A stone curtain wall construction method based on BIM technology
By using BIM technology and connection methods such as bolts and tightening bolts in the construction of stone curtain walls, the problem of unstable connection between stone panels and pendants is solved, and construction safety and panel stability are improved.
Patent Information
- Application Number
- CN202211313168.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-10-25
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2042-10-25
AI Technical Summary
In the existing stone curtain wall construction methods, the connection between the stone panels and the pendants is unstable, and it is easy to move or disengage during vibration, which poses safety hazards.
Using the stone curtain wall construction method based on BIM technology, by establishing a three-dimensional information model and a flat section construction drawing, the stone panel is fixed to the connecting plate using bolts and tightening bolts, and the stability of the panel is enhanced through the plug block and spring mechanism.
It improves the stability of stone panels and connecting plates, reduces the risk of movement of panels during vibration, and enhances construction safety.
Smart Images

Figure CN115506523B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of building curtain walls, and in particular to a stone curtain wall construction method based on BIM technology. Background Art
[0002] Stone curtain walls are usually composed of stone panels and supporting structures, and are building enclosures that do not bear the load and function of the main structure. In the prior art, when constructing building panel curtain walls, back bolt connection or short slot connection is mainly used. Both connection methods are to directly fix the panel curtain wall to the keel through the connecting parts.
[0003] The back bolt dry hanging stone curtain wall process is a construction process in which a hole is drilled on the back of the plate, a metal back bolt is inserted and expanded, and the plate is tightly connected to the plate, and the plate is fixed to the keel through a hanger. When vibration occurs, the vibration may cause the plate to move, and there will be misalignment between the back bolt of the plate and the anti-seismic hanger, and the back bolt may be detached from the hanger, which poses a certain safety hazard. Summary of the invention
[0004] In order to increase the stability of the connection between the plate and the hanger, the present application provides a stone curtain wall construction method based on BIM technology.
[0005] The present application provides a stone curtain wall construction method based on BIM technology, which adopts the following technical solution:
[0006] A stone curtain wall construction method based on BIM technology includes the following steps:
[0007] Using BIM technology, a 3D information model is established according to the design blueprint issued by the design institute. After the model is established, BIM software is used to issue plan and section construction drawings and on-site 3D technical briefings;
[0008] Measuring and laying out;
[0009] Install the skeleton;
[0010] Install the connecting plate;
[0011] Sequentially fixing the plurality of first plates to the frame by means of bolts;
[0012] Install the stone panel, place the stone panel on the third plate body, insert the back bolt into the corresponding connecting hole on the second plate body, tighten the nut on the back bolt, and then tighten the clamping bolt to move the clamping bolt and the abutment block toward the first plate body, move the plug-in block toward the outside of the third plate body, and insert the plug-in block into the corresponding plug-in hole of the stone panel, so that the connection between the stone panel and the connecting plate is more stable.
[0013] By adopting the above technical solution, when installing the stone panel, the stone panel is placed on the third plate body, the back bolt is inserted into the corresponding connection hole, the stone panel and the second plate body are fixed by bolts, and then the tightening bolts are tightened to make the plug-in block extend out of the third plate body and inserted into the plug-in hole on the stone panel, thereby increasing the stability of the stone panel. When vibration occurs, the stone panel is not easy to move.
[0014] Optionally, a reinforcing plate is fixed to the bottom of the first plate body, and one end of the reinforcing plate away from the first plate body is fixed to the wall body. After the first plate body is fixed to the frame by bolts, the reinforcing plate is fixed to the wall body.
[0015] By adopting the above technical solution, the reinforcing plate can increase the stability of the first plate body, thereby increasing the overall stability of the connecting plate, so that the connecting plate can stably support the plate.
[0016] Optionally, a cross-shaped auxiliary plate is provided between two adjacent third plates in the horizontal direction, one end of the auxiliary plate is embedded in the wall, the horizontal plate of the auxiliary plate is flush with the third plate, and the horizontal plate of the auxiliary plate supports the stone panel.
[0017] By adopting the above technical solution, one end of the auxiliary plate is embedded in the wall, and the auxiliary plate plays a certain supporting role on the stone panel, thereby increasing the stability of the stone panel.
[0018] Optionally, a support plate is fixed below the horizontal plate of the auxiliary plate, and the upper surface of the support plate contacts the upper surface of the first plate body. When the connecting plate is installed, the support plate supports the first plate body.
[0019] By adopting the above technical solution, when the connecting plate is installed, the first plate body is fixed to the frame by bolts, the upper surface of the support plate contacts the lower surface of the first plate body, and the support plate supports the first plate body, thereby increasing the stability of the connecting plate and the stone panel.
[0020] Optionally, a mounting groove is formed on a side of the second plate body close to the stone panel, a first abutment plate is arranged in the mounting groove, a first spring is fixed between the first abutment plate and a groove wall of the mounting groove away from the stone panel, and when the stone panel is installed on the third plate body, the first abutment plate is pressed into the mounting groove by the stone panel.
[0021] By adopting the above technical solution, when the stone panel is installed, the stone panel squeezes the first abutment plate, so that the first abutment plate squeezes the first spring, and the first abutment plate exerts a thrust on the stone panel away from the first spring. The plug-in block is inserted into the plug-in hole on the stone panel. Under the action of the first spring, the hole wall of the plug-in hole close to the first spring presses against the plug-in block, so that the plug-in block is not easy to fall out of the plug-in hole, thereby increasing the stability of the connection between the stone panel and the connecting plate.
[0022] Optionally, a second abutment plate is provided in the plug-in hole, and a second spring is fixed between the second abutment plate and the hole wall of the plug-in hole away from the third plate body. When the tightening bolt is tightened to insert the plug-in block into the plug-in hole, the plug-in block presses against the second abutment plate, and the second abutment plate compresses the second spring.
[0023] By adopting the above technical solution, when the stone panel is disassembled, the nut on the back bolt is first unscrewed, and then the locking nut is loosened to make the locking nut move away from the second plate body. The plug-in block is disengaged from the plug-in hole under the action of the corresponding second abutment plate and the second spring, thereby facilitating the disassembly of the stone panel.
[0024] Optionally, a positioning rod is fixed on one side of the stone panel close to the second plate body, a positioning hole is opened on the second plate body, the length of the positioning rod is greater than the length of the back bolt, and when installing the stone panel, the positioning rod is first aligned with the positioning hole, the positioning rod is inserted into the positioning hole, and then the back bolt is inserted into the corresponding connecting hole.
[0025] By adopting the above technical solution, when installing the stone panel, the positioning rod is first inserted into the positioning hole, so that the back bolt is inserted into the corresponding connection hole, which is convenient for installing the stone panel.
[0026] Optionally, a locking hole is formed at one end of the positioning rod away from the stone panel, and a locking pin is provided on the positioning rod, one end of the locking pin is inserted into the locking hole, and an outer wall of the locking pin contacts the side wall of the second plate body.
[0027] By adopting the above technical solution, after the positioning rod passes through the positioning hole, the locking pin is inserted into the locking hole to fix the stone panel and the second plate body, thereby making the stone panel more stable.
[0028] In summary, the present application includes at least one of the following beneficial technical effects:
[0029] 1. When installing the stone panel, place the stone panel on the third plate body, insert the back bolt into the corresponding connection hole, fix the stone panel and the second plate body with bolts, and then tighten the bolts to make the plug-in block extend out of the third plate body and insert it into the plug-in hole on the stone panel, which increases the stability of the stone panel. When vibration occurs, the stone panel is not easy to move;
[0030] 2. When installing the stone panel, the stone panel presses the first abutment plate, so that the first abutment plate presses the first spring. The first abutment plate has a thrust on the stone panel away from the first spring. The plug-in block is inserted into the plug-in hole on the stone panel. Under the action of the first spring, the hole wall of the plug-in hole close to the first spring presses against the plug-in block, so that the plug-in block is not easy to fall out of the plug-in hole, thereby increasing the stability of the connection between the stone panel and the connecting plate;
[0031] 3. When disassembling the stone panel, first unscrew the nut on the back bolt, then loosen the locking nut to move the locking nut away from the second plate body. The plug-in block is disengaged from the plug-in hole under the action of the corresponding second abutment plate and the second spring, thereby facilitating the disassembly of the stone panel. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 It is a schematic diagram of the wall and stone panel in this application.
[0033] Figure 2 It is a schematic diagram of a connecting plate in the present application.
[0034] Figure 3 It is a schematic diagram of the back bolt and the positioning rod in the present application.
[0035] Figure 4 It is a schematic diagram embodying the mounting groove and the first abutment plate in the present application.
[0036] Figure 5 It is the embodiment of Figure 4 Schematic diagram of a partial enlargement of part A.
[0037] Explanation of the accompanying drawings: 1. Wall; 2. Stone panel; 21. Positioning rod; 211. Locking pin; 212. Locking hole; 22. Plug-in hole; 221. Second spring; 222. Second abutment plate; 3. Connecting assembly; 31. Connecting plate; 311. First plate body; 312. Second plate body; 313. Third plate body; 32. Back bolt; 33. Reinforcement plate; 34. Positioning hole; 4. Accommodating cavity; 41. Abutment block; 42. Tightening bolt; 43. Countersunk hole; 44. Plug-in block; 5. Mounting groove; 51. First spring; 52. First abutment plate; 6. Auxiliary plate; 61. Support plate. DETAILED DESCRIPTION
[0038] The following is combined with Figure 1 -Attached Figure 5 The present application is further described in detail. The present application embodiment discloses a stone curtain wall construction method based on BIM technology. Figure 1 , Figure 2 and Figure 3The stone curtain wall includes a wall 1, a frame (the frame is not shown in the figure) and a stone panel 2. The frame is installed on the outside of the wall 1. A connection component 3 is provided between the frame and the stone curtain wall. The frame and the stone panel 2 are fixed by the connection component 3. Each stone curtain wall corresponds to a connection component 3.
[0039] The connecting assembly 3 includes a connecting plate 31, which includes a first plate body 311, a second plate body 312 and a third plate body 313. The first plate body 311 is arranged horizontally, the second plate body 312 is arranged vertically, and the third plate body 313 is arranged horizontally. The first plate body 311 is fixed to the frame by bolts.
[0040] The second plate 312 is fixed to the end of the first plate 311 away from the frame, and the third plate 313 is fixed to the side of the second plate 312 away from the first plate 311. Stone panels 2 are arranged above and below the third plate 313, and the side of the stone panel 2 close to the second plate 312 is in contact with the second plate 312. A reinforcing plate 33 is fixed below the first plate 311, and the side of the reinforcing plate 33 away from the first plate 311 is fixed to the wall 1 by bolts. The reinforcing plate 33 supports the first plate 311 and increases the stability of the first plate 311.
[0041] The four corners of the stone panel 2 close to the second plate 312 are all fixed with back bolts 32. The second plate 312 is provided with connection holes. The back bolts 32 penetrate the connection holes on the second plate 312 and are threadedly connected with nuts, thereby fixing the stone panel 2. A positioning rod 21 is fixed to the side of the stone panel 2 close to the second plate 312. The second plate 312 is provided with a positioning hole 34. The length of the positioning rod 21 is greater than the length of the back bolt 32. The positioning rod 21 is plugged into the positioning hole 34 and penetrates the positioning hole 34. A locking hole 212 is provided at one end of the positioning rod 21 away from the stone panel 2. A locking pin 211 is provided on the positioning rod 21. One end of the locking pin 211 is inserted into the locking pin 211. The outer wall of the locking pin 211 is pressed against the side of the second plate 312 away from the stone panel 2.
[0042] When installing the stone panel 2, first align the positioning rod 21 with the positioning hole 34. After the positioning rod 21 is inserted into the positioning hole 34, it is convenient to position the stone panel 2 and insert the back bolt 32 into the corresponding connection hole. The bottom of the stone panel 2 contacts the third plate 313, and the top of the stone panel 2 contacts the third plate 313 above.
[0043] Reference Figure 4 and Figure 5A accommodating cavity 4 is provided inside the third plate body 313, and a contact block 41 is provided inside the accommodating cavity 4. The contact block 41 is truncated cone-shaped, and a tightening bolt 42 is fixed on the contact block 41. A countersunk hole 43 is provided on the side wall of the third plate body 313 away from the second plate body 312, and the bolt head of the tightening bolt 42 is located in the countersunk hole 43, and the tightening bolt 42 is threadedly connected to the third plate body 313.
[0044] Two plug-in blocks 44 are arranged in the accommodating cavity 4, and the sides of the plug-in blocks 44 close to each other are inclined surfaces, and the abutment block 41 is located between the two plug-in blocks 44, and the ends of the plug-in blocks 44 away from each other can extend out of the third plate body 313. The top and bottom of the stone panel 2 are provided with plug-in holes 22, and the plug-in blocks 44 are plugged into and matched with the plug-in holes 22.
[0045] When installing the stone panel 2, after fixing the stone panel 2 by the back bolt 32, rotate the clamping bolt 42 to move the clamping bolt 42 and the abutment block 41 toward the direction of the second plate body 312. When the abutment block 41 moves, it abuts against the inclined surface of the plug-in block 44. As the abutment block 41 moves, the plug-in block 44 moves toward the outside of the accommodating cavity 4, so that the plug-in block 44 is plugged into the plug-in hole 22.
[0046] A second spring 221 is provided in the plug hole 22, one end of the second spring 221 is fixed on the hole wall of the plug hole 22 away from the third plate body 313, a second abutting plate 222 is also provided in the plug hole 22, the other end of the second spring 221 is fixed to the second abutting plate 222, and one end of the plug block 44 inserted into the plug hole 22 abuts against the second abutting plate 222. When disassembling the stone panel 2, first loosen the abutting bolt 42, and then under the action of the second spring 221, the second abutting plate 222 pushes the plug block 44 out of the plug hole 22, so that the stone panel 2 can be removed from the third plate body 313.
[0047] A mounting groove 5 is provided on one side of the second plate body 312 close to the stone panel 2, and a first spring 51 is provided in the mounting groove 5. One end of the first spring 51 is fixed to the groove wall of the mounting groove 5 away from the stone panel 2, and a first abutment plate 52 is fixed to the other end of the first spring 51. When the first spring 51 is not subjected to force, the first abutment plate 52 protrudes from the mounting groove 5. When the stone panel 2 is mounted on the third plate body 313, the stone panel 2 presses the first abutment plate 52 so that the first abutment plate 52 is pressed into the mounting groove 5.
[0048] When the plug-in block 44 is inserted into the plug-in hole 22, the first abutment plate 52 presses against the stone panel 2 under the action of the first spring 51, so that the side wall of the plug-in hole 22 in the stone panel 2 presses against the plug-in block 44, making it difficult for the plug-in block 44 to fall out of the plug-in hole 22, thereby increasing the stability of the stone panel 2.
[0049] Reference Figure 2and Figure 3 An auxiliary plate 6 is arranged between two horizontally arranged third plates 313, one end of the auxiliary plate 6 is embedded in the wall 1, the auxiliary plate 6 is in a cross shape, and the auxiliary plate includes a horizontal plate and a vertical plate, and the horizontal plate and the vertical plate are vertical and fixed.
[0050] The horizontal plate in the auxiliary plate 6 is flush with the first plate body 311, and the auxiliary plate 6 supports the stone panel 2. A support plate 61 is fixed below the horizontal plate of the auxiliary plate 6, and the upper surface of the support plate 61 contacts the lower surface of the first plate body 311, and the support plate 61 supports the first plate body 311, thereby strengthening the stability of the connecting plate 31, thereby improving the stability of the stone panel 2.
[0051] A stone curtain wall construction method based on BIM technology includes the following steps:
[0052] S1. Use BIM technology to build a 3D information model according to the design blueprint issued by the design institute. After the model is built, use BIM software to issue plan and section construction drawings and on-site 3D technical briefings;
[0053] S2. Measure and lay out, check the baseline of wall 1, set the marking control line, determine the positioning line and grid line;
[0054] S3, installing the frame;
[0055] S4, installing the connecting plate 31;
[0056] S41, sequentially fixing the plurality of first plates 311 to the frame by means of bolts, and the horizontal plates of the auxiliary plates 6 support the first plates 311;
[0057] S42, fixing the reinforcing plate 33 to the outer wall of the wall 1;
[0058] S5, installing stone panel 2;
[0059] S51, place the stone panel 2 on the third plate body 313, insert the positioning rod 21 into the positioning hole 34 to align, and insert the positioning rod 21 into the positioning hole 34, then the back bolt 32 is smoothly inserted into the corresponding connection hole, and the nut on the back bolt 32 is tightened, and the stone panel 2 presses the first abutment plate 52 into the installation groove 5;
[0060] S52 , inserting the locking pin 211 into the locking hole 212 on the positioning rod 21 .
[0061] S53, then tighten the tightening bolt 42 to move the tightening bolt 42 and the abutment block 41 toward the first plate body 311, and the plug-in block 44 moves toward the outside of the third plate body 313, and the plug-in block 44 is inserted into the corresponding plug-in hole 22, so that the connection between the stone panel 2 and the connecting plate 31 is more stable.
[0062] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A stone curtain wall construction method based on BIM technology, characterized in that: The stone curtain wall comprises a wall body (1), a frame and a stone panel (2); a connection component (3) is arranged between the frame and the stone curtain wall; the frame and the stone panel (2) are fixed via the connection component (3); the connection component (3) comprises a connection plate (31); the connection plate (31) comprises a first plate body (311), a second plate body (312) and a third plate body (313); the first plate body (311) is arranged in a horizontal direction, the second plate body (312) is arranged in a vertical direction, the third plate body (313) is arranged in a horizontal direction, and the third plate body (313) is arranged in a vertical direction. A plate body (311) is fixed to the frame by bolts, a second plate body (312) is fixed to an end of the first plate body (311) away from the frame, a third plate body (313) is fixed to a side of the second plate body (312) away from the first plate body (311), a stone panel (2) is arranged above and below the third plate body (313), a side of the stone panel (2) close to the second plate body (312) is in contact with the second plate body (312), and four corners of the side of the stone panel (2) close to the second plate body (312) are fixed A back bolt (32) is provided, a connecting hole is provided on the second plate body (312), the back bolt (32) passes through the connecting hole on the second plate body (312) and is threadedly connected with a nut, a receiving cavity (4) is provided inside the third plate body (313), an abutment block (41) is provided inside the receiving cavity (4), the abutment block (41) is truncated, a tightening bolt (42) is fixed on the abutment block (41), a countersunk hole (43) is provided on the side wall of the third plate body (313) away from the second plate body (312), and the tightening bolt (42) is provided on the side wall of the third plate body (313) away from the second plate body (312). The bolt head is located in the countersunk hole (43), the abutting bolt (42) is threadedly connected to the third plate body (313), two plug-in blocks (44) are arranged in the accommodating cavity (4), the side surfaces of the plug-in blocks (44) close to each other are inclined surfaces, the abutting block (41) is located between the two plug-in blocks (44), and the ends of the plug-in blocks (44) away from each other can extend out of the third plate body (313), the top and bottom of the stone panel (2) are provided with plug-in holes (22), and the plug-in blocks (44) are plugged into and matched with the plug-in holes (22); The steps include: Use BIM technology to build a 3D information model according to the design blueprint issued by the design institute. After the model is built, use BIM software to issue plan and section construction drawings and on-site 3D technical briefings; Measuring and laying out; Install the skeleton; Install the connecting plate (31); Sequentially fixing the plurality of first plates (311) to the frame via bolts; Install the stone panel (2), place the stone panel (2) on the third plate (313), insert the back bolt (32) into the corresponding connection hole on the second plate (312), tighten the nut on the back bolt (32), and then turn the clamping bolt (42) to move the clamping bolt (42) and the abutment block (41) toward the first plate (311), move the plug-in block (44) toward the outside of the third plate (313), and insert the plug-in block (44) into the corresponding plug-in hole (22) of the stone panel (2), so that the connection between the stone panel (2) and the connection plate (31) is more stable; A mounting groove (5) is provided on a side of the second plate body (312) close to the stone panel (2), a first abutment plate (52) is provided in the mounting groove (5), a first spring (51) is fixed between the first abutment plate (52) and a groove wall of the mounting groove (5) away from the stone panel (2), and when the stone panel (2) is mounted on the third plate body (313), the first abutment plate (52) is pressed into the mounting groove (5) by the stone panel (2); A second abutment plate (222) is provided in the plug hole (22), and a second spring (221) is fixed between the second abutment plate (222) and a hole wall of the plug hole (22) away from the third plate body (313). When the abutment bolt (42) is tightened to insert the plug block (44) into the plug hole (22), the plug block (44) abuts against the second abutment plate (222), and the second abutment plate (222) compresses the second spring (221).
2. The stone curtain wall construction method based on BIM technology according to claim 1 is characterized in that: A reinforcing plate (33) is fixed to the bottom of the first plate body (311); one end of the reinforcing plate (33) away from the first plate body (311) is fixed to the wall body (1); after the first plate body (311) is fixed to the frame by bolts, the reinforcing plate (33) is fixed to the wall body (1).
3. A stone curtain wall construction method based on BIM technology according to claim 1 or 2, characterized in that: A cross-shaped auxiliary plate (6) is provided between two adjacent third plate bodies (313) in the horizontal direction. One end of the auxiliary plate (6) is pre-buried in the wall body (1). The horizontal plate of the auxiliary plate (6) is flush with the third plate body (313). The horizontal plate of the auxiliary plate (6) plays a supporting role for the stone panel (2).
4. The stone curtain wall construction method based on BIM technology according to claim 3 is characterized in that: A support plate (61) is fixed below the horizontal plate of the auxiliary plate (6); the upper surface of the support plate (61) contacts the upper surface of the first plate body (311); when the connecting plate is installed, the support plate (61) supports the first plate body (311).
5. The stone curtain wall construction method based on BIM technology according to claim 1 is characterized in that: A positioning rod (21) is fixed to one side of the stone panel (2) close to the second plate body, and a positioning hole (34) is provided on the second plate body. The length of the positioning rod (21) is greater than the length of the back bolt (32). When installing the stone panel (2), the positioning rod (21) is first aligned with the positioning hole (34), the positioning rod (21) is inserted into the positioning hole (34), and then the back bolt (32) is inserted into the corresponding connection hole.
6. The stone curtain wall construction method based on BIM technology according to claim 5 is characterized in that: A locking hole (212) is formed at one end of the positioning rod (21) away from the stone panel (2). A locking pin (211) is provided on the positioning rod (21). One end of the locking pin (211) is inserted into the locking hole (212). The outer wall of the locking pin (211) contacts the side wall of the second plate body (312).
Citation Information
Patent Citations
Back-bolt type stone curtain wall and construction method thereof
CN109113239A
Environment-friendly building curtain wall structure easy to install
CN210117836U