A combined tower base steel lattice column precise positioning construction device
By accurately positioning the construction device with the combined tower base steel lattice columns, multiple fixed points are used to control the position and height of the steel lattice columns, which solves the problem of verticality deviation in the existing technology and improves the accuracy and safety of construction. , suitable for complex construction conditions.
Patent Information
- Application Number
- CN202211225122.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-10-09
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2042-10-09
AI Technical Summary
In the existing technology, during the construction of the combined foundation of the tower crane, there are deviations in the verticality control of the steel lattice columns, which affects the concrete pouring and the bearing capacity of the tower foundation, leading to potential toppling risks.
A combined tower base steel lattice column precise positioning construction device including a horizontal positioning adjustment frame, fixed support frame, jacking screws, auxiliary columns, support steel and hydraulic jacks is used to accurately control the position of the steel lattice columns through multiple fixed points. and height, ensuring that the verticality deviation is within the specified range.
It achieves precise positioning of steel lattice columns, reduces verticality deviation, simplifies construction operations, improves the convenience of concrete pouring, reduces the impact of tower foundation bearing capacity and the risk of toppling, and the device height is low, suitable for complex construction conditions .
Smart Images

Figure CN115492403B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of civil engineering construction, in particular to a combined tower base steel lattice column precise positioning construction device. Background Art
[0002] In the construction of building projects, tower cranes under some special conditions usually use modular foundations, which are composed of three main parts: cast-in-place piles, steel lattice columns, and concrete caps. During the construction of modular foundations, the verticality of existing steel lattice columns is controlled by a fixed point, such as the Chinese utility model patent with application number CN202220024920.7, named a real-time measurement and adjustment device for the verticality of lattice columns in a steel casing pile column. The verticality of the I-shaped lattice column is detected and analyzed through the verticality inclinometer data connection controller, and the command is generated and transmitted to the servo hydraulic press, which controls the pressure and stroke of each hydraulic rod by the servo hydraulic press. The hydraulic rod pushes the I-shaped lattice column to keep it in a vertical state at all times. However, the verticality of the steel lattice column is controlled by a fixed point, and its actual data has deviations, which further leads to unsatisfactory control effect.
[0003] Alternatively, the verticality of the steel lattice column can be controlled by adopting two upper and lower fixed points, such as the Chinese invention patent with application number CN201910049536.5, entitled A mechanism for improving the verticality pass rate of steel lattice columns in open-cut tunnel foundation pits and its use method. A set of swing angle sensing mechanisms installed on the steel lattice columns can be used to monitor and correct the swing degree of the steel lattice columns in real time, thereby achieving a one-time vertical installation of the steel lattice columns and avoiding the trouble of later adjustments. However, the height of the entire mechanism above the ground is too high, which increases the construction operation surface and affects the concrete pouring construction.
[0004] Therefore, there is an urgent need for a combined tower base steel lattice column precise positioning construction device to ensure that the verticality of the steel lattice columns meets the requirements while facilitating concrete pouring construction, thereby avoiding the impact on the tower crane concrete foundation construction due to the deviation of the steel lattice column position, thereby reducing the tower base bearing capacity and causing the tower crane to tip over. Summary of the invention
[0005] The present invention aims to overcome the defects in the above-mentioned prior art and provides a combined tower base steel lattice column precise positioning construction device, which can accurately locate the position of the steel lattice column, including the elevation, direction, coordinates, etc. of the steel lattice column, while ensuring that the verticality deviation of the steel lattice column is within a specified range during the construction process.
[0006] In order to achieve the above purpose, the technical solution adopted by the present invention is: a combined tower base steel lattice column precise positioning construction device, including a horizontal positioning adjustment frame, a fixed support frame, a top fixing screw, an auxiliary column, a supporting steel, and a hydraulic jack. The fixed support frame is installed in the horizontal positioning adjustment frame, and the horizontal positioning adjustment frame and the fixed support frame are located in the same horizontal plane, and the fixed support frame can adjust its horizontal and vertical positions in the horizontal positioning adjustment frame; the top fixing screws are installed at the four inner corners of the fixed support frame, and the top fixing screws are used to fix the auxiliary column on the inside; supporting steel is placed on both sides of the auxiliary column, and a hydraulic jack is placed under each end of the supporting steel.
[0007] As a preferred solution of the present invention, the horizontal positioning and adjustment frame includes a longitudinal moving frame and a transverse moving frame. The longitudinal moving frame is composed of two equal-length longitudinal C-shaped channel steels, and the transverse moving frame is composed of two equal-length transverse C-shaped channel steels. The transverse moving frame can move horizontally along the direction of the longitudinal C-shaped channel steel.
[0008] As a preferred solution of the present invention, a support rod is arranged at each end of the longitudinal C-shaped channel steel, the part of the support rod located at the lower end of the longitudinal C-shaped channel steel is used as a support for fixing the horizontal positioning adjustment frame and the fixed support frame, and the part of the support rod located at the upper end of the longitudinal C-shaped channel steel is used to locate the central axis position of the auxiliary column.
[0009] As a preferred solution of the present invention, a long level bubble for adjusting the horizontal position of the horizontal positioning adjustment frame is respectively installed on the longitudinal moving frame and the transverse moving frame.
[0010] As a preferred solution of the present invention, the fixed support frame is formed by splicing two longitudinal square tubes and two transverse square tubes. The length of the longitudinal square tube is larger than that of the transverse square tube. The two ends of the transverse square tube are respectively welded to the two longitudinal square tubes. A triangular steel tube is welded at the connection between the longitudinal square tube and the transverse square tube. The triangular steel tube forms a steel tube with an internal thread on the side facing the auxiliary column, and the steel tube is used to install the top fixing screw.
[0011] As a preferred solution of the present invention, four vertical square tubes are installed below the fixed support frame, the bottom ends of the vertical square tubes are connected to each other through strip steel plates, and the bottom ends of the vertical square tubes are provided with rotatable T-shaped support rods.
[0012] As a preferred solution of the present invention, a square steel plate is welded to both ends of each of the transverse C-shaped channel steels and the longitudinal square tube, and a bolt hole is provided on both sides of the square steel plate. Fixing bolts pass through the bolt holes to fix the transverse C-shaped channel steel and the longitudinal square tube to the longitudinal moving frame and the transverse moving frame respectively.
[0013] As a preferred solution of the present invention, the auxiliary column includes 4 angle steels, and the adjacent angle steels are welded and connected by a tie plate. Four hooks and 4 pins are welded on the tie plate at the lower end of the auxiliary column, and the hooks and pins are used to connect the steel lattice column.
[0014] As a preferred solution of the present invention, the internal width and length of the auxiliary column are greater than the external width and length of the steel lattice column, the auxiliary column has hanging ears on both sides of the upper end, and a lifting ring is arranged on the top of the auxiliary column.
[0015] As a preferred solution of the present invention, the top fixing screw is composed of a rotating handle, a top fixing angle steel, a steel sleeve, and a screw. The top fixing angle steel is used to clamp the auxiliary column. A steel sleeve is welded on the top fixing angle steel. One end of the screw extends into the steel sleeve, and the other end of the screw extends into the triangular steel cylinder. A rotating handle is provided in the middle of the screw, and the thread directions of the two ends of the rotating handle are opposite.
[0016] The beneficial effects of the present invention are:
[0017] 1. The present invention can accurately control the position of the steel lattice column through multiple fixed points, effectively preventing the steel lattice column from having a large deviation in verticality, and the overall height of the part of the device located above the ground is low, which is conducive to the concrete pouring construction operation.
[0018] 2. The present invention is easy to install and disassemble, has a simple and flexible operation method, can be quickly used, and saves a lot of costs.
[0019] 3. The components of the present invention are simple in composition and are suitable for all underground steel lattice column constructions, especially for complex construction conditions where the top elevation of the steel lattice columns is below the ground, including but not limited to tower crane combined foundation steel lattice columns and supporting steel lattice columns in foundation pits.
[0020] 4. The present invention adjusts the horizontal coordinates of the steel lattice columns through the cooperation of the horizontal positioning adjustment frame and the fixed support frame, and adjusts the elevation of the steel lattice columns through the cooperation of the supporting steel and the hydraulic jack. The long level bubble located on the horizontal positioning adjustment frame ensures that the horizontal positioning adjustment frame is located in the same horizontal plane during the adjustment process, thereby ensuring that the verticality deviation of the steel lattice columns is within the specified range during the construction process.
[0021] 5. The present invention can also be used for two purposes. If the top elevation of the steel lattice column is above the ground, the horizontal positioning adjustment frame, the fixed support frame, and the top fixing screws can be used to directly fix and position the steel lattice column, limit the steel lattice column to a specified height and coordinate, and ensure that the verticality deviation of the steel lattice column is within the specified range during construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a schematic diagram of the structure of the present invention;
[0023] Figure 2 is a top view of the present invention;
[0024] Figure 3 is a side view of the present invention;
[0025] Figure 4 It is a schematic diagram of the use of the present invention;
[0026] Figure 5 The present invention Figure 2 Middle AA vertical section;
[0027] Reference numerals in the figure: horizontal positioning adjustment frame 1, fixed support frame 2, top fixing screw 3, auxiliary column 4, supporting steel 5, hydraulic jack 6, steel lattice column 7, casing 8, steel pipe 9, longitudinal moving frame 11, transverse moving frame 12, longitudinal square tube 21, transverse square tube 22, square steel plate 23, fixing bolt 24, vertical square tube 25, T-type support rod 26, triangular steel cylinder 27, steel cylinder 28, rotating handle 31, top fixing angle steel 32, steel sleeve 33, screw 34, lifting ring 41, hanging ear 42, hook 43, pin 44, longitudinal C-shaped channel steel 1101, long level bubble 1102, support rod 1103, transverse C-shaped channel steel 1201. DETAILED DESCRIPTION
[0028] The embodiments of the present invention are described in detail below with reference to the accompanying drawings.
[0029] like Figure 1-Figure 5 As shown, a combined tower base steel lattice column precise positioning construction device includes a horizontal positioning adjustment frame 1, a fixed support frame 2, a top fixing screw 3, an auxiliary column 4, a support steel 5, and a hydraulic jack 6. The fixed support frame 2 is installed in the horizontal positioning adjustment frame 1, and the horizontal positioning adjustment frame 1 and the fixed support frame 2 are located in the same horizontal plane. The fixed support frame 2 can adjust its horizontal and vertical positions in the horizontal positioning adjustment frame 1; the top fixing screws 3 are installed at the four inner corners of the fixed support frame 2, and the top fixing screws 3 are used to fix the auxiliary column 4 on the inside; support steel 5 is placed on both sides of the auxiliary column 4, and a hydraulic jack 6 is placed under each end of the support steel 5.
[0030] Specifically, the auxiliary column 4 is used to position and fix the steel lattice column 7, and the fixing screw 3 located on the outside of the auxiliary column 4 is used to clamp the auxiliary column 4. Furthermore, the horizontal positioning adjustment frame 1 and the fixed support frame 2 fixedly connected to the fixing screw 3 are used to adjust the horizontal position of the steel lattice column 7 in the horizontal and vertical directions; at the same time, the supporting steel 5 and the hydraulic jack 6 located on both sides of the auxiliary column 4 can be used to adjust the height of the steel lattice column 7.
[0031] Correspondingly, if the top elevation of the steel lattice column 7 is above the ground, the horizontal positioning adjustment frame 1, the fixed support frame 2, and the top fixing screw 3 can be used to directly fix and position the steel lattice column 7 to limit the steel lattice column 7 to a specified height and coordinate, while ensuring that the verticality deviation of the steel lattice column 7 is within the specified range during construction.
[0032] The locking and loosening of the fixing screw 3 respectively fix and loosen the auxiliary column 4 therein; and the supporting steel sections 5 and the hydraulic jacks 6 on both sides of the auxiliary column 4 are used to support the auxiliary column 4, the horizontal positioning adjustment frame 1 and the fixed support frame 2 and make them reach the specified height; when constructing the steel lattice column 7, the auxiliary column 4 needs to be connected to the steel lattice column 7 as a whole, and the steel lattice column 7 is fixed at the specified height and coordinates through the above-mentioned construction device, and the verticality of the steel lattice column 7 remains unchanged during construction.
[0033] The horizontal positioning adjustment frame 1 includes a longitudinal moving frame 11 and a transverse moving frame 12. The longitudinal moving frame 11 is composed of two equal-length longitudinal C-shaped channel steels 1101, and the transverse moving frame 12 is composed of two equal-length transverse C-shaped channel steels 1201. The transverse moving frame 12 can move horizontally along the direction of the longitudinal C-shaped channel steel 1101.
[0034] A support rod 1103 is respectively arranged at both ends of the longitudinal C-shaped channel steel 1101, and the diameter of the support rod 1103 located at the lower end of the longitudinal C-shaped channel steel 1101 is larger than the diameter of the support rod 1103 located at the upper end of the longitudinal C-shaped channel steel 1101. The support rod 1103 located at the lower end of the longitudinal C-shaped channel steel 1101 serves as a support for fixing the horizontal positioning adjustment frame 1 and the fixed support frame 2, and the support rod 1103 located at the upper end of the longitudinal C-shaped channel steel 1101 is used to locate the central axis position of the auxiliary column 4 and the steel lattice column 7.
[0035] A long vial 1102 for adjusting the horizontal position of the horizontal positioning adjustment frame 1 is installed on the longitudinal moving frame 11 and the transverse moving frame 12 respectively. When the bubble in the long vial 1102 moves to the middle position, the longitudinal moving frame 11 and the transverse moving frame 12 are located in the same horizontal plane.
[0036] The fixed support frame 2 is formed by splicing two longitudinal square tubes 21 and two transverse square tubes 22. The length of the longitudinal square tube 21 is greater than that of the transverse square tube 22. The two ends of the transverse square tube 22 are respectively welded to the two longitudinal square tubes 21. A triangular steel tube 27 is welded at the connection between the longitudinal square tube 21 and the transverse square tube 22. The triangular steel tube 27 forms an internally threaded steel tube 28 on the side facing the auxiliary column 4. The steel tube 28 is used to install the top fixing screw 3.
[0037] Four vertical square tubes 25 are installed below the fixed support frame 2. The bottom ends of the vertical square tubes 25 are connected to each other through strip steel plates. The bottom ends of the vertical square tubes 25 are provided with rotatable T-shaped struts 26. When the T-shaped struts 26 at the bottom ends of the four vertical square tubes 25 are opened, the cross bars of the T-shaped struts 26 can fall on the upper edge of the auxiliary column 4. The four T-shaped struts 26 support the lower part of the auxiliary column 4 from four directions, which can fix the lower end of the auxiliary column 4 and prevent the auxiliary column 4 from displacement.
[0038] A square steel plate 23 is welded to both ends of each of the transverse C-shaped channel steels 1201 and the longitudinal square tube 21. A bolt hole is provided on both sides of the square steel plate 23. Fixing bolts 24 pass through the bolt holes to fix the transverse C-shaped channel steel 1201 and the longitudinal square tube 21 to the longitudinal moving frame 11 and the transverse moving frame 12 respectively.
[0039] The auxiliary column 4 includes 4 angle steels, and the adjacent angle steels are welded and connected by a gusset plate. Four hooks 43 and four pins 44 are welded on the gusset plate at the lower end of the auxiliary column 4. The four hooks 43 are located on different gusset plates, and each hook 43 corresponds to a pin 44. The hooks 43 cooperate with the pins 44 to connect the steel lattice column 7.
[0040] The internal width and length of the auxiliary column 4 are larger than the external width and length of the steel lattice column 7, which facilitates the installation of the steel lattice column 7 inside the auxiliary column 4. The auxiliary column 4 has hanging ears 42 on both sides of the upper end, and the hanging ears 42 are connected to the auxiliary column 4 by reinforcing ribs. A lifting ring 41 is arranged on the top of the auxiliary column 4, and the lifting ring 41 facilitates the auxiliary column 4 to be lifted by a crane.
[0041] The fixing screw 3 is composed of a rotating handle 31, a fixing angle steel 32, a steel sleeve 33, and a screw 34. The fixing angle steel 32 is used to clamp the auxiliary column 4. The steel sleeve 33 is welded on the fixing angle steel 32. One end of the screw 34 extends into the steel sleeve 33, and the other end of the screw 34 extends into the triangular steel tube 27. The middle position of the screw 34 is provided with a rotating handle 31, and the thread directions of the two ends of the rotating handle 31 are opposite; that is, when the screw 34 rotates in the clockwise direction, the two ends are respectively drilled into the internal thread of the steel sleeve 33, so that the fixing angle steel 32 moves toward the triangular steel tube 27, thereby shrinking the length of the fixing screw 3; correspondingly, when the screw 34 rotates in the counterclockwise direction, the fixing angle steel 32 slowly moves away from the triangular steel tube 27, and the fixing screw 3 becomes longer.
[0042] Specifically implement a combined tower base steel lattice column precise positioning construction device, including
[0043] Step 1: First, place the two transverse C-shaped channel steels 1201 of the transverse moving frame 12 at both ends of the longitudinal square tube 21 of the fixed support frame 2. The fixing bolts 24 pass through the transverse C-shaped channel steels 1201 and the transverse square steel plate 23 in sequence to install the fixed support frame 2 on the transverse moving frame 12. Before tightening the fixing bolts 24, ensure that the two ends of the two transverse C-shaped channel steels 1201 on the transverse moving frame 12 are aligned. Similarly, according to the above method, place the two longitudinal C-shaped channel steels 1101 of the longitudinal moving frame 11 at both ends of the transverse C-shaped channel steel 1201 and lock them with fixing bolts.
[0044] Step 2: Install the four fixing screws 3 together with the fixing angle steels 32 at their tail ends into the four inner corners of the fixed support frame 2, and turn the handle 31 to shrink the fixing screws 3 to the shortest state.
[0045] Step 3: Find out the installation positions of the four support rods 1103 of the horizontal positioning adjustment frame 1 through positioning, embed steel pipes 9 with the same inner diameter as the diameter of the support rods 1103 on the ground, and cover them with a cover plate for protection.
[0046] Step 4: Before the steel lattice column 7 and the steel cage are hoisted, it should be ensured that the pile hole has passed the secondary hole cleaning acceptance. After the steel cage and the steel lattice column 7 are welded, they are hoisted by a crane and slowly placed into the pile hole. When the steel lattice column 7 is lowered to a point where its top is about half a meter away from the upper edge of the casing 8, the steel pipe is inserted into the hole between the two gussets of the steel lattice column 7, and the steel lattice column 7 is placed on the casing 8.
[0047] Step 5: Use a crane to lift the horizontal positioning adjustment frame 1 and the fixed support frame 2 as a whole, align the criss-cross square hole in the middle of the fixed support frame 2 with the steel lattice column 7 and slowly lower it to the ground, insert the four support rods 1103 into the pre-buried steel pipes 9, and remove the lifting wire rope when the horizontal positioning adjustment frame 1 and the fixed support frame 2 are firmly fixed. Through the lifting ring 41 at the top of the auxiliary column 4, the auxiliary column 4 is lifted to the top of the steel lattice column 7, and slowly lowered until it is 20 cm away from the top of the steel lattice column 7, keeping the hooks 43 on the four directions of the bottom end of the auxiliary column 4 in the open state, manually adjust the direction of the auxiliary column 4 to be consistent with the lowered direction of the steel lattice column 7, and then slowly lower the auxiliary column 4 so that the four angle steels at the bottom end of the auxiliary column 4 will cover the top of the steel lattice column 7. After the bottom end plate of the auxiliary column 4 is aligned with the plate of the steel lattice column 7, stop lowering the auxiliary column 4, and at the same time, buckle the hooks 43 on the four sides of the lower end of the auxiliary column 4 to cover the lower edge of the plate of the steel lattice column 7, and insert the pin 44 to fix the hooks 43.
[0048] Step 6: Lift the auxiliary column 4 again, so that it and the steel lattice column 7 are both raised by about 10 centimeters, remove the steel pipe that is stuck in the steel lattice column 7, and place two support steels 5 on both sides of the steel lattice column 7 and the auxiliary column 4, and place a hydraulic jack 6 under each end of the support steel 5. Slowly lower the steel lattice column 7 and the auxiliary column 4 until the lower surface of the hanging ear 42 is 2 to 3 centimeters away from the upper surface of the support steel 5, and use the hydraulic jack 6 to lift the support steel 5 and simultaneously lift the horizontal positioning adjustment frame 1 and the fixed support frame 2, so that the height of the horizontal positioning adjustment frame 1 and the support steel 5 reaches the preset elevation. During the lifting process, constantly observe the position of the bubbles in the horizontal and vertical long level bubbles 1102 on the horizontal positioning adjustment frame 1, and accordingly adjust the height of the four hydraulic jacks 6 until the bubbles in the long level bubble 1102 move to the middle position. Lower the auxiliary column 4 until it is hung on the supporting steel 5 by the hanging ear 42, turn the rotating handle 31 on the fixing screw 3 so that the fixing angle steel 32 supports the four corners of the auxiliary column 4, and tighten the rotating handle 31 to fix the horizontal position of the auxiliary column 4. Before the supporting steel 5 fully bears the entire weight of the steel lattice column 7 and the auxiliary column 4, use the four support rods 1103 on the longitudinal shift frame 11 to re-measure whether the horizontal position of the auxiliary column 4 is offset, so as to ensure that the axial position of the steel lattice column 7 is accurate. After confirming that the position of the steel lattice column 7 is correct, the lifting wire rope can be removed. Open the T-shaped support rods 26 at the bottom ends of the four vertical square tubes 25 under the fixed support frame 2, so that the crossbar of the T-shaped support rod 26 falls on the upper edge of the auxiliary column 4 plate, and the four T-shaped support rods 26 support the lower part of the auxiliary column 4 from four directions to prevent it from displacement.
[0049] Step 7: When retesting with the support rod 1103, if there is any deviation, the center axis of the auxiliary column 4 can be located at the set positioning point by adjusting the longitudinal and lateral horizontal positions of the lateral moving frame 12 and the fixed support frame 2.
[0050] The specific operation is: loosen the fixing bolts on the transverse C-shaped channel steel 1201, move the transverse moving frame 12 to a specified position along the longitudinal moving frame 11, and then tighten the fixing bolts again. The operation of fixing the support frame 2 is similar to that of the transverse moving frame 12, and will not be repeated here.
[0051] Step 8: Place the construction operation frame on top of the horizontal positioning and adjustment frame 1, lower the concrete pouring guide tube along the central axis of the auxiliary column 4, and remove the guide tube after pouring the pile body concrete. Keep the horizontal positioning and adjustment frame 1, the fixed support frame 2 and the auxiliary column 4 in a static state. After the pile body concrete is initially solidified, turn the handle 31 on the top fixing screw 3 in the opposite direction to make the top fixing angle steel 32 separate from the auxiliary column 4. After the top fixing screw 3 shrinks to the bottom, adjust the hydraulic jack 6 to make the whole device sink a certain height, pull out the pin 44, pull up the hook 43 and the T-type support rod 26, use a crane to lift the auxiliary column 4, then unscrew the fixing bolts at both ends of the horizontal moving frame 12, pull out the four support rods 1103 on the longitudinal moving frame 11, and remove the two longitudinal C-shaped channel steels 1101. After removing the transverse C-shaped channel steel 1201 in the same way, lift the fixed support frame 2 to a certain height, remove the supporting steel 5 and the hydraulic jack 6, and finally lift the entire fixed support frame 2 out of the pile hole.
[0052] After all the above components are used, they should be flushed and cleaned in time to prevent the residual concrete in each component from solidifying and becoming unusable in the next steel lattice column pile foundation construction.
[0053] If the top elevation of the steel lattice column 7 is above the ground, there is no need to use the auxiliary column 4 for positioning. The horizontal positioning adjustment frame 1 and the fixed support frame 2 can be used to directly position the steel lattice column 7, that is, the steel lattice column 7 is directly fixed by the top fixing screw 3. The specific operation is the same as above and will not be repeated here.
[0054] Note: Before the device is put into use on site, it should be calculated whether the hook 43 can bear the weight of the steel lattice column 7 and whether the weld between the hook 43 and the auxiliary column 4 meets the bearing capacity requirements. If not, reinforcement measures should be taken.
[0055] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention; therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein. Although this article uses more of the figure markings: horizontal positioning adjustment frame 1, fixed support frame 2, top fixing screw 3, auxiliary column 4, supporting steel 5, hydraulic jack 6, steel lattice column 7, casing 8, steel pipe 9, longitudinal moving frame 11, transverse moving frame 12, longitudinal square tube 21, transverse square tube 22, square steel plate 23, fixing bolt 24, vertical square tube 25, T-type support rod 26, triangular steel cylinder 27, steel cylinder 28, rotating handle 31, top fixing angle steel 32, steel sleeve 33, screw 34, lifting ring 41, hanging ear 42, hook 43, pin 44, longitudinal C-shaped channel steel 1101, long level bubble 1102, support rod 1103, transverse C-shaped channel steel 1201 and other terms, but does not exclude the possibility of using other terms; these terms are used only to more conveniently describe and explain the essence of the present invention; interpreting them as any additional restrictions is contrary to the spirit of the present invention.
Claims
1. A combined tower foundation steel lattice column precise positioning construction device, characterized in that: The invention comprises a horizontal positioning adjustment frame (1), a fixed support frame (2), a top fixing screw (3), an auxiliary column (4), a support steel (5), and a hydraulic jack (6); the fixed support frame (2) is installed inside the horizontal positioning adjustment frame (1); the horizontal positioning adjustment frame (1) and the fixed support frame (2) are located on the same horizontal plane; the fixed support frame (2) can adjust its horizontal and vertical positions inside the horizontal positioning adjustment frame (1); the top fixing screw (3) is installed at the four inner corners of the fixed support frame (2); the top fixing screw (3) is used to fix the auxiliary column (4) on the inner side; support steel (5) is placed on both sides of the auxiliary column (4); the support steel (5) A hydraulic jack (6) is placed below each end; the internal width and length of the auxiliary column (4) are greater than the external width and length of the steel lattice column (7); the auxiliary column (4) comprises four angle steels, and the adjacent angle steels are welded and connected by a tie plate; four hooks (43) and four latches (44) are welded on the tie plate at the lower end of the auxiliary column (4); the hooks (43) cooperate with the latches (44) to connect the steel lattice column (7), that is, the hooks (43) on the four sides of the lower end of the auxiliary column (4) are buckled and covered with the lower edge of the tie plate of the steel lattice column (7); the latches (44) are inserted to fix the hooks (43); a fixing bracket (2) is installed below the fixing bracket (2). Four vertical square tubes (25) are installed, the bottom ends of the vertical square tubes (25) are connected to each other through strip steel plates, the bottom ends of the vertical square tubes (25) are provided with rotatable T-shaped support rods (26), the T-shaped support rods (26) are opened, so that the crossbars of the T-shaped support rods (26) fall on the upper edge of the auxiliary column (4) plate, and the four T-shaped support rods (26) support the lower part of the auxiliary column (4) from four directions to prevent it from displacement; the top fixing screw rod (3) is composed of a rotating handle (31), a top fixing angle steel (32), a steel sleeve (33), and a screw rod (34), the top fixing angle steel (32) is used to clamp the auxiliary column (4), the steel sleeve (33) is welded on the top fixing angle steel (32), and the top fixing screw rod (34) is provided with a rotating handle (31), a top fixing angle steel (32), a steel sleeve (33), and a screw rod (34), the top fixing angle steel (32) is used to clamp the auxiliary column (4), and the steel sleeve (33) is welded on the top fixing angle steel (32). One end of the screw rod (34) extends into the steel sleeve (33), and the other end of the screw rod (34) extends into the triangular steel cylinder (27). A rotating handle (31) is provided in the middle of the screw rod (34), and the threads at both ends of the rotating handle (31) are in opposite directions. The horizontal positioning adjustment frame (1) comprises a longitudinal moving frame (11) and a transverse moving frame (12). The longitudinal moving frame (11) is composed of two longitudinal C-shaped channel steels (1101) of equal length, and the transverse moving frame (12) is composed of two transverse C-shaped channel steels (1201) of equal length. The transverse moving frame (12) can move horizontally along the direction of the longitudinal C-shaped channel steel (1101).A support rod (1103) is provided at each end of the longitudinal C-shaped channel steel (1101); the portion of the support rod (1103) located at the lower end of the longitudinal C-shaped channel steel (1101) is used as a support for fixing the horizontal positioning and adjustment frame (1) and the fixed support frame (2); the portion of the support rod (1103) located at the upper end of the longitudinal C-shaped channel steel (1101) is used to locate the central axis position of the auxiliary column (4); a long level bubble (1103) for adjusting the horizontal position of the horizontal positioning and adjustment frame (1) is installed on the longitudinal moving frame (11) and the transverse moving frame (12) respectively. 1102); The fixed support frame (2) is formed by splicing two longitudinal square tubes (21) and two transverse square tubes (22); the length of the longitudinal square tube (21) is greater than that of the transverse square tube (22); the two ends of the transverse square tube (22) are respectively welded to the two longitudinal square tubes (21); a triangular steel tube (27) is welded at the connection between the longitudinal square tube (21) and the transverse square tube (22); the triangular steel tube (27) forms a steel tube (28) with internal threads on the side facing the auxiliary column (4); the steel tube (28) is used to install the fixing screw (3). ; 2. According to claim 1, a combined tower foundation steel lattice column precise positioning construction device is characterized by: A square steel plate (23) is welded to both ends of each transverse C-shaped channel steel (1201) and the longitudinal square tube (21), and a bolt hole is provided on both sides of the square steel plate (23). Fixing bolts (24) pass through the bolt holes to fix the transverse C-shaped channel steel (1201) and the longitudinal square tube (21) to the longitudinal moving frame (11) and the transverse moving frame (12), respectively.
3. According to claim 1, a combined tower foundation steel lattice column precise positioning construction device is characterized by: The auxiliary column (4) has hanging ears (42) on both sides of its upper end, and a lifting ring (41) is arranged on the top of the auxiliary column (4).
Citation Information
Patent Citations
Mechanism for improving qualified rate of verticality of steel latticework column of open excavation tunnel foundation pit and application method of mechanism
CN109853581A
Device for measuring and adjusting perpendicularity of latticed column in steel casing pile in real time
CN216552127U
Inverse method one-column one-pile construction method and correcting device thereof
CN101240534A
Abutting joint device of steel lattice column, and construction method of same
CN102493554A
Perpendicularity correcting device for concrete-filled steel tube columns constructed by top-down process and construction method implemented by perpendicularity correcting device
CN104110035A