A high-consistency grouting material pressure injection friction reduction device and working method thereof
By using a high-consistency grouting material press-injection and grouting device in shield tunnel construction, the grouting material is wrapped with bentonite slurry, the consolidation and shrinkage and penetration problems of grouting material are solved, the pressure loss and pipe plugging risks are reduced, and the Full filling and construction quality of the outer wall of the shield tunnel.
Patent Information
- Application Number
- CN202211120423.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-09-15
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2042-09-15
AI Technical Summary
In shield tunnel construction, the high moisture content of existing synchronous grouting materials leads to consolidation shrinkage and formation loss, affecting the construction quality, and the slurry with too low consistency is prone to permeation, resulting in 'slurry running', affecting the filling effect, and high consistency The material has great resistance in the grouting pipe, which increases pressure loss and risk of pipe blocking.
A high-consistency grouting material pressure injection and grinding reduction device is designed. By setting a tubular filter and grinding chamber in the grinding tube, the high-consistency grinding material is wrapped with bentonite slurry to reduce pressure loss and ensure fullness of the filling.
It effectively reduces the pressure loss of high-consistency grouting materials in the grouting pipe, avoids pipe blockage, ensures sufficient filling between the outer wall of the shield tunnel and the original strata, and improves the grouting effect.
Smart Images

Figure CN115492607B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of shield tunnel construction, in particular to a high-consistency grouting material pressure injection and friction reduction device and a working method thereof. Background Art
[0002] During the construction of shield tunnels, the space cut by the cutterhead is larger than the outer diameter of the shield tunnel. When the shield tail is removed after the shield tunnel is assembled, the space between the outer wall of the shield tunnel and the original stratum needs to be filled with materials, and the filling material must be filled at the same time as the shield tail is removed from the shield tunnel. For this reason, it is called synchronous grouting material. According to domestic and foreign research results and engineering reports, the synchronous grouting materials currently used are usually made of sand, cement, fly ash, bentonite and other materials mixed with water. In order to improve the fluidity of grouting materials and reduce the pressure loss of grouting materials in the grouting pipe, the water content of grouting materials is usually above 40%, or even higher; and because of the high water content of grouting materials, after being injected into the formation, consolidation shrinkage will cause formation loss, thereby inducing surface settlement; when grouting in higher permeability formations, slurry with too low viscosity can easily penetrate into the surrounding stratum soil and cause "slurry leakage", thereby affecting the filling of the gap between the outer wall of the shield tunnel and the original formation; in addition, grouting materials with a high water content can easily cause the shield tunnel to float during construction when injected around the tunnel, thereby affecting the construction quality of the shield tunnel.
[0003] Therefore, in order to fill the gap between the outer wall of the shield tunnel and the original stratum well during the shield tunnel construction process, reduce the disturbance effect of the shield tunnel construction on the surrounding strata and the floating of the tunnel during the construction period, especially when the shield tunnel is constructed close to existing buildings (structures), due to the high requirements for micro-disturbance control of shield construction, the existing measures are to reduce the shield construction speed, thereby increasing the supplement of synchronous grouting materials when the slurry in the grouting stratum consolidates, but it affects the progress of the project construction; in addition, after the construction of the shield tunnel is completed, secondary grouting is carried out through the grouting holes to reduce the impact of slurry consolidation on surface settlement, but it increases the workload and the overall effect is general, and drilling the grouting holes increases the risk of water leakage in the later structure.
[0004] Therefore, it is necessary to use high-viscosity grouting materials with low water content, so as to reduce the consolidation shrinkage of the grouting materials, prevent the grouting materials from penetrating into the soil of the formation, and greatly reduce the buoyancy of the grouting materials on the shield tunnel. However, the high-viscosity grouting materials have great resistance in the grouting pipe, which increases the pressure loss of the grouting materials in the grouting pipe, affects the filling fullness of the grouting materials in the formation, and even causes pipe blockage. Therefore, it is necessary to propose a high-viscosity grouting material pressure injection and friction reduction device and method. Summary of the invention
[0005] The purpose of the present invention is to provide a high-viscosity grouting material pressure injection friction reduction device and a working method thereof based on the above-mentioned deficiencies in the prior art. By setting up the friction reduction device, the bentonite slurry wraps the high-viscosity grouting material and passes through the grouting pipe together, which can reduce the pressure loss of the high-viscosity grouting material in the grouting pipe, ensure the filling fullness of the high-viscosity grouting material in the formation, and avoid the problem of pipe blockage.
[0006] The purpose of the present invention is achieved by the following technical solutions:
[0007] A high-viscosity grouting material pressure injection friction reduction device, characterized in that it includes a grouting machine, a friction reduction device and a grouting pipe, the output end of the grouting machine is connected to the input end of the grouting pipe, a section of the pipe wall on the grouting pipe adopts a tubular filter structure, the friction reduction device includes a friction reduction chamber, and the friction reduction chamber is mounted on the outside of the tubular filter to form a closed cavity.
[0008] The grouting machine includes a motor, a speed changer, a hopper and a pump head. The output end of the motor is connected to the input end of the speed changer and a screw is connected to the output end of the speed changer. The screw passes through the interior of the hopper and extends into the rubber sleeve stator of the pump head. The part of the screw inside the rubber sleeve stator of the pump head serves as a spiral rotor of the pump head, and the spiral rotor is adapted to the rubber sleeve stator.
[0009] The friction reducing device also includes a bentonite slurry storage container containing bentonite slurry and a grouting pump, one end of the grouting pump is connected to the liquid outlet of the bentonite slurry storage container through a pipeline, and the other end is connected to the liquid inlet on the friction reducing chamber through a pipeline.
[0010] The shape and size of the tubular filter are respectively consistent with the shape and size of the grouting pipe.
[0011] The mesh size of the tubular filter is 1-3 mm.
[0012] A working method of a high-consistency grouting material pressure injection and friction reduction device as described in any one of the above, characterized in that the working method comprises the following steps:
[0013] Add high-viscosity grouting material into the hopper and start the motor and the grouting pump at the same time, the motor drives the speed changer to rotate the screw to stir the high-viscosity grouting material and inject it into the grouting pipe; inject the bentonite slurry in the bentonite slurry storage container into the friction reduction chamber through the grouting pump, and the bentonite slurry enters the grouting pipe through the tubular filter, so that the bentonite slurry wraps the high-viscosity grouting material and passes through the grouting pipe together; wherein the high-viscosity grouting material has a plastic consistency and a consistency index of 0-1.
[0014] The advantages of the present invention are:
[0015] 1. When high-viscosity grouting materials are injected, a layer of bentonite slurry is wrapped around the slurry in the grouting pipe to reduce the pressure loss of high-viscosity grouting materials in the grouting pipe, which can reduce the probability of pipe blockage;
[0016] 2. Sufficient grouting pressure can make the high-viscosity grouting material fill the gap between the outer wall of the shield tunnel and the original stratum well, ensuring the grouting effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic structural diagram of a high-consistency grouting material pressure injection and friction reduction device of the present invention;
[0018] Figure 2 It is a schematic diagram of the installation of the tubular filter in the present invention. DETAILED DESCRIPTION
[0019] The features of the present invention and other related features are further described in detail below through embodiments in conjunction with the accompanying drawings to facilitate understanding by those skilled in the art:
[0020] like Figure 1-2 As shown, the marks 1-15 in the figure respectively represent: motor 1, speed changer 2, hopper 3, screw 4, spiral rotor 5, rubber sleeve stator 6, pump head 7, bentonite slurry storage container 8, grouting pump 9, friction reduction chamber 10, tubular filter 11, grouting pipe 12, handrail 13, movable frame 14, distribution box 15.
[0021] Example: Figure 1-2 As shown, the present embodiment relates to a high-viscosity grouting material pressure injection friction reduction device, which mainly includes a grouting machine, a friction reduction device and a grouting pipe 12, wherein the output end of the grouting machine is connected with the input end of the grouting pipe 12, one section of the pipe wall on the grouting pipe 12 adopts the structural form of a tubular filter 11, and the friction reduction chamber 10 in the friction reduction device is mounted on the outer side of the tubular filter 11 to form a closed cavity, wherein the grouting machine can inject high-viscosity grouting material into the grouting pipe 12, the friction reduction device can inject bentonite slurry into the grouting pipe 12, and the bentonite slurry can wrap the high-viscosity grouting material and pass through the grouting pipe 12 for grouting.
[0022] like Figure 1As shown, the grouting machine includes a motor 1, a speed changer 2, a hopper 3 and a pump head 7. The output end of the motor 1 is connected to the input end of the speed changer 2 and the output end of the speed changer 2 is connected to a screw 4. The screw 4 passes through the interior of the hopper 3 and extends into the rubber sleeve stator 6 of the pump head 7. The portion of the screw 4 in the rubber sleeve stator 6 of the pump head 7 serves as a spiral rotor 5 of the pump head 7, and the spiral rotor 5 is adapted to the rubber sleeve stator 6. Add high-viscosity grouting material into the hopper 3 and start the motor 1. The motor 1 drives the speed changer 2 to work and rotate the screw 4 to stir the high-viscosity grouting material and inject it into the grouting pipe 12.
[0023] like Figure 1-2 As shown, the friction reduction device includes a bentonite slurry storage container 8, a grouting pump 9 and a friction reduction chamber 10. The bentonite slurry storage container 8 contains bentonite slurry. Both ends of the grouting pump 9 are connected to the liquid outlet of the bentonite slurry storage container 8 and the liquid inlet of the friction reduction chamber 10 through pipelines. A tubular filter 11 is installed in the friction reduction chamber 10. The tubular filter 11 is arranged on the grouting pipe 12 and both ends of the tubular filter 11 are connected to the grouting pipe 12. The shape and size of the tubular filter 11 are respectively consistent with the shape and size of the grouting pipe 12, that is, it can be considered that the grouting pipe section in the friction reduction chamber 10 is replaced by the tubular filter 11. The bentonite slurry in the bentonite slurry storage container 8 is injected into the friction reduction chamber 10 through the grouting pump 9, and the bentonite slurry enters the grouting pipe 12 through the tubular filter 11, so that the bentonite slurry wraps the high-viscosity grouting material and passes through the grouting pipe 12 together. In this embodiment, the mesh diameter of the tubular filter 11 is 1-3 mm, so that the bentonite slurry can pass through the tubular filter 11 into the grouting pipe 12, and because the high-viscosity grouting material has a high consistency, wherein the consistency state of the high-viscosity grouting material is plastic, and its consistency index is 0-1, it is not easy for the high-viscosity grouting material to pass through the tubular filter 11 into the friction-reducing cavity 10, so the bentonite slurry can wrap the high-viscosity grouting material. In addition, the friction-reducing cavity 10 is also tubular, and the friction-reducing cavity 10 is coaxially arranged with the tubular filter 11, so that the bentonite slurry can pass through the tubular filter 11 evenly, so that the bentonite slurry can better wrap the high-viscosity grouting material.
[0024] like Figure 1 As shown, the grouting machine in this embodiment is installed on a movable frame 14, and the movable frame 14 can be pushed by the handrails 13 thereon, so as to facilitate movement in the construction site; in addition, the movable frame 14 is also equipped with a distribution box 15 for providing power supply to the motor 1 and the grouting pump 9.
[0025] like Figure 1-2As shown, this embodiment also has the following working method: add the high-viscosity grouting material that has been prepared and stirred in advance into the hopper 3 and start the motor 1 and the grouting pump 9 at the same time. The motor 1 drives the speed changer 2 to work to rotate the screw 4, and the screw 4 presses the high-viscosity grouting material into the grouting pipe 12 through the hopper 3 and the pump head 7 while stirring the high-viscosity grouting material; the bentonite slurry in the bentonite slurry storage container 8 is injected into the friction reduction chamber 10 through the grouting pump 9, and the bentonite slurry enters the grouting pipe 12 through the tubular filter 11, so that the bentonite slurry wraps the high-viscosity grouting material and is injected into the tunnel through the grouting pipe 12.
[0026] This embodiment also has the following beneficial effects: when the high-viscosity grouting material is injected, a layer of bentonite slurry is wrapped around the slurry in the grouting pipe to reduce the pressure loss of the high-viscosity grouting material in the grouting pipe, thereby reducing the probability of pipe blockage; sufficient grouting pressure can enable the high-viscosity grouting material to fill the gap between the outer wall of the shield tunnel and the original stratum well, thereby ensuring the grouting effect.
[0027] Although the above embodiments have described in detail the concepts and embodiments of the present invention with reference to the accompanying drawings, ordinary technicians in this field can recognize that various improvements and changes can still be made to the present invention without departing from the scope of the claims, so they are not described one by one here.
Claims
1. A working method of a high-consistency grouting material pressure injection and friction reduction device, characterized in that: The high-viscosity grouting material pressure injection friction reduction device comprises a grouting machine, a friction reduction device and a grouting pipe, the output end of the grouting machine is connected to the input end of the grouting pipe, a section of the pipe wall on the grouting pipe adopts a tubular filter structure, and the friction reduction device comprises a friction reduction chamber, which is sleeved on the outside of the tubular filter to form a closed chamber; The working method of the high-consistency grouting material pressure injection and friction reduction device comprises the following steps: Add high-viscosity grouting material into the hopper of the grouting machine and start the motor and the grouting pump at the same time, the motor drives the speed changer to rotate the screw to stir the high-viscosity grouting material and inject it into the grouting pipe; inject the bentonite slurry in the bentonite slurry storage container into the friction reducing cavity through the grouting pump, and the bentonite slurry enters the grouting pipe through the tubular filter, so that the bentonite slurry wraps the high-viscosity grouting material and passes through the grouting pipe together; wherein the high-viscosity grouting material has a plastic consistency and a consistency index of 0-1.
2. The working method of the high-consistency grouting material pressure injection and friction reduction device according to claim 1, characterized in that: The grouting machine includes a motor, a speed changer, a hopper and a pump head. The output end of the motor is connected to the input end of the speed changer and a screw is connected to the output end of the speed changer. The screw passes through the interior of the hopper and extends into the rubber sleeve stator of the pump head. The part of the screw inside the rubber sleeve stator of the pump head serves as a spiral rotor of the pump head, and the spiral rotor is adapted to the rubber sleeve stator.
3. The working method of the high-consistency grouting material pressure injection and friction reduction device according to claim 1, characterized in that: The friction reducing device also includes a bentonite slurry storage container containing bentonite slurry and a grouting pump, one end of the grouting pump is connected to the liquid outlet of the bentonite slurry storage container through a pipeline, and the other end is connected to the liquid inlet on the friction reducing chamber through a pipeline.
4. The working method of the high-consistency grouting material pressure injection and friction reduction device according to claim 1, characterized in that: The shape and size of the tubular filter are respectively consistent with the shape and size of the grouting pipe.
5. The working method of the high-consistency grouting material pressure injection and friction reduction device according to claim 1, characterized in that: The mesh size of the tubular filter is 1-3 mm.