0017] The beneficial effects of the present invention are as follows: the method can solve the on-site construction problem of concrete mortar in a dry-wet alternating environment; the FRP mesh cloth wrapped in advance is coordinated with the high-toughness mortar for repair, and the reinforcement layer has good mechanical properties, which can well control the deformation and cracking of the component; the shape and size of the closed sleeve can be flexibly adjusted according to the appearance of the component to be repaired, and can meet the needs of various components; the on-site construction is convenient, and the use of technologies such as injecting fresh water through the channel and wrapping the high-toughness mortar on the outside can effectively improve the durability of the repaired component; the repair, replacement and reconstruction of the component is in line with the concept of energy conservation and emission reduction, and can also bring good economic benefits.
[0018] The present invention can be applied to concrete components in the intertidal zone of the ocean where the chloride ion concentration is relatively high. The operation is simple, environmentally friendly and economical. The chloride ion concentration at the repaired part can be effectively reduced to within the standard range by the operation step of injecting fresh water. The repaired part is synergistically protected by the FRP mesh cloth and the high-toughness mortar, and the strength and density can be highly guaranteed, so as to achieve the purpose of repairing the above-mentioned components. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a structural schematic diagram of the present invention during on-site construction;
[0020] Figure 2 It is a schematic diagram of the closed sleeve structure of the present invention.
[0021] In the figure: first sleeve arc plate 1, second sleeve arc plate 2, connecting hinge 3, first arc sealing strip 4, second arc sealing strip 5, first connecting pipe 6, second connecting plate 7, second rubber plate 8, first connecting plate 9, first rubber pad 10, second connecting pipe 11, bolt hole 12, FRP mesh cloth 13. DETAILED DESCRIPTION
[0022] The preferred embodiments of the present invention are described in detail below in conjunction with the accompanying drawings so that the advantages and features of the present invention can be more easily understood by those skilled in the art, thereby making a clearer and more definite definition of the protection scope of the present invention.
[0023] Example: According to Figure 1-2 The present invention provides a technical solution: a method for repairing piers, columns, and pile structural components in the intertidal zone, and the specific steps are as follows:
[0024] S1: Adjust the shape and size of the closed sleeve according to the component to be repaired so that it can fit closely with the repaired component, and set sealing strips at the upper and lower ends and the opening, and perform pressure or air or water filling on site to test the sealing performance;
[0025] S2: Wrap the repaired component with FRP mesh cloth 13, and drill holes on the surface of the component and insert pins to fix the FRP mesh cloth 13;
[0026] S3: Install the closing sleeve; the sleeve is opened and closed by connecting the hinge 3 and is bolted closed on the other side, and then the sealing performance is checked by inflation or water;
[0027] S4: fresh water is injected from the upper first connecting pipe 6, and water is discharged through the lower second connecting pipe 11. During the whole process, the chlorine ion concentration is measured by a residual chlorine meter. When the chlorine ion concentration reaches a limit value, the valve of the second connecting pipe 11 is closed to stop water injection;
[0028] S5: The second connecting pipe 11 is connected to the grouting pipe, the valves on the first connecting pipe 6 and the second connecting pipe 11 are opened, and high-toughness mortar is injected from the second connecting pipe 11. After the mortar is discharged from the upper hole, the grouting is stopped, the valve on the second connecting pipe 11 is closed, and the grouting pipe is removed;
[0029] S6: After 24 hours, the sealing sleeve is removed and the repair is completed.
[0030] The method consists of three parts: an FRP mesh cloth internally wound and fixed to the component, a closed sleeve externally installed on the component, and high-toughness mortar injected into the sleeve.
[0031] The closed sleeve of the present invention solves the problem of solidification of concrete mortar in a dry-wet alternating working environment; the solidification of concrete needs to be carried out under dry conditions, while the concrete components to be repaired in the intertidal zone are in a wet state for a long time, which is not conducive to the construction of cement mortar nor to the subsequent maintenance; the closed sleeve proposed by the present invention can provide a closed space, so that the mortar can be solidified in a relatively dry environment after injection; at the same time, the connecting pipes on both sides can be injected with fresh water before injecting the mortar to flush out the seawater, and by repeatedly flushing the closed space, the chloride ion concentration in the sleeve is reduced, thereby greatly improving the durability of the repaired structure; the "Concrete Structure Durability Design Standard" (GB / T 50476-2019) stipulates in Article 6.2.1 and Appendix B.2 that under the condition that the marine chloride action level in the intertidal zone of the ocean is III-E, the maximum chloride ion content of concrete mortar should be less than 1%; FRP mesh cloth is used to improve the bearing capacity of the repaired components; experimental verification shows that after wrapping and reinforcement with BFRP mesh cloth, it can help concrete columns resist cracking and deformation, making them have better compressive performance; the selection of FRP mesh cloth in the present invention is not limited to a certain variety, and needs to be adjusted according to specific working conditions; high-toughness mortar solves the durability problem of the repair layer. High-toughness mortar has the characteristics of high ductility and strong impermeability. When the component is compressed and deformed, the high-toughness mortar can control the original wide long crack into multiple small cracks, which can improve the density of the repair layer and reduce seawater infiltration, which is beneficial to protect the internal steel bars and the FRP mesh cloth wrapped around the repaired component from chloride ion erosion.
[0032] The high-toughness mortar injected into the sleeve is a cement-based composite material reinforced with polyvinyl alcohol fiber. It can show the characteristics of strain hardening and multi-crack cracking in the tensile area of the axial tension test and the pure bending section under the four-point bending test. The ultimate bending strain can reach more than 3%, and the maximum crack is controlled below 0.1mm. The ultimate tensile strain of the high-toughness mortar is 100-200 times that of ordinary concrete. It produces multiple fine cracks in the working state, and has excellent anti-seepage and energy dissipation capabilities, thus changing the failure form of the single crack of the traditional mortar. Therefore, it replaces the traditional mortar, and the high-toughness mortar and FRP mesh cloth are combined to work together to further improve the durability, ductility and bearing capacity of the components.
[0033] Specific operation methods:
[0034] S1: Clean the parts to be repaired, remove the damaged excess concrete, artificially roughen the surface, wash with high-pressure water gun, etc.;
[0035] S2: Wrap the part to be repaired with FRP mesh cloth. It may be necessary to drill holes on the surface of the frame, clean the holes, inject epoxy resin glue, insert pins, and use wire ties to fix the FRP mesh cloth (the type of FRP depends on the specific working conditions);
[0036] S3: Adjust the size and shape of the closed sleeve according to the component to be repaired, and install sealing strips at the upper and lower ends and the opening. If necessary, pressurize (air or water) on site to test the sealing performance;
[0037] S4: Install the closed sleeve. The sleeve needs to be made according to the shape of the reinforced part and ensure that it is 50-100mm larger than its diameter to reserve the thickness of the reinforcement layer. The sleeve consists of two semi-cylinders, each with a valve with an aperture of about 20mm, connected by a hinge. The contact with the component needs to be sealed with a sealing strip for waterproofing, and the closed part needs to be fixed with bolts and other fixing measures;
[0038] S5: To ensure that the reinforced part is less corroded by chloride ions, fresh water is injected from the upper channel, and the chloride ion concentration is measured using a residual chlorine meter in the water discharged from the lower channel. When the chloride ion concentration reaches the limit value, the valve at the lower part of the channel is closed and water injection is stopped;
[0039] S5: The lower connecting pipe channel is connected to the grouting pipe, the upper and lower valves are opened, and high-toughness mortar is injected from the lower connecting pipe channel. Since the density of high-toughness mortar is much greater than that of water and the surface tension of water is large, the two will not mix during the injection process, and the mortar will push the water out from the upper valve. After the mortar comes out of the upper connecting pipe channel, stop grouting, close the lower valve, and remove the grouting pipe;
[0040] S6: Remove the device after 24 hours.
[0041] The upper and lower connecting pipe channels of the closed sleeve of the present invention can pass fresh water and high-toughness mortar. Fresh water is injected into the upper connecting pipe channel and discharged from the lower channel, which can effectively reduce the chloride ion concentration in the closed space and improve the durability of the repair component; high-toughness mortar is injected from the lower connecting pipe channel. Since the density of high-toughness mortar is much larger than that of water and the surface tension of water is larger, the two will not blend during the injection process, and the mortar will push the water out of the upper valve; the above process not only ensures the subsequent durability of the repair structure, but also solves the problem of the mix ratio of injecting high-toughness mortar after injecting fresh water, and the on-site construction is convenient.
[0042] The above embodiments only express several implementation methods of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention.
Claims
1. A method for repairing piers, columns and piles in intertidal zones, characterized by: The specific steps are as follows: S1: Adjust the shape and size of the closed sleeve according to the component to be repaired so that it can fit closely with the repaired component, and set sealing strips at the upper and lower ends and the opening, and perform pressure filling to test the sealing performance on site; S2: Wrapping the repaired component with an FRP mesh cloth (13), it is necessary to drill holes on the surface of the component and insert pins to fix the FRP mesh cloth (13); S3: Install the closing sleeve; the sleeve is opened and closed by connecting the hinge (3) and is fixed closed with bolts on the other side, and then the sealing performance is checked by inflation with air or water; S4: fresh water is injected from the upper first connecting pipe (6), and water is discharged through the lower second connecting pipe (11). During the whole process, the concentration of chloride ions is measured using a residual chlorine meter. When the concentration of chloride ions reaches a limit value, the valve of the second connecting pipe (11) is closed to stop the water injection; S5: the second connecting pipe (11) is connected to the grouting pipe, the valves on the first connecting pipe (6) and the second connecting pipe (11) are opened, high-toughness mortar is injected from the second connecting pipe (11), and the grouting is stopped after slurry flows out of the upper hole, the valve on the second connecting pipe (11) is closed, and the grouting pipe is removed; S6: After 24 hours, the sealing sleeve is removed and the repair is completed.
2. A method for repairing piers, columns and piles in intertidal zones according to claim 1, characterized in that: The closed sleeve in S1 is composed of a first sleeve arc-shaped plate (1) and a second sleeve arc-shaped plate (2), and the first sleeve arc-shaped plate (1) and the second sleeve arc-shaped plate (2) are connected via a connecting hinge (3).
3. A method for repairing piers, columns and piles in intertidal zones according to claim 2, characterized in that: A first arc-shaped sealing strip (4) is installed at the top and bottom of the first sleeve arc-shaped plate (1), a second arc-shaped sealing strip (5) is installed at the top and bottom of the second sleeve arc-shaped plate (2), a first connecting pipe (6) is welded to one side of the top of the second sleeve arc-shaped plate (2), a second connecting pipe (11) is welded to the bottom of one side of the first sleeve arc-shaped plate (1), and hand valves are installed on the first connecting pipe (6) and the second connecting pipe (11).
4. A method for repairing piers, columns and piles in intertidal zones according to claim 2, characterized in that: The first sleeve arc plate (1) is welded to the first connecting plate (9), the second sleeve arc plate (2) is welded to the second connecting plate (7), the first rubber pad (10) is bonded to the first connecting plate (9), and the second rubber plate (8) is bonded to the second connecting plate (7).
5. A method for repairing piers, columns and piles in intertidal zones according to claim 3, characterized in that: The first arc-shaped sealing strip (4) is bonded to the top and bottom of the first sleeve arc-shaped plate (1), and the second arc-shaped sealing strip (5) is bonded to the top and bottom of the second sleeve arc-shaped plate (2).
6. A method for repairing piers, columns and piles in intertidal zones according to claim 4, characterized in that: The first connecting plate (9) and the second connecting plate (7) are both provided with bolt holes (12), and the first connecting plate (9) and the second connecting plate (7) are fixedly connected by bolts.
7. A method for repairing piers, columns and piles in intertidal zones according to claim 1, characterized in that: The high-toughness mortar injected into the closed sleeve in the S5 is a cement-based composite material reinforced with polyvinyl alcohol fibers. It can show the characteristics of strain hardening and multi-crack cracking in the tensile area of the axial tension test and the pure bending section under the four-point bending test. The ultimate bending strain can reach more than 3%, and the maximum crack is controlled below 0.1 mm.