A method for preparing a geological model simulating piles passing through caves with different filling states
Through the determination of the ratio of rock mass simulation materials based on the three similar laws and orthogonal experiments of geological data, combined with the calcium carbonate cave simulation filler and isolation membrane, the complexity and high cost problems of cave simulation in the existing technology are solved, and flexibility is achieved The simulation of caves in shape and efficient testing have improved the management effect and testing efficiency.
Patent Information
- Application Number
- CN202210973759.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-08-15
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2042-08-15
AI Technical Summary
The existing indoor experiment simulation methods of cave simulation have problems such as complex operation, high cost, difficult to obtain raw materials, and difficult waste residues to be discharged. It is difficult to effectively simulate caves in different filling states, resulting in unsatisfactory management results and inefficient efficiency.
The ratio of rock mass simulation materials is determined by using three similar laws and orthogonal experiments based on geological data, pile-cave support bodies are made through molds, and cave simulations of different filling states are achieved by using calcium carbonate cave simulation fillers and isolation films, combined with detachable The tempered glass model box is tested to improve the test efficiency and accuracy.
It realizes low-cost, flexible-shaped cave simulation, improves the test efficiency and accuracy, and can effectively simulate different filling states after natural and artificial disposal, reduces waste residues, and enhances the practical application value of the test.
Smart Images

Figure CN115453086B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of civil construction engineering, and in particular to a method for preparing a geological model for simulating piles passing through karst caves with different filling states. Background Art
[0002] With the increase of national investment in infrastructure construction and the implementation of the western development strategy, there are more and more engineering construction projects in karst development areas. The existence of caves seriously affects the safety of on-site construction and pile foundation operation after completion. When the pile foundation passes through the cave, it is generally necessary to deal with the cave according to different geological conditions, such as grouting filling, throwing and filling with stone flakes, etc. Due to the complexity of the hydrogeological conditions in the karst area, it is difficult to find a method to achieve localized governance, which results in unsatisfactory governance effects and serious waste.
[0003] Considering the high cost of conducting field tests in areas with karst caves and the difficulty of conducting destructive tests, indoor model tests have become an ideal choice. At present, the methods for preparing karst caves mainly include filling and solidifying controlled compressive materials (such as ice, solid wax, etc.), heating them with built-in heating elements to melt them to form cavities, or using water-soluble materials to 3D print out the karst cave shell, filling it with water to dissolve it to form a cavity, burying silica gel bags or air bags to simulate water filling, etc. However, the existing methods for preparing karst caves still have the following defects:
[0004] (1) If the heating body can reach a higher temperature, the high temperature will have an impact on the rock simulation material. If the temperature of the heating body is low, it will take too long for the paraffin to turn into liquid. After the paraffin melts, it will flow out from the outlet pipe. Under low room temperature, the re-solidification of the paraffin will easily cause the outlet pipe to be blocked. The holes left by the outlet pipe in the geological model will affect the structural performance of the model. Moreover, under natural conditions, it is difficult for the liquid paraffin to be completely discharged, and it is easy to solidify again around the cave and pile foundation, which will affect the test.
[0005] (2) The shell printed by 3D printing with water-soluble material (PVA) has low strength and is easily damaged during the filling and compaction process; PVA material is a water-soluble product and will slowly soften and melt when exposed to moisture in the air, so the test requirements are too harsh;
[0006] (3) It is difficult to observe the integrity of the cave during the preparation process and the changing morphology of the cave during the test in the full pile test; it is difficult to determine the location of the cave after the geological model is completed; the monitoring device is difficult to install accurately, and the position accuracy of the earth pressure box and the survival rate of the strain gauge or optical fiber are difficult to guarantee;
[0007] (4) Moreover, the existing model test research on karst caves is mostly the analysis of karst caves in their natural state, and there are few analytical studies on karst caves after treatment. However, in actual engineering, most karst caves need to be treated. The current common methods and research are difficult to carry out localized and quantitative treatment, and the results are often unsatisfactory, with serious waste and high cost. Therefore, conducting experimental research in this regard is of great significance to karst area engineering;
[0008] (5) For caves filled with water, the existing technology uses silica gel bags or air bags filled with water for simulation. This method is only applicable to caves with regular shapes. It is difficult to simulate caves with irregular shapes, uneven inner walls, and edges and corners.
[0009] It can be seen that the current methods for simulating caves in indoor experiments have problems such as complex operation, high cost, difficulty in obtaining raw materials, and difficulty in discharging waste residues. There is still a lack of quantitative analysis of the changes in the bearing capacity of pile foundations and the improvement of the safety of karst areas caused by different cave management technologies, resulting in unsatisfactory management effects and low efficiency. Therefore, research in this area is particularly important for ensuring project quality and improving construction progress. Summary of the invention
[0010] In order to solve the problems of complex operation, high cost, difficulty in obtaining raw materials, and difficulty in discharging waste residues in indoor test simulating karst caves, the present invention proposes a method for preparing a geological model of a simulated pile passing through karst caves with different filling states.
[0011] The present invention is implemented by adopting the following technical solutions: A method for preparing a geological model for simulating piles passing through caves with different filling states, comprising the following steps:
[0012] Step A: Determine the control parameters of the rock mass and the size, shape and state data of the cave through on-site geological data;
[0013] Step B: Based on the geological data obtained in step A, determine the similarity ratio according to the three laws of similarity, obtain the theoretical value of the control parameter of the rock simulation material, and determine the final ratio of the rock simulation material through orthogonal test;
[0014] Step C, making a pile-karst cave support body according to the size, shape and state data of the karst cave;
[0015] Step D: fix the pile-cavern support body on the side wall of the test box to fill the rock layer; after the rock layer is consolidated, remove the side wall of the test box and erode the pile-cavern support body to achieve cave simulation with different filling states:
[0016] (1) Unfilled cave simulation: After the support body is completely eroded, the residue is cleaned up to complete the simulation of the unfilled empty cave;
[0017] (2) Simulation of filled caves, including filled caves in natural state and caves artificially treated in engineering;
[0018] The naturally filled caves are divided into semi-filled and fully filled. After simulating the empty cave, the filling material is filled into the cave through the side wall to complete the simulation;
[0019] Artificially treated karst caves in engineering projects: the filling material is made into the shape of the karst cave to be simulated, and it is regarded as a support for filling the rock layer. After the filling is completed, the simulation is completed.
[0020] Furthermore, in step A, a model separation similarity design method is adopted, and the bulk density, elastic modulus, compressive strength, cohesion, internal friction angle, and Poisson's ratio of the rock mass are selected as control parameters.
[0021] Furthermore, in step B, it is specifically implemented in the following manner:
[0022] (1) The ideal values of the control parameters of the model are calculated from the control parameters of the prototype, and the corresponding similarity relationships are determined based on the equilibrium equations, geometric equations, physical equations, stress boundary conditions, and displacement boundary conditions of the prototype and model;
[0023] (2) Select barite powder and standard sand as aggregates, silicate cement and gypsum as cementitious materials, and vaseline as admixture, and design an orthogonal experiment to determine the final ratio of rock simulation materials;
[0024] (3) Based on the actual working conditions, the pile length and pile diameter of the model pile are calculated.
[0025] Furthermore, in step B, the soil layer overlying the bedrock in the actual project is normalized into a single soil layer, the control parameters of the prototype soil layer are calculated by thickness-weighted average, the theoretical values of the simulated soil layer are calculated, and sand or soil that meets the theoretical values of the control parameters is selected as the test soil layer filler.
[0026] Furthermore, in the step C, the pile-cavern support body, wherein the pile is a model pile, and the cavern support body is a cavern model; the pile-cavern support body is made by using a mold; if the mold volume is large, the following method is used:
[0027] (1) When the mold volume is too large, adding a large amount of lime slurry will cause only the surface lime slurry to react with carbon dioxide. In this case, carbon dioxide is introduced into the lime slurry of the mold to ensure sufficient reaction;
[0028] (2) When it is inconvenient to introduce carbon dioxide, choose to apply lime slurry layer by layer on the side wall of the mold. After the previous layer is dry, apply the next layer until the entire mold is filled.
[0029] Furthermore, in step D, the test box includes a base and a model box disposed on the base, and four side walls of the model box are made of tempered glass.
[0030] Compared with the prior art, the advantages and positive effects of the present invention are:
[0031] This scheme uses a self-made calcium carbonate cave simulation filler, which is low in price and can be made into caves of any shape by mold or hand-kneading, thus solving the problem that caves of special shapes are difficult to simulate; calcium carbonate is soluble in acid and dissolved with acetic acid to form a cavity; to prevent acetic acid from reacting with rock simulation materials and to prevent residues after the calcium carbonate filler is dissolved, after the calcium carbonate filler is made, it is wrapped with a layer of isolation film, and the residues will be attached to the isolation film, and finally the isolation film is removed to ensure that there is no residue; the system uses a model box with detachable side wall tempered glass and a central symmetrical model test scheme. The four side walls are all detachable tempered glass. Four tests can be carried out in one filling, which increases the test efficiency by nearly four times; and through prefabrication or secondary processing, it can simulate the caves in natural state and after different treatment methods, and both liquid and solid fillers can be simulated, and the test efficiency is improved several times. It can simulate caves in different filling states under natural state and after artificial treatment, and has high practical application and promotion value. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 It is a schematic diagram of the arrangement of the embodiment of the present invention when used for a half-pile model test;
[0033] Figure 2 A connection diagram between a half-pile model pile and a karst cave support body according to an embodiment of the present invention;
[0034] Figure 3 This is a schematic structural diagram of a hemispherical mold according to an embodiment of the present invention;
[0035] Among them: 1. Model box; 2. Side wall; 3. Model pile; 4. Cave support body; 5. Base; 6. Isolation membrane. DETAILED DESCRIPTION
[0036] In order to more clearly understand the above-mentioned purpose, features and advantages of the present invention, the present invention is further described below in conjunction with the accompanying drawings and embodiments. In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention can also be implemented in other ways different from those described herein, and therefore, the present invention is not limited to the specific embodiments disclosed below.
[0037] Embodiment, a method for preparing a geological model of a simulated pile passing through a cave with different filling states, which is applied in the karst field, can simulate the state of the cave after treatment by different methods, and can meet the production requirements of cave models of various shapes, filling states, and treatment methods. The "filling" in the different filling states includes filling with mud, water, etc. in the natural state and filling after the cave is treated in the project. The filling in the natural state can be divided into complete filling and semi-filling. The cave treatment methods include clay balls, stone throwing, drilling grouting, etc. The raw materials of this scheme are simple, economical, and easy to operate. The force characteristics and structure of the produced cave model are very similar to those of the cave prototype, which can meet the test requirements. The method specifically includes the following steps:
[0038] Step A: Determine the physical parameters of the rock mass and the size, shape and state data of the cave through on-site geological data;
[0039] Step B: Based on the geological data obtained in step A, determine the similarity ratio according to the three laws of similarity, obtain the theoretical value of the control parameter of the rock simulation material, and determine the final ratio of the rock simulation material through orthogonal test;
[0040] Step C, making a pile-karst cave support body according to the size, shape and state data of the karst cave;
[0041] Step D: Fix the pile-cavern support body at an appropriate height and position on the side wall of the test box to fill the rock layer. After the rock layer is consolidated, remove the side wall of the test box and use acid to erode the pile-cavern support body to achieve cave simulation with different filling states:
[0042] (1) Unfilled cave simulation: After the support body is completely eroded and the residue is cleaned up, the simulation of the unfilled empty cave can be completed;
[0043] (2) Simulation of filled karst caves; these can be divided into filled karst caves in their natural state and karst caves artificially treated in engineering projects;
[0044] Naturally filled caves can be divided into semi-filled and fully filled ones, and the strength of the fillings is generally low. Therefore, after simulating an empty cave in (1), the simulation can be completed by filling the fillings into the cave through the side wall. Artificially treated caves are to ensure the safety of the construction process, so the strength of the fillings is generally high. The step of simulating an empty cave in (1) can be omitted, and the fillings can be made into the shape of the cave to be simulated, and regarded as a support for filling the rock layer. After the filling is completed, the simulation can be completed.
[0045] This embodiment is described by taking a hemispherical cave as an example, and the details are as follows:
[0046] 1. In step A, since there are many parameters in the prototype (actual on-site), it is very difficult to satisfy all parameters in the model. Therefore, the similarity of important objects must be comprehensively considered to maximize the similarity between the model and the prototype. Therefore, this embodiment adopts a model separation similarity design method and selects the bulk density, elastic modulus, compressive strength, cohesion (compressive strength and cohesion corresponding stress similarity ratio), internal friction angle, and Poisson's ratio of the rock mass as control parameters.
[0047] Second, the similarity ratio is determined according to the three laws of similarity, the theoretical value of the control parameters of the rock simulation material is calculated, and the final proportion of the rock simulation material is determined through orthogonal experiments, including:
[0048] (1) The ideal values of the control parameters of the model are calculated from the control parameters of the prototype. According to the equilibrium equations, geometric equations, physical equations, stress boundary conditions and displacement boundary conditions of the prototype and model, this model test has the following similarity relationships:
[0049] 1) Stress similarity ratio C σ , bulk density similarity ratio C γ and geometric similarity ratio C L The similarity relationship between them is: C σ = C γ C L;
[0050] 2) Displacement similarity ratio C δ , geometric similarity ratio C L and strain similarity ratio C ε The similarity relationship between them is: C δ = C L C ε ;
[0051] 3) Stress similarity ratio C σ , elastic modulus similarity ratio C E and strain similarity ratio C ε The similarity relationship between them is: C σ = C E C ε ;
[0052] 4) Physical model tests require that the similarity ratio of all dimensionless physical quantities (such as strain, internal friction angle, friction coefficient, Poisson's ratio, etc.) is equal to 1, that is: C ε = C f = C φ = C μ =1;
[0053] For the model of geotechnical engineering structure, when qualitative analysis is required, the geometric similarity ratio of the model is usually 1:200 to 1:100, and when quantitative analysis is required, the geometric similarity ratio of the model is between 1:50 and 1:20.
[0054] (2) Select barite powder and standard sand as aggregates, silicate cement and gypsum as cementitious materials, and vaseline as admixtures, design orthogonal experiments, select horizontal ranges for each material to design orthogonal experiments, make test blocks according to different proportions of each ingredient, measure control parameters after curing (generally curing for 21 days), and select the proportion with the measured parameter value closest to the theoretical value as the final proportion of rock simulation material. The test shows that the total stress-strain curves and typical failure forms of uniaxial compression tests of similar materials and rock materials are basically consistent, and the density distribution of similar materials is relatively uniform. The range of each control parameter is wide, which can meet the test requirements.
[0055] In order to simplify the test, the overlying soil layer on the bedrock in the actual project is normalized into a single soil layer. The control parameters of the prototype soil layer are calculated by thickness-weighted average, and the theoretical values of the simulated soil layer are calculated. Sand or soil that meets the theoretical values of the control parameters is selected as the test soil layer filler.
[0056] (3) Calculate the length and diameter of the model pile based on the actual working conditions;
[0057] Model pile 3 is made of magnesium-aluminum alloy. The magnesium-aluminum alloy tube is divided in the middle and processed into two half-mold tubes. In order to better simulate bored piles, the lower end of the magnesium-aluminum alloy is closed. Since the surface of magnesium-aluminum alloy is relatively smooth, and bored piles are generally made of concrete, in order to better simulate the friction between the pile side surface and the soil in actual engineering, the surface of the model pile is embossed to increase the roughness. The model pile body is drilled and a groove is processed to facilitate the pasting of strain gauges and protected with epoxy resin.
[0058] 3. The pile-cave support body is made using rock salt made in the laboratory. The rock salt is calcium carbonate. The production method of calcium carbonate is based on the slaking of quicklime. Quicklime is mixed with cold water to obtain lime slurry. The lime slurry is a calcium hydroxide suspension, which is hygroscopic and absorbs carbon dioxide and water in the air to generate calcium carbonate.
[0059] It should be noted here that the material filled into the cave in this embodiment includes a pile-cave support and a cave filler. The pile-cave support plays a supporting role in the process of filling the rock strata, that is, the outer contour shape of the pile-cave support is the shape of the cave. After the filling is completed, the pile-cave support is melted to complete the production of the empty cave; the main function of the cave filler is to change the filling state of the cave. For example, placing a cave filler in an empty cave can simulate a filled cave in the natural state. Since the filler strength of most caves in the natural state is relatively low, it generally does not play a supporting role. If you want to simulate a cave with a higher filler strength, you can also place the cave filler directly without placing a support during filling. After the filling is completed, the simulation of the cave with a higher filler strength is completed. At this time, the cave filler plays a supporting and filling role.
[0060] The pile-karst cave support body, wherein the "pile" is a model pile, and the "karst cave support body" is a karst cave model, is made by a mold, and the corresponding mold is obtained according to the shape of the karst cave. Figure 3 The figure shows a schematic diagram of a hemispherical mold, on which a groove for the model pile 3 to pass through and a groove for forming a karst cave support body are provided. The model pile is placed in the groove of the mold and fixed, and then the lime slurry is slowly poured into the mold until the mold is filled and the model pile is covered. The lime slurry is left to harden in the mold. After solidification, the karst cave support body and the model pile are fixed as one, and the relative relationship is "the pile passes through the karst cave". The pile-karst cave support body can be obtained, demolded and used, and the isolation material is checked for damage. If so, the isolation material is replenished in time.
[0061] Among them, when making the cave mold, molds of other shapes can be made according to actual needs. The mold can be divided into two halves for easy demoulding. A groove is left on the mold to place the model pile 3, and a release agent or vaseline is applied to the inner wall to prevent the isolation material from sticking to the inner wall of the mold. Spread the isolation material all over the inner wall of the mold to ensure that the isolation material is close to the inner wall and intact without leakage. If the required cave volume is large, pouring the lime slurry directly into the mold may cause the lime slurry to fail to fully react with carbon dioxide. This embodiment provides two alternative solutions:
[0062] (1) When the mold is too large, adding too much lime slurry at one time will result in only the surface lime slurry reacting with carbon dioxide, and the internal lime slurry cannot come into contact with carbon dioxide. Carbon dioxide can be introduced into the lime slurry in the mold to ensure sufficient reaction.
[0063] (2) If the mold is too large and it is inconvenient to introduce carbon dioxide, you can choose to apply lime slurry layer by layer on the side wall of the mold. After the previous layer dries, apply the next layer until the entire mold is filled.
[0064] In this embodiment, due to the special properties of lime slurry, the shape can be artificially molded. For irregularly shaped caves, it is difficult to make molds of the same shape. A mold with a slightly smaller size and regular shape can be selected for filling first, and then lime slurry is used for secondary processing after demoulding until the designed shape is reached. The outer surface of the support body is wrapped with an isolation film that does not react with acid to prevent it from contacting with the rock simulation material. After the mold is formed, the isolation film can be wrapped on the surface of the cave support body for isolation.
[0065] Fourth, the pile-karst cave support body is fixed on the side wall of the test box to simulate the karst cave geological model; the test box includes a base 5 and a model box 1 arranged on the base 5, and the four side walls of the model box 1 are made of tempered glass;
[0066] 1. Fix the pile-cavern support body on the side wall of the tempered glass to ensure vertical stability, such as Figure 1 As shown, according to the optimal ratio of the simulation materials determined in step B, barite powder, standard sand, gypsum, and cement are weighed in proportion, heated in a vaseline water bath, and put into a mixer. The mass of water added is 12% of the total mass of the solids. In order to prevent the gypsum from coagulating too quickly, a vegetable protein retarder is added. The mixture is fully stirred, and the rock simulation materials are filled and compacted. One-time filling or layered filling can be selected according to the test requirements and actual working conditions.
[0067] Among them, the pile-cavern support body is fixed on the side wall 2 of the model box to determine the influence range of the model pile and the cave when loaded. According to the properties of the central symmetric model, when the influence ranges do not intersect, the four side walls 2 can all fix the pile-cavern support body. The layered compaction method is adopted, and a rubber patter is used to compact every 5 cm of filling until the designed height is reached. Finally, the simulated soil layer is filled. After the filling is completed, it is maintained for a certain period of time. During the filling process, monitoring devices such as soil pressure boxes and optical fibers can be placed.
[0068] In the existing test scheme, one geological model can only be tested once. Since the rock simulation material has high strength and density, it is inconvenient to transport and move, and it takes a long time to maintain. If multiple groups of tests are to be conducted, multiple geological models need to be made. In order to ensure the boundary conditions, the geological model needs to be maintained and loaded in the model box. Therefore, it is only possible to wait for the previous geological model to be filled, maintained and loaded before refilling and maintaining the next address model, which is extremely inefficient. The present invention addresses this defect and can conduct tests on the four side walls of the model box at the same time, effectively improving the experimental efficiency.
[0069] When determining the influence range of the model piles and caves, Abaqus simulation software can be used for prediction. For example, the horizontal width of the semi-structure is 5 times the radius of the cave, and the rock layer below the pile end is 10 times the pile diameter. The model is meshed using 8-node hexahedral linear complete integration units. To ensure the boundary conditions, the area around the cave and the pile side is encrypted. Combined with the test plan, the rock layer around the pile and the rock layer at the pile end are calculated using the Mohr-Coulomb model. The stress changes at different measuring points are monitored to determine the influence range of the pile foundation and the cave under loading conditions.
[0070] 2. After a certain period of curing (for example, three days), when the geological model is stabilized, remove the tempered glass side wall 2 of the model box, and use a syringe to take acetic acid to flush the cave support (calcium carbonate). The model pile is made of magnesium-aluminum alloy and will not react with acetic acid. The isolation membrane on the outer surface of the cave support can prevent acetic acid from reacting with the rock simulation material; after sufficient flushing, the calcium carbonate model is dissolved, and some calcium acetate and acetic acid remain on the isolation membrane. At this time, the isolation membrane is peeled off from the surface of the rock simulation material, so that there is no residue to complete the cave simulation; then install the tempered glass side wall, and then load or other test steps can be carried out.
[0071] Among them, it should be emphasized that the simulation of caves with different filling states includes the following methods:
[0072] Natural caves and artificially filled caves. Natural caves can be divided into empty caves without filling, semi-filled caves and fully filled caves. The filling materials are mainly water, mud, etc., and the strength is generally low. Artificially filled caves are to prevent cave collapse during construction, and the filling materials are generally high in strength.
[0073] (1) Simulation of unfilled cave:
[0074] Based on the acid-base neutralization reaction, the side wall of the model box is opened, and the cave support is flushed with acid until the target cavity is formed. The ethylene film and residual impurities are removed to simulate an unfilled cave.
[0075] (2) Simulation of caves with fillings;
[0076] 1. Naturally filled caves:
[0077] First, a hollow cave is made, and then waterproof materials are used to form a closed space in the cave.
[0078] The waterproof material is epoxy resin. The epoxy resin is applied to the inner wall of the cavity, and a waterproof layer is formed after cooling and solidification. The lower half of the side wall cavity opening is sealed with an ethylene film, and the upper half is used as a feed inlet to inject water or mud into the cavity. If the cave is completely filled, the side wall cavity opening can be completely sealed, and a small hole is reserved for water or mud injection, which is then sealed after being filled. It is used to simulate a cave filled with water or silt in a natural state;
[0079] 2. In order to ensure the safety of construction, the caves after filling and disposal are:
[0080] This type of cave filling mainly plays the role of supporting the cave, so the uniaxial compressive strength and elastic modulus are selected as the control parameters of the cave filling. According to the cave filling and disposal method of the actual project, the uniaxial compressive strength and elastic modulus of the prototype are determined. Select appropriate geometric similarity ratio, stress similarity ratio and elastic modulus similarity ratio to calculate the parameters of the filling simulation material in the experiment. Design an orthogonal experiment to obtain the appropriate materials and optimal ratios required for filling simulation. Place the filling simulation material and the pile in the cave mold. This step can refer to the production of the support body. During the production process, an earth pressure box can be placed to monitor the internal stress according to the test requirements. After consolidation and stabilization, a filling body with the same shape as the cave is obtained, which is then filled and compacted, and can be used to simulate the cave after artificial filling and disposal.
[0081] All the above operations can be visually performed after removing the tempered glass on the side wall, without the need to bury pipes to ensure the integrity of the model. In addition, the shape of the cave can be observed more directly; the subsequent test process can be recorded by industrial cameras with DIC technology, making the test phenomenon more intuitive and the results more rigorous; the test efficiency is improved several times, and it can be made into any shape, thus meeting the simulation of caves of special shapes, and can also simulate caves in different filling states in natural conditions and after artificial treatment.
[0082] In addition, it should be noted that the rock simulation material in this embodiment is not limited to the several types mentioned in this patent, and can be changed according to the test requirements. The acid for dissolving the calcium carbonate filler is not limited to acetic acid, hydrochloric acid or other available acids can be used. The isolation film that wraps the calcium carbonate filler is not limited to plastic wrap, and flexible materials that do not react with acid can also be used.
[0083] The above description is only a preferred embodiment of the present invention and does not limit the present invention in other forms. Any technician familiar with the profession may use the technical content disclosed above to change or modify it into an equivalent embodiment with equivalent changes and apply it to other fields. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.
Claims
1. A method for preparing a geological model for simulating piles passing through caves with different filling states, characterized in that: The following steps are involved: Step A: Determine the control parameters of the rock mass and the size, shape and state data of the cave through on-site geological data, adopt the model separation similarity design method, and select the bulk density, elastic modulus, compressive strength, cohesion, internal friction angle and Poisson's ratio of the rock mass as the control parameters; Step B: Based on the geological data obtained in step A, determine the similarity ratio according to the three laws of similarity, obtain the theoretical value of the control parameter of the rock simulation material, and determine the final ratio of the rock simulation material through orthogonal test; normalize the overlying soil layer of the bedrock in the actual project into a single soil layer, calculate the control parameters of the prototype soil layer according to the thickness weighted average, calculate the theoretical value of the simulated soil layer, and select sand or soil that meets the theoretical value of the control parameter as the test soil layer filler; (1) The ideal values of the control parameters of the model are calculated from the control parameters of the prototype, and the corresponding similarity relationships are determined based on the equilibrium equations, geometric equations, physical equations, stress boundary conditions, and displacement boundary conditions of the prototype and the model; (2) Select barite powder and standard sand as aggregates, silicate cement and gypsum as cementitious materials, and vaseline as admixture, and design an orthogonal experiment to determine the final ratio of rock simulation materials; (3) Calculate the length and diameter of the model pile according to the actual working conditions; Step C, making a pile-karst cave support body according to the size, shape and state data of the karst cave; The pile-karst cave support body, wherein the pile is a model pile, and the karst cave support body is a karst cave model; the pile-karst cave support body is made by using a mold; when the mold volume is large, the following method is adopted: (1) When the mold volume is too large, adding a large amount of lime slurry will cause only the surface lime slurry to react with carbon dioxide. In this case, carbon dioxide is introduced into the lime slurry of the mold to ensure sufficient reaction. (2) When it is inconvenient to introduce carbon dioxide, choose to apply lime slurry layer by layer on the side wall of the mold, and apply the next layer after the previous layer is dry until the entire mold is filled; Step D: fix the pile-cavern support body on the side wall of the test box to fill the rock layer; after the rock layer is consolidated, remove the side wall of the test box and erode the pile-cavern support body to achieve cave simulation with different filling states: (1) Unfilled cave simulation: After the support body is completely eroded, the residue is cleaned up to complete the simulation of the unfilled empty cave; (2) Simulation of filled caves; Including filled caves in natural state and caves artificially disposed in engineering; The naturally filled caves are divided into semi-filled and fully filled. After simulating the empty cave, the filling material is filled into the cave through the side wall to complete the simulation; Artificially treated karst caves in engineering projects: the filling material is made into the shape of the karst cave to be simulated, and it is regarded as a support for filling the rock layer. After the filling is completed, the simulation is completed.
2. The method for preparing a geological model of a simulated pile passing through a cave with different filling states according to claim 1, characterized in that: In step D, the test box comprises a base (5) and a model box (1) arranged on the base (5), and the four side walls of the model box (1) are made of tempered glass.
